December 6, 2012
University Of Wisconsin-Eau Claire
Challenge Ropes Course
Amendment One (1)
Request for Bid SS-1310
Questions and Answers
Changes to Specifications and Event Requirements
Changes to Itemized Bid Form
Q. 1 Are bidders required to provide line item prices for Lot Two and Lot Three?
A No, if it is preferred to provide just a lot total bidders can do that. In this case the bidder shall identify that all of the line items are included in the lot total.
Q. 2 For the de-construction phase is the contractor responsible for filling holes where poles are removed?
A Yes, contractor is responsible for filling holes where poles are removed. Holes shall be filled with sand and capped with six (6) inches of topsoil.
Q. 3 Do ground anchors need to be cut off at least three (3) feet down?
A No, we changed this requirement to read, beneath ground level, with the surface smoothed with topsoil.
Changes to Specifications and Event Requirements:
Lot One
Floating Islands will be retained at the present location ( Delete )
Lot Two
Floating Islands will not be rebuilt ( Delete )
Lot Three
4-pole Transfer Tower delete “bronze steel roof”, add “maintenance free brown roof”.
3-pole Transfer Tower remove “with bronze steel roof” requirement.
5-pole Transfer Tower delete
“bronze steel roof”, add “maintenance free brown roof”.
2-pole Transfer Tower delete “bronze steel roof”, add “maintenance free brown roof”.
Addition; 4 each Small Transfer Platforms
New pages 11 and 12 are attached. Please replace when responding to this RFB
Changes to Itemized Bid Form:
Lot Three
Removed bronze steel roof requirement for item 2
Items 1, 3 and 4 changed from bronze steel roof to maintenance free brown roof
Quantity for item 4 corrected to 2 each
Added item 18, 4 each Small Transfer Platforms
A new page 13 is attached. Please replace when responding to this RFB
Please return a signed copy of this amendment page with your bid response.
Amendment one (1) has been received by:
Company Name: ________________________________________
Signature: _____________________________________________
Date: ___________________________
Lot One De-construction:
The following events shall be taken apart including:
Removal of all poles
Removal of all hardware
Cut off ground anchors at least three (3) feet down
Events:
Specifications and Event Requirements
Request for Bid SS-1310
Multvine Traverse
Dangling Duo
High Wild Woosey, two-line & three line bridge
Incline Log
Cat Walk
11
Ties in the Sky
Giant Swing
Zip Line
Nitro Crossing (relocate)
Whale Watch (relocate)
Hour Glass-off climbing tower
Ships Crossing in the Night-between Zip Platform & Hours Glass pole
Note: List all materials and components, on the Itemized Bid Form, that will be re-used from the de-construction.
Lot Two Re-build the following events off the existing climbing tower area:
High Wild Woosey
Static Dangling Duo - design to be used by 4 participants
Nitro Crossing – Under Wheel Chair Bridge
Whale Watch (relocate from current location)
T-P Shuffle (relocate from current location)
Add (2) belay posts for each climbing wall side of the climbing tower x 2
Add (4) belay posts for the Static Dangling Duo
Add (1) belay adjacent to the pamper pole belay post
Lot Three New Course Design to Include:
Specifications:
All High rigging to be life – line capable (no false clip-in points)
1 each 4-pole Transfer Tower Design with maintenance free brown roof
6’ Rappel wall on 2 sides of the tower to accommodate a dynamic lower or auto belay dismount
Accessible swing arm
LEAP anchors
1 each 3-pole Transfer Tower (No Roof Required)
1 each 5-pole Transfer Tower with maintenance free brown roof
Accessible swing arm
Non-belay cargo net access
Hand cranks to raise and lower cargo net for access
LEAP anchors
2 each 2-pole Transfer Tower Design with maintenance free brown roof
Accessible swing arm on platform dismount for giant swing
12
4 each Small Transfer Platform
New Course Events:
Floating Islands to accommodate 4 participants moving at the same time with separate belay cables per/participant
Mountain Tops initiative to accommodate up to 6 participants (2 per belay cable) 3 platforms built on 2 logs side by side. Mountain Top boards to be tethered
Kings Swing to accommodate 4 participants moving at the same time with separate belay cables per/participant
Zip Line towards existing course with gravity stop
Giant Swing seated with front attachment
Catwalk
Swing Beam
Hour Glass
Multivine Traverse
Horizontal Cargo Net
Bottomless Burma Loops
Low Static Training area to include:
Participant practice area
Facilitator/Training area to include LEAP anchor use and pole wraps
Zip transfer training area
Rescue bag & Atrie training area
Initiative to include:
Spider web (4) sides
Zig Zag
High All Aboard
Up & Over Beam
Lot Four Equipment:
35 each Static lanyards pairs without zorbers, with snap clips
35 each
12 each
40 each
Petzl Vortex Helmets
Headwall Chest Harnesses
Medium Universal Headwell sit harness
20 each
20 each
3 each
Small Universal Headwell sit harness
Steel screw gate carabiners
Rescue bags to include: 3 to 1 Sterling pulley system and rope
3 each
2 each
Atries
True Blue Auto Belays
Lot Five Services:
Employee/staff training, annually, ACCT level 1; Five-day training, for up to 14 participants
Course inspections once per year to meet ACCT certification
18
13
14
15
16
9
10
11
12
17
5
6
7
8
2
3
4
1
6
7
8
9
1
2
3
4
5
Challenge Ropes Course
Itemized Bid Form
Request for Bid SS-1310
Item Qty Description
Lot One
1 De-construction of the existing course per the Specifications and Requirements
Listed on page ______
Item
Price
Total Cost of Lot One
Please attach a list of materials and components that will be re-used in lot two.
13
Total
Price
$__________
1 ea.
Lot Two Re-build events using the existing climbing tower area and materials from the de-construction
High Wild Woosey
1 ea. Static Dangling Duo – design to be used by 4 participants
Floating Islands ( Delete from itemized bid form )
1 ea. Nitro Crossing – Under wheel chair bridge
1 ea.
1 ea.
Whale Watch (relocated from current location)
T-P shuffle (relocated from current location)
2 ea. Add belay posts for each climbing wall side of the climbing tower, X 2
4 ea. Add belay posts for the Static Dangling Duo
1 ea. Add belay post adjacent to the pamper pole belay post
Total Cost of Lot Two
Lot Three New Course
1 ea. 4-Pole Transfer Tower Design with maintenance free brown roof per specifications
1 ea. 3-Pole Transfer Tower Design no roof per specifications
1 ea. 5-pole Transfer Tower Design with maintenance free brown roof per specifications
2 ea. 2-Pole Transfer Tower Design with maintenance free brown roof per specifications
1 ea.
Lot Three Events
Floating Islands per specifications
1 ea. Mountain Tops per specifications
1 ea. Kings Swing per specifications
1 ea. Zip Line per specifications
1 ea. Giant Swing per specifications
1 ea. Catwalk
1 ea. Swing Beam
1 ea. Hour Glass
1 ea. Multivine Traverse
1 ea. Horizontal Cargo Net
1 ea. Bottomless Burma Loops
1 ea. Low Static Training Area to Include
Participant practice area
Facilitator/Training area to include LEAP anchor use and pole wraps
Zip transfer training area
Rescue bag and Atrie training area
1 ea. Initiatives to Include
Spider web (4) sides
$_________
$_________
$_________
$_________
$_________
$_________ $_________
$_________ $_________
$_________
$___________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
$________
Zig Zag
High All Aboard
Up and Over Beam
4 ea. Small Transfer Platform
Total Cost Lot Three
$________
$__________