Ref: Nirvana/MoEF-NRO/PR12/2905/2013

To,

The Director(S)

Northern Regional Office,

Ministry of Environment & Forests

Bays No.24-25, Sector-31-A

Dakshin Marg, Chandigarh -160030

Date: 29.05.2013

Subject: Six monthly compliance report (June, 2013) for “Nirvana Country”- the Residential

Plotted Colony with Amenities at South City II, Phase II, Gurgaon as per conditions mentioned in Environmental Clearance letter issued for the project.

Dear Sir,

With reference to above mentioned subject, we are submitting the 12 th

six monthly compliance report (with soft copy in CD) for “Nirvana Country”- Residential Plotted Colony with Amenities at

South City II, Phase II, Gurgaon, as per the guidelines issued in Environmental Clearance letter issued for the project.

Development & Construction of the project has been completed. The plots have been handed over and we have also obtained the “Consent to Operate” certificate from HSPCB for the commercial complex “Business Zone” as well as for “Nirvana Courtyard”.

Hope, you will find the information in order and will meet your expectations to assess the implementation status of environmental safeguard measures for the project.

Thanking you in anticipation,

Yours regards,

For Unitech Limited.

Authorised Signatory

Encl: As stated above.

ENVIRONMENTAL COMPLIANCE RPORT

“NIRVANA COUNTRY”

RESIDENTIAL PLOTTED

COLONY WITH AMENITIES

AT SOUTH CITY II, PHASE II, GURGAON

FOR THE MONTH OF JUNE 2013

SIX MONTHLY COMPLIANCE REPORT

OF

NIRVANA COUNTRY

RESIDENTIAL PLOTTED COLONY WITH AMENITIES

AT SOUTH CITY II, PHASE II, GURGAON.

S.no Compliance conditions Compliance status

Remarks

PART A- SPECIFIC CONDITIONS

I CONSTRUCTION PHASE i. Necessary approval of the State Forest

Department shall be obtained before commencing construction of the project. ii. All required sanitary and hygienic measures should be in place before starting construction activities and to be maintained throughout the construction phase. iii. A First Aid Room will be provided in the project both during construction and operation phase. iv. Adequate drinking water and sanitary facilities should be provided for construction workers at the site. The safe disposal of waste water and solid wastes generated during the construction phase should be ensured. v. All the top soil excavated during construction should be stored for use in

N/A. As the said project comes under the developed sector of Gurgaon and the development in the area is as per the approved Master Plan of the Gurgaon City.

Complied. All required sanitary and hygienic measures were as per our submitted “Standard Operation Plan

(SOP)-Environment & Health”. Presently the project is in its operation phase. Already we have obtained the consent to operate certificate for the commercial part “Nirvana courtyard” and “Business zone” from

Haryana State Pollution Control Board.

Already complied. Adequate first aid facilities had been provided to the labours engaged for the construction activities of the project. Presently the project is in its operation phase. Already we have obtained the consent to operate certificate for the commercial part “Nirvana courtyard” and

“Business zone” from Haryana State

Pollution Control Board.

During the whole construction phase adequate drinking water supply to the workers at construction site was ensured.

Proper drainage system for safe disposal of waste water was developed. Toilet with septic tank facilities were provided for construction labours.

Presently project is under operational stage and no labours are engaged at project site.

Complied.

vi. horticulture/landscape development within the project site.

Disposal of muck, including excavation material during construction phase should not create any adverse effects on neighboring communities and should be disposed off necessary precautions for general safety and health aspects.

Complied. vii. The Diesel generator sets to be used during construction phase should be of “Enclosed

Type” and should conform to E(P)A Rules prescribed for air and noise emission standards. viii. Ambient noise levels should conform to residential standards both during day and night.

Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase. ix. Construction spoils including bituminous material and other hazardous material must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water.

II OPERATIONAL PHASE

All the D.G. sets provided for the construction activities had been provided with necessary Acoustic Enclosures to reduce the noise from D.G. sets and stack heights were as per C.P.C.B norms. The

DG sets conform to the rules made under

Environment (Protection) Act for Air and

Noise emission.

Available best construction practices were followed for the construction work. The construction machineries/equipments used were of high standard of reputed make. So incremental noise level due to the construction activity in the site was of negligible amount. Please refer to the latest environmental monitoring report enclosed as Annexure-I for your ready reference.

Complied. i. The sewage treatment plant of adequate capacity shall be installed. The installation of

Sewage Treatment Plant (STP) should be certified by an independent expert and efficacy

The proposed project comprises of plotted development & two commercial Complexes namely: Business Zone” & “Nirvana

Courtyard”. Two STPs of capacity 150 and a report in this regard should be submitted to the Ministry before the project is commissioned for operation.

KLD each for Business zone and Nirvana

Courtyard has been installed for the treatment of generated waste water.

Adequacy report of the STP installed at

“Business Zone” has been already submitted via previous 6 th Monthly compliance report via letter no.

Nirvana/MoEF-NRO/PR9/0212/2011

dated 02-12-11.

While Adequacy report of the STP installed

v. ii. The solid waste generated should be properly collected & segregate before disposal to the city

Municipal Facility. iii. Any Hazardous waste including biomedical waste should be disposed of as per applicable rules & norms with necessary approvals of the Haryana

State Pollution Control Board. iv. Diesel generator sets proposed as back up power for lifts and common area illumination should be of enclosed type and conform to E (P) A Rules prescribed for air and noise emission standards as per CPCB guidelines. Exhausts should be raised to 4 meters above the rooftop.

The green belt design along the periphery of the plot shall achieve attenuation factor conforming to the day and night noise standards prescribed at “Nirvana Courtyard” has submitted via previous 11 th six monthly compliance report via letter no. Ref:Nirvana/MoEF-

NRO/PR11/0412/2012 Date: 04.12.2012

STPs of the project is in its running condition and all the parameters of outlet waste water sample (treated water) are well within the prescribe limit as suggested by

CPCB. Report enclosed under Annexure-I for your ready reference.

Solid Waste Management facility has been designed as per MSW Rule, 2000. The segregation of solid waste primarily at source. Adequate number of Green and

Blue coloured bins separate for biodegradable and non-biodegradable waste have been provided at all strategic locations and will be brought to a centralized collection facility.

Presently we have made arrangement for disposal of solid waste through M/s Clean up The Waste , Gurgaon.

Please find a copy for the work order issued for this purpose as Annexure-VII for your ready reference .

Agreed. There is no major hazardous waste generation from the project except Waste

Oil from DG sets. The waste oil from DG sets will be properly stored in a HDPE container and periodically transferred to

CPCB/HSPCB authorized reprocessor/ recycler. The Hazordous waste disposal details are enclosed herewith as Annexure-

VI for your ready reference.

The total nos of DG set 25 KVA x 3 Nos.,

62.5 KVA x 3 Nos are used as power back up source only. All the DG sets are acoustically treated and comply with E (P)

A Rule for air and noise emission standards.

The stack height will be as per CPCB norms. DG sets stack monitoring reports are enclosed herewith as Annexure-I for your ready reference.

Yes, the green belt development has been as per the prevailing norms in this regard.

vi. for residential land use. The open spaces inside the plot should be suitably landscaped and covered with vegetation of indigenous variety.

Incremental pollution loads on the ambient air quality, noise and water quality should be periodically monitored after commissioning of the project. ix. A report on the energy conservation measures conforming to energy conservation norms finalize by Bureau of Energy Efficiency should be prepared incorporating details about building materials & technology, R & U Factors, etc and submit the ministry in three months time. x. Rain water harvesting and ground water recharging shall be practiced. The ground water levels and its quality should be monitored regularly in consultation with the Central

Ground Water Authority. xi. Specific action on the following must be taken and the report submitted within three months; i.) The solid waste management must also make a specific provision/scheme for segregating and handling hazardous wastes/ewaste for the complex. ii.) Construction of STPs

Yes, necessary Environmental Monitoring has been carried out by MoEF approved Lab i.e.

Perfact Researchers Pvt. Ltd. (NABL Reg.

No. T-2106) on six monthly basis .

Environmental Monitoring reports for the project are enclosed herewith as an

Annexure-I for your ready reference.

Adequate energy conservation measures has been adopted for the project. vii. Application of solar energy should be incorporated for illumination of common areas, lighting for gardens and street lighting in addition to provision for solar water heating. viii. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site must be avoided, parking should be fully internalized and no public space should be utilized.

Due care has been ensured for smooth operation of the traffic. The whole development work in the area is as per the approved Plan of Haryana Urban

Development Authority (HUDA).

Sufficient parking spaces have been provided for the occupants as well as visitors of the project.

All possible energy conservation measures have been incorporated for the proposed project.

Already Complied.

Complied.

PART- B GENERAL CONDITIONS i. The environmental safeguards contained in the

EIA Report should be implemented in letter and

Yes, complied.

ii. spirit.

Provision should be made for the supply of kerosene/cooking gas and pressure cooker to the laborers during construction phase. iii. All the laborers to be engaged for construction works should be screened for health and adequately treated before issuing work permits. iv. Six monthly environmental monitoring reports should be submitted to the Ministry and its

Regional Office, Chandigarh.

Presently the construction work of the project has been completed project is under operational stage.

Presently the project is in operational phase.

5.

Yes, necessary Environmental Monitoring has been carried out by MoEF approved Lab i.e.

Perfact Researchers Pvt. Ltd. (NABL Reg

No T-2106) on six monthly basis .

Environmental Monitoring reports for the project are enclosed herewith as an

Annexure-I for your ready reference.

Yes, we will give our full cooperation to the

MoEF official during their inspection of project site.

6.

7.

8.

Officials from regional office of MoEF,

Chandigarh who would be monitoring the implementation of environmental safeguards should be given full cooperation, facilities and documents/data by the project proponents during their inspection. A complete set of all documents submitted to MoEF should be forwarded to the CCF, Regional office of MoEF,

Chandigarh.

In case of any change (S) in the scope of the project, the project would require a fresh appraisal by this Ministry.

The Ministry reserves the right to add additional safeguard measures subsequently, if found necessary, and to take action including revoking of the environment clearance under the provisions of the Environmental (Protection)

Act, 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner.

All other statutory clearances such as approvals for storage of diesel from Chief Controller of

Explosives, Fire Department, Civil Aviation

Department, Forest Conservation Act, 1980,

Wildlife Act 1972 etc. shall be obtained, as applicable by project proponents from the component authorities.

There is no change in the scope of the project. Project has been developed / constructed as per submitted plan only.

Yes, we are committed to comply with the said stipulated condition for the project as applicable and technically feasible of compliance.

All the applicable rules will be fulfilled for the project.

Consent to Operate:

Business Zone- Annexure-II

Nirvana CourtyardAnnexure – II

Chief Controller of Explosives:

For Business Zone- Submitted through 4 th compliance report Ref: Nirvana/MoEF-

NRO/PR4/2906/2009

Nirvana Courtyard- Submitted as

Annexure IV of the previous compliance report vide letter no. Nirvana/MoEF-

NRO/PR9/0212/2011 dated 02-12-11

Fire NOC:

Business Zone- Submitted through 4th compliance report Ref: Nirvana/MoEF-

NRO/PR4/2906/2009

Nirvana Courtyard- Submitted through

4th compliance report Ref:

Nirvana/MoEF-NRO/PR4/2906/2009

Civil Aviation :

Business Zone- Submitted through 4 th compliance report Ref: Nirvana/MoEF-

NRO/PR4/2906/2009

Nirvana Courtyard- Submitted through

4 th compliance report Ref: Nirvana/MoEF-

NRO/PR4/2906/2009

No NGO participated in the public hearing of the project.

9. A copy of environmental clearance would be marked to local NGOs, if any whom suggestions were received at the time of public hearing.

10. The project proponent should advertise in at least two local Newspapers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded environmental clearance and copies of clearance letters are available with the

Haryana State Pollution Control Board and may also be seen on the website of the Ministry of

Environment and Forests at http://

11. These stipulations would be enforced among others under the provisions of the water

(Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Pollution Control) Act,

1981, the Environment (Protection) Act, 1986 and the Public Liability (Insurance) Act, 1991.

12. www.envfor.nic.in

. The advertisement should be made within 7 days from the day of issue of the clearance letter and a copy of same should be forwarded to Regional Offices of Ministry at

Chandigarh.

The project authority will enter into MOU with all buyers of the property, to ensure operation and maintenance of the assets handed over to the society formed by the owners of the building.

Complied. The copy of the said advertisement has already been submitted through our 1st compliance report dated

31.08.2007.

Yes, all applicable rules will be followed with best of our efforts.

Yes the proponent enters into MOU with the buyers of the property to ensure operation and maintenance of the property.

CURRENT STATUS: The construction & development work of the project has been completed and we have received the ‘Consent to Operate’ Certificate for Commercial complexes namely Business Zone as well as Nirvana Courtyard located within Nirvana

Country. Also we have received the Electricity Connection Permission for both these commercial complexes.The plots too have been handed over.

1

Environmental Monitoring reports Annexure-I

2

Consent to operate under Water, Air Act &

Hazardous Waste Management.

Annexure-II

3

Environmental Management plan cost Annexure-III

4

Electrical connection approval from DHBVN Annexure-IV

5

Sewer connection approval Annexure-V

6

Hazardous waste disposal Form-13 Annexure-VI

7

Solid waste Management details Annexure-VII

8

Water connection Approval from HUDA Annexure-VIII

ANNEXURE-I

ENVIRONMENTAL

MONITORING REPORT

ANNEXURE-II

CONSENT TO OPERATE

ANNEXURE-III

EMP

EXPENDITURE DETAILS

Expenditure Made on Environmental Management (Approximate Cost for Business Zone & Nirvana Courtyard*)

S.No Details

Capital Cost (Lakh Rs.)

130.00

1.

Waste Water management (Sewage Treatment Plant)

38.00

2.

Water Management (RWH)

33.00

3.

Solid Waste Management

37.00

4.

Green Area Development ( Soft Landscaping)

-

5.

Monitoring for Air, Water, Noise & Soil

Total 238.00

Expenditure on Environmental Management (Approximate Cost)

S.No Details

1.

1

Waste Water management (Sewage Treatment Plant)

2.

2

Water Management (RWH)

3.

3

Solid Waste Management

4.

4

Green Area Development

5.

5

Monitoring for Air, Water, Noise & Soil

Recurring Cost (Lakh R.s)

4.35

1.90

-

6.0

0.75

13 Total

Project is operational phase and cost is incuded with maintenace cost.

Note: The plots in the colony have been handed over to the concerned residents.

ANNEXURE-IV

ELECTRICITY

CONNECTION PERMISSION

ANNEXURE-V

SEWER CONNECTION

ANNEXURE-VI

HAZORDOUS

WASTE DISPOSAL FORM-13

ANNEXURE-VII

SOLID WASTE

DISPOSAL DETAILS

ANNEXURE-VIII

WATER

CONNECTION FROM HUDA