Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ Technical specification for MIDS Crates to the Danish Armed Forces 19-02-2013 Side 1 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ 1. SPECIFICATION 2.1. Description of requirements and Compliance Matrix The below mentioned requirements and Compliance Matrix is divided into six (6) columns with the following information: identification number (Tag), description of requirements (Requirements), category of requirements (Category), declaration of whether the requirements is conditional (Conditional), declaration of whether the requirements cannot be fulfilled and thereby is unconditional (Unconditional) and a column for the bidders possible comments (Comments). 2.2. Category The requirements are divided into two categories: SHALL (U): Bidder shall be able to fulfill these requirements in order to be taken into consideration for the tender. SHOULD (C): These requirements will be evaluated together with the offered price. The results will be used in the final evaluation. 2.3. Description of purchase The acquisition consists of one (1) MIDS Crate to be used for training purposes by the Danish Armed Forces, with an option to buy further four individual (4) MIDS Crates. 19-02-2013 Side 2 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ Category Tag Requirement 1 Crate 1.1 (U) The MIDS Support equipment shall be mounted inside a transport crate. SHALL 1.2 (C) In order to easily move the transport crate, it should be possible to mount removable wheels on the bottom of the transport crate. SHOULD Conditiona Unconditional l (mark (mark with X) with X) Comments As a minimum the following equipment/functions shall be in the transport crate: 2 MIDS mounting tray: 2.1 (U) It shall be possible to mount a MIDS Low Volume Terminal 1 (LVT 1) (RT-1840) in the tray. SHALL 2.2 (U) It shall be possible to mount a Remote Power Supply (RPS) (PP-8476) next to the MIDS LVT, in SHALL 19-02-2013 Side 3 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ the tray. 2.3 (U) All necessary connecting cables between the MIDS LVT 1 and RPS shall be delivered with the MIDS Support Crate. SHALL 2.4 (U) There shall be a forced cooling of the MIDS LVT and RPS in the tray. SHALL 2.5 (U) In order to avoid a MIDS LVT and RPS breakdown as a result of operating under too high temperatures, there shall be a MIDS LVT overtemperature monitoring and reporting function in the tray. SHALL 3 Power Supply shall as a minimum consist of: 3.1 (U) A 115-230 VAC and 50-60 HZ Power Supply providing VDC for the RPS. SHALL 3.2 (U) Danish power plugs in accordance with Danish regulations (SR para 107-2-d1) or SRAF1962/DB 16/87 DN10A-R. SHALL 19-02-2013 Side 4 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ 3.3 (C) There should be 3 spare power outlets in accordance with Danish regulations (SR para 1072-d1) or SRAF1962/DB 16/87 DN10A-R, in the crate. 4 Functions and readouts (in a number of panels) shall as a minimum consist of: 4.1 (U) FAIL DECODE indicators: SHOULD SHALL To provide the operator with the last MIDS BIT results. 4.2 (U) RT ADDRESS switches: SHALL To select the MIDS 1553-bus Remote Terminal Address. 4.3 (U) IO IDENT switches: SHALL To select the MIDS platform type. 4.4 (U) CRYPTO CONTROL area: SHALL To provide controls for the MIDS keys management: 19-02-2013 Side 5 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ 4.5 (U) - To load the keys “FILL” - To erase the keys “ZEROISE” - To keep the keys “HOLD/NO HOLD” MIDS TERMINAL (MT) CONTROL: SHALL To provide controls and indicators for terminal management – 4.6 (U) - To switch the terminal “ON/OFF” - “PWR” for terminal power supply indication - “TERM Fail” for MIDS BIT indication - “MT Fail” for MT BIT indication - “RPS Fail” for RPS BIT indication POWER SUPPLY area: SHALL To provide indicators for DC power supply – 4.7 (U) - “Prime” to light when 28VDC is supplied - “12VDC” to light when 12VDC is supplied - “RPS” to light when 280VDC is supplied COOLING area: SHALL To provide indicators for MIDS cooling – - “Air Flow” to indicate when forced air is provided (Support to 2.4 (U)). 19-02-2013 Side 6 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ “TEMP” to indicate for MT over-temperature (Support to 2.5(U)). Voice 1 area: - 4.8 (U) SHALL To provide the MIDS Voice Port 1 functions – 4.9 (U) - Voice traffic indicator - Push to Talk - Audio level - Headset plug Voice 2 area: SHALL To provide the MIDS Voice Port 2 functions – 5 5.1 (U) - Voice traffic indicator - Push to Talk - Audio level - Headset plug External interfaces shall (in a number of panels) as a minimum consist of: RF output with the following: - SHALL Antennas A & B (type N coaxial connectors) Integrated RF load for unused antennas. 19-02-2013 Side 7 af 8 Danish Defence Acquisition and Logistics Organization _______________________________________________________________________________________________________ 5.2 (U) 6 Host interface with the following: SHALL - 1553 Primary Data Bus(BNC coaxial) - 1553 Secondary Data Bus (BNC coaxial) - Data Bus Ethernet (RJ45 Ethernet) - Support Port (RJ45Ethernet) - Input for External Time Reference Extra space (Rack Unit = U) that should house the following: 6.1 (C) One (1) U for GPS SHOULD 6.2 (C) Two (2) U for PC SHOULD 6.3 (C) One (1) U for Keyboard/display tray SHOULD 7 Delivery 7.1 (U) Delivery shall take place no later than five (5) months after DALO submits the purchase order. 19-02-2013 SHALL Side 8 af 8