7b - Utah Valley University

advertisement
RECOMMENDED ENERGY CONSERVATION MEASURES FOR UTAH VALLEY UNIVERSITY
COST SAVINGS
SUMMARY OF ECMS
Relamp at Phase 1 Buildings
Energy Efficient Lighting
Airport Hangar #2
Browning Administration building
Building L
McKay Education Building
Extended Education Building
Faculty Annex
Fire Science Building
Gunther Trades building
Losee Center
Marketing building
Tie Buildings into Existing Substation
West high voltage loop
Constant Volume to Single Zone to VAV
ME buildings
MATC
High Efficient Chiller
Geothermal Installation
Solar PV Installation
TOTAL FOR ALL RECOMMENDED ECMs
Installed
Cost
($)
Monthly
KW
Savings
Annual
Gas
Savings
Therms
Annual
KW
Savings
Electric
($)
Natural
Gas
($)
Total
($)
Incentive
Buydown
($)
Payback
(Years)
178,159
193,485
90.9
164.5
289,658.6
661,271.9
0.0
0.0
$21,444
$48,485
$0
$0
$21,444
$48,485
80,538
87,464
4.20
2.13
675,211
0.0
0.0
0.0
$69,136
$0
$69,136
0
8.15
11,188
0.0
29,462
1,426
$993
$1,111
$2,104
1,682
4.17
0
0
0
1,058,043
21.2
20.
0
297
54,090
23,118
51,193
1,108,793
0
4,252
0
5,678
$4,211
$2,122
$1,505
$147,896
$0
$3,753
$0
$4,864
$4,211
$5,875
$1,505
$152,760
6,252
0
0
175,936
5.20
Note: E1 Savings includes $16,695 based on soccer field 119 kW monthly operating 3 hours per day, 5 days per week for 4 weeks per month. Schedule 9 vs Schedule 6 assumes 30% coincident
demand and 30% energy consumed during on-peak hours. Schedule 6 has no on-peak rate differential, monthly charges include full 119 kW per month.
Note: L1 & L2 Lighting incentive based on 40% of full estimated value.
Download