Bio-retention basin design calculation summary CALCULATION SUMMARY Calculation Task Outcome Check Catchment characteristics Catchment area Ha Catchment land use (i.e. residential, commercial etc.) Storm event entering inlet yr ARI Conceptual Design Bioretention area Filter media saturated hydraulic conductivity Extended detention depth m² mm/hr mm 1 Verify size for treatment Bioretention area to achieve water quality objectives Total suspended solids % of catchment Total phosphorus % of catchment Total nitrogen % of catchment Bioretention area Extended detention depth REVISION DATE >> 7 MAY 2014 m² m Townsville City Plan Table SC6.4.3.9.10 2 Determine design flow Time of concentration Refer to SC6.4.4.4 Stormwater drainage design and QUDM minutes Identify rainfall intensities Minor storm (I1-5 year ARI) mm/hr Major storm (I 50 year ARI) mm/hr Design runoff coefficient Minor storm (C1-5 year ARI) Major storm (C 50 year ARI) Peak design flows Minor storm (1-5 year ARI) m³/s Major storm (50 year ARI) m³/s 3 Design inflow system Adequate erosion and scour protection? Coarse sediment fore bay required? Volume (Vs) m³ Area (As) m² Depth (D) m Minor storm flow width m *Check flow widths in upstream channel CHECK ADEQUATE LANES TRAFFICABLE *Kerb opening width Kerb opening length m 4 Specify bioretention media characteristics Filter media hydraulic conductivity Filter media depth mm/hr mm Saturated zone required Saturated zone depth REVISION DATE >> 7 MAY 2014 mm Townsville City Plan Table SC6.4.3.9.10 Drainage layer media (sand or fine screenings) Drainage layer depth mm Transition layer (sand) required Transition layer depth mm Flow capacity of filter media m³/s 5 Under-drain design and capacity checks Perforations inflow check Pipe diameter mm Number of pipes Capacity of perforations m³/s CHECK PERFORATION CAPACITY > FILTER MEDIA CAPACITY CHECK SATURATED ZONE WEIR/UP TURNED PIPE CAPACITY FILTER MEDIA CAPACITY Perforated pipe capacity Pipe capacity m³/s CHECK PIPE CAPACITY > FILTER MEDIA CAPACITY 6 Check requirement for impermeable lining Soil hydraulic conductivity mm/hr Filter media hydraulic conductivity mm/hr MORE THAN 10 TIMES HIGHER THAN IN-SITU SOILS? 7 Size overflow pit System to convey minor floods (2-5yr ARI) LxW 8 Verification checks Velocity for minor storm (<0.5m/s) m/s Velocity for major storm (<2.0m/s) m/s Treatment performance consistent with Step 1 *Relevant to streetscape application only REVISION DATE >> 7 MAY 2014 Townsville City Plan Table SC6.4.3.9.10