Directory One, and Energy-saving management pointer self assessment form Second, Energy-saving management pointers to trial data self review checklist Ginseng, Pointer to energy management checklist description Restaurants, Energy-saving management of pointer pointer First, Energy monitoring systems 1 、 Power saving monitoring system 2 、 Air conditioning control system 3 、 Lighting power monitoring system Second, the Energy management systems 1 、 Energy management function Third, the equipment Efficiency 1 、 Use of efficient equipment 1-1 、 Chiller or air conditioner air conditioning equipment complies with Department of energy standards or with national energy-saving mark certification 1-2 、 Fluorescent tubes or lamps and lighting equipment complies with the Ministry of economy Department of energy standards or with national energy-saving mark certification 1-3 、 Pumps, lifts and other power equipment with high efficiency device description data Four, Energy-saving technology 1, and intelligent outer energy-saving measures 1-1, and have to adapt to the environment, lower energy consumption and can automatically adjust blinds or window 2, and energy-saving measures of air-conditioning equipment 2-1, and set the number of hosts running control, heat exchangers, variable refrigerant, heat recovery, etc 3, and lighting energy-saving measures 3-1, and by daylight, initial adjustment of illumination, work surface lighting 4, and energy saving measures in power equipment 4-1, and use harmonic frequency conversion functions, optimal contracts of management capacity Five, Renewable energy equipment 1and the function of renewable energy equipment 1-1, and alternative energy sources such as electricity or heat produced Figure Figure Figure Figure Figure Figure Figure Figure Figure Map directory 1 energy management system architecture 2 power consumption real-time status screen 3 air conditioning energy monitoring system interface 4 lighting supervisory control subsystem interface 5 schedule of electric power data 6 trend data analysis in power system 7 power systems power charts 8 proportion of electricity in power system analysis 9 power monitor status and statistics report Figure 10 lighting energy monitoring Figure 11 -DC inverter air conditioning efficiency performance Table Table Table Table 1: 2: 3: 4: List of tables air conditioning system design and equipment selection table list of all kinds of lamps and statistics high efficiency equipment using rate tables air conditioning system design for heat exchanger machine table One, and Energy-saving management pointer self assessment form Application number Time s One Two Pointer projects Energy monitoring systems Energy management systems Building name Assessment project Energy monitoring function Energy management function Valuation Beautiful Sky Benchmark Partitio Goa Audi categorie n l t s With air conditioning or power or lighting Basic equipment such as 10 10 20 20 8 8 6 6 4 4 energy monitoring Energy monitoring of air conditioning or power or illumination Necessary device or power management features Chiller or air conditioner air conditioning equipment complies with Department of energy standards or with national energy-saving mark certification Thre Equipment e efficiency Use of efficient equipment Fluorescent tubes or lamps and lighting Encourage equipment complies with the Ministry of economy Department of energy standards or with national energy-saving mark certification Pumps, lifts and other power equipment with high efficiency device description data Time s Pointer projects Benchmark Partitio Goa Audi Assessment project Valuation categorie s n l 8 4 16 12 12 12 8 8 8 8 Basic 10 10 Necessary 20 20 Encourage 70 62 Have to adapt to the environment, lower Intelligent energy consumption and energy can automatically saving Encourage adjust blinds or measures in window ( The outer energy-saving measures 4 . ) Sets the number of Air hosts running control, conditioning heat exchangers, energy saving Energy-savin measures Four g technology Lighting variable refrigerant, Encourage heat recovery, etc ( The energy-saving measures 4 . ) By daylight, initial adjustment of illumination, work energy-savin Encourage surface lighting ( The g measures energy conservation measure 4 ) 。 Using a harmonic Energy frequency conversion saving functions, optimal measures for contracts of Encourage power management capacity equipment ( The energy-saving measures 4 . )。 Renewable Five energy equipment Function of renewable energy equipment Alternative energy such as electricity or Encourage heat generated ( Functions 4 ) Category partition t Time s Pointer projects Benchmark Partitio Goa Audi Assessment project Valuation Total score Intelligence levels categorie s n l 100 92 t ■ 100-80 Intelligent/excellenc □ 79~70 Intelligent/quality e □ 69~60 Intelligent/General □ 59 Points/no intelligent basis Second, Energy-saving management pointers to trial data self review checklist Overview of building structures Application number Building name , Assessment of "energy-saving management of pointer" check out data Times Pointer Project Assessment Project Valuation An illustration or page P7~P9 One Energy monitoring systems Energy monitoring function With air conditioning or power or lighting equipment such as energy monitoring Two Energy management systems Energy management function Energy monitoring of air conditioning or power or illumination device or power management features P9 Chiller or air conditioner air conditioning equipment complies with Department of energy standards or with national energy-saving mark certification P13 Fluorescent tubes or lamps and lighting equipment complies with Department of energy standards or with national energy-saving mark certification P14 Equipment Three efficiency Use of efficient equipment Pumps, lifts and other power equipment with high efficiency device description data Have to adapt to the environment, Intelligent lower energy consumption and can energy saving automatically adjust blinds or measures in window ( The energy-saving measures Energy-saving outer Four 4) technology Air Sets the number of hosts running conditioning control, heat exchangers, variable energy saving refrigerant, heat recovery, etc measures ( The energy-saving measures 4 ) P14~P15 P16 P16~P17 Renewable Five energy equipment By daylight, initial adjustment of Lighting illumination, work surface energy-saving lighting ( The energy-saving measures measures 4 ) P18 Energy saving Using a harmonic frequency measures for conversion functions, optimal power contracts of management capacity equipment ( The energy-saving measures 4 ) P19 Function of renewable energy equipment Two and examination units added Alternative energy such as electricity or heat generated ( Functions 4 ) P20 Ginseng, Pointer to energy management checklist description This building uses variable-frequency air conditioning system, and designing solar panels and water heaters to provide renewable energy, energy-saving environmental protection class II standard in energy-saving, high-efficiency motors. Lighting in addition to parking lot picking T5 lamps, a whole building efficient LED lamps, touch control and time management and event-related groups. Power monitoring and control system by relevant monitoring equipment for air conditioning, lighting and power systems group, status, metrology, tube, while needed control, starting and stopping of the intelligent monitor in order to reach concrete results of energy saving, such as Figure 1 energy management system architecture As shown in. 1 Energy-saving management system architecture Restaurants, Energy-saving management of pointer pointer First, Energy monitoring systems Building energy monitoring systems include electric power monitors, air conditioning equipment and lighting power equipment monitoring and many other subsystems. ( See annex III, figure S1-10 structure and specification of air conditioning and energy management system) 1、 Power saving monitoring system The building of electric power energy monitoring system, mainly for monitoring the public share in real-time voltage, current, demand, power factor and power, spent time and other information. Figure 2 power consumption real-time status screen shown in. ( See annex III, figure S1-10 structure and specification of air conditioning and energy management system) 2、 Air conditioning control system Setting common Hall this building air conditioning equipment, mining and energy-saving air conditioning inverter system, each indoor unit control mining BACNet Monitor interface, through the centralized switch controller for real-time remote monitoring function of the opening and closing of the air conditioning equipment, also available with switch control, such as 3 Air conditioning energy monitoring system interface As shown in. ( See annex III, figure S1-10 structure and air conditioning and energy management systems standard, S1-4, andS3-4 a weak plan,S3-5 Sandwich weak plan,S3-11 inrush from floor to roof level weak plane) 3 Air conditioning energy monitoring systems Interface 3、 Lighting power monitoring system Lighting equipment of power monitor system includes parking, exterior walls, stairwells, hallways, parking ventilation and lighting equipment. Independent control system can then be used by touch-sensitive subsystems hosts, such as Figure 4 lighting supervisory control subsystem interface Shown also with power saving monitoring subsystem integration even managed to achieve the goal of energy management. ( See annex II, figure E-07~E-11 single wire system diagram Catholic and in annex III, figure S1-5~S1-6 central control system schematics and specifications) 4 Lighting supervisory control subsystem interface Second, the Energy management systems 1、 Energy management function Power saving monitoring system according to the forecasts of electricity demand, and dismount the control signal of the digital meters, cascade control equipment such as air conditioning, power, lighting, control demand high. Meanwhile, power monitoring and data recording system provided as Figure 5 schedule of electric power data and the Figure 6 trend data analysis in power systems , and 7 Power systems power charts 、 8 Power system analysis 、 9 Power monitor status and statistics report 、 10 Lighting energy monitoring And other types of reports, the data required for the management of energy. ( See annex II, figure E-07~E-11 single wire system diagram Catholic and in annex III, figure S1-10 structure and air conditioning and energy management systems standard, S1-4, and S3-4 A weak plan, S3-5 Sandwich weak floor plan, S3-11 Inrush from floor to roof level weak plane) 5 Schedule of electric power data Third, the Equipment Efficiency 1、 Use of efficient equipment The public areas of the building using high efficiency equipment including air conditioning, lighting and power equipment. 1-1、 Chiller or air conditioner air conditioning equipment complies with Department of energy standards or with national energy-saving mark certification This building Daikin DC inverter air conditioning equipment, and its air conditioning system coefficient of performance of cold rooms / Greenhouses like Table 1 : Air conditioning system design and equipment selection table Using high efficiency equipment 3.15kw / 3.56kw In line with Department of energy energy-saving mark IV standards. Table 1 : Air conditioning system design and equipment selection table Indoor unit Floors Room name Outdoor unit Subtotal, Cold indoor room Model capacity Number cold room capacities (kW) The reading FBQ100 room 10.1 2 10.1 Model Cold room capacity Notes (kW) RZQ100 10.1 EER 3.15 / 3.56 Department of energy energy-saving mark IV EER 3.15 / 3.56 1 FBQ100 10.1 1 10.1 RZQ100 10.1 Gym FBQ100 10.1 1 10.1 RZQ100 10.1 Department of energy energy-saving mark IV EER3.15 / 3.56 Department of energy energy-saving mark IV FBQ71 R1 1 7.2 RZQ71 7.2 Restaurant EER 3.15 / 3.56 FBQ100 R2 7.2 Bar Subtotal EER 3.20 / 3.29 Department of energy energy-saving mark IV FBQ71 10.1 7.2 1 2 10.1 14.4 RZQ100 RZQ71×2 10.1 14.4 Department of energy energy-saving mark IV EER 3.20 / 3.29 Department of energy energy-saving mark IV 62.0 (See annex III, figure S1-10 Energy management and architecture plans and specifications, the air conditioning system S3-4 A weak plan, S3-5 Sandwich weak floor plan, S3-11 Inrush from floor to roof level weak plane) 1-2、 Fluorescent tubes or lamps and lighting equipment complies with the Ministry of economy Department of energy standards or with national energy-saving mark certification The building parts are used in fluorescent tube T5 Lamp, using energy-saving mark certification T5 Type of lamp. The remaining lighting using LED lamps, table 2: list of all kinds of lamps and statistics . ( See annex II, figure E-07~E-11 Grand Duchy of single wire system diagram, in annex III, figure S1-10 structure and specification of air conditioning and energy management system) Table 2 : All kinds of lamps and statistics list Times Wattage Lamps (w) The number of Compound meter (w) 1 T5 Light tubes 28 127 3556 2 LED Downlight 7 531 3717 3 LED Downlight 3 272 816 4 LED Downlight 1 24 24 5 LED Line lights 92 460 5 Notes Parking lanes, parking Hall, standard floor elevator Hall, wall, Garden tubes or automatic illumination control when grouping, see annex II, graph E-07~E-11 Single wire 6 LED Modeling lights system diagram, diagram 7 182 1274 in annex III S1-10 Structure and specification of air conditioning and energy management system Total 1228 9847 1-3、 Pumps, lifts and other power equipment with high efficiency device description data This building in the high-powered pump, efficiency rating IE1+ Above, lift Used Mitsubishi elevators ( model:NEXIEZ), Is superior to the traditional winch with worm gear transmission efficiency, savings of about 27%~42% power of environmental characteristics, The Environmental Protection Department of the Executive Yuan Environmental protection product category II product certificate ( certificate number 3749). Finishing as table 3: high efficiency equipment using rate tables . ( See annex II, figure E-07~E-11 Grand Duchy of single wire system diagram, in annex III, figure S1-10 structure and specification of air conditioning and energy management system) Table 3 : High efficiency equipment using rate tables Power device name Exhaust machine Fan Exhaust machine Fan Exhaust machine Device The total High Capacity The capacity Brand (HP) number of of (HP) 7.5 7.5 7.5 7.5 7.5 1 1 1 1 1 Model High Rated Efficiency efficiency efficiency Note Efficiency grade Amount of of equipment capacity 7.5 Hundreds of original BBF# 3 1/2 90% IE1+ 1 7.5 7.5 Hundreds of original BBF# 3 1/2 90% IE1+ 1 7.5 7.5 Hundreds of original BBF# 3 1/2 90% IE1+ 1 7.5 7.5 Hundreds of original BBF# 3 1/2 90% IE1+ 1 7.5 7.5 Hundreds of original BBF# 3 1/2 90% IE1+ 1 7.5 BBF# 3 1/2 90% IE1+ 1 7.5 1 20 Cert numb 1 20 Cert numb Hundreds Fan levator #1 levator #2 7.5 1 7.5 of original 15 1 15 Mitsubishi NEXIEZ Environmental protection class II certificate 15 1 15 Mitsubishi NEXIEZ Environmental protection class II certificate Lift pump 15 2 30 Kau 80-STU-11 89% IE1+ 2 30 Set water pump 2 2 4 Kau TOS-EF-32 82% IE1+ 2 4 Blower 3 2 6 TECO GTB5022 2 6 14 115 12 114 h efficiency ipment rates Capacity) 95% (115-6)/115=0.95 Four, Energy-saving technology 1、 Intelligent energy saving measures in outer 1-1、 Have to adapt to the environment, lower energy consumption and can automatically adjust blinds or window The built in 1F Exclusive meeting room and reading room, set at the North and South to 8 Automatically adjust the window, automatic environmental control hosts, sensor, wind sensor, outdoor temperature indoor temperature sensor, CO 2 Environmental conditions such as sensor intelligent combined control, according to the temperature difference between indoor and outdoor and outdoor wind speed, wind direction, rain sensing status, automatically adjust the window at the right time, adjust indoor temperatures reduce air-conditioning use of the interior space in order to adapt to the environment, lower energy dissipation purposes. ( See annex III, figure S1-10 structure and air conditioning and energy management systems standard,S1-26 air conditioning and environmental control and the host system architecture and action flow charts,S3-4 a layer of weak floor plans ) 2、 Energy saving measures of air conditioning equipment 2-1、 Set the number of hosts running control, heat exchangers, outdoor cold room, fan and Inverter air conditioning: public hall set 8 DC inverter type air conditioning units with large gold series, for example, carry reluctance DC motor in the compressor, the most commonly used during low-load operation, efficiency can be increased by about 20% , Such as 11 DC inverter type air conditioning efficiency performance 。 11 DC inverter type air conditioning efficiency performance Host running number control: 8 DC inverter type air conditioning and indoor units and the total heat exchanger equipment, central monitoring and control system at the management centre, depending on power demand set to concentrate controls the opening and closing of the air conditioning equipment status, running ( Dehumidifiers, air conditioners, air supply ) Functions and embedding-ring at each individual interior space control touch the host, can be based on indoor and outdoor temperature and humidity, CO2 And central monitoring conditions such as electricity demand removing intelligent combined control, timely adjusted host running set of control functions. ( See annex III, figure S1-10 structure and air conditioning and energy management systems standard,S1-26 air conditioning and environmental control and the host system architecture and action flow charts,S3-4 a weak plan, S3-5 sandwich weak plan,S3-11 inrush from floor to roof level weak plane) Heat exchangers: set in a gym, such as Table 4 : Air conditioning system heat exchanger selection table , And air conditioning control systems and CO 2 Sensor controlled through heat exchangers equipment at the time of introduction of fresh air, can be used with indoor cold room air heat exchange, reducing outdoor air temperature, to save electricity energy-saving effect. Outside the cold room, the fan: the built in 1F Exclusive meeting room and reading room, set at the North and South to 8 Automatically adjust the window, which is addition of outdoor temperature and humidity sensors, indoor temperature and humidity sensors, quiet fan and indoor cycling fans and other equipment. Embedded into type ring control touch control host, can according to indoor outside temperature humidity environment conditions do judge, in outdoor temperature below must degree of indoor temperature Shi ( can itself set, default for 6 degrees ), timely opened outside push window and the outside mute sent wind machine, first using outdoor low temperature to reduced indoor temperature, reduced air conditioning air-conditioning of using Until the indoor and outdoor temperature falls below a certain level ( can be set, the default is 2 ), close out the window and mute the outside air blower, turn on their air conditioners. ( See annex III, figure S1-10 structure and air conditioning and energy management systems standard,S1-26 air conditioning and environmental control and the host system architecture and action flow charts,S3-4 a layer of weak floor plans And theS3-5 sandwich weak floor plans) When air cooling is used, the space is used for indoor cycling fan to increase the space for air to circulate more air-conditioned cold room temperature effect, to save electricity energy-saving effect. ( See annex III, figure S1-10 structure and air conditioning and energy management systems standard,S3-4 a weak plan,S3-5 weak sandwich floor plans) 3、 Lighting energy-saving measures 3-1、 By daylight, initial adjustment of illumination, work surface lighting Day Use: this building 1F Elevator on each floor above the entrance hall and staircase are picking window design, usually not only increase fresh air, daylight space of lighting during the day, can effectively save electricity for lighting. Underground mining high skylights design, combined with detection and second-tier light control of illumination system, also energy-efficient. ( Refer to annex a A2-03 basement floor plan, map A2-04 one floor, andA2-05 mezzanine floor plan,E-07~E-11 Single wire system diagram) Initial luminance adjustment: the basement car park lighting is divided into lanes and parking spaces, such as class II lighting control design, the loops are included in the second-tier lamp control system control. In the vehicle lighting, dual-loop interval lighting control, usually only opens a circuit lighting illumination in the early to save on electricity in commuter peak clock systems and lighting circuit in the open lanes to adjust track illumination. In terms of parking lights, lighting control loop design in mining block, and lane long distance identification card reader access control system in the basement, when tenants enter driveway, can the residents parking locations, real-time lighting opened the region to enhance illumination adjustment of movement of persons and vehicles, while the system with automatic timings off, intelligent guidance and energy-saving effect of the turbine. ( See annex a, figure A2-01~A2-03 three ~ ground floor plan,E-07~E-11 single wire system diagram) Job surface lighting: for should different job conditions provides appropriate of light, as service management counter personnel, station with Service Shi, ceiling of light, provides usually reception activities of appropriate as degrees; need processing file job Shi, can opened anti-glare light of counter lighting, to Lee personnel comfortable and job security; room and reading room of lighting, Yu personnel seat Shi, can opened desktop lights; other places according to job nature provides for should different needs design. ( See annex a, figure A2-04 a floor plan,E-07~E-11 single wire system diagram) 4、 Energy saving measures for power equipment 4-1、 Using a harmonic frequency conversion functions, optimal contracts of management capacity The building uses Mitsubishi elevators ( model:NEXIEZ), the VVVF control system of commercial power supply three-phase AC voltage and converter amplitude, pulse-width modulation (PWM) AC variable voltage, variable frequency sinusoidal current output, effective suppression of harmonic current, harmonic management functions. ( Refer to annex a A2-03 ground floor plan, A2-04 one-floor,A2-05 mezzanine floor plan,A7-1 Elevator detail drawings,E-07~E-11 single wire system diagram) In optimal contractual capacity, real-time monitoring to monitor in power saving systems electricity demand, and dismount the control signal of the digital meters, with integrated control equipment such as air conditioning, power, lighting, control demand high. ( See annex II, figure E-07~E-11 single wire system diagram Catholic and in annex III, figure S1-10 structure and air conditioning and energy management systems standard, S1-4, andS3-4 A weak plan, S3-5 Sandwich weak floor plan, S3-11 Inrush from floor to roof level weak plane) Five, Renewable energy equipment 1、 Function of renewable energy equipment 1-1、 Alternative energy such as electricity or heat generated Heat: the top platform setting capacity 500 Litres of solar water heater device, usually using solar thermal energy heating water to provide hot water for use by mothers ' class. ( Refer to annex III S3-11 inrush from floor to roof level weak plane) Power: top floor platform for planning and design 230W Solar PV equipment 16 Maximum capacity for 3.6KW , Day use the principle of photoelectric conversion, converts sunlight into electricity, parallel to the electric system. Will produce environmentally friendly renewable energy sources - electricity power, for the Earth to make an effort ... ( Refer to annex III S1-10 energy management structure and norms, with the air conditioning systemS1-26 solar planning standards,S3-11 inrush from floor to roof level weak plane )