Variation Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Subject of Variation Alternative arrangements for the collection, storage and treatment/disposal of fridges/freezers. Delay of refurbishment of Malvern Household Waste Disposal Site. Confirmation of date to complete Hill & Moor Landfill Site and Rotherwas MRFs. Dealing with the cost consequences of sending waste to landfill rather than to an EfW plant. The Source Separation Service no longer been required under the Contract. Extending the opening hours at Upton Household Waste Site. Variation to excess rejects drafting in Variation 5. Trial use of the Coventry EfW and the cost of transporting waste to the same. Approval to apply for planning permission at the Worcester East Household Waste Site. Provision of Recyclate Bulking Facilities in Bromsgrove, Redditch and Wyre Forest. Extended opening hours for Tenbury Household Waste Site and licence fee for the same. Extended opening hours of Upton on Severn Household Waste Site. Extended opening hours for Tenbury Household Waste Site. Store and load kerbside recycling bags at Leominster Transfer Station and Rotherwas Materials Reclamation Facility. Extended opening hours for Tenbury Household Waste Site. Trial of additional staff, improved signage and wood recycling on the household waste site recycling rate. Separate collection system at Household Waste Sites and an alternative disposal route for all tyres received in the contract waste stream. Extra transport and tipping cost through the use of licensed third party sites for the disposal of asbestos. Introduction of new demountable waste collection system at Bromsgrove District Council. Extra transport and processing cost through the use of third party sites for composting green waste. Extra transport and processing cost through the use of third party sites for composting green waste. Status Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Current Fulfilled Current Current Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Variation Number 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Subject of Variation Status Provision of additional staff, improved signage, site modifications and wood recycling. Extra collection, transport and tipping costs through the use of third party sites for the disposal of cathode ray tubes. Use of third party contractors for the collection and disposal of fluorescent tubes. N/A Use of Coventry Waste to Energy Plant Use of bulking bays as a bulking facility for commingled recyclables delivered by Redditch Borough Council, Worcester City Council and Wyre Forest Borough Council. Allocation of cost for administration and consignment fee for collection of hazardous waste. Allocation of costs arising under the Aggregates Levy. Allocation of costs arising from the requirement to have a PPC permit. Initiation of negotiations with a developer to agree the purchase of land and the development of a Commingled Materials Reclamation Facility. Additional staff, signage and site modifications. Acquisition of land and progression of planning application for commingled MRF. Initiation of negotiations with a developer to agree the purchase of land and the development of a Commingled Materials Reclamation Facility. Extra transport and processing costs for the composting of green waste. Allocation of costs for modifications to the site licences and working plans to enable the handling of CRTs, fluorescent tubes and equipment containing ozone depleting substances. Input Restrictions on Household Waste Sites. Extra transport and processing costs for the composting of green waste. Provision of additional staff, improved signage, site modifications and wood recycling. N/A N/A Extra transport and processing costs for the composting of green waste. Adjustment in respect to WEEE. Food Waste Introduction of new collection vehicles. Fulfilled Fulfilled Fulfilled Current Fulfilled Fulfilled Current Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Current Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Variation Number 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 Subject of Variation Introduction of new collection vehicles. Extra transport and processing costs for the composting of green waste. Mercia to enter into a lease for use of Kington Household Waste Site. Mercia to enter into a lease for use of Rotherwas Composting Plant. Plasterboard EnviroSort WEEE Provision of additional Household Waste Site staff. PPC Extra transport and processing costs for the composting of green waste. Battery Directive Extra transport and processing costs for the composting of green waste. Timber Asbestos Provision of additional Household Waste Site staff. Allocation of cost for administration and consignment fee for collection of hazardous waste. Introduction of new collection vehicles. Kington Household Waste Site. Plasterboard Green Waste (Wyre Forest) PPC WEEE Tyres Third party landfill Extra transport and processing costs for the composting of green waste. Asbestos Rotherwas Composting Plant Leominster Alternate Week Collection Status Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Current Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Fulfilled Current Fulfilled Current Current Current Current Current Current Current Current Current Current Current Current Fulfilled Current