P.O. Box 5250 Majorstuen NO-0303 Oslo Application for financial support to NOx reducing measure from the Business Sector’s NOx Fund, Norway All information requested in this form shall be filled in to the extent it is relevant for the specific measure and the company. An incomplete application will get longer handling time, or it may risk not being handled at all. Applicant information Company name Organisation number: Postal address Postal code City Country Contact person Telephone no. Mobile phone no. E-mail address Ship/plant information Name of ship, rig or plant: IMO number (for ship/rig) ☐ The ship/rig has signed contract for operation until……….. Type of ship/plant Year built Other information about contract: Has the applicant's ship/rig/plant previously been grated support from the NOx Fund? ☐ NO, the object has not previously been granted support ☐ Yes, but the measure has not/will not be carried out The NOx Fund's reference number: ☐ Yes, the following measure is/will be carried out with support from the NOx Fund The NOx Fund's reference number: Application form 18.8.2015 1 Information about combustion units relevant for the measure Provide the following information for each different relevant combustion unit: Type of combustion unit (e.g. main engine, auxiliary engine, boiler, turbine) Power (kW or other capacity unit) Engine speed – rpm (for engines only) Producer/brand and type (for engines only) Number or equal units Type of fuel (HFO, MDO, MGO, LNG, electricity, other to be specified) In case of measures on existing ship/plant where an old unit is replaced with a new, information shall be provided for both the old and the new unit. Information can be provided in the table below (add rows according to needs) or enclosed to this application. Unit type Power rpm Producer/type # units Fuel type Information about the NOx reduction measure Brief description of the measure. Supplier offer and other information can be enclosed. Name of supplier (yard/builder) Application form 18.8.2015 Name of measure technology supplier Estimated completion date of measure 2 Energy consumption for ships/plants where the measure is installed Last 3 yrs.* Total fuel consumption leading to taxed and non-taxed NOx emissions (ton/yr) Fuel consumption leading to taxed NOx emissions (ton/yr) Fuel consumption leading to nontaxed NOx emissions between installations on the Norwegian continental shelf (ton/yr) Number of days operating in areas subject to NOx tax** For offshore service vessels only Year: Year: Year: Estimated change in fuel consumption resulting from implementation of measure [%] *Estimated fuel consumption and number of days in waters subject to NOx tax shall be given for the first year with full operation for new buildings. ** If operation does not cover full days in areas subject to NOx tax, calculate days as number of hours divided on 24 per day Reduction of NOx emissions subject to NOx tax NOx factor before NOx reducing measure (kg NOx / ton fuel): NOx factor after NOx reducing measure (kg NOx / ton fuel): NOx emission before measure*** (kg/year) What is the source of the NOx-factor: ☐ Customs standard factor. ☐ EIAPP certificate, with technical file ☐ Emission measurement carried out by accredited company ☐ Other (please specify)............................................. What is the source of the NOx-factor: ☐ Customs standard factor. EIAPP certificate and technical file Emission measurement carried out by accredited company Other (please specify)............................................. NOx emission after Estimated NOx reduction*** measure*** (kg/year) (kg/year) *** Documentation of how NOx-emissions are calculated shall de enclosed. Application form 18.8.2015 3 Emission reduction between installations on the Norwegian continental shelf NOx emission before NOx emission after measure Estimated NOx reduction measure (kg/year)*** (kg/year)*** (kg/year)*** *** Documentation of how NOx-emissions are calculated shall de enclosed. Consideration of why the measure is carried out Is the measure trigged by external conditions or demands e.g. motor breakdown, demand from the authorities, demand in tender or similar? ☐ No ☐ Yes, please specify: Financial information Additional cost for the measure (NOK)**** Applied support (NOK) **** Documentation showing specification of included costs shall be enclosed. Off-hire costs shall not be included. Bank account number for payment of support Name of bank Account number IBAN number (if non-Norwegian bank) SWIFT code (if non-Norwegian bank) Signature Name: Date: Enclosure Supplier offer and information about the measure Calculations and specifications of NOx-reduction and costs For LNG measure on ship, kindly enclose the form "LNG cost specification" Application form 18.8.2015 4