P.O. Box 5250 Majorstuen NO-0303 Oslo Norway Form for self-declaration of SCR systems This form shall be used to verify the effect of the implemented SCR system through 3 or 12 months respectively, with continuous good operation after the implementation1. This forms the basis for the final investment support granted. By agreement with the NOx Fund an additional 3 months period may also be reported if this will give a more representative picture of the vessel's regular operating situation. The NOx Fund reserves the right, when found necessary, to utilise AIS data for the relevant vessel to verify information in the self-declaration regarding the activity level, fuel consumption in traffic eligible for support and pertaining estimated NOx-reductions where this is available and considered as appropriate. Information about the company and vessel/facility Company name: Organisation number: Postal address: Postal code: Contact person: E-mail address: Telephone number: Mobile phone number: Name of ship, rig or production unit: City: The NOx Fund’s reference number (cf. Commitment Letter): IMO number (call signal if any): Financial figures Costs for purchase of SCR system [NOK]: Please enclose a copy of all invoices for expenses If the granted support depends on currency exchange rates, please quote the exchange rate Account number for payment of support 1 Name of the bank: Account number: IBAN number (if a non-Norwegian bank is used): SWIFT code (if a non-Norwegian bank is used) : The verification period for self-declaration of SCR-systems was set to 12 months in January 2014 for vessels that are not operating in regular routes. For vessels with a minimum of 3 months verification period it is important that the chosen period is representative of the vessel's operation. Updated 17.03.2015 Page 1 of 3 Information on the applied-for measure – feasibility Type of measure (supplier, number of engines and their size, and other information describing the measure): Installation finished (date): Start of regular operation (date): Description of contracts for operation in waters subject to NOx tax and regular routes: Prospective supplementing comments to the operating situation and description of operating interruption: Monthly consumption of urea and fuel The columns below are only for offshore service vessels² Operation subject to NOx tax Year: Month no. Urea consumption with emissions subject to NOx tax in Norwegian waters (litres)¹ Operation between installations in Norwegian waters not subject to NOx tax Fuel consumption with emissions subject to NOx tax in Norwegian waters (tonnes) Urea consumption in operation between offshore installations (litres)² Fuel consumption in operation between offshore installations (tonnes) 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL 1. 2. litre tonnes litre tonnes When recalculating the urea's weight into volume, 1.1 kg per litre is used. The Environmental Agreement (The Environmental Agreement concerning reduction of NOx emissions for the period 2011-2017) point 4.1, 2nd paragraph: "When implementing measures on ships, also the effect the measure has on ship operations between permanent installations at sea within Norway’s economic zone may be credited to the reduction obligations in article 3.2, on the condition that such shipping is part of shipping that is in its entirety conducted between Norwegian ports, without docking at a foreign harbour or at permanent installations at sea outside of Norway’s economic zone, i.e. that the emissions are included in the Norwegian emission inventory." Updated 17.03.2015 Page 2 of 3 Annual consumption and emission figures Consumption urea (litre/yr) Consumption fuel (ton/yr) NOx emission before measure (kg/yr) NOx emission after measure (kg/yr) NOx reduction (kg/yr) Operation subject to support (eligible for support) Operation eligible for support between offshore installations¹ Total operation (operation eligible for support and other operation) 1. Applies only to offshore service ships. See note 2 on the previous page. Signature from responsible applicant at the enterprise Date: Signature: Attachments: Copies of all invoices for purchase of urea as well as expenses for the SCR system. Measurement certificates before and after the SCR system. Calculations Photo of the implemented measure. Updated 17.03.2015 Page 3 of 3