200 12th Street SE Copper Roof/Gutter/Downspout: October 2010 Because the prior roof was a metal roof, it required frequent repainting. We also suspect it was the original roof. Consequently, we made the decision to install copper to achieve a life-time roof which would require no further maintenance. To improve our energy efficiency, we also had insulation blown into the entire attic/crawl space under the roof, along with the installation of two copper wind turbines. The rear gutter and downspout are also copper. This was the same time we replaced the Mansard tile on the front. Roof Hatch Replaced original closed door hatch with sky light hatch that opens for roof access or simply cranks open to allow fresh air (with screen). Rear Brick Wall: May 2009 The rear wall was originally painted 3 different shades of brown. Therefore, we had all the paint stripped and brick pointed the rear wall, leaving the brick natural. At the same time, we had the chimney above the roof line rebuilt and added a chimney cap. Radiators: June 2010 Had all the radiators (7) stripped of 3 coats of paint and restored to their original condition. This is absolutely the best heating system we have ever experienced. Pipes All plumbing is now copper or PVC. There are no lead pipes. We also had the water company replace the main lead line with copper. 2nd Level Interior Wooden Doors All have been stripped of 2-3 layers of prior paint and stained antique white. Basement Level Replaced prior carpet flooring with tile throughout basement level, including closet with cedar walls. Bathrooms Both original baths were gutted and redesigned. Kitchen Redesigned, including oak cabinets, and Italian tiled floors & counter tops. 2nd floor Guest Bedroom Installed iron sink Patio Replaced chain link fence with wooden fence & iron gate entry; landscaped entire patio area with new iron stairs, slate, and cedar shed. Front Porch Replaced old porch with stand-alone structure, new flooring, and iron railings. Fans Installed fans (5) in all rooms on 1st & 2nd level, plus porch. Boiler: October 2008 Replaced original 50 year old boiler. Electric & Gas Usage Our combined monthly electric & gas billing is currently $114. HVAC Contract Heating & Air under maintenance contract, which expires April 30, 2016. Termite Contract Under contract with Connors Pest Control – quarterly inspections of the Sentricon system, expires April 30, 2016. Internet Service Currently with DC Access, a wireless service – antenna is on roof – willing to allow buyer have remaining contract (expires January 2016).