Background
North West Leicestershire District Council has a variety of outstanding deficient
double glazed units that require replacement in a large number of domestic
properties across a wide geographical area. These have been batched and now
require attention. As a result, NWLDC needs to carry out urgent repairs as quickly as
possible.
2.
Outputs and Deliverables
Measure all units accurately and replace as required. Glazing to units shall comprise
hermetically sealed flat units of 2 no. leaves of 4 mm clear or obscured glass air filled
cavities of not less than 16 mm width, the inner leaf to incorporate a low-E coating.
The thermal performance of glazing used will be such that it will enable finished units
to achieve a thermal performance (U-value) of not more than 2.0 W/m2K.
All work to be completed by the end of the financial year (2013 -2014)
Proposal Submission
Interested bidders are required to provide the following information:
Note: Bidders are required to respond to the questions below: Each response must
not be longer than two sides of A4. Responses over this length will not be taken into
consideration. Also please note your answers as 1, 2 and 3
(1)
Proposed methodology – which should include reference to the following (this
list is not exhaustive):
Surveying
Supply Chain Management
Making Appointments
Fitting DGU’s
(2)
Please provide evidence to demonstrate how your business has previously
managed the delivery of ad hoc repairs to double glazed units and
replacement /repairs to upvc window and doors including any lessons that you
have learnt. (Please include 2 references of previous similar work undertaken,
including contact details of referees);
(3)
A programme of work setting out the timetable or steps to be taken to
undertake the work. A list of properties will be supplied
3.
Timescales
Publish Advert
14th November 2013
Deadline for submissions
Evaluation complete and award of
contract
Contract commencement
25th November 2013
26th - 27th November 2013
4.
December 2013.
Evaluation / Selection of provider
The Council reserves the right to write to or meet with bidders for clarification on any
points included within their submission. The points discussed may result in scores
being adjusted either up or down. We also reserve the right not to award any
contract, in whole, or in part.
The evaluation of the quotations submitted will be done using the criteria and
methodology set out below:
Financial Evaluation
The financial element is weighted at 70% of the overall evaluation. It is anticipated
that fees will follow the guidelines set out below:
The submission with the lowest % fee will be awarded the full score of 70.
All other bids are scored using the formula: Bid’s score = (maximum score available)
x (lowest total cost / bid price
So for example, where there are 70 points available:
Bidder 1 submits the lowest price of £50
Bidder 2 submits a price of £65
Bidder 1 will score 70, as their price is lowest
Bidder 2 will score 53.84, based on the formula 70 x (50÷65)
Pricing schedule
£ (excl.VAT)
Carry out survey and measure up glazed units to
replace on semi detached house
Supply and Fit: Double Glazed Clear. 1m x 1.5m.
Reglaze unit with Hermectically sealed with 4mm
clear float glass, flush edge unit, hack out glass
and glaze new unit to any frame, touch up and
decorate
Supply and Fit: Double Glazed Clear. 600mm x
900mm. Reglaze unit with Hermectically sealed
with 4mm clear float glass, flush edge unit, hack
out glass and glaze new unit to any frame, touch
up and decorate
Supply and Fit: Double Glazed Clear. 600mm x
300mm. Reglaze unit with Hermectically sealed
with 4mm clear float glass, flush edge unit, hack
out glass and glaze new unit to any frame, touch
up and decorate
Supply and Fit: Double Glazed Frosted. 600mm x
900mm. Reglaze unit with Hermectically sealed
with 4mm clear float glass, flush edge unit, hack
out glass and glaze new unit to any frame, touch
up and decorate
Supply and Fit: Double Glazed Frosted. 600mm x
300mm. Reglaze unit with Hermectically sealed
with 4mm clear float glass, flush edge unit, hack
out glass and glaze new unit to any frame, touch
up and decorate
Equipment Costs
Added Expenses
Any Discount Given
Quality Evaluation
The quality element is weighted at 30% of the overall evaluation. The different
elements of the submission will be scored against a maximum number of points
available as follows:
Proposed Methodology (1)
Experience and references (2)
Programme of work (3)
10 points
10 points
10 points
The total Quality score will be added to the total financial score to give the Grand
Total of points scored and the contract will be awarded to the agent with the highest
points overall.
Insurance requirements
Agents will need to have the following insurances:Public Liability cover of
Employer Liability cover of
Professional Indemnity cover of
£10 M
£10 M
Not Applicable
Please submit copies of all insurance documentation within your proposal. However,
applicants are not necessarily required to hold the required levels of insurance prior
to contract award, but the Council needs to see a commitment to attaining the
required cover prior to commencing work if successful.
Payment
Payment will be made 30days from receipt of invoice and upon satisfactory
completion of the work.
Terms of Business
The successful provider will be required to enter into a formal contract (sample
attached as Appendix 1).
Please note: The Council reserves the right not to award the contract to the
lowest or any bidder, reserving also the right to accept the same in whole or in
part.
Deadline for Submission
Please submit your proposal (ensuring you have included everything requested) to
Dr Richard Whitmore; Richard.whitmore@NWLeicestershire.gov.uk by 4:00 on 25th
November 2013/
Contact
Initial contact and any queries should be addressed to;
Dr Richard Whitmore
Responsive Repairs Manager
North West District Council
Council Offices
Whitwick Road
Coalville
Leicestershire
LE67 3FJ
Telephone: 01530 454850
Email: Richard.whitmore@NWLeicestershire.gov.uk
Appendix 1
<Insert standard terms and conditions supplied by legal services>
Appendix 2
Specification for Double Glazed Units
Glazing And Infill Panels
4.5.1 Glazing to units shall comprise hermetically sealed flat units of 2 no. leaves of
4 mm clear or obscured glass air filled cavities of not less than 16 mm width,
the inner leaf to incorporate a low-E coating. The thermal performance of
glazing used will be such that it will enable finished units to achieve a thermal
performance (U-value) of not more than 2.0 W/m2K.
Where safety glass is specified it shall comply with BS. 6262 and Approved
Document N of Building Regulations and shall be either 6.4 mm thick
laminated or toughened glass. Safety glass specified in high-level situations
(2.1 m or more above ground level) shall always be laminated.
4.5.2 Glazing beads shall incorporate EPDM weather/glazing gaskets, either post
calibrated or co-extruded, to meet the requirements of BS.7412, para 4.3.
Beading shall be fitted internally and prevent removal of the sealed unit form
the outside but enable glazing/re-glazing without the need to remove frames.
4.5.3 All glazing shall be packed in accordance with BPF/GGF recommendations,
all beads shall be neatly cut to the correct angle and butt against adjoining
sections.
4.5.4 Infill panel shall be 24 mm thick composite panels comprising inner and outer
skin of 3 mm thick glass reinforced plastic with a polyurethane foam core of
density not less than 55 kgm3, inner face to be in smooth semi-gloss finish,
outer face to have coloured decorative textured finish. Panels shall be fixed in
the same manner as double glazed units.
Appendix 3
Stock Profile.
By age of property
Flats/Maisonettes Bungalows
Total:
1,020
812
Pre 1945
147
217
1945 – 64
449
307
1965 – 74
318
165
Post 1974
106
123
By number of bedrooms
Flats/Maisonettes Bungalows
Bed Sits
87
4
1 Bedroom
570
326
2 Bedroom
353
475
3 Bedroom
10
7
4 Bedroom
0
0
5 Bedroom
0
0
By Ward
Appleby
33
18
Ashby Holwell
63
27
Ashby Ivanhoe
14
113
Bardon
0
6
Breedon
2
4
Castle Donington
53
52
Coalville
62
9
Greenhill
137
150
Hugglescote
63
59
Ibstock and Heather
68
172
Kegworth and Whatton 61
22
Measham
118
22
Moira
64
83
Oakthorpe/Donisthorpe 34
0
Ravenstone/Packington 9
0
Snibston
7
2
Thringstone
63
48
Valley
41
6
Whitwick
128
19
By fuel type
Economy 7
217
88
Gas Central Heating
572
675
Oil
1
Solid Fuel
231
48
Total:
1020
812
Of the 4,480 properties, 329 are in sheltered schemes.
Houses
2,648
1583
133
66
866
Totals
4,480
1947
889
549
1095
Houses
0
1
406
2,087
149
5
Totals
91
897
1234
2,104
149
5
37
55
268
4
72
227
115
509
51
173
84
205
203
152
65
33
141
119
135
88
145
395
10
78
332
186
796
173
413
167
345
350
186
74
42
252
166
282
43
2033
2
570
2648
348
3280
3
849
4480
Download