Minidoka County School District #331 “We will increase instructional intensity in all classrooms through the use of Idaho Core Standards and by incorporating 21st century strategies to improve academic achievement and demonstrate growth for all students. ” Supplemental Levy Information - Facilities October 2015 The following Facility Projects were completed or are scheduled to be completed using Supplemental Levy funds. 2014-15 2015-16 Minico High School Minico High School Installed carpet in the administration area Replaced bleacher seats Roof over bay window above the library Cafeteria doors replaced Fire alarm repairs West Minico Middle School Installed carpet/flooring in classrooms Painted rooms getting carpet Replaced bleacher seats Mt. Harrison School Exterior doors replaced or upgraded East Minico Middle School Replaced bleacher seats Paul Elementary School Heat pump/HVAC Carpet in most classrooms Acequia Elementary School Propane tanks raised Playgrounds/District Wide Bark added in play areas Maintenance Purchased three riding lawnmowers Track estimated (start date May 2016) Fieldhouse roof (estimated start date fall/spring) Painting some hallways East Minico Middle School Installed carpet/flooring in classrooms Painted rooms getting carpet Rupert Elementary School HVAC control project in design and engineering Heyburn Elementary School Drop off parking completed DSC Roof redone in flat areas Classrooms moved Conference room remodeled Paul Elementary School Fire panel replaced West Minico Middle School Fire panel and system replaced Mt. Harrison Reconstruct field for roof drains Maintenance Replacement pickup truck w/ snow plow 2016-17 Proposed 2017-18 Proposed Minico High School Acequia Interior Doors & Locks Boiler Make Up Water Bleacher Repair Main Gym HVAC Engineering Study Mt. Harrison School HVAC Engineering Study East Minico Middle School Roof - Science Addition Restroom Stalls Paul Elementary School Exterior Doors & Locks Restroom Stalls & Fixtures 2 HVAC Engineering Study Carpet/Flooring Heyburn Carpet/Flooring Rupert Elementary School HVAC Engineering Study TSC/DSC HVAC Engineering Study Food Service Roof Maintenance Large Area Mower Replace Roof – Metal District Sidewalks Paint Asphalt Playgrounds Furniture Drop Off Lane Carpet/Flooring Rupert Elementary School Restroom Stalls & Fixtures Exterior Doors & Locks Paul Elementary School Roof and Down Spout Restroom Stalls & Fixtures 3 Cafeteria Ceiling Mt. Harrison HVAC - Phases 1 & 2 Interior Doors & Locks Carpet/Flooring Maintenance Vehicles Custodial Equipment District Sidewalks Paint Asphalt Playgrounds $1,230,000.00 Matched Non School Grounds $ 1,139,000.00 2