CII Southern Regional Power Conference Reliable & Affordable Power for All - Managing the Next Decade 5-6 December 2012 : HICC, Hyderabad Tentative Programme Day-I : 1000-1115 hrs : Inaugural Session 1000 hrs Welcome Ms Suchitra Ella Chairperson, CII Andhra Pradesh State Council* 1010 hrs Theme Address Mr S Chandrasekhar Chairman, Energy & Power Sub-Committee, CIISR 1025 hrs Special Address Mr M Sahoo, IAS Principal Secretary – Energy Government of Andhra Pradesh 1030 hrs Inaugural Address Mr Kiran Kumar Reddy* Chief Minister Government of Andhra Pradesh 1050 hrs Vote of Thanks Mr Krishnaram Bhupal Co-Chairman, Energy & Power Sub-Committee 1055 hrs Tea/Coffee Break 1130-1330 hrs : Session-1 : Panel Discussion on Short Term Measures to Tackle Power Shortage for the Next 5 Years 1130 hrs Session Moderator 1140 hrs Signature statements by Panelists 1155 hrs Mr Elias George, IAS* Additional Chief Secretary Power, Transport & MD, Kochi Metro Rail Government of Kerala Mr Ramesh Kumar Khanna IAS* Principal Secretary – Energy Government of Tamil Nadu 1210 hrs Mr M Sahoo, IAS Secretary – Energy Government of Andhra Pradesh 1225 hrs Mr D N Narasimha Raju, IAS* Principal Secretary – Energy Government of Karnataka 1240 hrs Discussion 1325 hrs Concluding Remarks 1330 hrs Lunch 1415-1615 hrs : Session-2 : Panel Discussion on Generation 1415 hrs Session Moderator Signature Statements by panelists 1425 hrs EPC – Total/BoP – Reducing construction bottlenecks 1435 hrs Availability and affordability of funds Incessant delays in project completion Rising input and raw material cost Mobilization and availability of skilled labour Mr Vinayak K Deshpande* Managing Director Tata Projects Ltd 1445 hrs Vendor/Mfg – Incorporation on the latest technology in equipments for the power sector Timely delivery of client requirements 1455 hrs Logistical issues associated with transportation of heavy equipment Challenges and competition from foreign entrants Foreign Investment and technology transfer Mr Banmali Agarwala* President & CEO GE Energy India 1505 hrs Regulatory Support in Energy Generation, while meeting the needs and constraints of the end consumer Policy challenges affecting addition to generation capacity 1515 hrs Managing generation tariff keeping in mind the ability of the consumers Mr A Raghotham Rao* Chairperson Andhra Pradesh Electricity Regulatory Commission 1525 hrs Mr Vijay Anand, IAS MD APGENCO 1535 hrs Developer Meeting Generation Targets to catalyze the Growth Momentum Challenges associated with concept to commissioning- Reducing the gestation period Improving Efficiency of generating plants to meet international standards. Reducing plant load factor and minimizing auxiliary Mr Krishnaram Bhupal Co-Chairman, Energy & Power Sub-Committee & Managing Director GVK Power (Goindwal Sahib) Ltd Mr A Pattabhi Raman Chief Executive Officer East Coast Energy Pvt. Ltd Mr N Venu* President – Power Systems Division ABB Ltd Mr K J Mathew IAS (Rtd)* Chairman Kerala State Electricity Regulatory Commission GMR consumption. Incorporation of newer technologies. Issues related to unstable price of international coal while adhering to PPA contracts Challenges related to import of equipments 1545 hrs Panel Discussion 1610 hrs Sum-up 1615 hrs Tea/Coffee Break 1645-1845 hrs : Session-3 : Panel Discussion on Transmission & Trading 1645 hrs Session Chairman 1705 hrs Transmission Plans for Southern Region Trading Issues in Southern Region Mr V Sekhar* Executive Director Power Grid Corporation of India Ltd Mr Venkat R Chary, IAS (Retd) Chairman Indian Energy Exchange Ltd 1720 hrs Transmission Plans for Southern Region Mr Hiralal Samaria, IAS Managing Director APTRANSCO 1735 hrs Open Access in Southern Region Mr Rajendra S Mirji Dy General Manager Tata Power Trading Company Ltd 1755 hrs PPP in transmission - prospects for SR Adani 1815 hrs Discussion 1840 hrs Sum-up Day-II : 6 December 2012 0930-1130 hrs : Session-4 : Distributing Affordable Power 0930 hrs Session Chairman Mr R Venkateswaran* Regional Executive Director (South) NTPC 0945 hrs Reforms in utility management and distribution models Mr Santhosh Kamath Partner and Lead Renewable Energy and Natural Resources KPMG 0950 hrs Efficiency measures to reduce distribution losses - Distribution Companies Mr Nandkumar R Pai Vice President Wartsila India Ltd 1005 hrs Viability of renewable sources Solar Power Dr Satyendra Kumar Chief Technology Officer Lanco Solar Pvt Ltd 1020 hrs Distributing Affordable Power Mr Vijay Bhalaki Director Athena Infonomics India Pvt Ltd Suzlon/Regen/ZF Wind Power 1035 hrs Mr Anantha Ramu, IAS CMD CPDCL 1050 hrs Discussion 1120 hrs Sum-up 1125 hrs Tea/Coffee Break 1145-1345 hrs : Session-5 : Panel Discussion on Fuel & Logistics 1130 hrs Session Moderator Signature statements by panelists 1140 hrs Gas IOCL* Outlook for Natural Gas in India – Status and Challenges (with special emphasis on policy ) in meeting the demand Developing gas assets Uncertainty related to reduction of domestic gas production Overseas exploration potential Foreign investment 1150 hrs Coal - SCCL, CIL , imported coal – CEPL Meeting the coal requirement for the next decade. Availability Mining Capacity and best practices in mining Development of coal blocks and rail connectivity Coal Linkage issues Challenges related to coal block allocations including discussion on the recent CAG report Ramifications of increasing dependence on imported coal Meeting fuel supply agreement and price pooling Developing the mining eco-system 1200 hrs Mr Sutirtha Bhattacharya, IAS* Chairman & Managing Director The Singareni Collieries Company Ltd 1210 hrs Connectivity The Coal ‘Block’’- Addressing bottlenecks in fuel logistics High line occupancy along with shortfall in wagon availability Need for wagon capacity enhancement Scope for Private operators in coal transportation Exploring Alternate Logistical Solutions – Coastal Shipping, issues and challenges Increasing Role of ports – Issues and challenges Commercial Officer Southern Railways 1230 hrs Overall/General – Feedback Infra Mr Rakesh Jain Associate Director Feedback Infrastructure Services Pvt Ltd 1240 hrs Discussion 1320 hrs Sum-up 1330 hrs Lunch 1220 hrs *confirmation awaited Mr M L N Acharyalu Executive Director - Marine Infrastructure Karaikal Port Pvt Ltd