KINGDOM OF CAMBODIA NATIONAL RELIGION KING 3 3 DEMAND FOR GOOD GOVERNANCE PROJECT World Bank-IDA-Grant No H4410-KH FIRST QUARTERLY PROGRESS REPORT January-March, 2012 OWSO/DO Prepared by: NCDDS/DST/OWSO (Date): May/25/2012 TABLE OF CONTENT I. SUMMARY PROGRESS ................................................................................................................................... 1 1.1 PROJECT CONTEXT ...................................................................................................................................... 1 1.2 KEY OUTPUTS: ................................................................................................................................................... 1 1.3 KEY RESULTS: ................................................................................................................................................ - 2 II. CASE STUDIES/LESSONS LEARNT .................................................................................................................. 5 III. PROJECT IMPLEMENTATION PLAN (PIP) AND ITS ACHIEVEMENTS ............................................................... 5 3.1 COMPONENT 1: EXPANSION AND STRENGTHENING OF THE OWSOS ............................................................................ 5 3.2 COMPONENT 2: EXTENDING AND STRENGTHENING THE CAPACITY OF THE DO ............................................................... 6 3.3 COMPONENT 3: IMPLEMENTING NEW FORMS OF CITIZEN PARTICIPATION AND OUTREACH .............................................. 8 3.4 COMPONENT 4: MONITORING & EVALUATION AND LEARNING TO ENSURE HIGH PERFORMANCE STANDARD IN OWSO AND DO ....................................................................................................................................................................... 9 3.5 COMPONENT 5: PROJECT MANAGEMENT ............................................................................................................... 9 IV. FINANCIAL AND DISBURSEMENT STATUS .................................................................................................. 14 V. PROJECT’S PROCUREMENT STATUS ............................................................................................................ 15 VI. EMERGING PROBLEMS/CONSTRAINTS AND SOLUTIONS ........................................................................... 18 VII. COMPLAINTS SUMMARY .......................................................................................................................... 19 VIII. RISKS MANAGEMENT MATRIX ................................................................................................................ 19 IX. RESULT FRAMEWORK ................................................................................................................................ 26 X. GOOD GOVERNANCE FRAMEWORK (GGF) .................................................................................................. 30 XI. LEGAL COVENANTS AND COMPLIANCE ...................................................................................................... 49 XII. ACTIONS TAKEN ON THE RECOMMENDATIONS OF THE AIDE-MEMOIRE OF THE PREVIOUS SUPERVISION MISSION OF THE WORLD BANK ...................................................................................................................... 50 XIII. CONCLUSION AND RECOMMENDATIONS ................................................................................................ 53 13.1 CONCLUSION ................................................................................................................................................. 53 13.2 RECOMMENDATIONS ...................................................................................................................................... 53 ANNEXES ........................................................................................................................................................ 54 ANNEX 1: OUTPUT INDICATORS ................................................................................................................................ 54 ANNEX 2: PARTNERSHIP REPORTING.......................................................................................................................... 57 ANNEX 3: SERVICE TRANSACTION BY PROVINCE AND LINE AGENCY.................................................................................... 61 ANNEX 4: SERVICE REVENUES BY PROVINCE AND LINE AGENCY ........................................................................................ 62 ANNEX 5: COMPLAINTS RECEIVED AND RESOLVED BY PROVINCE ...................................................................................... 63 I. SUMMARY PROGRESS 1.1 Project Context This report is the first Quarterly report for Component 1 C (OWSO and DOs) of the Demand for Good Governance Project of the year 2012. During this quarter project implementation was severely hampered by cash shortaged due to a low ceiling of the Designated Account and with guidance of the World Bank office in Phnom Penh and good collaboration of the Ministry of Economy and Finance every effort was made to resolve this constraint (which succeeded in April). 1.2 Key Outputs: The key outputs achieved in the first quarter, 2012 are, 1) AWP 2012 submitted to the World Bank for approval and (2) Joint decision document/Implementation Agreements for 23 municipalities, (3) the 4th implementation support mission conducted by the World Bank facilitated by NCDDS/DST, (4) Draft of CIC guideline as action plan and was submitted to the World Bank for comments, (5) First round – refresher orientation training on OWSO/DO and project management to all 23 municipalities’ staff, (6) Recruitment for 6 new target municipalities and back office staff responsible for agriculture services in all 23 OWSOs, (7) Procurement of 3 packages of goods and 10 packages of services, (8) Draft annual report for 2011, (9) Identification of the modality of OWSO/DOs in a rural district and the location of OWSO/DOs in 9 Khans and other four municipalities. Policy Framework: In this quarter, the Ministry of Culture and Fine Art issued a Prakas on the delegation of functions to 9 Khans throughout Phnom Penh Capital with an OWSO. The Ministry of Land Management, Urban Planning and Construction issued a guideline (dated March 21, 2012) on the delegation of its functions to six new municipalities (Preah Vihear, Senmonorom, Samroang, Stoeung Traeng, Pailin and Kep). In addition, the Ministry of Health issued the guidelines on the implementation of Prakas on functional delegation to OWSOs for health services (27 March 2012). Legal Covenant: In the first quarter, 2012, two activities related to the covenants were relevant. Firstly, Technical Advisory Group (TAG) meeting was organized as planned on February 16, 2012 which produced an agreement on the selection of OWSO model for rural district, Bavel district of Battambang province. The second is the submission of first quarterly progress report - to the World Bank through PCO on May 3, 2012. Capacity Building: NCDDS/DST organized three refresher training courses on project management of OWSO/DO, which covered three major topics such as implementation agreement management, administrative and financial management and reporting system for 17 existing OWSOs and the first orientation training for 6 new target areas. There was a total of 192 trainees from 23 minicipalities as planned. Communication and Information: NCDDS/DST produced an article on the orientation training course organized in Kampong Cham from 28 to 29 March 2012 which was disseminated through local media such as National Kampong Cham Radio (FM 92.5MHz), 1 Women’s Media Center (FM 102MHz), Reaksmey Kampuchea Daily Newspaper and Kampuchea Thmey Newspaper. NCDDS/DST also developed the draft CIC guidelines for CICs in all 37 target areas which was send to the World Bank for comments. Monitoring and Evalaution and Learning Activites: Due to initial work of National Technical Advisers for Monitoring and Evaluation and -Information Technology, the development and design of the Management Information System (MIS) could not be started as planned. The activity schedule was revised with timeframe from three months to six month for MIS design and development and the period of piloting was reduced from 6 months to 3 months. The assignment will start in April and will be completed in December, 2012. Gender Mainstreaming: For the 6 new target municipalities, 34% out of 102 recruited staff are females. In NCDDS/DST, the number of female staff increased with 2 women in this quarter. As a result, 26% out of the 408 personnel working for OWSO/DO project at all levels (including officials receiving POC, contracted, NTA and ITA staff) are females. Thirty-five per cent of 22,495 clients who came to 17 OWSOs to request a public adminstration service in the first quarter were females. Eighteen per cent of the 192 trainees from 23 target muicipalities who attanded the three orientation training courses were females. This reflects the composition of key provincial and district staff concerned. Partnership: In this quarter, NCDDS/DST continued to strengthen the partnership with 10 line Ministries that have delegated their functions to D/M/Ks with an OWSO (or plan to do so). NCDDS/DST signed MoU with Democracy resource center for National Development (DND) in January 11, 2012 to continue to promote new forms of citizens’ participation and outreach. In 2012, DND extended its activities to three new target municipalities (Bavet of Svay Rieng, Stoeung Sen of Kampong Thom and Banlung of Rattakiri province). On January 19, 2012, NCDDS/DST also signed a MoU with a new NGO named Advocacy and Policy Institute (API) to promote new forms of citizens’ participation in three target muninicipalities (Chbarmorn of Kampong Speu, Pursat of Pursat province and Kampong Chhnang of Kampong Chhnang province). Both partnership NGOs help NCDDS/DST with disseminating information related to Prakas/decisions/guidelines on functions delegated and OWSO/DO’s services provision and prepare citzens’ reporting card and provide feedback to the services of OWSO/DO (Please see more in annex 2). 1.3 Key Results: Cases received and resolved: The total number of cases received from complainants in the first quarter amounted to 985 and 57 out of those cases were real complaints related to dissatisfaction of OWSOs’ services, slow service provision and unofficial payment and 94% of those cases are reports, suggestion for improvement, letters of appreciations and request for information. Among 57 complaints, 42 complaints or 74% were completely resolved by DOs (Please see annex 5). Number of line ministries and functions delegated: In the first quarter this year, the number of line agencies that assigned service function to D/M/Ks with OWSOs did not change from last year. Total line agencies cooperated with NCDDS/DST numbered 9 Ministries/ institutions and total services assigned by those Ministries are 32 functions and 211 subfunctions. 2 Service transactions: The number of service transaction provided in this quarter amounted to 22,495 (Please see annex 3). If compared to the total number in the first quarter last year, it increases 52%. Seventy six percent of these were provided in the 9 OWSOs that were existing already in Q1/2011, while twenty four percent in those that were opened in October 2011. Interestingly the number of services provided in Battambang decreased by 13% compared to Q1/2011, while it increased with 49% in Siem Reap. In the other 7 OWSOs together, the number services provided increased with 3%, with a considerable decline in Stoeung Sen, Kampong Thom Province and a major incease of 123% in Suong and 112% in Peam Ro. Revenues: The revenue generated by 22,495 service transactions reported in 17 OWSOs amounted to 315,766,400 Riels or US$ 78,922. Thirty-six percent of these revenues were generated in Siem Reap and Battambang together, twenty-eight percent by the 7 OWSOs that were established in 2010 and 36% by those established in 2011. In the 9 “old” OWSO total revenues increased 20% compared to those in Q1/2011, with 6% decrease in Battambang. In the other OWSOs the revenues increased between 162% in Soung and 9% in Kratie. Total revenue in those established in 2010 increased 54%, while the number of services increased 3%. Table 1: Performance in Q1/2012 compared to Q1/2011 Prov. Code Municipalities PRE-DFGG BAT Battambang SRP Siem Reap 1st-Year Target BMC Poipet KDL Takhmao KPC Suong KPT Stoeung Sen KRT Kratie PHV Preah Sihanouk PVG Peam Ro GRAND TOTAL Q1, 2011 Nr. Of Revenues Trans. (Riels) 9,017 95,635,000 4,121 47,210,700 4,896 48,424,300 5,993 57,735,900 714 10,164,400 482 10,916,300 315 2,359,400 3,019 11,927,200 298 7,866,300 972 10,692,600 193 3,809,700 15,010 153,370,900 3 Nr. Of Trans. 10,922 3,603 7,319 6,161 1,346 578 703 1,195 461 1,469 409 17,083 Q1, 2012 Revenues (Riels) 114,642,000 44,447,600 70,194,400 88,736,900 24,447,600 13,316,000 6,175,000 15,988,900 8,597,500 14,449,300 5,762,600 203,378,900 Change (%) Nr. Of Revenues Trans. (Riels) 21% 20% -13% -6% 49% 45% 3% 54% 89% 141% 20% 22% 123% 162% -60% 34% 55% 9% 51% 35% 112% 51% 14% 33% Table 2: Key results of OWSO/DO project For Each Year Result 2008 (Baseline) 2009 Only 2010 Only 2012 (Up to Current Quarter) 2011 Only Q1 Q2 Q3 Q4 Total 2012 I. # of case received, case resolved and % of case resolved by DO 0 59 181 401 57 57 a. Case received 0 53 174 401 42 42 b. Case resolved 0 90% 96% 100% 74% 74% c. % of case resolved II. # of citizen service delivery transaction completed in OWSO in 17 municipalities a. # of citizen service 38,343 45,001 40,379 63,150 22,495 22,495 delivery transaction b. % change to previous 17% -10% 56% 52% -64% year (Actual) c. % change to previous 475% 46% 329% year (Target) III. # of line agencies/service delivery function asigned to OWSOs 7 7 7 9 9 9 a. # of line agencies b. # of service delivery 71 85 112 144 211 211 function assigned IV. Average cost recovery ratio (in %) of OWSOs (i.e., service fee revenue as proportion of operating cost) a. Revenue fee (million 36 344 334 707 315 315 riels) 4 Cumulativ e (2009 to Current Quarter) 698 670 96% 171,025 74% 9 211 1,736 Comment II. Case Studies/Lessons Learnt Based on the evaluation report of one year implementation -2011 of DND the lessons learnt is: I was demanded by someone to pay US$300 for my business license. Yet, after consulted with CB, I decided not to give him because it was too expensive to my small business. Then I came to the Municipal Office, I paid only US$50. “We learned that the capacity intervention alone to OWSO officials is not enough to address the problems of the beneficiaries, unless they have a decent salary. Now, they HOURNG Heng, Crapper Seller in Kratie are paid only US$50 per month to work fulltime. Still, they are committed, punctual, and not corrupted, but how they could survive with such a small salary. At the same time we learned that the incomes from the OWSO services are still too low. And in the text boxes are the voice of a beneficiary.” III. Project Implementation Plan (PIP) and its Achievements 3.1 Component 1: Expansion and Strengthening of the OWSOs Legal Framework: In this quarter the Ministry of Culture and Fine Art issued Prakas number 37 PRK dated January 23, 2012 to delegate its functions to nine Khans of Phnom Penh Capiltal. The Ministry of Land Management, Urban Planning and Construction issued Guideline number 006 SNN/RSN dated March 21, 2012 on the delegation of its functions to six new municipalities (Preah Vihear, Senmonorom, Samroang, Stoeung Traeng, Pailin and Kep). The Ministry of Health issued another guideline related to the prakas issued in late 2011 Renovation and construction of OWSO’s Building: The renovation of the OWSO/DO building in Battambang was fully completed. Even after contract negotiations, the contractor's price for the construction of OWSO/DO buildings in 6 municipalities remained 7% higher than the estimated budget. Yet, MEF approved an increase in the budget on March 20, 2012, and the contract will be signed early April 2012. NCDDS/DST also identified the location of and completed safequard screening for nine Khans and 4 new municipalities (Kampong Cham, Prey Veng, Svay Rieng and Serei Sophoarn). OWSO’s Staffing: So far, six out of seven new targets areas completed the recruitment of new staff. The recruitment of the staff in the rural district (Bavel) is awaiting approval of DPM. As a result, 102 total staff have been recruited of whom 34% are females. Therefore, total staff to date in national, provincial and muicipality offices is 408 people with 26% female. Equipement: In this quarter, NCDDS/DST also procured 22 motorbikes that were delivered to the new target municipalities. In addition, NCDDS/DST equipped its office with 10 office desks and chairs, one meeting table with chairs and five filing cabinets. 5 Staff Capacity Building: In the first quarter of this year, NCDDS/DST organized two refresher training courses for 17 existing OWSO/DOs and the first orientation training course for the six new OWSO/DOs on project management including three major topics such as implementation agreement management, administrative and financial management and reporting system. The first training course was conducted from 20 to 21 February 2012 for 10 Year 1 (Y1) target municipalities with 69 participants. The second was organized from 22 to 23 February 2012 for 7 Y2 target municipalities with 53 trainees and the third from 28 to 29 March 2012 for 6 new (Year 3) OWSOs with 70 particiapants. All three trainings took place in Kampong Cham province. 3.2 Component 2: Extending and Strengthening the Capacity of the DO Ombudsman Election: NCDDS/DST collaborated with the governors of 6 new target municipalities (Preah Vihear, Senmonorom, Samroang, Stoeung Traeng, Pailin and Kep) to complete the election process of DO chief. The one in Bavil could not yet be elected since the OWSO/DO in this rural district is awaiting the approval of DPM. Alligment Study between DO and PAWG: NCDDS/DST recruited one interantional and one national consultant to conduct the study on the alignment of the DO and PAWG that started on March 19, 2012 and will be completed on April 9, 2012. Complaints received and resolved: Table 3 shows that among them, the DOs received 47 complaints (including those originally classified as “reports”). Forty-two or 74 % were resolved within the same quarter (See annex 5). Two complaints were about requests for unofficial fees: one in Koh Kong and the other one in Prey Veng. NCDDS/DST will monitor the investigation by the DO 6 Table 3: Number of communications received, by Municipality Complaint No. Province Code Municipalities About OWSO 1 BAT Battambang 0 2 SRP Siem Reap 6 3 BMC Poi Pet 5 4 KPC Soung 0 5 KPT Steoung Sen 0 6 KDL Takhmao 0 7 KRT Kratie 1 8 PVG Peam Ro 6 9 SHV Preah Sihanouk 3 Sub-Total old offices 21 Per cent 6% 10 KAM Kampot 2 11 KCH Kampong Chhnang 2 12 KKG Khemarak Phumint 9 13 KSP Chbarmorn 0 14 PUR Pursat 4 15 RAT Banlung 0 16 SVR Bavet 0 17 TAK Takeo 9 Sub-Total New Offices 26 Per cent 4% GRAND Total 47 Percentage 5% Suggestion Req. Info Appreciation Report Total 0 1 0 7 1 0 6 6 0 21 6% 2 2 1 4 2 8 0 0 19 3% 40 4% 115 15 11 25 29 22 17 21 19 274 75% 60 30 45 57 287 37 0 7 523 85% 797 81% 1 3 16 1 1 1 7 0 0 30 8% 3 2 7 2 10 5 0 0 29 5% 59 6% 16 2 0 1 0 0 0 2 0 21 6% 0 1 2 17 1 0 0 0 21 3% 42 4% 132 27 32 34 31 23 31 35 22 367 100% 67 37 64 80 304 50 0 16 618 100% 985 100% 7 3.3 Component 3: Implementing New Forms of Citizen Participation and Outreach Information Campaign: The communication team of NCDDS/DST produced an article on the orientation training course organized in Kampong Cham from 28 to 29 March 2012 that was dessiminated through local media such as National Kampong Cham Radio (FM 92.5 MHz), Women’s Media Center (FM 102MHz), Reaksmey Kampuchea Daily Newspaper and Kampuchea Thmey Newspaper. Citizen Information Center: Guidelines for the CIC were prepared and send to the World Bank for comments. Disclosure of Information: In this quarter, project activity-related information was posted on the OWSO website to raise the public’s awareness of the project. Twenty-eight articles related to training courses, meetings, project events, procurement, news, legal and policy documents, service prices and multimedia files such as Ayay were uploaded and posted into the OWSO home page. The viewer filter tracking on the OWSO’s home page showed that 5,509 viewers accessed the home page during the first quarter this year. Of the viewers 86% were Cambodian and the others were from 39 different countries. Moreover, NCDDS/DST participated in the disclosure workshop organized by PCO on 6 March 2012 and thereafter updated its disclosure traking sheet and posted it together with other relevant documents in the OWSO website as required by PCO and the World Bank. Also the the participation in the workshop on Good Governance Framework organized by PCO on 14 February was considered very fruitful. OWSO’s Outreach and Feedback: As of end March, 2012 the first round of advertisement of the Requests for Expression of Interest (RfEoI) from NGOs was completed but there were not enough NGO applying for this assignment. A second RfEoI was advertised through Cambodia Daily, Raksmei Kampuchea and OWSO’s and NCDDS’ home page from 6th to 27th April 2012. NCDDS/IP3-SNA Capacity Development: During this Q1, NCDDS/DST collaborated with the IP3-Subprogram 2, prepared plan and detail budget for training of the D/M/K Councilors and Administrations and OWSO management. The training topics are focused on D/M/K Organizational Development Facilitation Skill, Administration Manual, and D/M Development Project Implementation Fund. The training materials for D/M/K Organizational Development Facilitation Skill were already developed and the training test will take place at the end of April 2012. 8 3.4 Component 4: Monitoring & Evaluation and Learning to Ensure High Performance Standard in OWSO and DO Development of Management of Information System (MIS): Due to late start of the work of both national technical advisers on M&E and IT, this activity will be started in the second quarter. It will take approximately six months to complete the first version of MIS for testing in few municipalities where OWSO/DOs exist. The piloting will take approximately 3 months. Lessons Learnt: ToRs were prepared for a national and an international expert to conduct a second round of Lessons Learnt formulation. 3.5 Component 5: Project Management At NCDDS/DST, there were 11 government staff working among whom there was only one female. At the sub-national level, there were 358 staff, with 102 out of them being recruited in the first quarter, 2012. Twenty – eight per cent of all staff were females. Eleven out of all sub-national administration personnel resigned and one retired in the first quarter this year. Two out of them were replaced and recruitrment of the other 10 others needs to be continued in the second quarter. Technical Staff and Advisers: Three local advisers (Information Technology, Monitoring and Evaluation and Commuication Adviser) were recruited and started their work in March, 2012. Three assistants were also recruited within this quarter (Capacity Building Assistant, M&E Assistant and Finance Assistant). One M&E assistant resigned at the end of March and the recruitment of her replacement started in March and will be completed in April. NCDDS/DST’s Events: In this quarter, OWSO organized three monthly staff meetings to follow up the project progress. Support to IP3-SNA Management: Seventeen annual Joint Decision Documents/Implementation Agreements were finalized and signed between NCDDS and provincial governor at the end of March 2012. As a result 17 municipalities continue to use the IDA budget to implement their planned activities related to OWSO/DO operation, POC, new forms of citizen participation and outreach. Project Coordination, Planning and Reporting: Three major activities were implemented in this quarter. Firstly, NCDD/DST formulated the annual work plan (AWP) for 2012 and submitted it to the World Bank for approval. Secondly, NCDDS/DST consolidated the annual report for 2011 and the first draft was submited to the World Bank through the Project Coodination Office (PCO). Thirdly, NCDDS/DST facilitated the fouth implementation support mission for the Demand for Good Governance Project that was undertaken by the World Bank from 12 to 23 March 2012. Summary Progress in ProjectImplementation Plan (PIP) Table 5 presents the summary progress of Project Implementation Plan (PIP), for which the following colours were used 9 1. Green : 2. Red 3. Yellow : : Implemented according to plan (Completed or ongoing for recurrent activities, such as payment of Operational Cost) target date passed (including monthly dates, Delayed) Due only in the next quarter activities (Ongoing) Table 4: Progress of project implementation plan Starting Date Component 1: Expansion and Strengthening of the OWSOs 1 Establishment of 1.1 Facilitate and Jan-12 Legal Framework coordinate relevant for setting up and ministries to prepare/revise extending the and deliver the Prakas on competencies of functions delegated to the OWSOs OWSO target areas 1.2 Prepare guidelines and Jan-12 decisions related to OWSO/DO 2 Preparation and 2.1 Identify location and Jan-12 Renovation of safeguard screening for OWSO buildings new OWSO establishment in 1 rural district, 4 municipalities and 9 Khans 2.2 Building structural Mar-12 analysis and soil testing of new OWSO offices in 9 Khans of Phnom Penh Capital 2.3 Design of new OWSO Mar-12 offices in 9 Khans of Phnom Penh Capital 2.6 Monitor building Jan-12 construction/renovation 3 Office Materials 3.3 Performance based Jan-12 /Equipment equipment No. Key Activities 4 Operational Costs 5 Staffing 6 Training and Capacity Building Description of Activity 4.1 Operational costs for OWSOs 5.1 Staff selection for 7 target areas in Y3 and back office staff for Agriculture and Health in all target areas 5.2 POC allowances for OWSO officers/staff in target areas 5.3 Incentives for DO chiefs and contract staff in target areas 6.1 Orientation training for all OWSO target areas (management of Implementation Agreement between NCDD and 10 Completion Date If not achieved or delayed, reasons: Ongoing Ongoing 28 March Bavel was completed on 11 April only Procurement Plan not approved in time. Ongoing Procurement Plan not approved in time. Ongoing Lack of clarity of PBEF Guidelines with regard to state of maintenance of existing equipment. Too low a ceiling for DA Jan-12 Jan-12 DPM’s approval for staff selection was received on 6 April Jan-12 Too low a ceiling for DA Jan-12 Too low a ceiling for DA Feb-12 29 Mar No. 7 8 Key Activities Update and Provision of Additional Information at OWSO Website and information on other services Study on rural district options Starting Date Description of Activity Provincial Admin, Admin and Finance Management, OWSO/DO Reporting System, etc.) 6.2 Training for 7 OWSOs in Y3 target areas (incl. OWSO/DO role, responsibilities, code of conduct, etc.) 7.1 Update and post all relevant information of OWSO/DO in OWSO Website 7.2 Information on other services Mar-12 Alignment of DO and PAWG Ongoing Jan-12 Ongoing 29 Feb Prakas on Bavel awaited Ongoing Ongoing 3.1 Study on options to Mar-12 Ongoing align the DO with the PAWG system Component 3: Implementing New Forms of Citizens Participation and Outreach 1 Setting up 3.1 Monitor and support Jan-12 Ongoing monthly citizen’s the Municipal/District hour in each target Governor to organize area monthly citizen's hour 2 Periodic Jan-12 Ongoing 2.1 Talkback programs on information the radios and TV campaigns on campaign OWSO and DO 3 Preparation for 3.1 Prepare guidelines for Jan-12 30-Mar the Info Center commencement of Jan-12 24 Feb 3.3 Recruitment of and information salary for National TA for centers at the communication OWSOs 4 Support to 4.1 Support to Jan-12 Ongoing NCDDS/IP3-SNA NCDDS/IP3-SNA capacity capacity development development 11 If not achieved or delayed, reasons: Late recruitment due to late Prakas Jan-12 8.1 Study on rural district Jan-12 options (only payment continued from 2011) Component 2: Extending and Strengthening the Capacity of the DO 1 Training and 1.1 Training on DO Mar-12 Election of election procedure for rural Ombudsman district 1.2 DO election for 6 Jan-12 municipalities and 1 rural district 1.3 Training for 7 DOs in Mar-12 year 3 target areas (budget included in C1, Act 4.2) 2 Setting up the 2.1 Performance based Jan-12 Office of the DO equipment (included in C1, Act 3.7) 3 Completion Date delayed until 18 April Only DO for rural district delayed due to late Prakas Late recruitment due to late Prakas Lack of clarity of PBEF Guidelines with regard to state of maintenance of existing equipment. Starting Completion If not achieved or Date Date delayed, reasons: Component 4: Monitoring & Evaluation (M&E), and Learning to Ensure High Performance Standards in OWSO and DO 1 1.1 Design of suitable Mar-12 automated MIS Development of 1.2 Phnom Penh Baseline Mar-12 Ongoing Management Study by NGO Information 1.3 Recruitment of and Jan 12 24 Feb System (MIS) salary for National TA for IT and National TA for M&E 2 Baseline and 2.1 Payment of Baseline Jan-12 17 Jan Midline survey and Midline survey in 2011 Component 5: Project Management 1 POC for national 1.1 POC for national staff Jan-12 Too low a ceiling of IDA staff 2 Office Operation 2.1 Office operation Jan-12 Ongoing Too low a ceiling of IDA and Equipment 2.2 Office equipment Mar-12 Ongoing for DST 3 Meeting/Worksho 3.1 Consultation meeting Mar-12 Ongoing p/field with partner ministries for monitoring/ function delegation to missions Phnom Penh Capital including TAG meeting 3.2 DST regular meetings Jan-12 Ongoing 3.3 Field monitoring and Jan-12 Ongoing support by DST and TAG 3.4 Information production Jan-12 Pending Procurement plan 2012 and IEC Materials (incl. has not been approved signboards, training yet. manual, etc.) 4 Support to IP34.1 Supplement for Admin Jan-12 Ongoing Too low a cash ceiling SNA and Finance Assistants Management 4.2 Office operation and Jan-12 Ongoing Too low a cash ceiling maintenance 4.3 Equipment and Feb-12 Ongoing motorcycle 5 Recruitment of Jan-12 Ongoing 5.1 Existing National TA and salary for (6 persons) support staff and 5.2 Existing International Jan-12 Ongoing TAs TA for project management 5.3 Existing national Jan-12 Ongoing contract assistant (3 persons) 5.4 New national contract Mar-12 Ongoing assistant (3 persons: M&E, CB and Finance) 5.5 New International TA Mar-12 Ongoing for financial management (part time) 6 Sustainability of Mar-12 Ongoing The first meeting on the 6.1 Prepare a sustainability OWSO/DO sustainability strategy is strategy on 23 April 2012. 7 Coordination, 7.1 Prepare and or revise Jan-12 Ongoing Planning, and OWSO/DO AWP 2012 Reporting system 7.2 Prepare quarterly and Jan-12 Ongoing No. Key Activities Description of Activity 12 No. Key Activities for OWSO/DO Project and IP3SP2 Description of Activity annual progress report of OWSO/DO 7.3 Prepare and or revise OWSO/DO AWP 2012 under IP3-SP2 7.4 Prepare quarterly and annual progress report of OWSO/DO under IP3-SP2 7.5 Prepare Implementation Agreement between NCDD/OWSO and IP3SNA 7.6 Participate and facilitate in meetings/workshops of SP2/MoI and or NCDDS 7.7 Program review (WB Supervision Mission) 13 Starting Date Completion Date Jan-12 Ongoing Jan-12 Ongoing Jan-12 If not achieved or delayed, reasons: 6/23 are still awaiting signatures; all other have been completed entirely Jan-12 Ongoing Mar-12 23 Mar IV. Financial and Disbursement Status Table 5.A. ACTUAL EXPENDITURE IDA (USD) Expenditure in this quarter Cumulative expenditure for this year till current quarter IDA RGC 17,375 21,283 80,304 45,954 88,316 17,607 61,933 315,164 17,607 Expenditure by Categories 1. Civil Works 2. Goods 3. Consulting Services 4. Training and Workshops 5. Operating Costs 6. MBPI 7. PMG 8. POC Total IDA 17,375 21,283 80,304 45,954 88,316 61,933 315,164 RGC 17,607 17,607 % Expenditure of the year against AWP Target IDA RGC 2% 0% 3% 0% 8% 0% 8% 0% 24% 11% 0% 0% 0% 0% 12% 0% 8% 3% Cumulative expenditure for the project till current quarter IDA 328,260 397,337 411,188 272,874 267,724 12,692 6,886 242,943 1,939,905 RGC 363,030 39,199 1,402 403,631 Table 5.B. DISBURSEMENT FROM IDA TO IAs (USD) Expenditure in this quarter Expenditure by Categories 1. Expansion of OWSO and DO to New target districts 2. Expending and upgrade and Strengthening OWSO of BAT the Capacity and SRP of the DO 3. Implementing New form of Citizen Participation and Outreach 4. M&E and Learning and Ensuring High Performance Standards in OWSO and DO 5. Project Management Total % cumulative expenditure against Revised Total Project Amount IDA RGC 28% 48% 32% 0% 33% 0% 36% 0% 43% 18% 90% 11% 100% 0% 22% 0% 32% 33% Cumulative expenditure for this year till current quarter IDA RGC 103,517 17,607 1,784 - % Expenditure of the year against AWP Target IDA RGC 7% 3% 1% 0% Cumulative expenditure for the project till current quarter IDA RGC 1,103,733 402,229 17,925 - % cumulative expenditure against Revised Total Project Amount IDA RGC 30% 33% 9% 0% IDA 103,517 1,784 RGC 17,607 - 71,939 - 71,939 - 7% 0% 129,180 - 14% 0% 36,335 - 36,335 - 15% 0% 72,670 - 19% 0% 101,589 315,164 17,607 101,589 315,164 17,607 9% 8% 0% 3% 616,398 1,939,905 1,402 403,631 66% 32% 11% 33% 14 These expenditures expressed as a percentage of the budget for Q1/2012 by categories are as follows: entire first quarter budget : 56% for IDA and 22% for RGC civil work : 42% for IDA goods : 64% for IDA consulting services : 47% for IDA training and workshop : 65% for IDA operating costs : 85% for IDA and 59% for RGC priority operating costs : 44% for IDA The shortfall in expenditure of 44 % for IDA and 78% RGC funds compared to the first quarter budget is primarily due to: 1. Cash shortage arising from too low a ceiling for the Designated Account, which affected payments for: - The office renovation of OWSO office in BAT municipality that was completed in March; - Salary of project consultants for March 2012. - The 22 motorcycles that were delivered to new target areas. - Trainings conducted. During this period, the project borrowed money from RGC fund for project training activities in amount of USD 21,250. - Operating cost, priority operating cost 17 provinces started. Funds were only transferred in the first week of March 2012. Those expenses will be liquidated with the project in April 2012. 2. Procurement plan delayed, leading to delays in implementation, including design of OWSO buildings, procurement of goods and other services 3. Delays in construction of 6 OWSO buildings due to too high a bidding price, with knock-on effects on the recruitment and training of staff, etc. V. Project’s Procurement Status In quarter 1, NCDDS/DST completed 3 out of 5 packages of goods which included 22 motorbikes, 6 desktop computers and one set of office furniture for NCDDS/DST and OWSO/DOs (See table 6). At the end of March, NCDDS/DST was processing procurement of construction services for 6 new muicipalities. The bidding price was higher than the budget even after contract negotiation. MEF approved additional budget on March 20, 2012 and the process will be completed in April. Moreover, procurment of 19 packages of services started within this quarter. Eleven of the 19 service packages were completed. Two out of 11 contracts were signed for extension from previous year and 9 were new contracts (M&E, IT, Commuication Adviser one national and international consultants for allignment study between DO and PAWG, three assistants and one driver). Among the eight that are not com- 15 pleted are three NGOs contracts for outreach and feedback which had to be readvertised because of lack of interest of NGOs. Table 6: Procurement progress Categories: Goods Completed (according to plan): 3 packages: OWSO-G11-1: Supply and delivery of 22 motorbikes; OWSO-G12-01: Supply and delivery of 6 Computer desktops for admin and finance assistants in provinces; OWSO-G12-11: Office Furniture (10 desks/chairs, 1 set of meeting table including chairs, 5 filing cabinets) for NCDDS/DST. In progress: Delayed: Reason for Delay: 2 packages: OWSO-G12-10: Supply and deliver office equipment (Lot 1: 10 computer desktops+2printers, Lot2: 1 digital camera): it is in evaluation process; OWSO-G12-12: 1 Vehicle for DST: it is in preparation of specification. Civil Works 6 packages: OWSO/DO Construction for 6 target areas using RGC Fund, Y3: For 4 packages letters of acceptance were issued OWSO/DFGG/C W 11-17: OWSO/DO Building in Steung Treng Municipality, STG Province. OWSO/DFGG/C W 11-19: OWSO/DO Building in Preah Vihear Municipality, PVR Province. OWSO/DFGG/C W 11-20: OWSO/DO Building in Samroang Municipality, OMC Province. OWSO/DFGG/C W 11-21: OWSO/DO 16 Too high a contractor’s bid Categories: Completed (according to plan): In progress: Delayed: Reason for Delay: Building in Pailin Municipality, PLN Province. Services National Individual Consultant: (10 packages: 2 contract extensions and 8 new signed contracts) 2 contract extensions: OWSO-CS12-6: Contract extension for NCDDS/DST AdvisorOperations. OWSO-CS12-11: Contract extension for NCDDS/DST AdvisorCapacity Building & Planning. 8 new signed contracts: OWSO-CS-IC12-15 (NTA): NTA-Study on Options to Align the DO with the PAWG System. OWSO-CS-IC12-16: NCDDS/DST IT Advisor. OWSO-CS-IC12-17: NCDDS/DST M&E Advisor. OWSO-CS-IC12-18: NCDDS/DST Communication Advisor. OWSO-CS-IC12-19: NCDDS/DST M&E Assistant. OWSO-CS-IC12-20: NCDDS/DST Capacity National Individual Consultant 3 packages: Consultant for Designing of Training in Transparency and Access to Information: PRC signed on the evaluation report. OWSO-CS12-7: M&E Assistant: job announcement for a new M&E Assistant to replace an old assistant who just resigned. OWSO-CS-IC11-22: (Lot1) NTA-Design and structural analysis of 5 OWSO offices in Phnom Penh: TOR and REOI were sent to the Bank for comment. NGOs: 4 packages: were advertised in the newspapers and posted on the websites: OWSO-CS-NGO12-01: Conduct Baseline Study for Phnom Penh by 17 2 packages waited for decision on new location: OWSO/DFGG/C W 11-16: OWSO/DO Building in Senmonorom Municipality, MKR Province. OWSO/DFGG/CW 11-18: OWSO/DO Building in KEP Municipality, KEP Province. National Individual Consultant OWSO-CS-IC11-22: (Lot1) NTA-Design and structural analysis of 5 OWSO offices in Phnom Penh: TOR and REOI were sent to the Bank for comment. Firm: 1 package: OWSO-CS-IC1122: (Lot2) Firm-Soil Testing of 7 OWSO offices in Phnom Penh: Bidding Document and REOI were sent to the Bank for comments. International Individual Consultant Slow decision making process in Muncipalities The decision on location, size, and stories of the 9 buildings to be constructed in the 9 Khans was just issued by Phnom Penh Municipality Governor on February 15, 2012. Late approval of location by Phnom Penh Governor (15 Feb), followed by 6 weeks of searching World Bank’s comments to ToR and Bidding Documents Categories: Completed (according to plan): Development Assistant. OWSO-CS-IC12-21: NCDDS/DST Finance Assistant. DFGG/MOI-OWSO/11009: NCDDS/DST New Driver (replaced the old one who resigned). International Individual Consultants: 1 package: OWSO-CS-IC12-15 (ITA): ITA-Study on Options to Align the DO with the PAWG System. In progress: Delayed: NGOs (done by CKP/IPA). OWSO-CS-NGO12-02: NGOs for Outreach and Feedback to OWSO (Group1: Battambang, Siem Reap, Banteay Mean Chey and Pailin) OWSO-CS-NGO12-03: NGOs for Outreach and Feedback to OWSO (Group2: Kandal, Preah Sihanouk and Koh Kong). OWSO-CS-NGO12-04: NGOs for Outreach and Feedback to OWSO (Group3: Takeo, Kampot and Kep) 1 package: OWSO-CS-ITA1201: ITA-Finance Advisor: decision from the management on MOU. Reason for Delay: VI. Emerging Problems/Constraints and Solutions Table 7: Issues and challenges No 1 2 3 4 5 Emerging Problems/Constraints Proposed/Actual Solution The problem of staff resigning has not been resolved yet. In the first quarter, 11 people resigned for various reasons (4 in Prey Veng, 4 in Preah Sihanouk, 2 in Suong and one in Pursat) and one retired (Siem Reap) Low ceiling of designated acount The accounting software is not well functioning Late approval of procurement plan by the World Bank and MEF Lack of interest from consultants/NGOs 6 Late submission of monthly and quarterly report from some target OWSO/DOs to NCDDS/DST 7 Lack of citizens ‘participation in 18 NCDDS/DST will collaborate with subnational adminstration and line departments to recruit and train those replacements and investigate the cause of resignation. NCDDS/DST has requested to increase the ceiling from USD 300,000 to USD 600,000 since March, 2012 Peachtree will be used instead of Conical Hat software The World Bank and MEF speed up the approval process of the procurement plan NCDDS/DST readvertised and request for NOL from the World Bank Chief of OWSO and DOs should send soft of copies of the report through district adviser or DITA by e-mail to NCDDS/ DST, if internet is not available. NCDDS/DST has to regularly remind and confirm this with chief of OWSO and DOs. Increase dissemination through media and 8 OWSO/DOs fora and demand for services due to limited dissemiation of OWSO and DOs and lack of understanding of OWSO/DOs 8 new target OWSOs did not yet deposit revenues in provincial treasury due to lack of the understanding of MEF guideline NGOs NCDDS/DST will cooperate closely and immediately with MEF to strengthen the implementation of the guideline VII. Complaints Summary In this quarter, NCDDS/DST received two anonimous complaints through OWSO website related to the breach of code of conduct in Bavet municipality which also relate to the presence of a middleman. Based on the complaint, NCDDS/DST conducted an investigation. Consequentlty, NCDDS management instructed the governor to (a) resolve the issue, ensuring that service delivery procedures and the code of conduct are strictly followed, (b) improve working relationship in the OWSO, (c) report back to NCDDS and (d) consult with the municipality council to assess the performance of the DO. VIII. Risks Management Matrix In the reporting period there were no changes in terms of score or likelihood and consequence of NCDD/DST except that risk 2 (Relevant Line Ministries in Phnom Penh Capital are not sufficiently prepared to delegate functions to new and additional competencies to the existing OWSOs.” ) was removed because it is almost identical to risk Nr 1 (The Prakas from the ministries for the delegation of competencies to the new OWSOs especially for the Phnom Penh capital do not come into effect in time). 19 Table 8: Updated risk management matrix Risk Description Risk Impact 1. The Prakas from the ministries for the delegation of competencies to the new OWSOs especially for the Phnom Penh capital do not come into effect in time The start of the new OWSO will be postponed or the OWSOs will start with less services Risk Score/ Magnitude Consequence: 4 Likelihood: 3 Risk Score:12 M Mitigation Strategy Action Agents Through the series of TAG meetings and coordination, the competencies (Prakas) from concerning Ministries to OWSOs. NCDDS/DSTand TAG Action undertaken (Give details of tasks completed) Q1/2012: The NCDD-S arranged TAG meeting in Feb 2012 to review the potential OWSO for rural district after the study. Ministry of Culture and Fine Art issued Prakas on the delegation of functions to OWSOs - in 9 Khan throughout Phnom Penh Capital. MLMUPC issued letter of instruction number 006 dated in March 21, 2012 on the delegation of its functions to six new municipalities (Preah Vihear, Senmonorom, Samroang, Stoeung Traeng, Pailin and Kep). In addition, 20 Remaining Action (Give resource requirements and timelines) The Prakas of Ministry of Education, Youth and Sport will be issued in 2012 Prakas on delegation of competencies of four ministries (, MoH , MPW&T , MoT inistry of Tourism, for the 7 OWSO/DO targets are being prepared The DST will coordicate with the line Ministries to review the delegated functions through the TAG meeting and organize a joint field visit in June-July, 2012. All line Ministries will issue Prakas on delegation of functions to 9 Khans in Phnom Penh Capital and 4 new Risk Description Risk Impact 2. The RGC does not have the financial means to make the necessary offices for the OWSO and Ombudsman available in year 3 The project goals will not be met. 3. Failure of RGC funding for recurrent cost OWSO will not function properly Risk Score/ Magnitude Risk Score: 8 M Q1/2012: Consequence: 4 Likelihood: 1 Risk Score: 4 L Consequence: 5 Likelihood: 1 Risk Score: 5 L Mitigation Strategy Action Agents NCDD-S will discuss with MEF the financial issues regarding the budget for the buildings. OWSOs might be funded by WB or other development partners. NCDD-S Fully implement agreements and commitments. Prior and ongoing consultations with MEF. Preparation and monitoring of financial sustainability model and strategy to replace donor funded POC with incentives funded from OWSO’s revenues. WB and RGC 21 Action undertaken (Give details of tasks completed) the MoH issued a guideline on the implementation of Prakas on functional delegation. (27 March 2012). Q1of 2012: USD376,237.29 of RGC budget for 7OWSO/DO buildings in year 3 was approved by MEF on 20 March 2012 (No. 1666សហវវស) MEF approved the proposal for USD 422,180 for 7 buildings and operational costs of 7 target areas in year 3. (No. 1533 សហវ-វស dated 23 March 2011) NCDDS/DST discus with MEF and line Ministries about the financial sustainability strategy of all OWSO/DOs in the annual workshop which conducted in Remaining Action (Give resource requirements and timelines) municiaplities in 2012. Only one more requests for RGC commitments will be needed for operational costs in three months until the end of the project A sustainability strategy will be formulated in Q2/ 2012. Risk Score/ Magnitude Risk Description Risk Impact 4. Lack of Incentives for the staff in the OWSO means that official staff do not perform well, especially after expiry of DP funded POC scheme Unmotivated officers. Temptations for staff to take bribes. Lack of qualified staff to work in OWSO Previous Quarter: Consequence:4 Likelihood: 4 Risk Score: 16 H 5. Lack of staff capacity or qualified staff/officials to deliver quality services to the public Credibility of the OWSO program eroded. Loss of trust of the people Consequence: 4 Likelihood: 2 Risk Score: 8M Mitigation Strategy Seek other ways to encourage staff /officials to volunteer to work in the OWSO’ office. Use OWSO’s revenues to cover operations cost, including incentives for the staff. Negotiate with MEF about the strategy to replace donor funded POC with incentives funded from OWSO’s revenues. Continue to provide extensive orientation training to all OWSO staff and also technical training to all BO staff. Where necessary, the amount of training must be increased. Seek others ways to encourage staff/officials to encourage them to volunteer to work in the OWSO’ office. 22 Action Agents RGC/NCDD-S NCDDS Remaining Action (Give resource requirements and timelines) Action undertaken (Give details of tasks completed) December 2011. Q1/2012: The fourth support mission confirmed that POC scheme is approved by WB until the end of the project. Q1/2012: 2 refresher-training and one orientation courses on the OWSO/DO Project Management (including Implementation Agreement management, administrative and financial management, and reporting system of OWSO/DO) were organized in February and March A sustainability strategy will be formulated in Q2 2012 . NCDDS/DST will provide training on roles and responsibilities, work performance and code of conduct to 7 new OWSO.DOs in MayJune, 2012. NCDDS/DST will coordinate with line Ministries to provide techical training on functions delegated Risk Description Risk Impact Risk Score/ Magnitude Mitigation Strategy Action Agents Action undertaken (Give details of tasks completed) respectively. 6. Sustainabili ty of the OWSO expansions beyond DFGG Project Public demand for services will be unmet and the expectations raised during the Project will be similarly unsatisfied Consequence: 4 Likelihood: 2 Risk Score: 8M During the project period, NCDDS build a track record and demonstrate to the RGC the demand for OWSO/DOs. It could use this track record to secure RGC’s commitment to support the OWSOs after the DFGG project cycle. Seek fund from international agencies, development partners interested in supporting local governance reforms. In line with the National Program, integrate OWSO in the existing institutional setup of the District/Municipality /Khans Strengthening the 23 NCDDS/DST The 9 Ministries have actively participated and supported the expansion of the OWSO/DOs to new target municipalities/districts through issuance of competencies, conduct training and provision of technical support to the OWSO/DOS. Integration of OWSO/DOs into SP2 of IP3. Prakas No.740 of MEF dated 4 Oct 2010 on creation of the operation budget for OWSO/DOs. Guidelines, No. 001 dated 6 Jan 2011 on the budget preparation and implementation of OWSO/DOs. All OWSO/DO staff, were trained on roles Remaining Action (Give resource requirements and timelines) to all OWSO/DOs in June-September, 2012. Publish the achievements of OWSO/DOs (Continuously since Q4/2011) Finalize Prakas on one office to supptort OWSO/DOs in 2012 Sustainability strategy will be developed in the second quarter, 2012 and approved before 2013. Risk Description Risk Impact Risk Score/ Magnitude Mitigation Strategy Action Agents capacity of officials and relevant staff based at target Municipalities /Districts. Loss of trust Diminishing credibility of the Government Consequence:4 Likelihood: 2 Risk Score 8 M Random Inspections of the OWSO at least 4 times a year by the national level. Code of Conduct prominently displayed in all offices Strong punitive actions (in Consultation with Provincial Governor) in case of 24 Remaining Action (Give resource requirements and timelines) and responsibility, good governance concept in Cambodia, procedure and preparation forums, meeting, DO Selection, mechanism of complaints handling. Back Office officials were trained by the ministries on technical competencies. NCDD-S will establish an office under the General Department of Local Administration to directly support and monitor the OWSO performance. 7. Corruption – poorly salaried service staff at OWSO counters receives or extorts bribes for services rendered. Action undertaken (Give details of tasks completed) NCDDS/DST/OWS Os MOI has drafted Prakas on restructuring the GDLA by including one office responsible for supporting and monitoring OWSO/DOs. Q1/2012: In all OWSOs, the code of conduct were issued and displayed as instructedby NCDDS 8 of 17 OWSO/DOs have placed signboard in OWSO as instructed by NCDD/DST such as Continued implementation of the mitigation strategy (see fourth column) Risk Description Risk Impact Risk Score/ Magnitude Mitigation Strategy behavior conflicting with Code of Conduct. A confidential Customer Complaints Procedure is prominently displayed in all offices. Fees and response time for public services to be prominently displayed in all offices. Improved outreach activities raise awareness of the client population about service standards, SOPs and codes of conduct, etc. through: - Talkback Program - Random inspections by the Ombudsman - Comparison of the cash balance and receipts - Questioning of 25 Action Agents Action undertaken (Give details of tasks completed) : 1. "Do not pay more than the officially fees" 2. "If you are not happy or have any complaints about OWSO staff or the services, please contact Tel # ( Municipality governor , OWSO chief and DO chief) 3. Roles and functions of DO Broadcast everyday OWSO/DO short video at TVK started from 2nd April 2012 until Mid May 2012 In March 9, 2012, NCDD/DST conducted a visit to OWSO/DOs in Bavet municipality to investigate an aninomous complaint. NCDDS/DST has conducted ... visits to Remaining Action (Give resource requirements and timelines) Risk Description Risk Impact Risk Score/ Magnitude Mitigation Strategy Action Agents customers in Exit surveys - Feedback from citizen forum and public forum - Cooperation with Provincial Accountability Working Group 8. Not enough interest and participation in the forums Decreased accountability Consequence:3 Likelihood: 1 Risk Score: 3 L Intensive campaigning set up outreach activities by OWSO/ DOs with involvement of NGOs, LCFG. More communications and outreach by SA and NSA/NGOs as partner IX. Result Framework 26 NCDDS/DSTOWSO / Action undertaken (Give details of tasks completed) ..... OWSO/DO targets in 2010. Services fees have been continuously posted in OWSO website, and disseminated and displayed at the waiting room of each OWSO and through the leaflets. Code of conduct, reports and bid documents were disclosed. Q1 of 2012: NCDDS/DST signed MoU with DND and API for outreach and feedback activities of 9 target areas. In Jamuary 2012, NCDDS/DS Encouraged and participated in DND’s launching program in Banlung Stoeung Sen and Bavet. Remaining Action (Give resource requirements and timelines) Strengthen and encourage citizens in particiapting the forum through civil society from Q2 onward. The result framework has been revised by NCDDS/DST as discussed with the World Bank on March 27, 2012. Table 9: Result framework for monitoring and evaluation Indicators C=Continu ed from oldframework, N=New R=Revised Baseline [Year] Cumulative Target Values and Actual Values (underlined) 2009 2010 2011 2012/ Endline Data Collection and Reporting Data Collection Instruments Responsibil ity for Data Collection Comment OWSO /DO Client Exit survey by NGOs (as part of NGO’s outreach and feedback) NGOs Only the adults who are in need of a service are expected to be aware and understand the OWSOs and 2/3 some of them the DO. DO records (reported in QPR) NCDDS/D ST The 101 % for 2011 includes a carry over of one complaint from 2010 that was resolved in 2011. PDO LEVEL INDICATORS 1.2: % of citizens in targeted districts, who a) are aware of services provided by OWSO (after 1 yr: 30 %, 2yrs 50 % andd 3yrs 60 %) b) understand services provided by OWSO c) are aware of the DO d) understand the DO R 2.3 Number of complaints: a) received by DO b) resolved by DOs (as % of number received) c) reported back to complainant by the DO C 1. Promoting DFGG in priority reform areas N/A N/A [2011] a: 24 % a: 60 b: 17 % b: 40 c: 4 c: 40 d: 2 d: 25 2. Mediating DFGG in priority reform areas a: 59 [2009] a: 59 a: 181 a: 401 a: 57 (Q1) b: 90% b: 96% b: 101% b: 100 % c: 100% b: 74% indicator C will be reported in Q2 27 Indicators C=Continu ed from oldframework, N=New R=Revised 2.4: % of DO clients who report a high confidence in the: a) independence, b) credibility and c) Effectiveness of the district complaints handling system. R 3.1: Number of transactions completed in OWSOs across targeted districts. a) BAT and SRP b) OWSOs established in 2010 (Y2) c) OWSOs established in 2011 (Y3) d) OWSOs established in 2012 (Y4) C 3.2: Percentage of: a) clients b) local officials who are satisfied with the quality of the services provided at OWSOs across the targeted districts 4.3: Percentage of OWSO clients who C Baseline [Year] N/A Cumulative Target Values and Actual Values (underlined) 2009 2010 2011 2012/ Endline N/A N/A a: 74 % b: 86 % c: 83% 3. Responding to DFGG in priority reform areas T: T: T: a:145,000 38,300 56,000 b:60,000 a: 38,343 a:45,001 c:35,000 [2008] ACC: ACC: (NB. 83,300 139300 cumulativ e) a:77,850 a:112,75 (Q1) b:5,520 0 a: 10,922 b:27,125 b: 6,161 c:6,645 c: 5,412 [2011] N a: 95 % b: 95 % c: 95 % [2011] N/A 5% increase 10 % cum. increase a: 93% b: 97% N/A 5% 28 a: 97 % b: 99 % N Data Collection and Reporting Data Collection Instruments Responsibil ity for Data Collection OWSO/ DO Client exit survey (as part of the Outreach and Feedback) NCDDS/D ST NGOs OWSO records NCDDS/D ST BaselineMidline survey OWSO/DO citizen survey. Client Exit NCDDS/D ST (Green Goal) NCDDS Comment The number for 2010 includes BAT and SRP for the whole year and the 7 Y1 OWSOs for only Q4. The number for 2011 includes 9 Y2 OWSOs for the whole year and the 8 Y3 OWSOs for only 6 months Indicators report paying unofficial fees. Nr. of cases reported about the provincial departments in target areas providing services that have been delegated to OWSOs a: OWSOs established < 2012-04-23 b: OWSOs established in 2012 C=Continu ed from oldframework, N=New R=Revised Baseline [Year] Cumulative Target Values and Actual Values (underlined) 2009 2010 2011 2012/ Endline New (since 2012) a: 0 % b: 5 % IO1.3: Number of line agencies/service delivery functions assigned to OWSOs. R I01.4 Cost and time takenfor processing OWSO services that are highest in demand: a) License for house constructions under 500 m2 b) Motorbike number plates (registration) c) License to open a restaurant d) Permission to display a banner of 2- 4 m2 e) License to open an Beauty Salon for weddings f) Beauty salons for weddings (Compared to cost and times of services N INTERMEDIATE OUTCOME INDICATORS Component 1: Support to State Institutions 10/122 10/122 10/148 6/71 6/85 6/112 9/144 9/211 (Q1) [2008] 36,000 108,000 Riels & 0 - 15 days, dependi ng on service [2011} 29 a- f : 50 % time an cost saving Data Collection and Reporting Data Collection Instruments Responsibil ity for Data Collection Survey NGOs Comment OWSOs reports to NCDDS/DS T OWSO records (reported in QPR) OWSO/DO citizen reporting cards. NCDDS/D ST NCDDS/D ST/NGOs Until now we don not have the baseline data for the two functions. API will conduct citizen reporting card and the questions realted to these are included. Indicators C=Continu ed from oldframework, N=New R=Revised Baseline [Year] Cumulative Target Values and Actual Values (underlined) 2009 2010 2011 2012/ Endline Data Collection and Reporting Data Collection Instruments Responsibil ity for Data Collection OWSO records (reported in QPR) NCDDS/D ST OWSO monitor IP3 monitoring OWSO QPR NCDDS/D ST Comment provided by provincial departments). IO1.5: Average cost recovery ratio (in %) of OWSOs (i.e., service fee revenue as proportion of operating costs, excluding RGC salaries)* a) SRP and BAT b) OWSOs established in 2010 c) OWSOs established in 2011 d) OWSOs established in 2012 IO1.6: Steps taken to integrate district complaints mechanism (DO) in IP3 subnational accountability system. IO3.3: Lessons (cases, reports, studies) and experiences from within the project are documented, and used in training and capacity building programs C 50% NA NA 60% NA 70% 53 % * a:214% b:45% c: 9 % d: a: 200 % b: 70 % c: 50 % d: 20 % N N/A No No Yes Yes R N/A N/A N/A Yes * Prakas; pilots; commitment to roll out. OWSO X. Good Governance Framework (GGF) Table 10, presents the updated good governance framework and reflects the commitment of NCDDS/DST to comply with all guidelines, procedures and manual provided by the Demand for Good Governace Project. Some measures have been taken and put into actual actions from early January to March, 2012 as shown in 9c, 9d, 9f, 9g and 9h of table 10 and in the highlighted text. 30 Table 10: Updated good governance framework Issue Action to Mitigate Risk 9. Element 9: OWSO-DO Specific Issues 9a Procurement Unless otherwise Responsibilitie agreed between the s of OWSO RGC and the IDA, MOI/NCDD will be responsible for the complete procurement cycle only for: (1) vehicles to be procured from UNOPS; (2) consultants where recruited through single source selection (SSS) procedures; and (3) any direct contracting that has received prior approval of the IDA. In such cases, procurement shall be undertaken in accordance with the Bank’s Guidelines and the procedures specified with SOP/PM, as mandated by MEF Sub-Decree No. 14 dated February 26, 2007. 9b Procurement NCDD shall assign Need to one qualified Action Plan for 2012 Target/Mon itoring Implementation Status as of 31 March 2012 MOI/NCDD with PCO oversight. IDA to monitor through prior or post reviews. Project Management Advisor was recruited and commenced work on September 6th, 2011. OWSO/DO subcomponent applied WB procedure in its procurement, requesting prior approval whenever required. In case of vehicles, SSS procedures, prior review and direct contracting OWSO/NCDDS has received the prior approval from IDA. Goods (office furniture and office equipment, motors, IEC materials), Civil works (OWSO/DO building construction), Consulting Service (Consultant/advisors and contract staff) are procured respectively and accordingly the procedures specified with SOP/PM. NCDDS/OWSO will continue to follow the Bank's guidelines and procedures specified with SOP/PIM (whole year) NCDD with PCO oversight NCDD to assign staff, New NCDDS Procurement Officer was Procurement Officer/advisor will Responsibility 31 Revised Target Date Any Resources Required Issue 9c Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 Action Plan for 2012 strengthen procurement capacity. government procurement staff or recruit one national procurement consultant to coordinate NCDD’s procurement activities with the IPA, MEF and WB and carry out the procurement specified in item 9a1. and IDA NOL if consultant is recruited. or start recruitment of consultant, after negotiations. Staff or consultant to be in place two weeks after effectiveness . assigned to replace the former one since Jan 2011 Recruited a national consultant for procurement on 1st June 2011. Procurement Officer and Operation & ME Advisor attended all procurement trainings, meetings and WS organized by PCO, WB and/or MEF. Procurement Officer gained knowledge on procurement from ITA for procurement (PCO) through a series of training and on- job training every week. attend all relevant meetings, WSs, trainings, especially on the job training organized by PCO, WB, and MEF. (whole year) International Management Advisor will also assist the Procurement officer and Advisor (whole year) Financial Management Strengthen financial management capacity. MOI/NCDD will designate a Project Accountant and appoint one accounting officer for central level duties on the OWSO-DO component, all under TOR acceptable to the IDA. MOI/NCDD with PCO assistance and IDA NOL. MOI/NCDD with PCO assistance. Agree TOR at appraisal. Admin and finance Officer appointed by September 2008. PCO Internal Audit Unit TOR of International Finance Advisor was NOL from WB on 31 Jan 2012 and the MOU is in the process of review and approval by project Director. Participate in capacity development activities and continue to use all reports and formats for the financial system of DFGG. (whole year) 1 9a. Procurement: Responsibilities of OWSO 32 Below are actions taken Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility MOI/NCDD will designate at least one accounting staff for each province in which OWSO-DO operations are being supported by the Project. 9d Financial Management Provide controls for disbursements for operating a. Controls for disbursement all OWSO-DO operating costs will be specified in detail in the FMDM. PCO (see item 2a)2 Action Plan for 2012 Target/Mon itoring Implementation Status as of 31 March 2012 to monitor accounting standards and IDA to verify accounting practice during supervision missions. Provincial staff already in place. PCO Internal Audit Unit to monitor accounting standards and IDA to verify accounting practice during supervision missions. (See item 2a) A NCDDS/DST Project Accountant was assigned formally in Jan 2011. Selected and trained 8 admin & Fin assistants for 8 target areas in year 2. Administration & Finance officer and Project Accountant attended the financial trainings, meeting and WS organized by PCO and or MEF Appoint a part-time International Finance Advisor (Q1/2012) Since January 2012, NCDDS/DST Informed the OWSO targets that have not displayed publicly the code of conduct/internal rule, NCDDS will follow up and provide regular back stopping to the 17 target areas every 3 months; 2 2a: strengthen internal control 33 Revised Target Date 1 May 2012 Any Resources Required Issue costs, especially at provincial level. Action to Mitigate Risk Responsibility Target/Mon itoring b. Ensure compliance of all staff to Code of Conduct and spirit of OWSO principles c. Take appropriate action if code of conduct is breached Implementation Status as of 31 March 2012 and signboards to ensure the compliance of all staff to code of conduct and spirit of OWSO principles Implementation Agreement (Gov contract) between NCDDS and 17 provincial governors were signed and used in March 2012 Refresher training on Financial management/financial reporting for 17 OWSO targets was conducted in February 2012 The workshop on preparation and implementation of Implementation Agreement was conducted in February 2012 In March, 2012 NCDDS/DST received two anonimous complaints through OWSO website related to the breach of code of 34 Action Plan for 2012 NCDDS will use Implementation Agreement (Joint Decision) for Financial Mgt/ fund allocations in 7 more targets in year 3 (whole year) NCDDS will continue to investigate complaints, rumors and accusations and take appropriate action if the code of conduct is breached (whole year) Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 conduct in Bavet municipalities which imply, contrary to all regulation a middleman. Based on the complaint, NCDDS/DST investigated and reported to NCDDS management for further action. NCDDS management instructed the governor to (a) resolve the issue, ensuring that service delivery procedure and the code of conduct are strictly followed, (b) improve working relationship in the OWSO, (c) report back to NCDDS and (d) consult with municipality council to do the performance assessment of the DO. Below are actions taken before 2012 a, b & c: Project Manager, Advisor for Policy, Advisor for Operations, and Advisor for Capacity Building investigated a rumour published in the 35 Action Plan for 2012 Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 newspaper about improper request for payments of the information campaign at the OWSO-Preah Sihanouk Municipality. NCDDS’s investigation did not find evidence to support this rumor but did discover that the Chief of OWSO was collecting quotations himself instead of letting the admin/ finance assistant collect at least 3 quotations. This was reason for NCDD to request the Governor to issue a general warning. H.E. SakSetha sent such a request in the name of the DPM. b & c: Project manager and Capacity development advisor conducted an investigation at Suong Municipality and reported to management level of NCDD-S. The investigation revealed that the chief of OWSO failed to comply with the Code of Conduct and 36 Action Plan for 2012 Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 had indeed adjusted the client's documents of a concert for selling Leo beer to the advertisement of Leo beer, and requested for informal payments from the client. The Governor of Kampong Cham province suspended the Chief of the OWSO, as per decision No. 124 សសរ កច dated 28 June 2011. He subsequently consulted with MoI and on 25 July 2011 MoI confirmed that the Governor’s measures were appropriate. a. Project Manager, Administration & finance officer, Operations advisor, project accountant, Policy advisor regularly backstopped the 9 target areas as planned. a. NCDDS Operations Advisor and Finance & Admin Officer conducted trainings/ orientations of relevant 37 Action Plan for 2012 Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 staff such as Admin & Fin assistants, Chief of OWSO/DO, district governors on FM & contract, disbursement for 17 target areas. a. NCDDS Operations Advisor, project accountant, Finance & Admin Officer and Project Manager and Project Director continue to follow the FMDM. a. NCDDS/OWSO prepared and used Govt contract Database for Financial Mgt/ fund allocations to 9 target areas for the year 2010. The Expenditure and financial reporting system have been computerized and will be expanded for year 2011 to another 8 target areas. a. NCDDS advisorOperations were selected and assigned to be responsible the Financial work. a. All relevant staff such as OWSO/DO staff, Finance and Admin assistant, Finance advisor/ PSDD, SPPAs 38 Action Plan for 2012 Revised Target Date Any Resources Required Issue 9e Disclosure Enhance the disclosure and transparency Action to Mitigate Risk NCDDS/DST will implement its communications strategy with assertive outreach methods to announce the services available, through advertisements in the national media and locally using megaphones and flyers. Responsibility NCDDS/DST in accordance with details in its approved Project Proposal. Target/Mon itoring To commence after effectiveness . PCO to monitor and IDA to verify during supervision missions Produce short video on OWSO/DO in addition other IEC materials Implementation Status as of 31 March 2012 at ExCom were oriented on FM of OWSO. Disclosure tracking sheet was updated and sent to PCOin March 2012 while a lot of necessary document/files were uploaded to OWSO website accordingly. DND and API assisted NCDDS and OWSOs/DOs in information outreach and feedback in the 9 OWSO targets started from JanDec, 2012 Informations and Communications strategy was revised in QTR 1 of 2012. Below are actions taken before 2012: Produced, distributed posters, calendars, Tshirts, diaries, stickers, brochures and leaflets on roles and functions of to 17 OWSO/DO target areas OWSO/DO to strengthen the public awareness and trust of citizen.s 39 Action Plan for 2012 Short video will be broadcasted by TVK from April 2nd 2012 to May 14th 2012. The revised information and communications strategy will be implemented in QTR 2 onward. of 2012 Continue the public awareness raising of the OWSO services through media locally using megaphones and IEC materials. Strengthening the effective mechanisms of NCDDS and DO in complaint handling and publish the findings of DO's investigations. Revised Target Date Any Resources Required Issue 9f Civil Society Role Enhance involvement with CSOs Action to Mitigate Risk MOI/NCDD will implement an annual Citizens’ Forum in all districts in which OWSO-DO services are available, open to all citizens and covering issues related Responsibility MOI/NCDD in conjunction with an NGO acceptable to the IDA, and in accordance with details in its approved Target/Mon itoring Starting when communicat ion and participation activities begin, and annually 40 Implementation Status as of 31 March 2012 Produced and distributed short Video, audio on OWSO/DO to 9 target areas, and to NSA like DND as partner to disseminate in accordance with its plan and project. All service fees are publicly displayed on the boards/walls of OWSO. Project Manager was a guest speaker - On air of RNK, Women Media center and Sarika radio respectively. OWSO website development completed (www.owso.gov.kh) and in use with complaint and feedback box for NCDDS Reports, project proposal, WP, Tracking disclosure, procurement tracking, etc., are posted in OWSO website. Actions from 1 January -31 March 2012: 2 MoUs with NSAs (DND and API) were signed in January 2012 to assist NCDDS in raising awareness and Action Plan for 2012 CSO representatives will be invited to participate in the evaluation of bids organized by NCDDS/OWSO. (whole year) Revised Target Date Any Resources Required Issue Action to Mitigate Risk to the OWSO and DO offices, and how these can be further improved. MOI/NCDD will implement a SemiAnnual Public Forum with both business and citizen representatives to receive feedback on OWSO and DO operations and suggestions for their improvement. Responsibility Project Proposal. MOI/NCDD in conjunction with an NGO acceptable to the IDA, and in accordance with details in its approved Project Proposal. Action Plan for 2012 Target/Mon itoring Implementation Status as of 31 March 2012 thereafter. Starting when communicat ion and participation activities begin, and biannually thereafter. collecting feedback in 9 OWSO targets areas ( Suong, PeamRoa, Stung Sen, Kratie, Svayrieng, Pursat, Kampong Chhnang, and Chbar Mon) for the whole year of 2012, after the series of consultation and meeting. 5 NGOs will be contracted in May 2012 to assist the administration and OWSO/DO in 14 provinces in their outreach activities and provide feedback. The bid opening of office equipment and digital camera was attended by NSA-CCSP among 3 NSAs invitedby NCDDS DND and API will conduct the similar activities in the remaining 9 OWSO targets. Below are actions taken before 2012: In 9 target Municipalities/ district Annual Citizen's Forums were conducted respectively by NGOs (hired) for all OWSO targets with the 250-400 participants. 17 semi-annual forums were conducted in the 9 target areas. For target areas covered by DND partner, the semi- annual forum was assisted and facilitated by partnerDND. 41 Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 In 9 target Municipalities/district semi-annual forums were organized with participants from NGO and business representatives to express the citizen's concerns and suggestions for improvement of service quality provided by district administration, particularly by OWSO/DO. MoU with DND (NGO) as partner in Prey Veng, Kratie and KPC, signed in Jan 2011 and start the partnership activities as agreed Communication officer and Policy advisor participated sharing lesson learned with 12 member-NGOs of LCFG. Communication Officer with support from Policy advisor made a presentation about OWSO/DO to WGPD members. Meeting with Asia 42 Action Plan for 2012 Revised Target Date Any Resources Required Issue 9g Complaints (Grievances) and Remedies Mechanism Complaints and grievances by citizens to the DO. Action to Mitigate Risk MOI/NCDD will supplement the Project-wide Complaints (Grievances) and Remedies Mechanism (item 5a) by designing, publicizing and implementing a simple procedure for citizens to make complaints to the DO. Responsibility MOI/NCDD with PCO oversight. Target/Mon itoring Procedure to be designed and in place by six months after effectiveness . Implementation Status as of 31 March 2012 Foundation on partnership and respond to local NGOs interested in applying the Grant from Asia Foundation. Promoted OWSO project and seek more partners in the TOT on Social Accountability (SA) training in Cambodian context organized by SILIKA. Distributed IEC to DND to disseminate information in DI forum and in the 3 target areas. For none MOU partners, NCDDS collaborated with Buddhism for Development in SRP, and with AMARA NGO in BAT. From 1January -31 March 2012: A study on the alignment of DO with (P)AWG started in March 19th and will be finished in April 9th 2012 by International and national consultants Overall, in Q1 of 2012, 43 Action Plan for 2012 NCDDS will hold discussions to persuade Chiefs of Communes and Chiefs of villages to report complaints they hear to DO. (April 2012) Strengthening of the quality of implementation and dissemination Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 44% of complaints were solved by DO (received: 57, solved: 42, transfered: 12, , nextstep solved: 3) Instructed the OWSOs/DOs in all target areas (17) to place signboard in OWSOs/DOs such as : 1. "Do not pay more than the officially fees" 2. "If you are not happy or have any complaints about OWSO staff or the services, please contact Tel # ( Municipality governor , OWSO chief and DO chief) 3. Roles and functions of DO Below are actions taken before 2012: In Q3 during PRC’s evaluation bidders of IEC, Sunway Publishing Company complained that PRC had made a wrong judgment. OWSO/DO Project Manager has resolved 44 Action Plan for 2012 Revised Target Date of complaint handling of DO both national and sub-national levels thru website, partners (NSAs and SAs) Broadcast OWSO/DO short video at TV and radio stations each target areas. (starting March 2012) Align DOs with Accountability Working Group of NCDD/IP3 (April 2012 onwards after the consultancy) From 2nd April to Mid May 2012 Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 successfully this case by sending a clarification to the company and CC to World Bank after the PRC meeting. PRC decided to cancel bidding process since Sunway was not able to give sufficient clarifications regarding the company’s ownership. To avoid the risk of rewarding collusion, PRC decided to cancel the bidding and re-advertise the request for EoI. In QTR 2, in 9 target areas, 107 complaints were received and all of them were resolved by DO Guidance to DO and district administration to strengthen the mechanism received and solved or coordinated the complaints/ grievances by citizens. Advisor for operation and communication officer attended Complaints Handling Mechanisms co-hosting by WB along with the 45 Action Plan for 2012 Revised Target Date Any Resources Required Issue 9h Informal Payments Piloting of OWSO has revealed that informal payments are sometimes requested for service Action to Mitigate Risk A list of official fees and response times for services which the OWSO is mandated to provide, together with copies of the Complaints (Grievances) and Remedies Mechanism (item 5a), procedure for complaints to the DO (item 9d), Code of Ethical Conduct (item 6a), and Sanctions (item 7a), will be publicly displayed in all OWSO offices. Feedback from users of the OWSO will be obtained from the Citizens’ Forum and Semi-Annual Public Responsibility MOI/NCDD with PCO oversight. Target/Mon itoring Public display at each OWSO office from the time it is established. PCO to monitor and IDA to verify during supervision missions. Implementation Status as of 31 March 2012 ADB and the MEF. Developed and put in place the procedures to handle Complaint report formats for DO. NCDDS Collected reports from DOs regularly. Complaint Handling Mechanism for National and sub-national level have been developed and is in use. Period of 1January -31 March 2012: 8 of OWSOs/DOs (17) have placed signboard in OWSOs/DOs as instructed by DST/NCDD such as : 1. "Do not pay more than the officially fees" 2. "If you are not happy or have any complaints about OWSO staff or the services, please contact Tel # ( Municipality governor , OWSO chief and DO chief) 3. Roles and functions of DO In addition to the instruction by telephone , 46 Action Plan for 2012 NCDDS will continue to place the same signboard in other OWSO offices as in Sihanouk (June 2012) The Code of Conduct for OWSO staff will be reinforced through a separate training session). Exit surveys will be conducted by NGOs to measure citizen’s satisfaction and to test whether or not informal payments Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Forum. Implementation Status as of 31 March 2012 M&E officer and Policy advisor have conducted field monitoring and instruction related to signboard to strengthen the transparency in service provision to 4 OWSO targets- (BAT, SRP, KPC and KDL) in March 2012 There was no rumour or complaint about corruption from OWSO target in Q1 of 2012. Below are actions taken before 2012: As instructed by NCDD/NCDDS PreahSihanouk has placed signboard in the OWSO with the following text: 1. "Do not pay more than the officially fees" 2. "If you are not happy or have any complaints about OWSO staff or services, please contact Tel # ( Municipality governor , OWSO chief and DO chief) All OWSO staff 47 Action Plan for 2012 are requested. (April.- May and Sept-Oct 2012 depending on the OWSO) NCDDS will continue to investigate rumors and accusations of informal payments. (whole year), if any The code of conduct will be included in the contract, and signed by contract staff/ consultants. (whole year) Use Ayay song and video/Audio at TV and radio stations to raise awareness about fees (starting March 2012) Revised Target Date Any Resources Required Issue Action to Mitigate Risk Responsibility Target/Mon itoring Implementation Status as of 31 March 2012 /consultants were trained on code of conduct, Internal rule/regulations and sanctions before they started their work. The code of conduct of project staff, sanction, and internal rule and regulation at 9 OWSO targets has been displayed on the walls of some OWSO since their commencement. All service fees are publicly displayed on the information boards/ wall of OWSO at each target. The DOs’ responses to letters /complaints collected from suggestion boxes were given to the complainants and made public during meetings and forums. Developed and put in place the procedures of Complaint handling and report formats for DO Circulated and displayed the reports, result of the complaints resolved by DO. 48 Action Plan for 2012 Revised Target Date Any Resources Required XI. Legal Covenants and Compliance As per the Financing Agreement, NCDDS is committed to deliver some activities such as the submission of the progress reports to the World Bank, convene meetings of Technical Advisory Group (TAG). The following table presents these activities. Table 11: Updated legal covenants and compliance Activity Responsible Agency Expected Outputs Expected Delivery Progress as of March 31, 2012 N/A Submit to World Bank / MEF comments to financial auditors’ reports 2011 NCDDS through PCO Agreed Financial auditor’s reports 2011 30 June 2012 Submit 1st quarterly report 2012 to World Bank NCDDS through PCO 1st quarterly report 2012 22 April 2012 Submitted to PCO on 30 April 2012 Submit 2nd quarterly report 2012 to World Bank NCDDS through PCO 2nd quarterly report 2012 22 July 2012 N/A Submit 3rd quarterly report 2012 to World Bank NCDDS through PCO 3rd quarterly report 2012 22 October 2012 N/A Submit annual report 2012 to World Bank Establish baseline for Phnom Penh NCDDS through PCO Annual report 2012 15 February 2013 N/A NCDDS Baseline Database and report July 2012 Review of procurement plan (incl. specification of Performance Based Equipment) NCDDS Revised procurement plan September 2012 Transfer of recurrent cost to the OWSO/DO NCDDS Efficient operations of OWSOs/DOs Monthly Sent ToR and REOI to CKP/IPA Requests for PBEF are being evaluated and will be included in the procurment plan in April In February 2012 NCDDS transferred advance (IDA: USD 5,000 and RGC: USD 2,000 for each OWSO) to all OWSOs targets (17) then they have 49 Activity Responsible Agency Expected Outputs Expected Delivery Progress as of March 31, 2012 to ask for replenishment monthly Why???? Organize meetings of Technical Advisory Group (TAG) in first quarter 2012 NCDDS Recommendations for policy and implementation decisions regarding OWSO/DO 16 February 2012 Organize meeting of TAG in second quarter 2012 NCDDS Recommendations for policy and implementation decisions regarding OWSO/DO June 2012 16 February 2012: The TAG agreed on the selection of OWSO model for Rural district-Bavel district, BAT province N/A Organize meeting of TAG in third quarter 2012 NCDDS Recommendations for policy and implementation decisions regarding OWSO/DO September 2012 N/A Organize meeting of TAG in fourth quarter 2012 NCDDS Recommendations for policy and implementation decisions regarding OWSO/DO December 2012 N/A Introduce MIS first on pilot basis (Q2) and across all OWSOs (Q4) NCDDS Management avails of appropriate and accurate information November 2012 N/A XII. Actions taken on the Recommendations of the Aide-Memoire of the Previous Supervision Mission of the World Bank IAs: NCDD (OWSO/DO) Area Action Date agreed Progress/ clarification Agreed actions NCDD (OWSO/ DO) Outline proposal for reallocated funds June 30, 2011 Sent to WB on 23 Sep 2011and approved by WB on 3 Oct 2011 USD 2, 602,211 of additional fund was approved by WB on 50 Area Action Detailed proposal for reallocated funds agreed with Bank Agreed Proposal and revised AWP Documentation of lessons learnt Date agreed July 23, 2011 July 30, 2011 Started by early August Revised timeline for M&E activities, linked to overall project results framework. National TA communications specialist appointed; Communications action plan. 31 August 2011 Coordinate and agree PIM revisions to ensure that double reporting is eliminated. Aug 31, 2011 Complaints received and resolved to be included in GGF Roadmap for reorganization of IAs agreed with Bank. July 31, 2011 International project management TA September 2011 July 31, 2011 Other actions in the MTR End of July 2011 Expanding the context of OWSO/DO piloting: 1. Study for potential OWSO model in Phnom Penh 2. Study for rural district OWSO model 51 Progress/ clarification October 03, 2011 AWPB-2011 with additional budget was approved by WB on October 24, 2011 Started 1st October 2011 and sent LL to WB on December 13, 2011 The timeline for M&E were revised accordingly with PCO and other IAs. NTA communications has signed contract and is on board on March 15, 2012 The Supervision Mission of March 2012 concluded that two different formats has to be accepted, because (i) the IP3 has not yet completed its format and (ii) there will only be 3 Quarterly and 1 Annual report to be produced. Was included in GGF reported in Q3-2011 AWBP of OWSO/NCDD was integrated into Sub-Program 2 of IP3 (Staffing, Institutional and Staff Capacity Development and Provision of Facilities for District and Municipal Administrations) and furthermore a budget will be provided to NCDDS to provide training to all M/D councilors in 2012. ITA-project management advisor has been on board since Sep 5, 2011 1. The study was completed and TAG agreed b on 31 August 2011 to establish OWSOs in each Khan (9) of Phnom Penh capital 2. The study was completed and TAG agreed on March 16, 2012 to establish OWSO in Bavel district of Battambang province, where 3 sub-front offices will be added in the outer communes plus a mobile front office for the other communes.. Area Action Date agreed Progress/ clarification In addition to the Implementing New Forms of Citizens Participation and Outreach organized by NSDD-S: Two partners-NGOs signed a 12 month-MoU with NCDD-S early 2012 to work in 9 OWSO-target areas under the DFGG grant through TAF Improve access to information and outreach Five NGOs will be recruited by NCDDS/DST (advertised in March 16 2012) under 5 different contracts. Their services will commence in April and May 2012, and will continue until December 2012 and January 2013 for outreach and feedback to OWSO in 14 OWSO-target areas. The establishment of Information Centers with equipment for each OWSO (37) was planned in 2012 M&E Forms were improved in Q3 and Q4 2011. National TA-M&E advisor came on board on Mach 26, 2012. He will strengthen all M&E tasks including designing an MIS by working closely with the National IT advisor who came on board on March 1st, 2012. At national level: 3 NTAs (1 M&E, 1 Communications, 1 IT) is on board in March 2012 One part time financial ITA is being recruited. 3 Assistants (1 ME&, 1CB & 1finance) are on board in March 2012. 2 ITAs & 1TA (1 part time Finance Advisor, and 1 short term for the Alignment -short term) are recruited to study on alignment of DO and (P)AWG The study commenced on Marh 16, 2012 and will complete on April 9, 2012. M&E Capacity Alignment of DO function with the accountability systems in the IP3 52 XIII. Conclusion and Recommendations 13.1 Conclusion From the above we can conclude that project implementation was considerably delayed. The main reasons were (i) ceiling of the Designated Account, (ii) too high a bidding for construction activities with its knock on effects on other components of the OWSO/DO project, (iii) late approval of the Procurement Plan. As a result, overall disbursement amounted to 50 % of the budget for Q1. 13.2 Recommendations In response to these constraints and challenges identified NCDDS/DST would like to raise the following recommendation to the World Bank: The World Bank and the Ministry of Ecomic and Finance should increase the ceiling of designed account for NCDDS/DST from USD 300,000 to USD 600,000 to ensure that the shortfall of budget for payment will not be repeated. The World Bank and MEF should speed up the approval of the procurement plan for NCDDS/DST to enable proceeding procurement process as planned. 53 Annexes Annex 1: Output Indicators 2009 Project Outputs Indicators Number of Prakas/guideline on delegation of competencies received from Ministries/ institutions Number of OWSO/DO buildings Municipalities Districts Khans Number of Project Management Orientation Total number of participants Number of female Number of trainings on One Window Service Office and Ombudsmen (incl. role & responsibility, working procedure, code of conduct) Total number of participants Number of females Number of trainings on DO Election Procedure Total number of participants Number of females Study tour for OWSO officers and staff within the country Total number of participants Number of females Internship for OWSO Chiefs within the country 2010 2012 2011 Total 2012 Q1 Q2 Q3 Q4 Actual Value Actual Value Actual Value Total Actua l Value Targe t Value Actua l Value % achievement (By the end of Q1) 1 N/A 39 0 0 0 0 35 24 2 9 15 14 1 0 43% 58% 50% 0% 3 5 6 120% Targe t Value Actua l Value Target Value Actual Value Target Value Actual Value Target Value Actual Value N/A 1 N/A 30 N/A 27 N/A 1 0 0 0 0 0 0 0 0 7 6 1 0 7 6 1 0 8 8 0 0 8 8 0 0 20 10 1 9 0 0 1 1 1 2 3 3 0 0 0 0 60 18 60 11 171 25 184 25 185 30 192 35 416 43 436 71 105% 97% 0 0 1 3 1 3 3 0 5 6 120% 0 0 0 0 104 31 106 14 152 45 151 31 130 30 386 106 257 45 67% 42% 1 2 1 1 1 3 3 100% 40 5 199 37 50 5 51 3 30 5 120 15 250 3 208% 267% 1 1 2 2 2 5 3 60% 103 31 102 18 130 39 131 29 125 30 358 100 233 47 65% 47% 1 1 2 2 2 5 3 60% 54 2009 Project Outputs Indicators Total number of participants Number of females Study tour for DO Chiefs and assistants within the country Total number of participants Number of females Internship for DO Chiefs within the country Total number of participants Number of females Training on Service Delivery Technique on Commerce Total number of participants Number of females Training on Service Delivery Technique on Culture and Fine Arts Total number of participants Number of females Training on Service Delivery Technique on Public Work and Transport Total number of participants Number of females Training on Service Delivery Technique on Construction Total number of participants Number of females Training on Service Delivery Technique on Tourism Total number of participants Number of females Training on Service Delivery Technique on Industry Total number of participants Number of females Targe t Value Actua l Value 2010 2012 2011 Total Target Value Actual Value Target Value Actual Value Target Value 7 1 7 1 15 3 8 3 7 2 29 6 15 4 % achievement (By the end of Q1) 52% 67% 1 1 2 2 1 4 3 75% 7 1 7 1 32 6 25 6 7 3 46 10 32 7 70% 70% 1 1 2 2 1 4 3 75% 7 1 7 1 23 3 8 2 7 3 37 7 15 3 41% 43% 1 1 2 1 1 4 2 50% 60 18 58 8 150 30 92 12 55 15 265 63 150 20 57% 32% 1 1 2 1 1 4 2 50% 60 18 64 9 130 39 68 9 55 15 245 72 132 18 54% 25% 1 1 2 1 1 4 2 50% 60 18 58 5 130 39 70 8 55 15 245 72 128 13 52% 18% 1 1 2 1 1 4 2 50% 60 18 62 5 130 39 72 7 55 15 245 72 134 12 55% 17% 1 1 2 1 1 4 2 50% 60 18 58 8 130 39 69 8 55 15 245 72 127 16 52% 22% 1 1 2 1 1 4 2 50% 60 18 73 9 70 21 84 7 55 15 185 54 157 16 85% 30% 55 2012 Q1 Q2 Q3 Q4 Actual Value Actual Value Actual Value Actual Value Total Actua l Value Targe t Value Actua l Value 2009 Project Outputs Indicators Training on Service Delivery Technique on Agriculture Total number of participants Number of females Training on Service Delivery Technique on Health Total number of participants Number of females Training on Service Delivery Technique on Education Youth and Sports Total number of participants Number of females Number of Annual Forums across target districts Number of districts Total number of participants Number of females Number of Semi-Annual Forums across target districts Number of districts Total number of participants Number of females Number of Monthly Citizen’s Hour across target districts Number of districts conducted Total number of participants Number of females Targe t Value Actua l Value 2010 Target Value 2012 2011 Actual Value Target Value Actual Value Total 2012 Q1 Q2 Q3 Q4 Target Value Actual Value Actual Value Actual Value Actual Value Total Actua l Value Targe t Value Actua l Value % achievement (By the end of Q1) 4 4 0 0% 150 30 150 30 0 0 0% 0% 4 4 0 0% 150 30 150 30 0 0 0% 0% 4 4 0 0% 150 30 150 30 0 0 0% 0% 9 9 17 9 24 50 18 36% 9 3,600 1,080 9 3,758 940 17 6,800 2,040 9 3,106 983 24 6,000 2,000 50 16400 5120 18 6864 1923 36% 42% 38% 9 9 26 17 40 75 26 35% 9 770 231 9 637 161 17 1,820 546 9 1,346 487 24 3,000 1,000 50 5590 1777 18 1983 648 36% 35% 36% 24 13 108 61 136 268 74 28% 2 2,160 648 2 2,177 653 17 2,640 792 7 2,345 672 17 4,000 1,200 36 8800 2640 9 4522 1325 25% 51% 50% 56 Annex 2: Partnership Reporting Partnership Note 11/January/2012 One Window Service and Ombudsman Project (NCDDS/DST) (A) Name of Partner Organization: Democracy resource center for National Development (DND) DND is a local NGO that is willing to work with the government in supporting: the government policies such as Rectangular Strategy and National Development Plans; the implementation of millennium goal; Decentralization and De-concentration reform for better livelihood and poverty reduction. (B) Brief description of partnership: Current MoU Y (11/01/2012) IA Budget allocation N Agreed division of labor Y Planned Y N Y Past & Ongoing Activities: DND signed on MOU on 11 January 2012. District Support Team open program at Banlong, Bavet, and Stueng Sen. DND oragnise citizen forum at peamror district, krung Soung, krung kratie, krung banlung, krung bavet, krung steung sen. As a partnership DND is also starting implement their activities as stated in MOU. Planned Activities: Publicate standard letter and others principles which related to role, function, duty, service and others information of OWSO. Provide feedback from ciziten and sharing lesson and others experiences to OWSO officer. Participate in any activity such as orientation, seminar, and other meeting as request Participate and Cooperate to operate others activities that request by OWSO. Provide semester and annual reports (C) Highlight how this partnership supports DFGG objectives at the project and IA level: DND’s activities (i) strengthen the OWSOs, (ii) raise citizen’s awareness of the improved modalities of service delivery and (iii) provide feedback to the OWSO staff on the new forms of citizens’ participation. DND activities contribute to the effectiveness, efficiency and transparency of the OWSOs and thus the realization of the objectives of the DFGG project. (D) Key outputs and outcomes to date: 57 Project launching: DND organized 3 sessions of project launching in the new target areas in Bavet municipality Svay Rieng province, Stung Sen municipality Kampong Thom province and in Banlung municipality Ratanakiri province. The main topics of activity were presentation project, experience of working with partnership in promoting OWSO and DO office, activities and result of OWSO and DO and role and responsible of OWSO. Citizen hours: In this quarterly, DND conduct 12 session of citizen’s hour meeting hold on the third week every month in the six target area: Soung, Kratie, Peamro, Stung Sen, Bavet and Banlung were facilitated by DND staffs with 26 participants in average per month include 15 were the ordinary citizen and 5 were member of citizen body. 50% of the participants raised complaints, question and request regarding OWSO’s performance. District/Municipality governor, DO and OWSO played roles as a chair and speakers. Regular collective feedback from service user in target project: In every month on the week three or four DND staffs especially Executive Director, Senior Program Officer and Project coordinator always conduct monitoring to OWSOs. For the methodology of this monitoring using individual interviews with citizen who used to get services from OWSOs by using checklist. In this quarterly, 90 citizens in all target projects were interview to review and reflection on OWSO performent. (E) Key challenges to maximizing the value of this partnership: Challenge/constraint: The governor authorities were busy with core work and their party. The governor authorities feel DND monitors their work. Actions taken to address the challenge: Have a dating in the morning or afternoon and flexible with them. DND staff tried to explain our project and show them role and responsibility of CBs. (F) What is the agreed division of labor for 2011 and how does this address the challenges: DND assists OWSO in capacity development, communication and outreach activities, and providing feedback on service delivery. (F) Primary contact person: Mr. Bun Rithy (Director) (G) Contact details: Tel: 011 767 573 email: Rithy Bun [bunrithyed@yahoo.com] Agreement to include as a partnership under DFGG definitions for IA. Comments and endorsement by PCO: (to be made before submitting to the Bank) Comments by World Bank: 58 Partnership Note 19/January/2012 One Window Service and Ombudsman Project (NCDDS/DST) (A) Name of Partner Organization: Advocay and Policy Institue (API) The Advocacy and Policy Institute (API) is a Cambodian non-profit and non-governmental organization which has a mission to serve the long-term democratic and social development needs of Cambodia through the provision of services in the areas of advocacy and policy development. (B) Brief description of partnership: MoU IA Budget allocation Agreed division of labor Current Y (19-01-2012) N Y Planned Y N Y Past & Ongoing Activities: API signed MOU on 19, January, 2012. They are now ongoing to preapre the ciziten rating card in 3 municiples target area.They are alo starting implement their activities as stated in MOU. Planned Activities: Facilitate and Collabrate to share lesson and good experiences to officer of OWSO. Broadcast information and other activities related to OWSO to others people through the public forum. Publicate standard letter and others principles which related to role, function, duty, service and others information of OWSO. Participate in any activity such as orientation, seminar, and other meeting as request Oragnize citizen rating card Provide semester and annual reports (C) Highlight how this partnership supports DFGG objectives at the project and IA level: API had celebrated publication and orientation about partnership to 3 municipal targets: Chba morn Kampong Chhnang, and Porsat. Dicussion and correction on questionaires for evaluation on capacity building. Consulation on preparation to produce banner, publish picture, and guidline book for the 3 municiples target. (D) Key outcomes to date: Since API just starts activity as partnership with OWSO there is no outstanding outcomes produce yet. (E) Key challenges to maximizing the value of this partnership: 59 Challenge/constraint: The project start date was delayed due to the project MOU development and funding contract and the recruitment of additional project staff. IEC development: Diversity of Information Education and Communication (IEC) materials are being produced. By gathering input and endorsement from OWSO leaders, the municipality governor, District Support Team (DST) of MoI, The Asia Foundation and the API project team to ensure the high quality of its content and design and procurement process. More time to complete this is needed. Actions taken to address the challenge: Some of the original activity plan in January and February will be carried out and completed in March 2012. API will do its best during the consultation process with a limited timeframe and clear dateline for gathering input and endorsement from all partners and stakeholders on IECs materials. maximizing the value of this partnership: (F) What is the agreed division of labor for 2011 and how does this address the challenges: (F) Primary contact person: Neb Sinthay, Director, API (G) Contact details: 0 12 527 004 email: sinthayneb@apiinstitute.org Agreement to include as a partnership under DFGG definitions for IA. Comments and endorsement by PCO: (to be made before submitting to the Bank) Comments by World Bank: 60 Annex 3: Service transaction by province and line agency Prov. Code Municipalities PRE-DFGG BAT Battambang SRP Siem Reap 1st-Year Target BMC Poipet KDL Takhmao KPC Suong KPT Stoeung Sen KRT Kratie PHV Preah Sihanouk PVG Peam Ro 2nd-Year Target KAM Kampot KCH Kampong Chhnang KHK Khemarak Phumint KSP Chhar Morn PUR Pursat RAT Banlung SVR Bavet TAK Daun Keo GRAND TOTAL (Q1, 2012) Legalization 6,087 1500 4,587 3,583 426 139 583 826 197 1199 213 3,208 327 455 348 234 477 579 369 419 12,878 Tourism 64 41 23 98 13 10 1 20 16 36 2 107 12 16 11 13 10 1 35 9 269 Culture 152 41 111 211 35 40 31 33 31 13 28 260 24 41 49 12 93 9 17 15 623 61 Commerce 97 31 66 399 45 75 13 13 99 128 26 518 52 95 30 66 128 60 48 39 1,014 Public Work 4,356 1947 2,409 1,746 807 303 75 277 96 57 131 1,132 33 118 76 132 207 292 132 142 7,234 Industry 32 9 23 56 13 5 8 14 12 4 40 10 1 3 7 9 10 128 Land Management 134 34 100 68 7 6 18 8 24 5 147 5 34 23 35 12 10 12 16 349 Total (Q1, 2012) 10,922 3,603 7,319 6,161 1,346 578 703 1,195 461 1,469 409 5,412 453 769 538 495 934 960 613 650 22,495 Annex 4: Service revenues by province and line agency Prov. Code Municipalities Legalization Tourism Culture Commerce Public Work Industry Land Mangement Total (Q1, 2012) Riels Dollars (1S=4001) PRE-DFGG BAT Battambang SRP Siem Reap 28,829,800 8,036,700 20,793,100 5,432,000 1,794,000 3,638,000 6,884,000 1,899,000 4,985,000 2,425,000 775,000 1,650,000 62,684,200 27,301,900 35,382,300 1,618,000 468,000 1,150,000 6,769,000 4,173,000 2,596,000 114,642,000 44,447,600 70,194,400 28,653 11,109 17,544 1st-Year Target 11,261,100 7,556,000 13,324,000 10,285,000 36,375,800 3,160,000 6,775,000 88,736,900 22,179 BMC Poipet KDL Takhmao KPC Suong KPT Stoeung Sen KRT Kratie PHV Preah Sihanouk PVG Peam Ro 2nd-Year Target KAM Kampot KCH Kampong Chhnang KHK Khemarak Phumint KSP Chhar Morn PUR Pursat RAT Banlung SVR Bavet TAK Daun Keo 1,080,000 613,700 2,064,500 2,713,600 546,100 4,022,000 221200 12,550,700 1,724,000 960,600 1,635,500 761,500 2,482,300 3,230,000 749,400 1,007,400 1,338,000 1,558,000 52,000 492,000 910,000 3,072,000 134000 9,832,000 928,000 892,000 1,622,000 1,326,000 882,000 402,000 2,822,000 958,000 2,214,000 1,991,000 1,815,000 3,801,000 1,516,000 512,000 1475000 14,943,600 1,605,000 1,651,000 2,469,000 694,000 6,160,000 752,000 982,600 630,000 1,125,000 1,875,000 676,000 325,000 2,470,000 3,164,000 650000 12,911,000 1,300,000 2,375,000 750,000 1,650,000 3,200,000 1,500,000 1,200,000 936,000 16,869,100 6,214,300 1,567,500 5,789,300 2,006,400 1,191,300 2737900 45,157,200 689,700 2,466,700 1,588,400 2,782,400 4,326,300 6,102,800 24,872,100 2,328,800 950,000 295,000 400,000 693,000 600,000 222000 1,993,000 500,000 50,000 153,000 350,000 450,000 490,000 871,500 769,000 2,468,000 456,000 1,888,000 322500 15,000,000 469,000 4,249,500 2,048,500 2,730,000 1,673,000 820,000 2,088,000 922,000 24,447,600 13,316,000 6,175,000 15,988,900 8,597,500 14,449,300 5,762,600 112,387,500 6,715,700 13,094,800 10,163,400 10,096,900 19,073,600 13,256,800 32,714,100 7,272,200 6,110 3,328 1,543 3,996 2,149 3,611 1,440 28,090 1,679 3,273 2,540 2,524 4,767 3,313 8,176 1,818 GRAND TOTAL (Q1) 52,641,600 22,820,000 35,151,600 25,621,000 144,217,200 6,771,000 28,544,000 315,766,400 78,922 62 Annex 5: Complaints received and resolved by province No Province Code 1 BAT 2 SRP 3 BMC 4 KPC 5 KPT 6 KDL 7 KRT 8 PVG 9 SHV 10 KAM 11 KCH 12 KKG 13 KSP 14 PUR 15 RAT 16 SVR 17 TAK Grand Total # camplaints related to owso (incl from Reports) 0 4 5 7 0 0 5 8 2 0 3 8 4 2 8 0 1 57 # complain & Suggestion resloved related OWSOs 0 4 5 0 0 0 5 7 2 0 0 7 2 1 8 0 1 42 63 % complain & # unoffical Suggestion fees receieved Resolved N/A 100% 100% 0% N/A N/A 100% 88% 100% N/A 0% 88% 50% 50% 100% N/A 100% 73.68% 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1