THE UNIVERSITY OF TEXAS AT AUSTIN Project Management & Construction Services Austin, Texas 78722 Final Construction Document Review Coversheet Building: Project Name: CP #: Delivery Method: PM Name: JOC Shops Contract Sole Source Requested Completion Season: Final TPC Estimate: Alternates (contract projects only) Requirements (Attach supporting documentation) Comments CD Phase estimate of probable Construction Cost Schedule Copy of Funding Request or DEFINE Screen Print Add-Update-Retire Log User/Client Sign-off on Scope and Final Design PSP’s seal and signature (drawings & specs) Requirements (Attachments NOT required) Comments EHS Requirements ( asbestos/lead, chem. review, radiation, fluorescent lighting, storm water, grease traps) TDLR details submitted to PMCS Regulatory Analyst State Energy compliance submitted to SECO liaison (over $2M) Interior Signage Room Numbers and Room Codes on drawing, approved by SPACE CD (High Resolution pdf ) and CAD drawings from PSP forwarded to SPACE Approval from Parking & Transportation; Contractor laydown and parking area shown on drawings (contract projs only) Construction Coordinator reviewed Specifications against General Conditions Stakeholder Reviews Solicited Zone Maintenance Facilities Maintenance Fire Prevention Services Locks & Keys ITS (Telecom) Other: EHS Fire Safety Shop Other: Sr. PM/Mgr (inits) Team Mem (init) Team Mem (init) AD, Proj Mgmt (M. DeBow) Team Mem (init)) Team Mem (init) Approvals Proj Mgr (inits) TRT Mgr (A. Thiemer) Mgr, Contracts (M. Cool) Revised: 7/30/2015 Filing Location: I. Design and CDs\Project Documents\Final