Manohar CV

advertisement
CV profile
Personal Information
First Name:
Manohar
Email:
gomathimanohar@rocketmail.com Date of Birth:
02-07-66
Nationality:
India
Residence:
United Arab Emirates
Gender:
Male
Marital
Status:
Married
Contact 1:
0503380947
Contact 2:
043262590
Last Name:
Gomathi
Education
Qualification
Major
Start Date
End Date
Bachelors Degree
B.E(Agriculture)
03-09-1986
06-03-1991
Bachelors Degree
B.Sc(Maths)
04-07-1983
17-04-1986
Masters Degree
M.B.A.
04-09-1995
15-09-1997
Training
Course Name
Institute
Start Date
End Date
OGD Project in
Habshan
ADNOC
04-01-1998
03-01-2000
IRRIGATION
CENTRAL
CONTROL
WORKSHOP
MEA COLLEGE
30-10-2007
30-10-2007
HUNTER
IRRIGATION
PRODUCT
PRESENTATION
MEA COLLEGE
25-11-2010
25-11-2010
Experience
Organization
Department
Start Period
End Period
PROJECT MANAGER in
PROSCAPE LLC, Dubai,
U.A.E
Landscape Projects Manager
APR-2013
APR-2014
EMIRATES LANDSCAPE
LLC,
Landscape Irrigation Manager
JUN-2010
APR-2013
Barari Forests Management
LLC, Al Ain, U.A.E.
Senior Irrigation Engineer
JUL-2009
MAY-2010
Second Nature Landscape
Design, Dubai,U.A.E.
Senior Irrigation Engineer
JUN-2007
MAY-2009
SEP-2002
MAY-2007
Nael Energy & General Ent. Al Landscape Project Engineer
Ain, U.A.E.
Al Fujair Trading Services
Est. Abu Dhabi, U.A.E.
Irrigation and Landscaping
Engineer
JUNE-2000
AUG-2002
Scott Wilson Kirkpatrick Co.
Dubai,U.A.E
Irrigation and Landscaping
Site Engineer
Orchard and Plantation Firms
in India.
Assistant Project Manager
MAR-1998
MAY-2000
MAY-1991
FEB-1998
References
Full Name
Designation
Mobile
Email
Mr. Prahalathar
Technical
Manager Gulf Dunes
LLC Abu
Dhabi
00971508348202
praha_agri@yahoo.com
. Mr. Jesper
Madson
General
Manager Emirates
Landscape
LLC Abu
Dhabi.
00971508344122
. Mr.Ramkumar
Project
Director Proscape
LLC Dubai.
Other Information
Languages
ENGLISH , HINDI , TAMIL, MALAYALAM , FRENCH
Driving License
Light Vehicle
Total Experience
23 years.
Work in Shifts
Yes
UAE Experience
Other Qualifications
16 + years.
Certificate course in AUTOCAD, 3DSMAX, MS Office
and PRIMAVERA (Proficient in AUTOCAD)
PROFESSIONAL EXPERIENCE:
APRIL 2013 – TILL DATE: Working as PROJECT MANAGER in PROSCAPE LLC,
Dubai, U.A.E.
Job Responsibilities and Achievements:
Project planning, co-ordination and management for landscape project
implementation.
Liaise closely with Client, Consultant, Main contractor and Sub-contractors.
Manage a team of supervisors and deploy work for the areas under my
charge to ensure
smooth operations to complete the project in time and
within budget.
Resource planning(Manpower, Material and Machinery)
Attend site meeting with Client, Consultant, Main contractor and provide
management information system on the site work progress
Preparation and submission of daily, weekly and monthly progress report
internally to the top management of the company and externally to the main
contractor/Consultant.
Planning of monthly and annual work schedule.
Tracking of work progress to ensure work are completed on time.
Close coordination and supervision on work for monthly management
reporting.
Attend site briefing, Raise SIR, MIR, Material submittal approval, shop
drawing approval.
Prepare cost variation, As Built drawings, attend site walk down with
Consultant.
 Execution of Daman tower project, DIFC, Dubai which includes
Construction of Hard landscaping, Soft landscaping, Irrigation,
Swimming pools, water features.
 Construction of soft landscaping and Irrigation for Al Maktoum
Hospital Redevelopment, Deira, Dubai.
 Construction of hard landscaping, soft landscaping and irrigation in
pavilion sales centre, Downtown Dubai.
 Construction of soft landscaping and irrigation in Saha Café, Burj Lake
Realm Project.
 Construction of soft landscaping and irrigation in MBR city
 Construction of soft landscaping and irrigation in Arabian Ranches
phase-2
JUNE 2010 – APRIL2013: Worked in EMIRATES LANDSCAPE LLC, as
Irrigation manager Abu Dhabi, U.A.E.
Job Responsibilities and Achievements:







Worked in emirates landscape looking after Design, Construction and
Maintenance the Landscape projects of the Company.
Designed,Executed and Maintained prestigious projects like Paris Sorbonne
University in Al Reem Island, Abu Dhabi Women’s College, Khalifa City A,
Abu Dhabi, Khalifa City A School, Al Shamkha school under Abu Dhabi
Education Council.
Design, Construction and Maintenance Project for Abu Dhabi Education
Council Schools(Abu Dhabi West, Al Khatem, Al Khazna)
Design, Construction and Maintenance of Mosque at Mohammed Bin Zayed
City for Shaikha Fatima.
Design Construction and Maintenance of Khalifa Port and Industrial Zone at
Taweelah, Abu Dhabi.
Design, Construction and Maintenance Project for Sadiyaat Island and
Maqtaa Village.
Maintaining prestigious projects like Shaikh Sultan Palace, Sir Baniyas Island,
Abu Dhabi Men’s College, Abu Dhabi Women’s College, Shangri La Hotel
and New Zayed University, Takreer Abu Dhabi and Ruwais.
JUL 2009 –MAY 2010: Worked as SENIOR IRRIGATION ENGINEER in Barari
Forests Management LLC, Al Ain, U.A.E.
Job Responsibilities and Achievements:
 Designed Irrigation system for an area of 1800 Hectare at President’s palace
in Rowdha, Al Ain with 35 bore wells feeding irrigation to this area including
the well gathering pipe network to a 1 MG reservoir and the irrigation is fed
from the reservoir by a booster set with 400mm dia. UPVC pipes as Irrigation
mainline feeder for this entire area. This project was a turn key project and
the Client was Environmental Agency, Abu Dhabi. Job responsibility for this
project includes initial survey, yield test of the bore wells, water analysis,
Preparing estimation, scope of work, specifications, drawings, details, Bill of
Quantities,Programme of work including manpower, material and machinery
details, Discussions and meetings with Client for Contract award, organizing
material by coordinating with Purchase Department, mobilizing manpower
and machinery, Demarcation of the area, irrigation shop drawings, Applying
for clearance from various bodies for the existing underground services,
supervision of works, quality enhancement, monitoring the project to ensure
activities stick to time schedules, Installation of the entire network including
the pumps, Testing and Commissioning of the entire network and handing
over the project in time to the Cient.
 Designed network connections between the Sewerage Treatment Plant
Effluent tank and the Forest tanks in seven stations at Al Ain thereby
transmitting irrigation water from the effluent tank to the forest tank and in
some stations the distance between effluent tank and forest tank is 25KM, the
proposal with estimation, scope of work, drawings and details has been
forwarded to ADSSC and EAD for initial approval of the project.
JUN 2007 – MAY 2009
Worked as SENIOR IRRIGATION ENGINEER in
Second Nature Landscape Design, Dubai,U.A.E.
Job Responsibilities and Achievements:
 Designed Irrigation primary and secondary network with pumping systems for
a landscape area of 20 Sq.Km with 800mm dia. HDPE line tie-off from
1200mm dia. DEWA TSE line and then collecting this TSE water in a
underground concrete tank of capacity 5000 Cu.m and the water is pumped
to the irrigation primary network of 400mm dia. HDPE line with VFD and PLC
controlled pumping stations and the capacity of each pump being 50 LPS.
The primary network has 53 Distribution chambers from which the irrigation





secondary mainline of 160mm dia. UPVC pipe network is covering the part of
landscape area and all the 53 Irrigation satellite controllers located near the
DC chamber is connected to the Central control system by means of fiber
optic cable communication, the Tie-in point near DC chamber is protected
with Flow sensor and Pressure sensor against a possible breakage in
secondary irrigation mainline.
Supervision of Contractor’s works for the installation of entire irrigation
network.
Supervision of Contractor’s soft landscaping works in the site
Writing irrigation specifications, preparing design drawings at various design
stages, preparing bill of quantities for irrigation works, Review and approval of
shop drawings and submittals.
Interface with Client and Contractor’s representatives and other Consultants
to resolve project and technical issues.
Review and approval of Contractor’s monthly payment Certificates.
SEP 2002 – MAY 2007 Worked as PROJECT ENGINEER in Nael Energy &
General Ent. Al Ain, U.A.E.
Job responsibilities and Achievements:
 Tendering for various irrigation and landscape projects released from AAM
and other bodies.
 Post-Tender meetings with Consultants and Client Engineers.
 Forecasting Men, Material and machinery schedule immediately upon award
of a Contract.
 Executed Zakher Sewerage pumping stations(M7) as an Electro-mechanical
Engineer with 600mm carbon steel pipe including welding and pumps
installation etc.
 Executed landscape projects for Al Ain Municipality such as H67, H94.
 Executed Civic Centre irrigation network with 400mm dia. UPVC mainline with
12 irrigation satellite controllers controlled by Site control Rainbird Central
Control system located near civic centre pumping stations by installing 2 Nos.
of 1200 Cu.m/hr screen filters with automatic flushing system and also a
weather station was installed to calculate the ET on daily basis and make the
irrigation network to work on a ET based system.
 Executed irrigation network in Qattara, Applied Technology, zoo, HCT
women’s college, Airport Road and 21 Roundabouts in AlAin-Dubai Road.
 Executed irrigation network in New Cemetery for Non-Muslims in AlAin-Dubai
Road.
 Procurement of Materials for the landscaping projects.
 Strict adherence to Budget and schedule without compromising the quality.
 Weekly and monthly meetings with Consultant and Client representatives to
update the progress, raise project and technical issues and resolve, raise
variations whenever the Client issue verbal instruction for works beyond the
scope of work of the project.
 Preparing Weekly and Monthly progress reports and forecasts.
 Ensuring smooth transition of day-to-day operation of the project.
 Preparing Shop drawings, material approval submittal and Inspection
Requests and other basic documents necessary to fulfill the contractual
obligations.
 Testing and Commissioning of Irrigation network and the pumping station with
Central control system to the entire satisfaction of the Client and handed over
the project to the incumbent maintenance contractor Al Darmaky by giving
proper training to the personnel of the company.
JUN 2000 – AUG 2002 Worked as Irrigation and Landscaping Engineer in Al
Fujair Trading Services Est. Abu Dhabi, U.A.E.
Job Responsibilities and Achievements: Executed Maintenance works of Irrigation and Landscaping in Adnoc
premises in AbuDhabi City and Umm-Al-Nar Adnoc Training Center.
 Executed Irrigation network and soft landscaping works for Onshore Gas
Development Project-Phase2 in Habshan for which CCC is the main
contractor and Bechtel and Technip is the Consultant. In this project, I was
involved right from tendering stage to project completion stage including
twelve months liability period for the maintenance of irrigation and soft
landscaping works.
 Executed Irrigation network and soft landscaping works for Offshore Ethylene
Utilities Project in Ruwais for which Al Jaber is the main contractor, Parsons
International is the consultant and Borouge Petrochemicals is the Client. In
this project, I was involved right from tendering stage to project completion
stage including twelve months liability period for the maintenance of irrigation
and soft landscaping works and by evaluating our performance in that project
the Client has extended our maintenance contract by another three years.
 Executed Operation and Maintenance of Irrigation and Soft landscaping
works in Arzhana Islands and Zirku island in Abu Dhabi for which ZADCO is
the Client.
MAR 1998 – MAY 2002 Worked as Irrigation and Landscaping Site Engineer in
Scott Wilson Kirkpatrick Co. Dubai,U.A.E.
Job responsibilities and Achievements: Supervision of Irrigation and Landscaping works executed by Contractor and
ensure that the works are being carried out as per project specifications, bill
of quantities, Approved shop drawings and Standard Details.
 The project is installation of irrigation networks(315mm dia and 225mm dia
UPVC irrigation mainline) throughout Town centre area and the landscaping
works under the project Parking and Traffic Improvements Project in AlAin
Town Centre and the value of irrigation and landscaping works is 80 Million
AED.
 Review and approval of shop drawings and submittals.
 Interface with Client and Contractor’s representatives and other Consultants
to resolve project and technical issues.
 Review and approval of Contractor’s monthly payment Certificates.
 Inspection of Irrigation and Landscaping works for the raised RFI from the
contractor.
MAR 1991 – DEC 1997 Worked as Assistant Project Manager in Orchard and
Plantation Firms in India.
Job Responsibilities and Achievements:
 Established Orchards and Teak plantations in various areas and involved in
land purchase, site establishment, manpower recruitment, procurement of
materials, establishing irrigation networks and plants for orchards and
plantations, arranging well drilling, organizing water resources collectively into
a tank and installing master booster pump to feed the plants through drip
irrigation systems, maintenance of orchards and plantations by using various
crop protection techniques, maintaining good investor relations during their
visit to the site.
Download