Roads Service Plan 2015/16 Roads Service 2015-16 Service Plan Supporting Infrastructure Department’s vision: “Securing the Best for Shetland” Page 1 of 29 Roads Service Plan 2015/16 Contents Introduction ......................................................................................................................................................... 3 Vision Statement ................................................................................................................................................. 3 Drivers for Change.............................................................................................................................................. 4 About Us .............................................................................................................................................................. 5 Who We Are .....................................................................................................................................................................................6 Organisational Chart ......................................................................................................................................................................6 Locations .........................................................................................................................................................................................7 Governance .....................................................................................................................................................................................7 Regulation and Compliance ...........................................................................................................................................................7 What We Do .....................................................................................................................................................................................8 Our Customers ................................................................................................................................................................................8 Our Costs and Income ..................................................................................................................................................................11 Funding and resources ................................................................................................................................................................12 Aims and Objectives......................................................................................................................................... 13 Detailed Actions/Plan for Change.................................................................................................................... 14 Previous Actions Completed in 2014/15 ........................................................................................... Error! Bookmark not defined. Ongoing Actions/Projects Started prior to 2015/16 ...................................................................................................................15 Page 2 of 29 Roads Service Plan 2015/16 New Planned Actions Due to Start in 2015/16 .......................................................Error! Bookmark not defined. Risks to Delivery ......................................................................................................Error! Bookmark not defined. Performance Indicators .................................................................................................................................... 23 Performance Indicators from Council Wide Performance Measures .......................................................................................23 Key Directorate Indicators ...........................................................................................................................................................25 Directorate Performance Indicators from the Local Government Benchmarking Framework ...............................................25 Directorate Performance Measures from the Shetland Single Outcome Agreement ................... Error! Bookmark not defined. Other Performance indicators .....................................................................................................................................................28 Contact Details.................................................................................................................................................. 28 Introduction Every year, each Service within the Council is required to produce a Service Plan for the following year. This Service Plan provides an overview of the Roads Service for 2015/16, the Roads Service is in the Infrastructure Directorate. This plan contains information on major activities, aims, objectives, actions, targets, performance indicators and risks. Service plans are approved and “signed off” at Director Level as part of the Executive Manager’s Employee Review and Development process. Vision Statement The Roads Service is committed to supporting the Infrastructure Directorate’s Vision of “Securing the Best for Shetland”. For the Roads Service Team this Vision means: Ensure the provision of a quality road network which meet the needs of our customers; Page 3 of 29 Roads Service Plan 2015/16 being realistic about the resources we have to deliver our outcomes and manage public expectations about what those resources can achieve; delivering Best Value and living within our means by providing a suitable road network within the available budget; maintaining the roads asset we have already rather than improving or building more; delivering all our services safely; meeting our statutory requirements as Road Authority and delivering compliant services; reduce incidents of casualties as a result of road accidents; contributing to and supporting remote and rural Shetland by maintaining access with the road network; being a caring employer by valuing and investing in our most important asset - our staff, and providing a positive workplace with training and career development; maintaining a ‘Can-do’ attitude and aim to provide a suitable service at the first attempt; building relationships external to Shetland to assist with Shetland based solutions for Shetland issues; protecting the environment by being mindful of the potential impacts of works; anticipating the future needs of customers and developing our service accordingly using innovation to develop new solutions; building positive relationships between Members and Officers in order to work together to deliver Council outcomes. Drivers for Change The Services priorities are: reliably delivering our day to day statutory services; maintaining our existing asset of the road network; placing importance on our customers’ needs in our decision making whilst providing best value for the public funds invested in our service and infrastructure; reducing the environmental impact of our activities and making longer term plans to adapt to climate change. The key aims for 2015/16 are: We will deliver the best possible service we can which balances needs and resources. Maintain and manage the public road network to meet the Statutory requirements. Maintain the reliability of the road and footway network including the provision of the Winter Maintenance Service as required. We will ensure staff feel valued and supported particularly through periods of challenge and change. Page 4 of 29 Roads Service Plan 2015/16 Continue to operate an efficient quarry and the Islands only coated stone provision at competitive prices. Provide a design and construction service to both internal and external customers. The most immediate pressures on the Service are changes in our workforce; - loss to private sector recruitment issues age demographic reduced motivation and wellbeing of staff due to new and additional work pressures market forces and higher industry standard wages reduced opportunities for training and development perceived loss of job security The Council needs to achieve financial sustainability and this budget pressure will continue to impact on our Service; so we need to: plan ahead for minimum 2% ongoing efficiency savings each year; prepare plans for cyclical expenditure – 5 year capital programme; develop better contingency budgeting; where possible, continue to reduce assets such as street lighting in line with available maintenance budgets and public opinion; develop lifecycle costing through a Roads Asset Management Plan to manage investment in the road network and prevent high future expenditure; prepare plan for responding to the impacts of climate change – more extreme weather events creating unforeseen costs and need for long term investment in works to prevent future expenditure; About Us The Service was created as part of the Council organisation and management re-structure in 2011. The Service comprises a statutory Roads Authority, an operational Road Maintenance Service and a Design Service. Page 5 of 29 Roads Service Plan 2015/16 Who We Are This Service sits within the Infrastructure Department and is lead by the Director of Infrastructure (Maggie Sandison). The following Services are also in the Infrastructure Department: (Environmental Services, Ferry Operations, Harbour Master & Port Operations, and Estate Operations) Organisational Chart Chief Executive Mark Boden Infrastructure Directorate Maggie Sandison Environmental Services Ferry Operations Maintenance South/West Barrie Scobie 26 FTE Page 6 of 29 Roads Service Dave Coupe 78.17FTE Maintenance North/Isles Brian Wood 19 FTE Harbour Master & Port Operations Asset and Network Neil Hutcheson 18 FTE Design George Leask 6 FTE Estate Operations Roads Service Plan 2015/16 Locations The Roads Service is located at: Main Office - Gremista, Lerwick. Maintenance South/West – Gremista, Lerwick & Robins Brae, Dunrossness & Murrister, Bridge of Walls Maintenance North/Isles – Sellaness & Mid Yell & Unst Airstrip Asset & Network – Main Office & Scord Quarry Design – Main Office Governance The Roads Service is part of the Infrastructure Directorate and reports to the Environment and Transport Committee. The Service’s performance is reported to the Directorate Management Team monthly and PIs from this plan is reported to the Environment & Transport Committees 4 times per year as part of the Department’s quarterly performance report. Regulation and Compliance The Council as Roads Authority has a statutory duty to manage and maintain all public roads in Shetland, but with some discretion allowed with respect to the standards of maintenance applied, subject always to the policies and priorities of the Council. The main legislation relevant to Roads in Scotland is: The Roads (Scotland) Act 1984 The Road Traffic Regulation Act 1984 The Road Traffic Act 1988 The New Roads and Street Works Act 1991 The Transport (Scotland) Act 2005 Other relevant legislation includes: The Health and Safety at Work Act 1974 Page 7 of 29 Roads Service Plan 2015/16 The Town and Country Planning (Scotland) Act 1997 The Road Traffic Reduction Act 1997 The Local Government in Scotland Act 2003 The Water Framework Directive The Water Environment and Water Services (Scotland) Act 2003 The Water Environment (Controlled Activities) Regulations 2005 The Climate Change (Scotland) Act 2009 In addition to this legislation the Service has adopted the guidance contained in the following documents published by the Government: “Well Maintained Highways – A Code of Practice;” “Well Lit Highways – A Code of Practice;” “Management of Highway Structures;” and “ICE Design and Practice Guide: Winter Maintenance.” We undertake an annual Road Maintenance Condition Survey jointly with all other roads authorities in Scotland. It is a machine-based survey and measures rutting, surface texture, longitudinal profile and cracking. This provides independent and consistent information on road condition over time throughout Scotland. Every year 100% of the Class A network is surveyed, along with 50% of Class B roads and 10% of the remaining roads. This provides a Road Condition Index (RCI) which is used as a Statutory Performance Indicator. What We Do Maintenance (South/West & North/Isles) Team, responsible for: Maintenance of All Public Roads and Footways Winter Maintenance Service (Operations) General Construction Works Ensuring the longevity of the roads network and safety of the public by maintaining the roads asset in a safe and economical way. Maintenance Operations for all Public Roads(Carriageways, Verges, Footpaths & Footways, Structures, Drainage etc) Page 8 of 29 Roads Service Plan 2015/16 Including: Hot and Cold Tar Patching, Weed Control, Grass Cutting, Kerbing, Surfacing, Road Sweeping, Hand applied White Lines, Gully Maintenance, Trenching/Cabling/Ducting Winter Maintenance (Operations) Sign Manufacture and Erection Oil and Fuel Spill Clearance Topographical Surveying Hydrographical Surveying Emergency response to incidents Asset & Network Team, responsible for: Management and development of the public road network Management and co-ordination of roadworks Maintenance and improvement of street lighting, barriers and signs Planning of roads resurfacing and surface dressing works Winter Maintenance service (Planning) Operation of the Scord Quarry The management, operation, maintenance and enhancement of the public road network to meet the needs of current and future road users Roads authority/client function as required by legislation Road Asset Management Plan Co-ordination of all road works on the public road network Road opening permits etc Inspection of roadworks Inspection and survey of road condition Traffic orders Traffic Management Accident Investigation & Prevention Road Authority input for Planning Applications Disabled parking spaces Page 9 of 29 Roads Service Plan 2015/16 Programming of road improvement schemes Carriageway resurfacing Surface dressing Street lighting renewals and maintenance Maintenance of safety barriers, cattle grids, road markings and traffic signs Winter maintenance (gritting and snow clearance) Design Team, responsible for: Infrastructure Design AutoCAD Drawing Contract Document Preparation and Tendering The design and construction management of refurbishment schemes and new works. Infrastructure design for Roads, Housing and Building Projects Contract supervision Project Management of construction Projects AutoCAD Drawing Contract Documentation and Tendering Surveying Production of Land Plans Construction Design and Management (CDM) Coordinator Site investigation Our Customers The Roads Service maintains 652 miles of road in Shetland The Roads Service maintains approximately 4000 street lights The Roads Service undertakes analysis of 32 road traffic injury accidents on average each year The Roads Service grits over 300 miles of road on 60 days in the average year Page 10 of 29 Roads Service Plan 2015/16 The customers of the Roads Service include: all road users; all residents in Shetland; all visitors to Shetland; commercial and industrial businesses and enterprises. The provision of a comprehensive road and footway network benefits every business, visitor and person in Shetland and contributes to the social and economic well being of the community. It is not just car users and pedestrians that benefit; all transport, emergency and other services (including utilities) require a safe and well maintained road network to operate effectively and serve their customers. We also provide civil engineering advice, design and construction works for other Council departments and public bodies. Our Costs and Income The Service has [around] 78 full time equivalent staff and annual revenue expenditure of £3.9m [and a capital budget of £1.75million]. Service Number of Staff (FTE) Testing Laboratory 2.02 Carriage Ways 40.11 Footways 0.50 Street Lighting 3.02 Structures 1.72 Page 11 of 29 Gross Expenditure 104,020 5,500,012 65,633 529,735 155,471 Income - Net Budget 10,502 93,518 - 2,990,396 2,509,616 Capital Budget 527,375 - 30,242 35,391 - 158,963 370,772 174,000 - 58,161 97,310 585,000 Roads Service Plan 2015/16 Street Furniture 0.50 Traffic Management 0.46 Inspections 2.40 Winter Maintenance 8.42 Road Authority Functions 5.51 Maintenance & External Project Design 2.74 Scord Quarry 8.60 Road Safety 1.00 Roads Total 77 89,107 - 1,165 87,942 120,000 - 21,328 100,000 - 72,904 137,840 - 595,080 888,815 - 21,227 320,757 - 100,014 57,142 21,328 210,744 1,483,895 341,984 157,156 2,160,548 42,706 10,862,339 - 2,837,205 - 676,657 - 42,706 - 6,875,859 3,986,480 199,500 1,705,875 Funding and resources Roads Service has contributed to the Infrastructure Directorate savings of £6.3 million since 2012/13 including the £320k required for 2015/16. Infrastructure Services accounts for 20% of the overall Council General Fund budget. Page 12 of 29 Roads Service Plan 2015/16 Aims and Objectives Directorate Plan Aims Action The replacement of the Trondra Bridge bearings to maintain the road asset Manage the project with Roads staff using external contractor. The development of the new AHS roundabout and access roads, Clickimin footpath and cycle ways Manage the project with Roads staff using external contractor. Deliver the externally funded electric vehicle charging points and electric pool car pilot project Undertake the operation construction works. Directorate workforce planning to succession plan for future vacancies and fill skills gaps Training younger Roads staff to succeed leaving staff. Investigate employing modern apprentice in Roads Maintenance Operatives. Service Aims/Priorities Objectives/Actions (Details below) Improve the Asset Investment Plan decision making process by developing whole lifecycle costing for asset repairs and replacement Develop the Roads Asset Management Plan Maintain the roads network within budget constraints Complete the maintenance programmes for the year Page 13 of 29 Roads Service Plan 2015/16 Service Aims/Priorities Objectives/Actions (Details below) Maintain Best Practice in roads Collaborate with other councils and bodies to form Best Value and embrace new and cost effective methods/materials Detailed Actions/Plan for Change Previous Actions Completed in 2014/15 Description Deliver the agreed carriageway re-surfacing programme. Delivered Early/ontime/late 100% delivered on time Slight increase in carriageways requiring remedial treatment so intention to maintain the road network in current condition not quite met. 100% delivered on time Slight increase in carriageways requiring remedial treatment so intention to maintain the road network in current condition not quite met. 100% delivered on time Slight increase in carriageways requiring remedial treatment so intention to maintain the road network in current condition not quite met. Currently 90% delivered Maintain Shetland’s Road Network to ensure transport restrictions are minimised Deliver the new agreed surface dressing programme. Deliver the agreed programme for road reconstruction Deliver the agreed programme of Bridge Replacement and Maintenance Schemes. Page 14 of 29 Achieved original intention? Roads Service Plan 2015/16 Deliver the agreed street lighting improvement programme. Complete the replacement of the Laxaburn Brig, Sandsting Update the roads maintenance hierarchy Review of customer “minor works” request list to create a 5 year rolling programme for future use Page 15 of 29 Currently 80% delivered Ensure Shetland’s public road network is maintained and the Council’s carbon footprint is reduced by the introduction of low energy LED lighting 100% delivered on time Improve Shetland’s road network to allow a safer and more efficient network for “customers.” 100% delivered on time To prioritise the appropriate and efficient maintenance of the road network. 100% delivered on time List prepared and sent to Community Council’s for their ranking Roads Service Plan 2015/16 Ongoing Actions/Projects Started prior April 2015 Title/Heading Replacement of the Burra Bridge bearings and construction of maintenance walkway Team Design Start Nov 2014 End Output Expected Outcome/Supported Aims/Objectives June 2015 Walkway due to be installed before end of this financial year, bearings replaced next year Maintain Shetland’s Road Network to ensure transport restrictions are minimised This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ SIC currently in top 3 nationally in league of completed RAMP sections Completed RAMP and asset inventory that will enable decisions to be taken on the best use of limited resources when maintaining the road network. This will support the Council’s Aim of “Living within our means” Complete the missing sections of the Road Asset Management Plan (RAMP) in accordance with the SCOTS initiative Network Ongoing Ongoing Planning applications to be dealt with in specified time frame Network Ongoing Ongoing Continue to implement the streetlighting review Design and construct AHS access roundabout Page 16 of 29 Network Design Ongoing Ongoing April 2014 October 2015 Compliance with statutory duty Works programmed for the remainder of this financial year Roundabout constructed following design in 2014 The installation of 20 part-night lighting schemes plus the complete removal of 2 lighting circuits, thereby making long term cost and carbon savings. This will support the Council’s Aim of “Living within our means” Provide access to new AHS and proposed housing development at Staney Hill. This will support the Council’s Aim of “Best possible start for every child”. Roads Service Plan 2015/16 Ongoing Actions/Projects Started prior April 2015 Title/Heading Design and construct the new footpath/cycleway around the Clickimin Loch Replace 3 bitumen storage tanks at the Scord Quarry Team Start End Output Expected Outcome/Supported Aims/Objectives Provide access to new AHS and proposed housing development at Staney Hill. This will support the Council’s Aim of “Best possible start for every child”. Replace 3 bitumen storage tanks at the Scord Quarry to maintain the economies of bulk bitumen purchase. Design July 2014 June 2015 Footpath/cycleway constructed following design in 2014 Network June 2014 Sept 2015 Replace 3 bitumen storage tanks at the Scord Quarry New Planned Actions Due to Start in 2015/16 Title/Heading Deliver the new agreed carriageway re-surfacing programme. Page 17 of 29 Team Network Start April 2015 End March 2016 Output Maintain the carriageway in its present condition Expected Outcome/Supported Aims/Objectives Ensure Shetland’s public road network is maintained and any rutting and profile defects to the carriageways are improved This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ Roads Service Plan 2015/16 New Planned Actions Due to Start in 2015/16 Title/Heading Team Start End Network May 2015 August 2015 Maintain the carriageway in its present condition Deliver the new agreed programme for road reconstruction Maintenance April 2015 March 2016 Maintain the carriageway in its present condition Install new bitumen storage tanks, with electric heating, in the Scord Quarry boiler house to replace the old steam heated tanks. Network Sept 2015 Dec 2015 Reduce running costs at the Quarry Deliver the new agreed surface dressing programme. Output Install new bitumen emulsion plant at the Scord Quarry Network April 2015 May 2015 Maintain the ability to produce emulsion for the surface dressing operation Deliver the agreed programme of Bridge Replacement and Maintenance Schemes. Design April 2015 March 2016 Maintain the carriageway in its present condition Page 18 of 29 Expected Outcome/Supported Aims/Objectives Ensure Shetland’s public road network is maintained and any texture and cracking defects to the carriageway are improved This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ Ensure Shetland’s public road network is maintained and improved This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ To reduce the cost of heating bitumen at the Scord’s asphalt batching plant by approximately £18,000 per year. There will also be a reduction in CO2 production. This will support the Council’s Aim of “Living within our means” Ensure that bitumen emulsion for surface dressing can still be produced in Shetland This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ Maintain Shetland’s Road Network to ensure transport restrictions are minimised This will support the Council’s Aim of “The transport services we need most” “including roads which are maintained properly “ Roads Service Plan 2015/16 New Planned Actions Due to Start in 2015/16 Expected Outcome/Supported Aims/Objectives Ensure Shetland’s public road network is Reduce running costs maintained and the Council’s carbon footprint Deliver the agreed street lighting April March is reduced by the introduction of low energy Network of the street lighting improvement programme. 2015 2016 LED lighting stock This will support the Council’s Aim of “Living within our means” Bridge bearings and Maintain Shetland’s Road Network to ensure Replacement of the Trondra Bridge May October walkways installed transport restrictions are minimised bearings and construction of Design This will support the Council’s Aim of “The 2015 2015 and bridge maintenance walkway transport services we need most” “including serviceable roads which are maintained properly “ The Directorate level actions or most strategically significant operational actions to be delivered are set out in the Directorate Plan and will be monitored each quarter by the Directorate Management Team and Committee Members as part of the quarterly reviews. The key actions for this service are set out in this operational Service plans. Title/Heading Page 19 of 29 Team Start End Output Roads Service Plan 2015/16 Risks to Delivery/ Risk Register Almost certain 5 10 15 20 25 Rating Descriptor Description I would not be at all surprised if this happened within the next few months I would be mildly surprised if this occurred, but cannot entirely rule out the possibility I think this could maybe occur at some point, but not necessarily in the immediate future I think this could occur sometime in the coming year or so I would be very surprised to see this happen, but cannot entirely rule out the possibility Likely 4 8 12 16 20 5 Almost certain Possible 3 6 9 12 15 4 Unlikely Unlikely 2 4 6 8 10 3 Possible Rare 1 2 3 4 5 2 Likely 1 Rare Insignificant Minor Current risk details Page 20 of 29 Significa nt Major Catastro phic What we are going to do to manage those risks Residual Risk Roads Service Plan 2015/16 Operational Risks for Roads Service Gross Likelihood Gross Impact Gross Risk Rating Risk Details Services /contracts affected due to costs being higher than expected Roads buy in rock salt for winter gritting. lead time is up to 9 months. At times of severe weather the government implement their Salt Cell which is where they take control of all salt supplies in Scotland and issue supplies, at an inflated price. Salt boat takes time to organise, even when salt has been allocated to Shetland (2 weeks +) Possible Minor Medium (6) Storm, flood and other weather related Some areas of Shetland only have one access road, which is potentially vulnerable to being cut off, such as the Cunningsburgh cliffs which severs transport to the whole of the south mainland, and around Voe in the North. Unlikely Major Medium (8) Page 21 of 29 Residual Likelihood Residual Impact Residu al Risk Rating Ongoing monitoring of costs of services / contracts Unlikely Minor Low (4) Executive Manager None Unlikely Major Medium (8) Executive Manager Current and Planned Control Measure Lead Officer Roads Service Plan 2015/16 Gross Impact Gross Risk Rating Likely Significa nt High (12) Fit staff are designated to do all the intense physical work. Quarry also to have first call on roadworkers when short staffed. Failure of a main supplier causing a lack of resources, materials or equipment for service delivery Possible Minor Medium (6) Labour relations/dis gruntled staff Staff require specialist qualifications and skills to do the job. There is an expectation to travel for aspects of training. Unlikely Minor Bad debts Contractor/supplier unable to complete work or supply materials etc Contractor goes bankrupt Possible Significa nt Risk Details Staff numbers/sk ill shortages Staff at the quarry need to be versatile and adept at operating various complex machinery. Staff must also be able to drive and be psychically mobile enough to clime ladders and sloping walkways carrying spares, tools and equipment. Failure of key supplier Page 22 of 29 Gross Likelihood Residual Impact Residu al Risk Rating Likely Significa nt High (12) Executive Manager Manager tries to plan drilling, blasting and crushing to ensure some stock is always available. Unlikely Minor Low (4) Executive Manager Low (4) Look at workers remit. Flexible working. Issues dealt with at annual Review and Development meeting. Rare Minor Low (2) Executive Manager Medium (9) Regular monitoring of service. Spending/financial checks on contractors Rare Significa nt Low (3) Executive Manager Current and Planned Control Measure Residual Likelihood Lead Officer Roads Service Plan 2015/16 Risk Details Gross Likelihood Gross Impact Gross Risk Rating Current and Planned Control Measure Residual Likelihood Residual Impact Residu al Risk Rating Lead Officer Denial of access Lack of access to site due to land purchase problems / plannng issues Unlikely Significa nt Medium (6) Regular reviews of procedures with other department sections. Check meetings on land aquisition. Rare Minor Low (2) Executive Manager Professiona l errors and omissions Mistakes or omissions in contract documents or poor advice Possible Minor Medium (6) Staff training. Checking of documents. Cross section working. Unlikely Minor Low (4) Executive Manager Budget control failure Schemes/jobs/Procurement costing more than anticipated Possible Significa nt Medium (9) Regular monitoring of service spending/training Rare Significa nt Low (3) Executive Manager Late delivery Transport issues / Supplier out of stock Possible Significa nt Medium (6) Long lead-in time, make orders in good time, time management. Unlikely Minor Low (4) Executive Manager Performance Indicators Performance Indicators from Council Wide Performance Measures [P&I will establish next year’s “Council Wide” measures; they are likely to include the ones below. P&I will populate the table APART from the Directorate and Service target and the 2 statements, Directorates should complete these. These statements should declare what the Services will do to improve these indicators.] Page 23 of 29 Roads Service Plan 2015/16 Council Infrastructure Directorate 2013/14 Roads Service 2013/14 Indicators / Measure 2014/15 Performance 2015/16 Target 2014/15 Performance Sickness Absence Rates 3.9% 3.9% 3.6% Employee Review and Development Meetings held in Policy Period (MarMay) 26% 100% 21% Employee Review and Development Meetings held in the previous 12 months (as at Jan 2015) 57% 100% 60% Return to Work Interviews N/A 100% Page 24 of 29 2015/16 Target 2014/15 Performance 2015/16 Target 3.8% 3.7% 100% 35% 100% 100% 59% 100% 100% 100% Performance Statement Improvement Statement Infrastructure has a lower level of sickness than most of the Council Managing sickness absence effectively and monitoring it is a key activity for Roads Systems have been put in place to monitor the completion of return to work interviews. Managing sickness absence effectively and monitoring the return to work interviews is a key activity for Roads Roads Service Plan 2015/16 Key Service Indicators [As a rule, movement in an indicator should trigger a subsequent action. Caution against using PIs that have "always been measured" or reporting PIs just because they are easy to measure.] Performance Measure Performance 2012/13 Performance 2013/14 Performance 2014/15 Target 2015/16 RCI Indicator of Road condition 42.5% 41.4% 41.9% Maintain Performance Statement Improvement Statement Our Road infrastructure is aging and needs maintenance. The RCI is an indicator of the change in condition We use the RCI to target our repairs and maintenance in order to maintain the condition of the asset through better targeting of expenditure Service Performance Indicators from the Local Government Benchmarking Framework Scotland 2012/13 Shetland Indicator Min Page 25 of 29 Avg Max Year Value Rank Target Performance Statement Improvement Statement Roads Service Plan 2015/16 Scotland 2012/13 Shetland Target Performance Statement Improvement Statement The Service aims to maintain its improved ranking by continuing to target its reduced resources effectively. 9 The maintenance cost has been reduced by better targeting of reduced resources using the RCI survey The ranking has been improved by better targeting of reduced resources using the RCI survey The Service aims to maintain its improved ranking by continuing to target its reduced resources effectively. The ranking has been improved by better targeting of reduced resources using the RCI survey The Service aims to maintain its improved ranking by continuing to target its reduced resources effectively The ranking has been improved by better targeting of The Service aims to maintain its improved ranking by continuing Indicator Min Avg Max ENV4a - Cost of maintenance per kilometre of roads 804.60 ENV4b Percentage of A class roads that should be considered for maintenance treatment ENV4c Percentage of B class roads that should be considered for maintenance treatment ENV4d Percentage of C class roads that Page 26 of 29 14.70 20.95 8140.36 27.31 33.34 25959.71 44.50 65.00 Year Value Rank 11/12 8860.64 19 12/13 3831.93 8 13/14 3634.58 9 10/12 26.37 14 11/13 25.20 15 12/14 21.08 6 10/12 41.80 25 11/13 39.60 28 12/14 38.01 21 10/12 40.71 21 6 21 Roads Service Plan 2015/16 Scotland 2012/13 Shetland Indicator Min should be considered for maintenance treatment ENV4e Percentage of unclassified roads that should be considered for maintenance treatment Page 27 of 29 11.52 23.90 Avg 36.43 40.31 Max 62.60 60.40 Year Value Rank 11/13 39.90 23 12/14 38.18 14 08/12 54 30 09/13 53.20 30 10/14 53.99 25 Target Performance Statement Improvement Statement reduced resources using the RCI survey to target its reduced resources effectively The ranking has been improved by better targeting of reduced resources using the RCI survey The Service aims to maintain its improved ranking by continuing to target its reduced resources effectively 14 25 Roads Service Plan 2015/16 Other Performance indicators [Some work areas have specific indicators, or suits of Performance indicators that don't fit in to the above categories. Services to populate where applicable HEAT/APSE/ARC etc] Improvement Statement Indicator 2012/13 2013/14 2014/15 Target 2015/16 Performance Statement APSE 100% 100% 100% 95% This is a measure of Roads response to emergency defects and public notification. Reduced staffing numbers will make it difficult to retain the current percentages. Maintain the current High standard 97.14 97.14 96.88 95% This is a measure of Roads commitment to maintaining the carriageways is a safe condition. Reduced staffing numbers will make it difficult to retain the current percentages. Maintain the current High standard PI 03a - % of Category 1 defects made safe within response times APSE PI 39 - % of Safety inspections completed on time Contact Details Dave Coupe Executive Manager Gremista Lerwick ZE1 0PX dave.coupe@shetland.gov.uk 01595 744104 Page 28 of 29 Neil Hutcheson Asset & Network Gremista Lerwick ZE1 0PX neil.hutcheson@shetland.gov.uk Barrie Scobie Maintenance South & West Gremista Lerwick ZE1 0PX barrie.scobie@shetland.gov.uk Brian Wood Maintenance North & Isles Gremista Lerwick ZE1 0PX brian.wood@shetland.gov.uk George Leask Design Gremista Lerwick ZE1 0PX george.leask@shetland.gov.uk Roads Service Plan 2015/16 01595 744882 Page 29 of 29 01595 744134 01595 744108 01595 744137