Case study: № 1. When the sanitary survey treatment plant aeration "Salar" established that the waste water of the city of Tashkent in the amount of 50,000 cubic meters day passes cleaning on these plants: grille, sand traps, circular tanks, aeration tanks, secondary circular tanks. Wastewater disinfection with chlorine is carried out. The contact time is 30 minutes, if the index after chlorination of wastewater of 600 - 1000, the residual chlorine of 1.5 - 1.8 mg / l. Rate purification scheme, the conditions and the effectiveness of chlorination. Solutions. The purification scheme for sewage aeration "Salar" correctly. Terms and effectiveness of chlorination meets the hygienic requirements as for 0056-96 SanPin contact time must be at least 30 minutes, if the index is not more than 1000 chlorine residual of at least 1.5 mg / l Case study: № 2. When the sanitary survey treatment plant aeration "Salar" established that the waste water of the city of Tashkent in the amount of 100,000 cubic meters day passes cleaning on these plants: sand traps, circular tanks, aeration tanks. Wastewater disinfection with chlorine is carried out. The contact time is 30 minutes, if the index after chlorination effluent 600 - 900, residual chlorine of 1.5 - 1.6 mg / l. Rate purification scheme, the conditions and the effectiveness of chlorination. Solutions. The purification scheme for sewage aeration "Salar" wrong, because according to KMK "Sewerage. Internal and external networks "should be grille and secondary sedimentation tanks. Terms and effectiveness of chlorination meet hygienic requirements, as for 0056-96 SanPin contact time must be at least 30 minutes, if the index is not more than 1000 chlorine residual of at least 1.5 mg / l n the sanitary survey treatment plant aeration "Salar" established that the waste water of the city of Tashkent in the amount of 1000 cubic meters day passes cleaning on these plants: sand trap grille, circular tanks, aeration tanks secondary sedimentation tanks. Wastewater disinfection with chlorine is carried out. The contact time is 25 minutes, if the index wastewater after chlorination 1600 - 1900, residual chlorine of 1.2 - 1.4 mg / l. Rate purification scheme, the conditions and the effectiveness of chlorination. Solutions. The purification scheme for sewage aeration "Salar" wrong, because according to KMK "Sewerage. Internal and external networks' money had to be aeration tanks and secondary sedimentation tanks. Terms and effectiveness of chlorination does not meet hygienic requirements, as for 0056-96 SanPin contact time must be at least 30 minutes, if the index is not more than 1000 chlorine residual of at least 1.5 mg / l Case study number 4 Assess the effectiveness of wastewater treatment aeration station "Salar" according to the given protocol №33.Spusk wastewater is carried out in the Salar River within the city limits. Protocol №33. Studies wastewater purification steps. Location of sampling -ochistnye facilities. Time-sampling 25.12.2008g. indicators analysis 125.0 waste water After after circular aeration tanks 110.0 12.0 11.0 37.0 99.0 99.0 Relative stabilonost% 55.0 55.0 50.0 50.0 Chlorides, mg / l 18.2 18.0 10.2 9.8 Ammon nitrogen, mg / l 0.0 0.0 0.1 0.14 Nitrite Nitrogen, mg / l 0.0 0.0 9.6 9.0 nitrate nitrogen ------- -------- -------- 1.5 incoming BOD, mg.02 / l after chlorination 10.0 Solutions In assessing the biological treatment should first clarify the analysis of waste water availability indicators reflecting 1 (BOD stability) and 2 (ammonia nitrogen, nitrate nitrogen) phase oxidation of organic substances. To assess the technical efficiency of biological treatment is necessary to focus on the performance analysis of wastewater BOD aqueous stability of the compounds of group nitrogen (ammonia nitrogen, nitrite nitrogen, nitrate nitrogen). Method of determining the technical efficiency izlazhena above. Results: The technical efficiency for BOD. Is 96%, which corresponds to the KVM trebuvaniyam Sewerage. From the analysis it follows that the process of oxidation of organic substances is evidenced: 1, reducing the concentration of ammonia nitrogen from 18 to 10.2 mg / l 2-appearance of nitrite and nitrate nitrogen (0.1 and 9.6 mg / l) Assessing the relative stability of the wastewater should be aware that the biological ochistkaaa effective in terms of relative stability is not meene .Poskolku 80% in the above analysis of the stability of wastewater after treatment is 99% it can be otsenina positive. Case study number 5 Assess the effectiveness of wastewater treatment aeration station "Salar" according to the given protocol №205.Spusk wastewater is carried out in the Salar River within the city limits. Protocol №205. Studies wastewater purification steps. Location of sampling -ochistnye facilities. Time-sampling 20.10.2008g. indicators analysis Temperatura.S 22.5 waste water After after circular aeration tanks 22 19.5 transparency.sm 2.0 9.0 12.0 19.0 Precipitate volume 2.1 1.1 0.9 0.2 suspended solid matter in mg / l 110.0 55.0 92.0 16.0 Total mikrob.chislo 380000 92000 38000 3000 if the index 2380000 238000 238000 800 Incomin g After chlorination 20 Residual chlorine mg / l -------- ------- ------- 1.5 solutions To evaluate the effectiveness of the mechanical cleaning technology primarily from analysis should identify indicators wastewater precipitate volume defined in further transparency (%) reduction in the concentration of suspended solids (x1) precipitate (x2) after the mechanical treatment compared to the incoming. Taking as 100% the amount of suspended solids or sludge volume in the incoming waste water find% suspended solids remaining in mg l and sludge volume. 55 х 100 1 х 1 х 100 Х 1 = ----------------------= 50 % Х2 = --------------------------- = 50 % 110 2, 2 It follows that the technical efficiency of mechanical treatment is 50%. The analysis shows that, along with a decrease in the weighted substances increases the transparency of wastewater can vary from 2 to 9 cm. Assessing technical efficiency mechanical treatment should focus on the KVM Sewerage which provides for effectiveness delay the weighted substances in lagoons at 45-50%. To evaluate the effectiveness of disinfection should be in addition to determining if% reduction index rely on surface water from sewage pollution SanPin 0056-96 .Otsutstvie anija contain pathogens in the water is achieved by disinfection of biologically treated wastewater to the index if not more 1000pri residual chlorine less than 1.5 mg / l. Thus, treatment of wastewater as on stages and in general shows a high technical efficiency. Case studies: № 1. Assess the effectiveness of wastewater treatment aeration station "Salar" according to the given protocol №22.Spusk wastewater is carried out in the Salar River within the city limits. Protocol №22. Studies wastewater purification steps. Location of sampling -ochistnye facilities. Time sampling-12.11.2008. indicators analysis waste water Incomin g Temperatura.S 23.5 After circular tanks 21 after aeration After chlorination 19.0 21 transparency.sm 2.5 8.0 14.0 18.0 Precipitate volume 2.2 1.5 0.8 0.3 suspended solid matter in mg / l 115.0 75.0 95.0 15.0 Total mikrob.chislo 370000 95000 37000 3100 if the index 2350000 235000 235000 810 Residual chlorine mg / l -------- ------- ------- 1.4 Situational problem number 2. Assess the effectiveness of wastewater treatment aeration station "Salar" according to the given protocol №20.Spusk wastewater is carried out in the Salar River within the city limits. Protocol №20. Studies wastewater purification steps. Location of sampling -ochistnye facilities. Time-sampling 25.11.2008g. indicators analysis Temperatura.S 22.0 Waswte water After after circular aeration tanks 21 19.7 transparency.sm 2.3 9.7 13.0 19.5 Precipitate volume 2.5 1.7 0.8 0.2 suspended solid matter in mg / l 115.0 58.0 97.0 18.0 Total mikrob.chislo 3805000 925000 385000 3500 if the index 23850000 2385000 2385000 850 Residual chlorine mg / l -------- ------- ------- 1.1 Incoming Situational tasks number 3. After chlorination 20.1 Assess the effectiveness of wastewater treatment aeration station "Salar" according to the given protocol №15.Spusk wastewater is carried out in the Salar River within the city limits. Protocol №15. Studies wastewater purification steps. Location of sampling -ochistnye facilities. Время взятие пробы22.10.2008г. indicators analysis Temperatura.S Waste water incoming After after circular aeration tanks 22.5 22 19.5 transparency.sm 2.0 9.0 12.0 19.0 BOD 125.0 110.0 12.0 10.2 relative stability 11.0 35.0 95.0 99.0 chlorides 55.0 55.0 50.0 50.0 if the index 2380000 238000 238000 800 Residual chlorine mg / l -------- ------- ------- 1.3 After chlorination 20 Situational problem number 4. When san. Survey treatment plant orders. doctors established that the fault of the chief engineer of the sewage treatment plant control treatment plant is carried out once a week. These laboratory analysis showed that the effluent quality to allow epidemiological indicators consider water sbrasyvaemy open water epidemiological safety. Earlier workers with storany treatment plant violations were noted. Give your decision. Situational problem number 5. When san. Survey treatment plant orders. doctors established that the fault of the chief engineer of the WWTP control of chlorination of water is carried out once a day. These laboratory analysis showed that the effluent quality to allow epidemiological indicators consider water sbrasyvaemy open water epidemiological safety. Earlier workers with storany treatment plant violations were noted. Give your decision.