Akhtar Rasool Maken S/O:Ghulam Mohy Uddin Email Address: engrarmaken@gmail.com Permanent address :Maken House Kundian, Teh.Piplan Dist. Mianwali, Mob. #: 00923343900809 DOB: 10/10/1985 Domicile :Mianwali (Pakistan) Religion: Islam Marital status: Single CNIC #: 38303-1910130-1 Objective To work in an environment where my technical and interpersonal skills can be put to fruitful use and make motivate me to demonstrate my knowledge and creativity to become a successful engineer. Experience Center for Advance Research in Engineering Pakistan Pvt. Limited. Designation: System Automation Engineer Duration: May 2010 to update.(above 3 years ) Responsibilities: Consulting customer during design and implementation of the new complicated services, experiencing severe problems resulting in successful issue resolution. Analyzing new automation system requirements, architecting and implementing creative solutions to achieve goals. Leading multiple concurrent projects for different applications, responsible for timely development, coordination, smooth implementation and production functioning of the automation systems. Developing applications mainly using (open source development platforms such as EPICS control system) Responsible to develop software and provide technical leadership. Used real time and Linux environment Administrative tasks for Linux based systems Developing automated systems for Oil and Gas Stations for sensing pressure, temperature, and fuel flow using Linux based system development Specify Install, and Program Programme able Logic Controller (PLC) Participating in controls R&D projects. Read and interpret technical information from the manufacturer's and OEM technical manual. Yanbu Cement Company Saudi Arabia Designation: Instrumentation Engineer. Duration: Dec 2009 to May 2010 (Half year approx.) Responsibilities: Successful commissioning of the raw mill, Coal mill. Complete in house engineering like that IO allotment, Cable schedule Preparation, Field instrument erection, Calibration, Loop testing and programming. Designing of Control Philosophy & Plant Automation for Raw mill, Coal mill, Preparation technical Specification of various all Instrumentation Equipments. Preparation of Input-Output List and of P & ID Diagram Raw mill, Coal mill, Preparation of Control Scheme for Raw mill, Coal mill, Preparation of Cable Schedule from Remote I/O Panel to IJB & FJB. Looking after the activities related to commissioning of Raw mill, Coal mill. Preparation and defining control logics for operation in software for automation control System Supplied by Rockwell Automation. Modification of the control logic for smooth and effective operation of the plan Material management and handling. Best Way Cement Factory Chakwal Pakistan. Designation: Maintenance Engineer. Duration: Jan 2009 to Dec 2009 (1 year approx.) Maintenance of Different Equipment Like. Material Handling Equipments: Belt conveyors, Bucket Elevators, Screw conveyors, Air slides, Truck unloader, Bag filters, etc. Utility Equipments: Air compressors, Blowers, pumps. Packing plant equipment like packer, belt conveyor, vibrating screen, truck loader etc & maintain & follow-up spare part list. Planning and effecting preventive maintenance schedules of various machinery and instruments to increase machine up time / equipment reliability; thereby accomplishing planned production targets within budget. Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement of specification and offer evaluation. Planning and executing capital procurement. Drawing checking. Preparation of Flow sheet, Bill of material etc. Fabrication of equipment,& structure. Contractor bill checking. Erection & Commissioning of PACKING PLANT EQUIPMENT supplied by enexo. Erection &Commissioning or ROLLER PRESS, BALL MILL, BUCKET ELEVATOR, BAG FILTER, TRUCK UNLOADER 100 TPH. SKS SEPERATOR, CYCLONE ETC. Erection &Commissioning of CLINKER SILO (10000, 20000MT CAPACITY) & FLY ASH SILO (CAP.5000 MT.) Plant Modification work in Grinding Unit. Production Department in Cement Plant. 1 Area of work- Operation and controlling of process parameters of Kiln, Coal Mill (VRM),Raw Mill(VRM), Roller Press, Ball Mills and maintaining required quality of the product at all stage of manufacturing to achieve targeted production at optimum cost with zero accident. Inspection and installation of refractory in complete plant (Cooler, Kiln & Preheater) during shutdown. 2 Directly involved with the Process and Production Department. Also involved in various project enhancements. Planning and monitoring maximum budgeted running hour of all the equipments, planning and monitoring maintenance activities. Down time analysis, troubleshooting and problem solving. Chashma Hydroelectric Power Plant Mianwali Pakistan Designation: Electrical Supervisor. Duration: Feb 2008 to Jan 2009 (1 year approx.) Responsibilities: 184 MW Chashma Right Bank Hydro Electric Power Plant, consisting of 8 turbines of 23 MW each. Generators, HT & LT motors and motor protection relays, step up Power transformers and Interconnecting transformers and step down Auxiliary transformers with protection relays. HV and LV switchgear including 20 KV GCB, 400/220 KV circuit breakers and isolators and 6.6 KV vacuum breakers & contactors and ACBs with protection relays and interlocks. EHV switchyard including four 400KV and eight 220 KV overhead lines with Lightning Protection, Earthing System, PLCC and Protection Relays. BSDGs, Static frequency converters (for gas turbine start up), Static excitation system, UPS, Battery chargers, Inverters, VFDs, Cathodic protection, Chillers, HVAC systems. Water pre-treatment and Demineralization plant, Chemical dosing plant, Effluent treatment and disposal plant, River water pumping station, Fire Fighting system, Gas pressure reducing station, Plant drainage and sewage treatment plants. Power plant operation and control with DCS and EHV Switchyard operation and control with SCADA and DM and Water pre-treatment plant operation and control with WIN CC system. Power plant Operation handling three combined cycle units (382.5 MW each) and balance of plant equipments including switchyard. Conducted regular inspection and tests to ensure the performance capacity of various machines and equipments. Assist in the functions of troubleshooting and breakdown / preventive / corrective / routine maintenance for reducing machinery downtime to minimum. Supervision of erection and assistance in commissioning of plant. Coordination with Contractors, Subcontractors, Consultants and Vendors. Erection & Commissioning of Fire fighting system, Water pre-treatment plant, Demineralization plant, Black start Diesel Generators, Chillers Plant, HVAC systems and power plant lighting equipments. Supervision of Mechanical/Electrical Erection & Commissioning works at site involving Inspection, witnessing of tests as per FQP, measurement and certification of works carried-out at site by the contractors and sub-contractors. Involved with Successfully implementation of ISO 9001:2000, ISO 14001:2004, OHSAS 18001:2007 – Integrated Management System in the organization. Also involved with Integrated Management System Audits. Education 2003-2007-08 2001-2003 1999-2001 Dawood College of Engineering & Technology Karachi affiliated with Mehran University of Engineering & Technology Jamshoro Hyderabad - Pakistan B.E. Electronics Engineering. Percentage: 72.6% PAEC Model College for Boys Chashmamianwali -Pakistan FSc in Science Group (Physics, Maths& Chemistry) Percentage: 72% Govt. Higher Secondary School Kundian , Mianwali - Pakistan Matriculation Percentage: 83%