NBSAP English December 28

advertisement

United Nations Development Programme

UNDP Project Document

Country: Republic of Azerbaijan

Project title: National Biodiversity Planning to Support the implementation of the

Convention on Biological Diversity 2011-2020 Strategic Plan in

Republic of Azerbaijan

UNDAF Outcome(s): UNDAF Outcome 1.3 Relevant national strategies, policies, and capacities strengthened to address environmental degradation, promote the green economy, and reduce vulnerability to climate change.

Expected CP Outcome(s) 1.3.3 Priority ecosystems and/or economic sectors vulnerable to climate change are identified and strategies for improving their resilience are in place 1.3.8 Size of marine and other ecosystems registered and managed as Protected Areas is expanded

Implementing Agency: Ministry of Ecology and Natural Resources of the Republic of

Azerbaijan

Brief description

This project is part of the second generation of Biodiversity Enabling Activities (BD EA) under the

GEF. Azerbaijan has been Party to the Convention on Biological Diversity (CBD) since 08/03/2000.

The project addresses the country’s need to continue to fulfill its obligations under the CBD, with particular focus on the Convention’s Article 6 and the CBD COP Decision X/2 . It should be mentioned, that on the 10 th meeting of Member States conducted on October 18-29 2010 in Aichi

District of Nagoya city of Japan the updated Strategic Plan, including Aichi Targets on Biodiversity for the years 2011-2020 have been adopted. Above all, the project is a significant contribution to

Azerbaijan’s efforts towards implementing the CBD Strategic Plan 2011-2020 at the national level. The project builds on the current status and achievements of Azerbaijan with respect to biodiversity planning and reporting. It aims to integrate Azerbaijan’s obligations under the CBD into its national development and sectoral planning frameworks through a renewed and participative ‘biodiversity planning’ and strategizing process. This process is expected to produce measurable targets for biodiversity conservation and sustainable use. It will equally ensure that the value of ecosystems’ goods and services, as well as the challenges and opportunities for ecosystem-based adaptation and resilience are taken into consideration in the process. The project will achieve its objective through the implementation of three components, whose activities are thoroughly described in the GEF approved proposal for BD EA. They are: (1) A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi Targets; (2) The

NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience; and (3) National frameworks for resource mobilization, Convention reporting and exchange mechanisms are strengthened.

PRODOC 4779 GEF5 BD EA Azerbaijan 1

Programme Period: 2011-2015

Key Result Area (Strategic Plan): Environment and sustainable development: Mainstreaming environment and energy

Atlas Award ID: 00063580

Atlas Project ID: 00080589

Start date: January 2013

End Date December 2015

Management Arrangements: National

Implementation

Total resources required US$ 243,000

Total allocated resources (in the TBW): $ 243,000

Regular (UNDP) $ 33,000

GEF $210,000

PRODOC 4779 GEF5 BD EA Azerbaijan 2

Contents

ACRONYMS .................................................................................................................................................. 4

SITUATION ANALYSIS .............................................................................................................................. 5

MANAGEMENT ARRANGEMENTS ........................................................................................................ 8

MONITORING AND EVALUATION PLAN AND BUDGET................................................................ 10

LEGAL CONTEXT ..................................................................................................................................... 11

STRATEGIC RESULTS FRAMEWORK ................................................................................................. 13

TOTAL BUDGET AND WORKPLAN ..................................................................................................... 16

PRODOC 4779 GEF5 BD EA Azerbaijan 3

PRODOC

Acronyms

APR/PIR

BD Biodiversity

BD EA Biodiversity Enabling Activities

CBD Convention on Biological Diversity

CDR Combined Delivery Report

CHM Clearing House Mechanism

CO Country Office (UNDP)

COP Conference of the Parties

CPAP Country Programme Action Plan

DRR Deputy Resident Representative

GEF Global Environment Facility

ID Identification number

LOA Letter of Agreement

M&E Monitoring and Evaluation

NBSAP National Biodiversity Strategy and Action Plan

Annual Project Review / Project Implementation Report

NBS National Biodiversity Strategy

NEX National Execution

NGO Non-Governmental Organization

PM Project Manager

PMU Project Management Unit

PA Protected Areas

POPP

PoWPA

UNDP’s Programme and Operations Policies and Procedures

CBD’s Programme of Work on Protected Areas

PSC

QOR

SBAA

Project Steering Committee

Quarterly Operational Reports

Standard Basic Assistance Agreement

SRF Strategic Results Framework

TBW Total Budget and Workplan

TTTT Tourism, Trade, Travel and Transport

TEEB The Economics of Ecosystems and Biodiversity

UNDAF United Nations Development Assistance Framework

UNDP United Nations Development Programme

TOR Terms of Reference

USD United States Dollar

4779 GEF5 BD EA Azerbaijan 4

Situation Analysis

Consistent measures were taken in the Republic of Azerbaijan in protecting biodiversity. Among other steps, the territory of the special protected areas has been increased 2-3 times, 9 National

Parks, 4 new State Reserves and 6 new State Sanctuaries were created, goited gazelle, which has been included in the “ Red Book ” of the Republic of Azerbaijan, has been introduced to its historic area of habitat, the dynamic of growth of such species as leopard, mountain moufflon, pasan, dotted wild cats, has been studied, the 2 nd

edition of the Republic of Azerbaijan ’ s “ Red

Book ” has been published.

This Project Document serves to operationalise at the level of UNDP and the Ministry of

Ecology and Natural Resources, the proposal for Biodiversity Enabling Activities approved by the GEF on November 14 2011.

The project builds on the current status and achievements of the Republic of Azerbaijan with respect to its obligations vis-à-vis the Convention on Biological Diversity (CBD), to which she is a party to, in particular the country’s biodiversity planning and Convention reporting processes, and its commitment to implement, at the national level, the CBD’s Strategic Plan for the period

2011-2020.

The NBSAP for Azerbaijan was completed in 06/28/2008. This version of the NBSAP does not include a number of elements of the CBD Strategic Plan’s Aichi Targets and newer COP guidance. The new CBD Strategic Plan, adopted at CoP-10 in 2010 in Nagoya, clearly addresses the need for updating NBSAPs, stating in Target 17 that “By 2015, each Party has developed, adopted as a policy instrument, and has commenced implementing an effective, participatory and updated national biodiversity strategy and action plan.” The strategic plan also covers a range of issues that will need to be incorporated into the revised NBSAPs, including guidance to countries to: a) fully realise the value of biodiversity and ecosystem services, and incorporate these values into national and local development and poverty reduction strategies (Targets 1 and 2); b) increase the global terrestrial protected area estate from 12% to 17% and the marine estate from

6% to 10% (Target 11); c) restore and safeguard key ecosystem services, especially for water, health and livelihoods (Target 14); and d) strengthen ecosystem resilience to climate change and promote ecosystem-based approaches to climate change adaptation and mitigation (Target 15).

Together, all of the above elements constitute the ‘Point of Departure’ and general context for the current Biodiversity Enabling Activities project of Azerbaijan.

Strategy

1.

The stakeholder engagement process in Azerbaijan will start with the CBD national focal points, the NBSAP responsible authority, namely the Ministry of Ecology and Natural

Resourses; and thereafter it will expand to include a much broader range of national actors.

Developing and implementing Azerbaijan’’s NBSAP will be a widely inclusive and participative process.

PRODOC 4779 GEF5 BD EA Azerbaijan 5

2.

A National Steering Committee, an Advisory Board and one or more working groups will be proposed for accompanying the process of developing national targets, updating the NBSAP and preparing the national reports. Below is an overview of the potential role of different stakeholders and the rationale for their involvement in the project.

Biodiversity conservation

Academia

Sustainable agriculture

Climate change

Tourism

Sector

Non-governmental

Organization

Energy

Fisheries

Forestry

Forestry

Legislation

Awareness and Education

Economic Development

Table 1. Stakeholder Matrix

Ministry, Committee, Agency and Organization

Ministry of Ecology and

Natural Resources

National Academy of Sciences Advisory Board member, contributor of information and participant in consultative meetings

Ministry of Agriculture

Ministry of Ecology and

Natural Resources

Advisory Board member, contributor of information

Executing agency of the project and responsible for development of policy and legislation

Ministry of Culture and

Tourism

Ruzgar

(NGO)

Potential role in the project and rationale for involvement

Executing agency of the project and responsible for development of policy and legislation

Advisory Board member, contributor of information

Advisory Board member, contributor of information and participant in consultative meetings

Ministry of Industry and

Energy

Ministry of Ecology and

Natural Resources

Ministry of Ecology and

Natural Resources

State Committee on Land and

Cartography

Ministry of Justice

Ministry of Education

Ministry of Economic

Development

Advisory Board member, contributor of information and participant in consultative meetings

Executing agency of the project and responsible for development of policy and legislation

Executing agency of the project and responsible for development of policy and legislation

Advisory Board member, contributor of information,

Legislative support

Support in awareness-raising and education

Contributor of information

Project Goal, Objective and Components

3.

The project’s goal

is to enable Azerbaijan to integrate its CBD obligations into national planning processes, in light of the CBD’s Strategic Plan 2011-2020.

4.

Project Components:

Component 1

Biodiversity planning and preparation of biodiversity inventory by attracting involved stakeholders in accordance with Aichi Targets

PRODOC 4779 GEF5 BD EA Azerbaijan 6

Component 2

Preparation of NBSAP and inclusion of NBSAP into national development strategy

Component 3

National frameworks for resource mobilization, Convention reporting and exchange mechanisms are established and strengthened

Component 4

Project management

5.

There are 3 Outcomes expected as a result of GEF Components implementation:

Outcome 1

A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi Targets

Outcome 2

The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience

Outcome 3

National frameworks for resource mobilisation, Convention reporting and exchange mechanisms are established and strengthened

Project Risks

I DENTIFIED R ISKS

Table 2. Project Risks Assessment and Mitigation Measures

Inability to reach consensus among some stakeholders on an agreed strategy and action plan

Limited human and technical capacity to implement the project

Many sources of available information on biodiversity conservation outside the Ministry of Ecology and Natural Resources and authorities. Lack of willingness to share this information

R ISK

A SSESSMENT

M ITIGATION M EASURES

Moderate The main stakeholders in Biodiversity Conservation and

Mainstreaming in Azerbaijan will be identified and brought together in a NBSAP committee and working groups as required.

A broader range of stakeholders will be engaged in the larger process through consultative mechanisms e.g. workshops, information requests.

Low The Project Director will be a CBD National Focal Point, a senior government official with extensive experience in biodiversity conservation. She will be supported by a National

Technical Advisor with prior experience in biodiversity planning.

Low The CHM will be developed in such a way that it is beneficial to all stakeholders and users that provide information. This will include advance information search, discovery, retrieval and dissemination functions. Also uniform identity attributes, information security standards, information access rules, user authorization and access control will be put in place to promote common trust. Tools and incentives will be developed to collaborate and share knowledge and expertise and information.

PRODOC 4779 GEF5 BD EA Azerbaijan 7

Management Arrangements

6.

A Project Steering Committee (PSC) is proposed to serve as the project’s coordination and decision-making body. The Steering Committee will consists of central executive agencies involved in day-to-day management of the Project, therefore the Ministry of Ecology and

Natural Resources and UNDP will be represented in it. The Steering Committee will function as the ‘Project Board’, as per guidance in UNDP’s Programme and Operations Policies and

Procedures (POPP).

However, to guarantee the involvement of all major stakeholders in policy-making and strategysetting, the broader Advisory Board will be created to provide counseling on NBSAP and all related activities. The composition of Advisory Board is given in Table 1.

7.

Until the PSC has met and has deliberated, the following are the proposed TOR for the

Committee:

Provide policy and strategic oversight and support to the implementation of the project by the

Ministry of Ecology and Natural Resources, in particular to the process of updating the

NBSAP, developing the country’s CHM and of completing and submitting national reports to the CBD with full government endorsement.

Advise and ensure stakeholder involvement on matters of biodiversity sectoral and development mainstreaming, biodiversity valuation and on the nexus biodiversity-climate change.

Review and approve project’s annual work-plans, as well as other project planning and implementation instruments.

 Provide inputs to the projects’ APR/PIR.

Support project evaluations, if applicable

Deliberate on the TOR and membership for other committees and working groups that are expected contribute to the implementation of project activities and the achievement of its outcomes.

Any other relevant task as applicable.

PRODOC 4779 GEF5 BD EA Azerbaijan 8

Project Organisation Structure

Senior Beneficiary and Executive Agency:

Ministry of Ecology and Natural Resources

Project Board

Senior Supplier:

UNDP/DRR

Advisory Board

Project Manager Project Support

Admin/Finance

NBSAP Review

Consultant

Expert in the interface

Biodiversity and Climate

Change

BD Capacity Needs

Assessment Consultant

Management Arrangements

8.

Project Board/Steering Committee is responsible for making management decisions for a project in particular when guidance is required by the Project Manager. The Project Board plays a critical role in project monitoring and evaluations by quality assuring these processes and products, and using evaluations for performance improvement, accountability and learning:

Implementing Partner- this role will be performed by the Ministry of Ecology and

Natural Resources

Senior Supplier- this role will be implmented by the Deputy Resident Representative of the UNDP or designated Programme Adviser

9.

Project Assurance.

UNDP will designate a Programme Advisor to provide independent project oversight and monitoring functions, to ensure that project activities are managed and milestones accomplished. The UNDP Programme Advisor will be responsible for reviewing

Risk, Issues logs, Annual Plan of Activities, budgets and ensuring compliance with the

Monitoring and Communications Plan.

10.

Project Support. UNDP will provide financial and administrative support to the project including procurement, contracting, travel and payments.

PRODOC 4779 GEF5 BD EA Azerbaijan 9

11.

Expert Support.

Most of the activities will be conducted by both national experts. Additional experts can be hired to provide a third party assessment of the projects activities and accomplishment of project goals and outputs.

12.

Project Manager : The Project Manager (PM) has the authority to run the project on a dayto-day basis on behalf of the Implementing Partner within the constraints laid down by the

Board. The Project Manager’s prime responsibility is to ensure that the project produces the results specified in the project document, to the required standard of quality and within the specified constraints of time and cost.

13.

Project Support : The Project Support role provides project administration, management and technical support to the Project Manager as required by the needs of the individual project or

Project Manager.

14.

Audit : In compliance with LOA with the Government of Azerbaijan (15/02/2010) on provision of support services the project will be subject to audit as deemed necessary.

Monitoring and Evaluation Plan and Budget

Monitoring and reporting

15.

At the initial stage of the project, the project Monitoring and Evaluation system, composed of following components will be developed: a) Monitoring plan, with defined benchmarks, indicators and targets, based on results and resources framework to be developed by the PM/coordinator in consultation with relevant

UNDP programme staff – this will be based on the M&E Plan included in the GEF proposal b) Risk, issues and quality logs to be created by the PM and relevant program officer; c) Annual project planning (with detailed activities and budget) and reporting to be conducted by the PMU; d) Annual project reporting and monitoring, conducted by the PMU and the Project Board

(also to include risk and issues monitoring and development of lessons learned reports);

16.

All main reports will be complied by the PMU and endorsed by the Project Board. Regular financial reports will be submitted to UNDP according to the UNDP financial rules and regulations. The M&E System should include standardized formats (aligned with UNDP procedures and formats) for the following documents:

- annual progress report, including financial report

- annual monitoring report, including risk monitoring report

- annual lessons learned report

- annual action plan

- annual report, including financial report,

- Quarterly Operational Reports (QOR), which is to be prepared every three months on key activities, but which is brief and does not exceed 150 words.

PRODOC 4779 GEF5 BD EA Azerbaijan 10

- the simplified Biodiversity Enabling Activities Annual Project Review / Project

Implementation Report (APR/PIR)

- PMU monthly workplans and progress reports

- task reports

- final report, including lessons learned

Communications and visibility requirements

17.

Full compliance is required with UNDP’s Branding Guidelines. These can be accessed at http://intra.undp.org/coa/branding.shtml

, and specific guidelines on UNDP logo use can be accessed at: http://intra.undp.org/branding/useOfLogo.html

. Amongst other things, these guidelines describe when and how the UNDP logo needs to be used, as well as how the logos of donors to UNDP projects needs to be used. For the avoidance of any doubt, when logo use is required, the UNDP logo needs to be used alongside the GEF logo. The GEF logo can be accessed at: www.thegef.org/gef/GEF_logo . The UNDP logo can be accessed at http://intra.undp.org/coa/branding.shtml

.

18.

Full compliance is also required with the GEF’s Communication and Visibility Guidelines

(the “GEF Guidelines”). The GEF Guidelines can be accessed at: www.thegef.org/gef/sites/thegef.org/files/documents/C.40.08_Branding_the_GEF%20final_0.pdf

. Amongst other things, the GEF Guidelines describe when and how the GEF logo needs to be used in project publications, vehicles, supplies and other project equipment. The GEF

Guidelines also describe other GEF promotional requirements regarding press releases, press conferences, press visits, visits by Government officials, productions and other promotional items.

19.

Where other ministries and project partners have provided support through co-financing, their branding policies and requirements should be similarly applied.

Legal Context

20.

This document constitutes a Project Document as referred to in the SBAA signed between the Government of Azerbaijan and UNDP on January 6, 2001 and all CPAP provisions apply to this document.

21.

Consistent with the Article III of the Standard Basic Assistance Agreement, the responsibility for the safety and security of the implementing partner and its personnel and property, and of

UNDP’s property in the implementing partner’s custody, rests with the implementing partner.

22.

The implementing partner shall: a) put in place an appropriate security plan and maintain the security plan, taking into account the security situation in the country where the project is being carried;

PRODOC 4779 GEF5 BD EA Azerbaijan 11

b) assume all risks and liabilities related to the implementing partner’s security, and the full implementation of the security plan.

23.

UNDP reserves the right to verify whether such a plan for this project is in place, and to suggest modifications to the plan when necessary. Failure to maintain and implement an appropriate security plan as required hereunder shall be deemed a breach of this agreement.

24.

The implementing partner agrees to undertake all reasonable efforts to ensure that none of the

UNDP funds received pursuant to the Project Document are used to provide support to individuals or entities associated with terrorism and that the recipients of any amounts provided by UNDP hereunder do not appear on the list maintained by the Security Council

Committee established pursuant to resolution 1267 (1999). The list can be accessed via www.un.org/Docs/sc/committees/1267/1267ListEng.htm

. This provision must be included in all sub-contracts or sub-agreements entered into under this Project Document.

PRODOC 4779 GEF5 BD EA Azerbaijan 12

STRATEGIC RESULTS FRAMEWORK

Strategic results framework, SRF (formerly GEF logical framework) analysis

Indicator framework as part of the SRF

Objective/ Outcome Indicator Baseline

Objective – To integrate

Azerbaijan’s obligations under the

Convention on Biological Diversity

(CBD) into its national development and sectoral planning frameworks through a renewed and participative ‘biodiversity planning’ and strategizing process, aligning the results of the process to the global guidance contained in the

CBD’s Strategic Plan for 2011-

2020.

Outcome 1 – A participative

End of Project target Risks and assumptions

The inclusion of measurable biodiversity conservation and sustainable use targets into the following sectoral planning frameworks:

Agriculture,

Forestry

Livestock

Extractive Industries

Tourism, Trade, Travel and Transport

(TTTT)

Fishery

Water

The inclusion of measurable biodiversity conservation and sustainable use targets into the following development frameworks:

Land-use management, including spatial and infrastructural development planning

Population & urban planning

Poverty alleviation

Rural development and livelihoods

Climate change mainstreaming

No targets available in order to measure the loss of biodiversity and ecosystem functionality in the agriculture, forestry, tourism, trade, travel and transport and fishery sectors

No targets to measure the integration of biodiversity and sustainable development into the main development frameworks of

Azerbaijan

By the end of 2015, national targets have been defined for measuring the integration of biodiversity conservation and sustainable use in the agriculture, extractive industries, forestry, livestock, TTTT, fishery and water sectors and these targets are included in the national planning frameworks of the sectors, where available.

By the end of 2015, all the main development sector/areas considers biodiversity conservation and sustainable use in their development decisions

Poor buy-in by line ministries and agencies to mainstream biodiversity conservation limits agreement on targets.

Any institutional reform in

Azerbaijan administration is smooth and does not hinder biodiversity conservation.

Environmental protection remains a priority of Azerbaijan government.

Private sector understands requirement for, and benefits of, biodiversity conservation and sustainable use.

All relevant stakeholders will agree to proposed targets.

Effective cooperation from relevant ministries and agencies

Output 1.1 Review and stocktaking of products and results from previous biodiversity planning processes at the national

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 13

Objective/ Outcome stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi

Targets

Indicator Baseline level are carried out in participative manner.

End of Project target Risks and assumptions

Output 1.2 In response to the global Aichi Targets, national biodiversity targets are developed in a manner that is attuned to Azerbaijan’s reality.

Output 1.3 The achievement of national targets, developed in line with the global Aichi Targets, is duly monitored during the project duration and beyond, and this is reported upon to the CBD through national reports and other means.

Output 1.4 In an iterative manner, Azerbaijan taps into useful information on, and participates into, global networks and initiatives on biodiversity data and indicators, develops awareness-raising and educational programs, prepares cadre of specialists (such as the Biodiversity Indicators Partnership, Global Biodiversity Information Facility and the World Conservation Monitoring Centre, the Global Environment Outlook portal, among other relevant ones)

Outcome 2 – The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience

Effective establishment of a multisectoral/multi-stakeholder working group

Development of a national targets in response to the global Aichi Targets

No working group is established

No national targets have been developed

By end of 2013, a multisectoral/multistakeholder working group is established and it completes the stocktaking exercise.

By 2013, national targets in response to the global Aichi Targets are developed.

Output 2.1 A National Biodiversity Strategy and Action Plan (NBSAP) for Azerbaijan, anchored into national development frameworks, is updated, in a manner that is participative, widely disseminated and fully integrates new aspects of the CBD strategic plan, such as: (i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii) the incorporation of challenges and opportunities linked to ecosystem-based adaptation and resilience.

Output 2.2 The updated and fully endorsed NBSAPs for Azerbaijan is submitted to the CBD preferably within the deadline set by the COP.

Status of NBSAP vis-à-vis the guidance in the CBD Strategic Plan

(2011-2020)

NBSAP is out of date and does not consider newer guidance

By early 2015, the

Azerbaijan’s NBSAP is fully updated, it is in line with the guidance in the CBD Strategic Plan

.

As above

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 14

Objective/ Outcome

Outcome 3 – National frameworks for resource mobilisation,

Convention reporting and exchange mechanisms are established and strengthened

Indicator Baseline End of Project target Risks and assumptions

(2011-2020) and has been submitted to the

CBD COP

Output 3.1 National frameworks for NBSAP implementation is in place and includes: (i) institutional leadership for implementation is established and strategic partnerships forged (nationally and internationally); (ii) a costed and prioritized Action Plan is appended to the NBS; (iii) needs assessments on capacity, technology, awareness-raising and education, and finance are carried out; and (iv) a strategy for resource mobilization for the implementation of the NBSAP is produced and includes a baseline assessment of existing biodiversity finance.

Output 3.2 An effective, user-friendly and easily updatable country-driven CHM site is developed; it is linked up to the

CBD’s global CHM networks and to other information and knowledge exchange network on biodiversity.

Output 3.3. Immediate CBD reporting obligations are met by Azerbaijan in a timely manner: (1) By 2013 Azerbaijan has developed national targets to achieve the CBD Strategic Plan; and (2) The Fifth National Report to the CBD by 31 March 2014.

Status of the national clearinghouse mechanisms (CHM)

Status of the capacity, technology and financial frameworks for implementing the revised NBSAP

CHM is not created

No framework exists

By 2014, the national

CHM is complete, kept up-to-date and has been improved

As above

By the end of 2015, a complete plan for implementing the

NBSAP, including capacity, technology and finance needs assessment, has been produced and underpins

NBSAP implementation

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 15

Total Budget and Workplan

Award ID:

Project ID:

00063580

00080589

Business Unit:

Project Title:

Award Title:

GEF Component

(Outcome) /Atlas

Activity

PIMS 4779GEF-5 BD EA Azerbaijan Implementing Partner

(Executing Agency)

Impl.

Agent

NEX

NEX

NEX

Fund

ID

62000

62000

62000

Donor Name

GEF-10003

GEF-10003

GEF-10003

ATLAS

Budget Code

71200

71300

71400

Atlas Budget

Description

International

Consultants

Local

Consultants

Contractual

Services -

Individ

Information

Technology

Equipmt

Comp 1. Stocktaking and national target setting

NEX 62000 GEF-10003 72800

GEF Subtotal Atlas Activity 1 (Comp 1)

NEX

NEX

04000

04000

UNDP

RESOURCES -

00012

UNDP

RESOURCES -

00012

UNDP Resources Activity 1 (Comp 1)

71600

74500

TOTAL ACTIVITY 1 (Comp 1)

Travel Local

Miscellaneous

Expenses

AZE10

National Biodiversity Planning to Support the implementation of the CBD 2011-2020 Strategic Plan in

Azerbaijan

Ministry of Ecology and Natural Resources

TOTAL

Amount

(USD)

10,000

12,000

10,000

2,000

34,000

2,000

2,000

4,000

38,000

2013

(USD)

10,000

12,000

10,000

2,000

34,000

2,000

2,000

4,000

38,000

2014

(USD)

0

0

0

2015

(USD)

0

0

0

Budget

Notes a b c d e f

Comp 2. NBSAP update

NEX

NEX

NEX

62000

62000

62000

GEF-10003

GEF-10003

GEF-10003

71200

71400

72100

International

Consultants

Contractual

Services –

Individ., local

Contractual

Services-

10,000

20,000

51,400

10,000

20,000

51,400 a c g

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 16

GEF Component

(Outcome) /Atlas

Activity

Impl.

Agent

NEX

NEX

NEX

Fund

ID

62000

62000

62000

Donor Name

GEF-10003

GEF-10003

GEF-10003

ATLAS

Budget Code

71600

72800

74200

Atlas Budget

Description

Companies

Travel

International

Information

Technology

Equipmt

Audio

Visual&Print

Prod Costs

GEF Subtotal Atlas Activity 2 (Comp 2)

NEX

NEX

04000

04000

UNDP

RESOURCES -

00012

UNDP

RESOURCES -

00012

71600

74500

A UNDP Resources Activity 2 (Comp 2)

TOTAL ACTIVITY 2 (Comp 2)

NEX 62000 GEF-10003 71200

Travel Local

Miscellaneous

Expenses

Comp 3. National frameworks for

NBSAP implementation, CDB reporting and exchange mechanisms

NEX

NEX

NEX

NEX

NEX

NEX

62000

62000

61998

62000

62000

62000

GEF-10003

GEF-10003

GEF-10001

GEF-10003

GEF-10003

GEF-10003

71400

71600

72098

72100

72100

72200

International

Consultants

Contractual

Services -

Individ

Travel

International

Contractual

Services-

Companies

Contractual

Services-

Companies

Contractual

Services-

Companies

Equipment and

Furniture

TOTAL

Amount

(USD)

5,000

3,000

2,000

10,000

10,000

19,000

12,000

4,000

5,000

2013

(USD)

5,000

3,000

4,000

93,400

2,000

8,000

0

4,000

97,400

10,000

0

8,000

5,000

4,000

2014

(USD)

2,000

4,000 0

85,400 4,000

10,000

5,000

4,000

2015

(USD)

4,000

81,400 4,000

2,000

10,000

19,000

4,000

4,000

5,000

Budget

Notes h i j e f a c h g k l m

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 17

GEF Component

(Outcome) /Atlas

Activity

Impl.

Agent

Fund

ID

Donor Name

ATLAS

Budget Code

GEF Subtotal Atlas Activity 3 (Comp 3)

NEX

NEX

04000

04000

UNDP

RESOURCES -

00012

UNDP

RESOURCES -

00012

UNDP Resources Activity 3 (Comp 3)

71600

74500

TOTAL ACTIVITY 3 (Comp 3)

Atlas Budget

Description

Travel Local

Miscellaneous

Expenses

TOTAL

Amount

(USD)

70,000

2,000

2,000

4,000

74,000

2013

(USD)

9,000

0

0

0

9,000

2014

(USD)

2015

(USD)

9,000 52,000

0 2,000

2,000

0 4,000

9,000 56,000

Budget

Notes e f

Project Mgt

NEX

NEX

62000

62000

GEF-10003

GEF-10003

71400

72400

Contractual

Services -

Individ

Communic &

Audio Visual

Equip

Supplies

6,000

3,600

2,000

1,200

2,000 2,000

1,200 1,200 n o

NEX 62000 GEF-10003

GEF Subtotal Atlas Activity 4 (Comp 3)

72500 3,000

12,600

1,000

4,200

1,000 1,000

4,200 4,200 p

NEX 04000

UNDP

RESOURCES -

00010

71400

Contractual

Services -

Individ

21,000 7,000 7,000 7,000 q

UNDP Resources Activity 3 (Comp 3)

TOTAL ACTIVITY 4 (Project Management)

21,000

33,600

7,000

11,200

7,000 7,000

11,200 11,200

SUB-TOTAL GEF

SUB-TOTAL UNDP Resources

.

.

210,000

33,000

55,200

11,000

GRAND TOTAL (in cash) 243,000 66,200

Budget Notes a Int. NBSAP Consultant fee (lumpsum $30K / or approx. 10 weeks) - budget divided equally among the three components

94,600 60,200

11,000 11,000

105,600 71,200 b Nat. NBSAP Review Consultant fees (lumpsum $12K / or approx. 10 weeks) c

Nat. Enabling Activity Technical Manager, responsible also for organizing 6 National Coordination Workshops (lumpsum $40K / or approx. 93 divided among the three components) d Two laptops for local consultants, for NBSAP Review Consultant and for the Technical Advisor

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 18

Budget Notes e A budget of $2000 per year, $6K in total from UNDP is included for local travel expenses for each component f Miscellaneous expenses not envisaged at the planning stage, bank charges, insurance etc. g

Technical Assistance Service Provision package (refer to Annex E for details): Knowledge and Capacity Building Services for integrating new global biodiversity guidance into Azerbaijan’s sectoral planning frameworks, climate change response and biodiversity planning and management practices (Total budget $70,400, spread over Components 2 and 3). h Lead Consultant international travel i Purchase of a laptop computer, printer and photocopier. j Printing of final NBSAP k Contract with IT company for CHM, $12k equally divided between three years l Stakeholder meetings, consultations and working groups m Equipment for CHM n Managerial tasks of the Nat. Enabling Activity Technical Manager. o Costs of communication, including telephone costs and internet service provision. p Stationary and other supplies for the office. q Managerial tasks of the Nat. Enabling Activity Technical Manager.

Note:

The national individual consultancy in budget line “b” was initially foreseen for a 4-5 week period (as of the GEF approved proposal in Annex 1).

However, the Project’s Appraisal Committee considered that the scope of the tasks of this consultant would require an input of a slightly longer duration. The TBW was slightly re-managed with less $6K for the output based consultancy in budget line “g” and plus $6K for this individual contract.

GEF amounts as in the approved proposal

($)

Component 1

Component 2

Component 3

Project Management

TOTAL GEF

33,000

94,400

70,000

12,600

210,000

GEF amounts as in the approved proposal after slight re-management of the budget

($)

34,000

93,400

70,000

12,600

210,000

GEF APPROVED PROPOSAL 4779 GEF5 BD EA Azerbaijan 19