WI Alliant Techsystems Mesa Facility SUPPLIER MATERIAL QUALITY REQUIREMENT CODES N-W-7-4401 Revision: 7.0 (See Electronic Signature for Approval) 1 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 Table of Contents (Linked to Document Sections) 1. Purpose ................................................................................................................... 4 2. Scope ....................................................................................................................... 4 3. Responsibilities ...................................................................................................... 4 3.1 Mission Assurance/Quality SQE/QE ............................................................. 4 4. Definitions ............................................................................................................... 4 5. Quality Code List .................................................................................................... 4 18QC12 WELDING CERTIFICATIONS ................................................................. 5 18QC29 CERTIFICATION REVIEW PRIOR TO SHIPMENT .................................. 6 18QC30 BUILD READINESS REVIEW (BRR) ........................................................ 6 6. Supplier Quality Assurance Requirements Text: ................................................. 6 18QC01 QUALITY SYSTEM COMPLIANCE .......................................................... 6 18QC02 NON-CONFORMING MATERIAL ............................................................. 7 18QC03 CERTIFICATE OF CONFORMANCE........................................................ 8 18QC04 RECORDS RETENTION ........................................................................... 9 18QC06 FIRST ARTICLE INSPECTION (FAI) PER SAE AS9102 ....................... 11 18QC07 MATERIAL AND PROCESS CERTIFICATION ...................................... 12 18QC08 NATIONAL AEROSPACE AND DEFENSE CONTRACTORS ACCREDITATION PROGRAM (NADCAP)............................................................... 12 18QC09 EXPERIMENTAL PARTS ........................................................................ 13 18QC10 CERTIFIED TEST REPORT .................................................................... 13 18QC11 ATK MESA PROPERTY ......................................................................... 14 18QC12 WELDING CERTIFICATIONS ................................................................. 14 18QC13 INSPECTION RECORDS ........................................................................ 15 18QC14 DELETED ............................................................................................... 15 18QC15 APPROVAL OF CHANGES TO PROCESSES ....................................... 15 18QC16 ATK MESA FACILITY SOURCE SURVEILLANCE ................................ 17 18QC17 ATK MESA FACILITY SOURCE INSPECTION ...................................... 17 18QC18 GOVERNMENT SOURCE SURVEILLANCE .......................................... 18 18QC19 GOVERNMENT SOURCE INSPECTION ................................................ 18 18QC20 PROCESS VERIFICATION AND AUDITS .............................................. 19 18QC21 AGE LIMITATIONS, LIFE LIMITS AND SHELF LIFE............................. 19 2 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC22 LARGE MATERIAL PACKING INSTRUCTIONS ................................... 20 18QC23 ACCEPTANCE INSPECTION EQUIPMENT ........................................... 20 18QC24 FIRST ARTICLE ACCEPTANCE TEST (FAAT) ..................................... 21 18QC25 REQUIREMENTS FOR CALIBRATION SERVICES ............................... 21 18QC26 GOVERNMENT PROPERTY .................................................................. 22 18QC27 SPECIAL TOOLING REQUIREMENTS .................................................. 22 18QC28 NON-DESTRUCTIVE TEST (NDT) CERTIFICATION ............................. 23 18QC29 CERTIFICATION REVIEW PRIOR TO SHIPMENT ................................ 23 18QC30 BUILD READINESS REVIEW ................................................................. 24 7. Records ................................................................................................................. 24 8. Forms ..................................................................................................................... 24 9. References ............................................................................................................ 24 10. Description of Change.......................................................................................... 24 3 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 NOTE: (1) The quality codes listed in this procedure are the only authorized and recognized codes to be used by SQE/QE’s when coding Purchase Orders and Requisitions. Additional codes that may still reside in the “system” must not be used unless added to this procedure. 1. Purpose This document has been established to provide the quality flow-down requirements to applicable Suppliers listed on the Approved Supplier List (ASL). This document outlines requirements for suppliers of materials, products or services provided to ATK Mesa Facility. It is intended to clearly communicate to the Supplier the requirements they are responsible for meeting in relation to quality. 2. Scope It is understood by both ATK Mesa Facility and the Supplier that this document is applicable to every purchase order/contract where the procured product, services or processes are deliverable/consumable by ATK Mesa Facility customers. Suppliers of specific component parts or special processes must meet the quality system requirements contained herein when performing to an ATK Mesa Facility purchase order/contract which contains reference to this document. 3. Responsibilities 3.1 Mission Assurance/Quality SQE/QE Responsible for ensuring proper quality codes are flowed down on the purchase order to the suppliers. 4. Definitions N/A 5. Quality Code List 18QC01 QUALITY SYSTEM COMPLIANCE 18QC02 NON-CONFORMING MATERIAL 18QC03 CERTIFICATE OF CONFORMANCE 18QC04 RECORDS RETENTION 18QC05 PACKAGING, LABELING AND TRACEABILITY 18QC06 FIRST ARTICLE INSPECTION REPORT 4 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC07 MATERIAL AND PROCESS CERTIFICATION 18QC08 NATIONAL AEROSPACE AND DEFENSE CONTRACTORS ACCREDITATION PROGRAM (NADCAP) 18QC09 EXPERIMENTAL PARTS 18QC10 CERTIFIED TEST DATA REPORT 18QC11 ATK MESA PROPERTY 18QC12 WELDING CERTIFICATIONS 18QC13 INSPECTION RECORDS 18QC14 DELETED 18QC15 APPROVAL OF CHANGES TO PROCESSES 18QC16 ATK SOURCE SURVEILLANCE 18QC17 ATK SOURCE INSPECTION 18QC18 GOVERNMENTS SOURCE SURVEILLANCE 18QC19 GOVERNMENT SOURCE INSPECTION 18QC20 PROCESS VERIFICATION AND AUDITS 18QC21 AGE LIMITATIONS, LIFE LIMIT, AND SHELF LIFE 18QC22 LARGE MATERIAL PACKING INSTRUCTIONS 18QC23 ACCEPTANCE INSPECTION EQUIPMENT 18QC24 FIRST ARTICLE ACCEPTANCE TEST (FAAT) 18QC25 REQUIREMENTS FOR CALIBRATION SERVICES 18QC26 GOVERNMENT PROPERTY 18QC27 SPECIAL TOOLING REQUIREMENTS 18QC28 NON-DESTRUCTIVE TEST (NDT) CERTIFICATION 5 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 6. 18QC29 CERTIFICATION REVIEW PRIOR TO SHIPMENT 18QC30 BUILD READINESS REVIEW (BRR) Supplier Quality Assurance Requirements Text: 18QC01 QUALITY SYSTEM COMPLIANCE All suppliers shall maintain quality system certification to a current revision of ANSI/ASQ/ISO 9001:2000, (Model for Quality Assurance in Design/Development, Production, Installation, and Servicing) or the current revision of The Society of Automotive Engineers document SAE AS9100 (Quality Management System Requirements for Suppliers, or to a current revision of the ISO /TS16949 : 2009 Quality System Certification. Registration with, or certification by, an independent third party certification body or registrar is required. Evidence of such registration or certification to this quality standard may show compliance to this requirement without further actions by ATK Mesa Facility or the supplier. ATK Mesa Facility reserves the right to conduct surveillance at the supplier's facility to determine that the supplier's quality system meets the requirements of the quality standard as set forth herein. ATK Mesa Facility approval of the supplier's system does not constitute acceptance of goods or services or relief of purchase order or subcontract requirements. All suppliers on the ATK Mesa Facility Approved supplier list (ASL) as of 7/1/10, will be considered “grandfathered” in and may be compliant to the standards as approved by ATK Mesa Facility via new supplier audit. In the event a supplier is removed from the ASL after 7/1/10, the supplier will be required to be certified to one of the standards listed above –before being allowed back on the ATK Mesa Facility ASL. When AS9100 certified, the supplier shall grant access to ATK Mesa Facility MA Supplier Quality Representative to their file in the OASIS database (http://www.sae.org/?PORTAL_CODE=IAQG) for their certification information. The Supplier shall assure that the current configuration of all drawings, specifications, and instructions required by the purchase order/ contract, as well as authorized changes, are used for manufacturing, inspecting, and testing. Supplier’s configuration management system will control all elements of the supplier’s and sub-tier suppliers’ design, design changes, manufacturing and process procedures, manufacturing and process procedure changes, test procedures, and test procedure changes of the items on this purchase order/contract. 6 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC02 NON-CONFORMING MATERIAL Suppliers do not have MRB authority on behalf of ATK Mesa Facility. The supplier shall not deliver any material that departs from drawing, specification or maintenance requirements. Non-conforming material is to be submitted for review and disposition on Supplier Request for Material Review Board (SRMRB). The SRMRB request form (N-F-S-8-4401-2) is available in the Supplier Portal. Completed forms must be routed to the applicable Supply Chain Buyer for review and disposition. If dispositioned acceptable, the non-conforming part(s) must be clearly identified and segregated from conforming product. A copy of the dispositioned SRMRB shall accompany the part(s). Product that does not meet ATK Mesa Facility requirements may be provided to ATK Mesa Facility only after this approval has been given. Root Cause and Corrective Action along with all objective evidence must be submitted with any SRMRB. Failure to submit will result in rejection of SRMRB request. SRMRB submittals, that are supplier caused, are subject to a $600 processing fee – per submittal. The supplier shall document and maintain a system for handling, controlling, and disposition nonconforming material. This system shall ensure that all nonconforming material is positively identified to prevent use, shipment and intermingling with conforming material. The supplier is required to ensure containment of identified non-conformance’s within the supplier's system which prevents shipments of similar defects. If non-conformances are found after delivery, the supplier is required to support an investigation into them. This may include deploying resources to ATK Mesa Facility to sort, rework or provide support for investigation of issues. Non-conformances discovered at ATK (receiving inspection, in process build, final inspection, testing, or not previously approved on an SRMRB request), that are supplier caused, are subject to a $600 processing fee – per rejection. Suppliers are responsible for all parts, processes, and services rendered by sub-tier suppliers. Any quality concerns or rejections as a result of the sub-tier supplier are the responsibility of the supplier. The supplier shall notify ATK Mesa Buyer of any systemic quality concerns (i.e. “Major” findings) discovered by the supplier, any third party audit body – (i.e. NADCAP, ISO/AS registrars), or other customers that may affect the quality or performance of product already delivered to ATK Mesa Facility. 7 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 The supplier shall provide prompt, written notification to ATK Mesa Buyer if nonconforming product or process escapes are identified after shipment to ATK Mesa Facility. Any travel and travel related expenses incurred by ATK personnel related to a supplier caused escape, may result in a chargeback to the supplier for the travel costs. Supplier performance is reviewed by ATK SCM on a monthly interval. Suppliers whose performance is Bronze or less, may be subject to third party over inspection being imposed. Third party is defined as an independent contracted inspection service acting on the behalf of ATK, performing final inspection(s) at the supplier location to ensure ATK requirements are met. The cost of this third party over inspection would be at the supplier’s expense. ATK Mesa Facility may chargeback a supplier for rework, repair and/or analysis related to nonconforming product where it has been determined that the non-conformance is supplier caused and the suppliers schedule to complete the rework/repair does not support ATK’s scheduled need for the product. 18QC03 CERTIFICATE OF CONFORMANCE The Supplier shall provide a Certificate of Conformance with each shipment. Failure to submit the certification will result in rejection of the lot. Mark the appropriate container “DATA ENCLOSED.” The Certificate shall contain as a minimum: Supplier’s name and location. Manufacture’s name and location, if different. Date of Manufacture / expiration, if applicable. Date of Certification, signed or stamped and “Title” of certifying official of the supplier. ATK Part Number, Revision level, and Description. Manufacturer's Part Numbers and National Stock Number, if applicable. ATK Purchase Order/Contract Number and line item number(s). Quantity of items. Identification of the lot number, batch and/or date codes, all serial numbers, if applicable. 8 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 Shelf Life Requirements, if applicable. Fixed Process Identifier, if applicable. All required governing specifications and revisions as specified on the ATK Mesa Facility Purchase Order/Contract and notes. Any exclusions to the requirements of the applicable drawings, specifications, purchase document requirements, or design configuration requirements and the method by which such exclusions were authorized by ATK Mesa Facility. A statement certifying material meets all requirements of the contract such as: “The undersigned, as the authorized representative of the contractor, warrants and represents all the information supplied above is true and accurate and that the material covered by this certificate conforms to all contract requirements, including but not limited to the drawings and specifications.” Note 1: CoC shall be supported by inspection and test data, material analysis, or certification from the raw material producer or processor and shall be made available as requested for specifications such as raw material, processed material, processes, etc. Note 2: When the items on this purchase order are supplied by a distributor, a copy of the manufacturer’s certification and the distributor’s certification stating compliance and the manufacturer’s name and address shall be provided. (e.g., raw material, pan stock, COTS (commercial off the shelf)) 18QC04 RECORDS RETENTION Quality records generated as the results of performance to an ATK Mesa Facility issued purchase order/contract shall be maintained and preserved as legible for a period of seven (7) years and available for review by authorized ATK Mesa Facility Mission Assurance/Quality representatives, ATK Mesa Facility customers, and/or Government representatives. Additionally, distributors shall assure that manufacturers maintain quality assurance/inspection records and that these records are also available upon request. These records shall include, but are not limited to, receiving, in-process, and final inspection records, Certificates of Conformance, raw material mill certifications, test results, documented non-conformances and corrective actions, and measuring and test equipment calibration documentation etc. Commercial Off the Shelf (COTS) may be subject to specific industrial standards; exemptions or modifications of record retension may apply. 9 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC05 PACKAGING, LABELING AND TRACEABILITY Packaging: The supplier is responsible for proper packaging to prevent damage, corrosion, or contamination to the parts whether through part-to-part contact or normal handling via the selected carrier environment. Packaging is part of the manufacturing process and shall be included in the supplier’s Quality Plan. Product produced that require tamper proof seals are to be placed across any areas of internal access. Labeling and Traceability: This does not replace any part identification as required by the engineering drawing and/or Purchase Order notes. It is an addition to packaging identification. For identification and traceability purposes, the supplier shall provide packaging labels containing the following six criteria including the human readable information and in a 2D barcode format on the outside of the shipping container: Part Number, Revision, Quantity, Lot Number, P.O. Number, Supplier Code. The human readable part number shall include the cage code; the 2D barcode shall not contain the cage code. A corresponding label, with an adjusted quantity, shall be found on each individual piece part packaging, including Bag and Tag parts on the bag. In the case of bulk or batch packaged parts, only one label is required on the internal bag, the shipping label requirements remain the same. Size of the label must be such that the label is legible and the 2D barcode scanable. The label on the box, containing multiple sub-containers or a single part, shall be a 4x6 label. For sub-containers within the container or Bag and Tag parts, the label shall be a size applicable to the packaging and still remain read/scannable. The 2D barcode shall be the PDF417 or Data Matrix format. See samples below, reference only. 10 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC06 FIRST ARTICLE INSPECTION (FAI) PER SAE AS9102 The supplier shall perform and complete a First Article Inspection (FAI) in compliance with AS9102 requirements on the forms directed therein and submit the FAI to ATK Mesa Facility Mission Assurance/Quality Representative for approval via the ATK Mesa Buyer prior to the delivery of any items on this purchase order/contract, see Note 1 and 2. For questions regarding SAE and for ordering SAE documents, contact the SAE website at http://www.sae.org. Supplier equivalent forms are acceptable with written approval by the applicable ATK Mesa Facility Mission Assurance/Quality Representative. Partial or complete re-accomplishment of the FAI may be required for deliveries subsequent to the original FAI as directed per AS9102 and also require submittal and approval prior to deliveries of the items. The FAI shall be performed for an item representative of the lot of the items on purchase order/contract. This includes all details and sub-assemblies which constitute the end-item ordered. The FAI shall not be considered complete until all non-conformities have been resolved and the FAI is reviewed and approved by ATK Mesa Facility Mission Assurance/Quality. Allow 5 working days to complete the review of the FAI. Note 1: The FAI shall be updated (Delta FAIR) when changes occur to any of the following: part number configuration, method of production, to include new process equipment, tooling, measuring equipment, and/or process flows, and/or facility re-location, change in location of machinery or applicable equipment (i.e. – unplug equipment and relocate to new area within the facility), a lapse in production for two years (or less if contractually required by customer), a natural disaster, such as fire, flood or earthquake 11 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 which may adversely affect the manufacturing process, or when required as part of the corrective action process. Note 2: A FAI is not required if one has already been submitted and approved for the product revision on a previous procurement and there have not been any changes listed in Note 1, including sub-tier process houses. Note 3: Approval will constitute AS9102 Form 1 signed off by ATK Mesa Facility Mission Assurance/Quality Representative. 18QC07 MATERIAL AND PROCESS CERTIFICATION The supplier shall include certification(s) for the material(s) and/or process(es), in conjunction with any 18QC08 NADCAP requirements, used in this order and includes them in the shipping documentation package. Certification(s) shall include, as a minimum; The purchase order number/contract. Date of processing. Quantity processed, including accept/reject status The material and/or process specification(s) number that the material(s) and/or process(es) conform to, where applicable. The nomenclature(s) of the material(s) and/or process(es) used. Certification(s) must be signed by an officer/agency that has certified the material(s) and/or process (es) used whose authority is binding on the company. Failure to submit the certification(s) will result in rejection of the shipment. 18QC08 NATIONAL AEROSPACE AND DEFENSE CONTRACTORS ACCREDITATION PROGRAM (NADCAP) All suppliers and processing sources used by suppliers and their sub-tier suppliers shall be certified for that process by a NADCAP accredited process house. Suppliers must provide evidence with shipment certifying that special process(es) were performed by facilities that are National Aerospace and Defense Contractors Accreditation Program (NADCAP) approved for the process being performed (i.e. Non Destructive testing, Heat Treating/Furnace Brazing, Chemical Processing, Paint, Coatings, Welding). NADCAP supplier approval information can be found at: https://www.eauditnet.com/eauditnet/ean/user/mainpage.htm Note 1. When a NADCAP accredited process house cannot be utilized due to special circumstances, ATK may elect to waive the NADCAP requirement and approve the non-NADCAP process house on a Purchase Order by Purchase Order basis. A SRMRB shall be generated to track the waiver request. 12 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 Note 2. The supplier shall flow down the contract requirements to all subtier suppliers to ensure the requirements are maintained and followed. SHIPMENT DOCUMENTATION: Each shipment shall be accompanied by a certification (C of C) stating the name and address of the ATK Mesa Facility approved processing source and the specification performed. 18QC09 EXPERIMENTAL PARTS Product produced as experimental, x-part, or prototype shall conform to all drawing requirements as if it were a production part, unless otherwise stated in the purchase order. A formal First Article Inspection, 18QC06, is not required for experimental parts; however, documentation for experimental parts shall include a characteristic accountability with variable data for ATK engineering evaluation of the experimental part. 18QC10 CERTIFIED TEST REPORT The supplier shall submit an entire test data report for this item upon successful completion of the item’s acceptance testing for each lot of material, parts, assemblies, and sub-systems by lot number prior to acceptance. The test report shall contain as a minimum: Company name and date. The ATK Mesa Facility Purchase Order/Contract number. National Stock Number and Drawing Number. Date of Certification, signed or stamped and “Title” of Certifying official of the supplier. Description of supplies, lot number or other identification and lot quantity. Listing the characteristics inspected, product serial number (if applicable), sample and lot size, actual measurement(s), and number found defective. All recorded test results used during all phases of the item’s testing through final acceptance testing (e.g; material, processes, performance, functional, etc.) showing quantitative measurement results and tolerance(s) for values measured including all special testing performed on the item, any noteworthy observations, anomalies, or unexpected events; such as reports or raw material producers’ chemical, mechanical and physical analyses for product/process conformance. o Reports shall identify each submitted lot for acceptance by lot number, specification or drawing, revision and date, grade, class or type as applicable, number of specimens tested, specified characteristics and requirements to include actual results. 13 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 Serial numbers, lot numbers, date codes, and all other identifications used to track the item tested. Test data annotated with appropriate test operator and quality inspector level, signatures and/or stamps applied. Copies of all major and minor non-conformance’s and test failure reports with root cause and corrective action are required. A statement certifying material meets all requirements of the contract such as: “The undersigned, as the authorized representative of the contractor, warrants and represents all the information supplied above is true and accurate and that the material covered by this certificate conforms to all contract requirements, including but not limited to the drawings and specifications.” SHIPMENT DOCUMENTATION: Each shipment shall include a copy of the inspection plan/report for delivered product using an ATK Mesa Facility supplied data inspection plan/report (if mandated) or on the form for which the product features are identified. Mark the appropriate container “Data Enclosed.” Acceptance of product will be based on inspection at ATK Mesa Facility unless otherwise stated in this Purchase Order/Contract. 18QC11 ATK MESA PROPERTY Item(s) furnished to the supplier in conjunction with this order are the property of ATK Mesa Facility or ATK Mesa Facility customer. The supplier assumes total responsibility for care and maintenance of said property unless otherwise agreed to in this purchase order/contract. The supplier shall maintain accurate inventory and use records for the property and provide this information to ATK Mesa Facility upon request. The property is not to be used for products not identified on this procurement without the written consent of ATK Mesa Facility. Supplier shall not remove any markings or tags from the property. Supplier agrees not to sell, assign, loan, lease, mortgage, borrow against, pledge, or otherwise create a legal or equitable interest in the item(s) or otherwise permit the item(s) to be subject to any legal process. 18QC12 WELDING CERTIFICATIONS When welding is performed, the supplier shall certify that all welding was performed in conformance with applicable specifications pertaining to certifications of processes and operators. Records of welders’ certifications will be maintained by the supplier and will be subject to buyer review upon request. They buyer shall be notified prior to any necessary weld repair, except where prior buyer approval has been granted or waived. ATK considers welding a NADCAP required special process. 14 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC13 INSPECTION RECORDS Supplier shall provide inspection reports at the time of delivery for items on this purchase order. Reports shall include: The test and/or inspection procedure document number and revision level. Part number inspected. Serial, lot, batch, or date code numbers, as applicable. Identification of each inspection point. The results of each inspection point. The identification of the person performing the inspection. Inspection results outside of the required limits that have been accepted shall reference the ATK Mesa Facility SRMRB (Supplier Request for Material Review Board), by which the departure was accepted. The supplier shall ensure that these requirements are flowed down through the supply chains that support the item(s) on this order. Suppliers and sub-tier suppliers shall maintain the inspection records for their respective first-tier suppliers. 18QC14 DELETED 18QC15 APPROVAL OF CHANGES TO PROCESSES Approvals For parts identified by ATK as control processes, the supplier and sub-tier supplier shall be required to have approval by ATK prior to initiation of production. Personnel performing special processes such as NDT (Ultrasonic inspection, radiographic inspection, etc.) shall be certified in accordance with applicable special process certifications. The supplier shall have records of their personnel certification and sub-tier supplier approvals on file, available for review by ATK. Approvals do not relieve the supplier from exercising those control measures necessary to ensure that work performed by sub-tier suppliers is in accordance with specification for drawing requirements. For each ATK identified part requiring process control, the supplier or subtier supplier shall complete appropriate control document(s) and submit to ATK for approval. The document(s) may be in the supplier’s or sub-tier supplier’s format and shall be the document used for actual performance and inspection. These documents shall be recorded/referenced on the test reports/certifications submitted by the supplier to ATK. 15 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 The documentation describing the process should at a minimum include but is not limited to the following: Part Number or process name to include revision, purchase order number, serial lot number(s), materials used, including processing aids such as but not limited to gauges, gloves, brushes, etc. Actual process work instructions; process control detail plans, process procedures, process technique sheets, specification sheets, inspection plans, process drawing, flowcharts, etc. Method or type of processing utilized, applicable specifications, type, grade, class, etc. Manufacturing location, including any satellite locations. Packaging methods and materials, handling and transportation. A complete description of the change, including a statement of the “From” and “To” conditions of change. Justification for the change, including background information in sufficient detail to allow an adequate study of the proposed change. The proposed affectivity of the change stated either in terms of a calendar date or a part serial number range. A copy of the revised document; proprietary information, if applicable, may be excluded. Signature and title of person on authorizing document(s). Changes The supplier shall notify ATK Mesa Facility Mission Assurance/Quality Representative via the ATK Mesa Buyer, of any proposed or inadvertent changes to special process procedures, technique sheets, procedure specification sheets, process control procedures/documents, operation process sheet, inspection method sheets, manufacturing procedures, work instructions, travelers, manufacturing process procedures, prior to incorporation of such changes. The supplier shall not proceed with the initiation of production without written approval from ATK Mesa Facility Mission Assurance/Quality Representative via the ATK Mesa Buyer. The supplier shall ensure that these requirements are flowed down through the supply chains that support the item(s) on this order to the lowest subassembly level. See 18QC06, Note 1, for documentation of said changes. Once the manufacturing process has been approved, any change to the manufacturing process requires ATK approval prior to implementation. Typographical errors, formatting errors, misspellings or clarifications changes are not considered a process modification or change. 16 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC16 ATK MESA FACILITY SOURCE SURVEILLANCE ATK Mesa Facility maintains the prerogative of source surveillance inspection by an ATK Mesa Facility Mission Assurance/Quality Representative. ATK Mesa Facility will notify the supplier if and when this option will be exercised. 18QC17 ATK MESA FACILITY SOURCE INSPECTION Source Inspection by an ATK Mesa Facility Mission Assurance/Quality Representative is required at the supplier’s facility. The supplier shall provide all test reports, inspection records (including access to all quality records and related data for contracted goods), facilities, assistance, equipment and personnel necessary to perform the appropriate inspection of product. Unless otherwise notified, the ATK Mesa Facility Mission Assurance/Quality Representative will perform or witness end item acceptance tests. Supplier shall notify the ATK Mesa Buyer, unless otherwise notified, at least: Seven (7) working days prior to performing product acceptance testing and/or Fifteen (15) working days prior to the expected time of the presentation of the item to ATK Mesa Facility Mission Assurance/Quality Representative for source inspection. Shipment shall be withheld pending necessary action by the ATK Mesa Facility Mission Assurance/Quality Representative. Upon notification from Supplier to ATK Mesa Facility buyer - of source readiness, ATK Mesa Facility SQE will make travel arrangements. In the event, supplier notifies ATK Mesa Facility of source readiness- and then does not have product ready on agreed upon date, ATK Mesa Facility may initiate a debit memo for expenses incurred (i.e. change of flight fees, cancellation fees, et al.). Acceptance of source shall be denoted by a stamp and/or signature or both by the authorized ATK Mesa Facility Mission Assurance/Quality Representative on the supplier's inspection document to be included in the shipping documents package. Relief from this source inspection requirement may only be obtained with a written waiver of source inspection from ATK Mesa Buyer signed by ATK Mesa Facility Mission Assurance/Quality Representative. The request for source inspection waiver will include the build and inspection documentation for approval by the ATK Mission Assurance/Quality Representative. The approved request shall be included with the shipping document package. 17 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 NOTE: If ATK Customer source inspection is required, ATK Mesa Facility Customer Representative will accompany the ATK Mesa Facility Mission Assurance/Quality Representatives when the source inspection is scheduled. During the scheduling of the source inspection ATK Mesa Facility Mission Assurance/Quality Representative will notify supplier that ATK Mesa Facility Customer will be accompany him/her during the scheduled source inspection. 18QC18 GOVERNMENT SOURCE SURVEILLANCE During performance of this Subcontract/Purchase Order, activities of the supplier may be monitored by an authorized Government Representative through delegation from the Government QAR located at the contractor’s facility. This may include audits, inspections, and/or tests. Government Inspection or release of product prior to shipment is not required unless otherwise notified, in writing, by the authorized government representative. (Note: Neither notification of ATK Mesa Facility by the authorized government representative nor notification of the supplier by ATK is required.) 18QC19 GOVERNMENT SOURCE INSPECTION Government inspection is required prior to shipment . Upon receipt of the order, promptly notify the Government Quality Assurance Representative (QAR) who is assigned to the supplier, so that appropriate planning for: • Government Source Inspection (GSI) and/or • In Plant Quality Evaluation (IQUE) can be accomplished. In the event, the Government representative or office cannot be located, the supplier shall notify the nearest Army, Navy, Air Force or Defense Logistics Agency inspection office. If the representative or office cannot be located, the supplier shall notify ATK Mesa Buyer immediately. The delegated government representative may review work instructions and identify mandatory inspection points that the government must accept prior to further processing of the item. A letter of delegation (LOD) authority signed by the DCMA (Defense Contract Management Agency) showing that the specific part number being shipped has been granted GSI delegation shall also be acceptable. Any letter of delegation authority must be linked to the part numbers that have been granted delegation. Evidence of Government Source Inspection (QAR acceptance stamp or office number and signature on the shipping document) shall accompany each shipment of product to ATK Mesa Facility. 18 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC20 PROCESS VERIFICATION AND AUDITS Process Verification and Audits will be required at the supplier. At any time, during the term of this purchase order/contract, ATK Mesa Facility may notify the supplier of specific requests for on-site product verification, and/or an audit function that shall be accomplished by an authorized ATK Mesa Facility Mission Assurance/Quality Representative. Process verification may include product selection of a random sample for independent inspection, re-inspection of samples, witnessing inspection, or test by an ATK Mesa Facility Mission Assurance/Quality Representative. Process verification is to ensure product integrity is being maintained. The ATK Mesa Facility Mission Assurance/Quality Representative may verify each process by use of the following: Process Control Documentation (PCD) – including risk to product fit, form, function, cost, and schedule. Quality Plan – per product and process. Product inspection at the process location. Time monitoring of the process. Other methods considered standard industry testing methods. Audits may be performed on Product, Gaging or Test Equipment, Calibration, Special Processes, Procedures and Work Instructions covering the in-process activities at the supplier. The supplier shall provide reasonable facilities, equipment, and assistance, including access to all quality records and related data for contracted goods shall be made available to the ATK Mesa Facility Mission Assurance/Quality Representative. 18QC21 AGE LIMITATIONS, LIFE LIMITS AND SHELF LIFE Product supplied, or any product used in a part or assembly supplied under this purchase order/contract, is considered age sensitive by the product's manufacturer, the shipping documents shall state the shelf life and any unique environmental storage conditions required. The supplier shall assure that a minimum of 75% of the shelf life is remaining at time of shipment to ATK Mesa Facility. If the product requires unique environmental storage conditions, the exterior package shall be prominently marked indicating the type of storage required. The date of manufacturer and expiration date must appear on a certificate supplied with the material. Mark the appropriate container with “Data Enclosed.” 19 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC22 LARGE MATERIAL PACKING INSTRUCTIONS This special provision will take precedence over any conflicting packaging instructions contained herein. Package per applicable ATK Mesa Facility material handling instructions: OMH-0001 – Raw Material Special Packing Instructions All large billets, barrels, castings and forgings must be palletized and bound to the pallet with steel banding or equivalent method to constrain material. Parts shall not be mixed and conform to part dimensions with minimum overhang. All small and medium size billets, barrels, castings and forgings must be contained using either wood or corrugated material depending upon material characteristics. Parts with critical surfaces must be individually packaged. Each heat lot must be packaged separately. Certifications for raw material shall be included with each heat lot. 18QC23 ACCEPTANCE INSPECTION EQUIPMENT Acceptance Inspection Equipment (AIE) used to perform the inspections and tests of those characteristics specifically identified must be submitted to ATK Mesa Facility for approval prior to the first shipment of product. Acceptance of product by ATK Mesa Facility will not be granted prior to approval of AIE. AIE documentation shall contain sufficient information to allow review and approval. AIE identification shall include the following: Part Number, Revision, and Name. Specification Number and Paragraph, if applicable. Classification of Characteristics Number. Characteristic description and dimension/parameter. Purchase Order Number and Revision. Submission of standard measuring equipment shall include: Manufacturer. Model Number. Accuracy. Calibration procedure, as applicable. Functional gaging and laboratory equipment shall include: Gage Number. Gage drawing (2 copies). Set-up, calibration and operating procedures, as required. 20 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 If the listed characteristic is performed by a sub-tier supplier or independent inspection service, their AIE must also be submitted by Supplier to ATK Mesa Facility for approval. If functional testing is required, ATK will specify the requirement in writing. 18QC24 FIRST ARTICLE ACCEPTANCE TEST (FAAT) The supplier shall perform a First Article Acceptance Test (FAAT) in accordance with the FAAT Plan and any other requirements imposed by this purchase order/contract. The supplier shall submit the FAAT results to the ATK Mesa Buyer for review and approval by ATK Mesa Facility Mission Assurance/Quality Representative prior to production. ATK Mesa Facility reserves the right to witness and/or perform surveillance by ATK Mesa Facility personnel, Government and/or ATK Mesa Facility customer representatives in support of this purchase order/contract, which will be communicated via the FAAT plan or this purchase order/contract. 18QC25 REQUIREMENTS FOR CALIBRATION SERVICES Items supplied on this purchase order/contract require a calibration service and shall be calibrated by an organization whose system is in compliance with Calibration System Requirements; ISO 10012-1, Metrological confirmation system for measuring equipment; ISO/IEC 17025 using standards traceable to the National Institute of Standards and Technology (NIST), or ANSI/NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment—General Requirements. The Supplier shall provide a calibration certificate for each unit or item delivered shall also have a data sheet attesting to the actual measurements for each ATK Mesa Facility identified characteristic of calibration each item specified on the ATK Mesa Facility purchase order/ contract. Each unit or item delivered shall also have a data sheet attesting to the actual measurements for each ATK Mesa Facility identified feature of calibration. The data sheet shall include a list of the actual results for all the characteristics including tolerances as specified by ATK Mesa Facility. All certifications and supporting data shall be included in the shipping documentation package. During the performance of this order, calibration system and manufacturing processes are subject to review, analysis, and verification by ATK Mesa Facility Mission Assurance/Quality Representative. Note: Contact ATK Mission Assurance/Quality department for questions regarding calibration dimensions and for approval of the Calibration Certificate prior to shipment. 21 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 SHIPMENT DOCUMENTATION: 1. A Calibration Certificate shall be sent stating the identification of the item, reference to the calibration standards used, date calibration was performed, environmental conditions, measurement traceability (i.e.; traceable to NIST, international standards, etc.) and a statement referencing the calibration or quality system used by the Seller or company performing the calibration certification. 2. Each Shipment shall include a copy of the calibration inspection data sheet/report for each delivered product (Using either an ATK Mesa Facility supplied data calibration inspection data sheet/report or on the suppliers form) for the product features identified. 18QC26 GOVERNMENT PROPERTY Item(s) furnished to the supplier in conjunction with this order are the property of the U.S. Government. The supplier assumes total responsibility for care and maintenance of said property, in accordance with FAR 52.2451, unless otherwise agreed to in this purchase order/contract. The supplier shall maintain accurate inventory and use records for the property and provide this information to ATK Mesa Facility upon request. The property is not to be used for products not identified on this procurement without the written consent of ATK Mesa Facility. Supplier shall not remove any markings or tags from the property. Supplier agrees not to sell, assign, loan, lease, mortgage, borrow against, pledge, or otherwise create a legal or equitable interest in the item(s) or otherwise permit the item(s) to be subject to any legal process. The supplier shall use form DD1149 when transporting government property back to ATK Mesa Facility. 18QC27 SPECIAL TOOLING REQUIREMENTS All special tooling on this purchase order/contract shall be fabricated and inspected in compliance with the enclosed Tool Order, applicable Tooling Manual, and ATK Mesa Facility Inspection Plan, if applicable. For all special tooling, that will be retained by the supplier for the purpose of fabricating production parts for ATK, the supplier shall notify ATK Mesa Buyer one week prior to tool completion to schedule ATK Mesa Facility Tool Quality Source Inspection. This order includes special tooling that will remain the property of ATK Mesa Facility or the U.S. Government. The referenced special tooling shall be stored at the supplier's location. The supplier shall take reasonable care of said tooling. The special tooling is not to be used for products not identified on this procurement without the written consent of ATK Mesa Facility. 22 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 Supplier shall not remove any markings from the property. Supplier agrees not to sell, assign, loan, lease, mortgage, borrow against, pledge, or otherwise create a legal or equitable interest in the special tooling or otherwise permit the tooling to be subject to any legal process. Supplier shall attach an ATK Mesa Facility supplied property tag to the special tooling identified on this order. The supplier shall maintain inventory records for the identified item(s). Copies of such records shall be made available to ATK Mesa Facility upon request. If the ATK supplied special tooling included with this purchase order is used in the manufacture of any 387-xxxx or 230-xxxx part as either production or development/experimental, or is otherwise a Boeing contracted Special Tool, the supplier shall conform to the requirements defined by Boeing@ BDS Seller Special Tooling Requirements document # D950-11059-1. 18QC28 NON-DESTRUCTIVE TEST (NDT) CERTIFICATION Prior to fabrication on any deliverable item, the supplier shall provide the planned manufacturing, testing, and inspection procedures for NDT. These procedures shall include, as applicable, drawings of the special tooling that may be used for the dimensional acceptance and plans for performing tests on raw, semi-finished, and /or finished materials, including special process techniques to be approved by a NDT Level III. The procedures must document all operations to be performed. The supplier is responsible for meeting all drawing/specification and approved fabrication process requirements. Supplier shall include with each shipment a certificate that lists the Nondestructive Tests (NDT) performed, the specification(s) used, NDT method used, and the results of the inspection. The supplier shall maintain records to include the procedures/techniques used signature or stamp of the employee performing the NDT, the NDT certification level of the employee, and the results. Identification of any sub-contracted testing services performed shall be clearly noted with the name and location of the facility. When radiography is performed, the resulting radiographs will be supplied with the parts. Film must be identified with ATK part number and serial number. 18QC29 CERTIFICATION REVIEW PRIOR TO SHIPMENT Certifications shall be submitted to ATK for review and approval prior to shipment. The supplier shall provide copies of certifications/documents to ATK. Upon concurrence with the certifications, ATK shall authorize shipment. Advanced review and approval will not reduce the supplier’s responsibility for conformance to contractual requirements. The presubmittal requirement is waived if ATK Source Inspection is performed. 23 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 18QC30 BUILD READINESS REVIEW A Build Readiness Review (BRR) shall be used when new, complex, or unique processes or products are manufactured. ATK needs to confirm materials and processes are accurate and conform to the Total Design Package (TDP), process documentation, inspection requirements, test instrumentation/equipment, tooling, gages, and training, are completed prior to product build. Milestone tracking may be used to track progress and monitor schedule requirements. 7. Records All records will be maintained per N-S-4-4401 Control of Records and ATK Electronic Record Retention Schedule. 8. Forms N-F-S-8-4401-2 9. References ANSI/ASQ/ISO 9001:2000 SAE AS9100 ISO/TS16949 AS9102 ISO 10012-1 ISO/IEC 17025 ANSI/NCSL Z540-1 FAR 52.245-1 D950-11059-1 Supplier Request for MRB (SR-MRB) Model for Quality Assurance in Design/Development, Production, Installation and Servicing Aerospace Standard Quality Management System Requirements for Suppliers Automotive Quality System Certification Aerospace First Article Inspection Requirement Calibration System Requirements National Institute of Standards and Technology Calibration Laboratories and Measuring and Test Equipment-General Requirements Government property Boeing BDS Seller Special Tooling Requirements 10. Description of Change Rev. Date Description of Change C 09/30/09 a) Changed ATK MCS to ATK IWS throughout document. b) Changed Quality Assurance to Mission Assurance throughout document c) Deleted quality codes Q027, Q066 and Q083. d) Added quality codes Q005A, Q103 and Q104. e) Added/changed text in paragraphs Q006 thru Q009, Q012, Q016 thru Q018, Q020 thru Q025, Q028, Q030, Q031, Q036, Q040, Q044, Q053, Q064, Q070, Q071, 24 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision. N-W-7-4401 SUPPLIER MATERIAL QUALITY REQUIREMENT CODES Revision: 7.0 D 2/23/10 E 7/13/10 F 11/29/10 G 1/4/11 H 1.0 2/10/11 7/5/11 2.0 1/16/2012 3.0 9/19/2012 4.0 5.0 10/04/2012 3/26/13 6.0 07/29/2013 7.0 09/30/2013 Q074, Q082, Q090 and Q094. f) Changed form # from WI-7.4.1-2-1 to FM-MA-WI-7.4.1-21. Changed text in Quality Code number Q071 Requirements for Rework/Repair. Corrected form number in Quality Code Q005A. Modified Q16 Note 1 to clarify FAIR requirements. Q001/Q 002 Combined. Revised wording to require certification. Added paragraph concerning “grandfathering”. Added para “Supplier shall grant access…OASIS…” Q005 – revised website location for ASL. Added words “C of C” next to certificate. Added NADCAP ASL info. Changed procedure number from MA-WI-7.4.1-2 to N-W-7-4401. Changed form number from FM-MA-WI-7.4.1-2-1 to N-F-W-74401-1. Added Quality Code Q105 - OPSEC Program Requirement. Removed Quality Code Matrix. Q007 – MRB info added. SRMRB submittal charge information added. Non-conformance chargeback information added. Added Note 3 and Note 4. Q007 – Modified charge info. Added note 5. Initial load into SharePoint and conversion from revision H to revision 1.0. Add vendor flow down of Boeing D950-11059-1 to Q039.Changed reference of ATK-IWS to ATK Mesa Facility. Corrected document numbers. Removed non-essential codes, including redundant and Ammo specific codes. Changed Q-code prefix nomenclature. Re-numbered codes. Re-numbered codes for DELTEK implementation. Clarification to 18QC05. 18QC23: added functional testing comments. No content change. Added table of contents and accepted all previous changes. Changes to 18QC02, 03, 04, 05, 06, 08. Deleted 18QC14 (Special Visual Inspection, Tin Soldier). Removed any personal pronouns. Updated the Forms and References Section. It is the responsibility of the reader to review the changes to this document. Contact the Process Owner for further clarification. 25 of 25 This document is not controlled when printed or downloaded. Refer to on-line status for latest revision.