Activity: Floor Condition FLT Hazard* Site: What is the possible outcome? Company: Persons at risk Rough ground or poorly maintained surface causing injury to driver. Minor to major injury. FLT Driver S 3 Rough ground or poorly maintained surface causing loss of load Minor to major injury. Pedestrians 4 Rough ground or poorly maintained surface causing FLT to tip FLT driver, others in Minor to major injury. area 4 x x L 4 x 4 x 4 Rough ground or poorly maintained surface causing damage to vehicle or load Date: Control Measures Before Controls 3 S Floors inspected every 6 months for signs of wear; list of repairs created; Vehicles to be 15 limited to 10mph; all drivers to be authorised. = 22 July 2015 Carried out Dave Gilford by: Position: Health and Safety Advisor *Include site specific and general hazards DG02/15 Document1 Page 1 of 2 x L = R 3 x 1 = 3 4 x 1 = 4 4 x 1 = 4 Floor inspection records; warnings and instructions; safe system of work; training records 3 x 1 = 3 Warnings and instruction records; Segregation of FLT and pedestrians; Floors inspected every 6 months for signs of wear; list of floor inspection records. = 16 repairs created. Training records; daily inspection FLT drivers trained and competent; FLT fitted checklists; with adjustable seat and restraining belt; maintenance supervisors to check for compliance; Floors inspected every 6 months for signs of wear; list of records; floor inspection records = 16 repairs created; - After Controls R Training records; FLT drivers trained and competent; FLT fitted with adjustable seat and restraining belt; Floors maintenance inspected every 6 months for signs of wear; list of records; floor inspection records = 16 repairs created. Property damage x 5 = Ref: Reference Records Date for Review: 23 July 2016 RISK / PRIORITY INDICATOR KEY SEVERITY (CONSEQUENCE) LIKELIHOOD 1. Negligible (delay only) 1. Improbable / very unlikely 2. Slight (minor injury / damage / interruption) 2. Unlikely 3. Moderate (Lost time injury, illness, damage, lost business) 3. Even chance / may happen 4. High (Major injury / damage, Lost time business interruption, disablement) 4. Likely 5. Very High (Fatality / Business closure) 5. Almost certain / imminent Likelihood RISK / PRIORITY INICATOR MATRIX SUMMARY 5 5 10 15 20 25 12-25 High As soon as possible 4 4 8 12 16 20 6-11 Medium Within next 3-6 months 3 3 6 9 12 15 1-5 Low Whenever viable to do so 2 2 4 6 8 10 1 1 2 3 4 5 1 2 3 4 5 SEVERITY (CONSEQUENCE) DG02/15 SUGGESTED TIME FRAME Document1 Page 1 of 2