BIOGAS UNIT ESTABLISHMENT AT UAP DAIRY FARM FOR ENERGY AND POWER GENERATION AT THE DAIRY FARM Technical details specifications are as following: Plant Size: 100 cubic meters Type of Plant: Hybrid Fix Dome (Nepal) Daily Input: 800 kg dung + 800 liters water Biogas Production: 35 M³/day Bio-Slurry: 1000 liters bio-slurry/day Scope of Work: Using biogas for energy and power generation (Dual Fuel) Life of the plant: 20 years Structural components Receiving and mixing chamber Manure inlet Digestion gas holder Outlet Gadgets and machinery Pressure gauge (Germany made) Temperature gauge Flow meter Safety valve Mechanized mixing and feeding system Filters Filter at manure inlet Moisture filter Hydrogen-Sulphide gas scrubber Storage Storage for 20 kg gas Fittings Connectivity fitting (PE) polyethylene materials or GI Deliverables Hand driven trolley ------------------------------------------------------ 2 no. Mixing system fitted with agitator, gear motor and other fittings--2 set Pressure gauge (Germany made) -------------------------------------- 3 no Temperature gauge ------------------------------------------------------ 2 no Flow meter ---------------------------------------------------------------- 1 no Safety valve --------------------------------------------------------------- 2 no Moisture filter ------------------------------------------------------------- 1 no Hydrogen-Sulphide scrubber -------------------------------------------- 1 no Pipe fittings electric generator and steam generator Fitting for gas supply to the main buildings (Farm administration, DTC and SPU) Training (practical) to the operator along with operational and maintenance manual After sales service for one year (12 months)