Learning & LEEDing Green Building Checklist- DRAFT Y/N I. ☐ ☐Reduce Lighting Power Density to 90% of ASHRAE 90.1-2007 or Title 24, Part 6. Points ___ /___ Provide lighting design plans and/or specifications. Calculate the total LPD and include on plans. II. Install high performance NFRC-rated windows for all those to be replaced. Provide windows schedule and a copy of each related NFRC Certified Ratings label(s). III. All new or replaced windows must have low conductivity frames. Metal frames do not qualify except those with thermal breaks. ☐ ___ /___ ☐ ___ /___ ☐ ___ /___ ☐ ___ /___ ENERGY Provide finish schedule and/or specifications with applicable material(s) highlighted. IV. Install automatic daylight sensors in at least 75% of non-north facing windows. Sensors must turn lights on, off, or dim according to daylight. Highlight areas to daylight and locations of sensors on plans. Provide calculations (using window area) that 75% or more of the space in daylit areas are under daylighting control. V. Install or locate occupancy sensors in 40% of intermittent or non-regularly occupied spaces. Classrooms are always included. Highlight intermittent spaces + location of sensors on plans. Provide calculations. Energy Total MATERIALS I. During construction divert 100% of concrete and asphalt, and at least 65% of remaining job construction waste landfill via recycling and/or reuse. ☐ Complete a construction waste management plan prior to construction. Postconstruction, provide final plan and verification (service provider weight tags and/or receipts). II. Contact ReUSE and arrange for material salvage before deconstruction. Provide documentation on metrics of waste diverted through ReUSE giveaway program. III. Use environmentally preferable products in 5 of the following categories at the indicated minimum percentage: ☐ ☐ ___ /___ ___ /___ ___ /___ ☐ ___ /___ ___ /___ ___ /___ ☐ ___ /___ ___ /___ Provide mechanical plans with CO2 monitors highlighted. Provide Title 24 “Acceptance” forms. I.E.Q. ___ /___ ___ /___ ___ /___ Materials Total II. Use ergonomic seating or furniture. ___ /___ ___ /___ - Cabinets/shelving – 10% - Countertops/substrates – 10% - Insulation – 10% - Interior Trim – 10% - Furniture – 10% - Flooring – 10% - Doors and door cones – 10% - Ceiling tiles – 10% - Exterior Paint – 10% 1. Provide finish schedule or specifications with applicable material(s) highlighted. 2. Provide manufacturer literature to support environmental claims of material. 3. Provide calculation of applicable material percentage. I. Install fresh air monitor for densely occupied spaces. ___ /___ I.E.Q. Total ___ /___ ___ /___ ___ /___