Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data PART C2: PRICING DATA PRICING DATA CONTENTS C2.1 PRICING INSTRUCTIONS ………………………………………………………………2 C2.2 BILL OF QUANTITIES ……………………………………………………………….......4 C2.3 SUMMARY OF PRICE SCHEDULE …………………………………………….….…18 Page 1 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data C2.1 PRICING INSTRUCTIONS 1. General 1.1 This section provides the tenderer with guidelines and requirements with regard to the completion of the Price Schedule. The Schedule has to be completed in black ink and the tenderer is referred to the Tender Specifications in regard to the correction of errors. 1.2 The Price Schedule shall be read with all the documents which form part of this Contract. 1.3 The following words shall have the meanings hereby assigned to them: Unit: The unit of measurement for each item of work in terms of the Specifications and the Project Specifications. Quantity: The number of units of work for each item. Rate: The payment per unit of work at which the tenderer tenders to do the work. Amount: The product of the quantity and the rate tendered for an item. Lump sum: An amount tendered for an item, the extent of which is described in the Price Schedule, the Specifications and the Project Specifications, but the quantity of work of which is not measured in any units. 1.4 Reference shall be made to the General and Special Conditions of Contract regarding Provisional and Prime Costs Sums. 2. Pay Items 2.1 Descriptions in the Price Schedule are abbreviated and comply generally with those in the Standard Specifications. The measurement and payment clause of each Standard Specification, read together with the relevant clauses of the Scope of Work, set out what ancillary or associated activities are included in the rates for the operations specified. Should any requirements of the measurement and payment clause of the applicable Standard Specification, or the Scope of Work, conflict with the terms of the Price Schedule, the requirements of the Standard Specification or Scope of Work, as applicable, shall prevail. 2.2 The item numbers appearing in the Price Schedule refer to the corresponding item number in the standard specifications or as amended in the Scope of Work. In the latter case, the item number is prefixed with the letter “B”. The same applies to new clauses added to the standard specifications. 2.3 Unless otherwise stated, items are measured net in accordance with the drawings, and no allowance is made for waste. 2.4 The quantities set out in the Price Schedule are the estimated quantities of the Works, but the Contractor will be required to undertake whatever quantities may be directed by the Engineer from time to time. The Contract Price for the completed contract shall be computed from the actual quantities of work done, valued at the relevant unit rates and prices. 2.5 The units of measurement described in the Price Schedule are metric units. Abbreviations used in the Price Schedule are as follows: Page 2 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data mm = m = Km = m2 = 2 m .pass = ha = m3 = 3 m .km = l = kl = MPa = V = A = month = day = pd = millimetre metre kilometre square metre square metre pass hectare cubic metre cubic metre-kilometre litre kilolitre Mega Pascal Volt Ampere per month per day per person per day h kg t no. sum MN MN.m PC sum Prov sum % kW KVA R/only pe pm p = = = = = = = = = = = = = = = = hour kilogram ton (1000kg) number lump sum mega Newton mega Newton-metre Prime Cost sum Provisional sum Per cent kilowatt kilovolt-ampere rate only per establishment per person per month per person 3. Rates 3.1 The prices and rates to be inserted in the Price Schedule are to be full inclusive prices for the work described under the several items. Such prices and rates shall cover all costs and expenses that may be required in and for the execution of the work described, and shall cover the cost of all general risks, liabilities, and obligations set forth or implied in the documents on which the tender is based, as well as overhead charges and profit. Reasonable prices shall be inserted as these will be used as a basis for assessment of payment for additional work that may have to be carried out. 3.2 A price or rate is to be entered against each item in the Price Schedule, whether the quantities are stated or not. An item against which no price is entered or where a word or phrase such as “included” or “provided elsewhere” will be accepted as a rate of nil (R0,00) having been entered against such items and covered by the other prices or rates in the Schedule. Any work executed to which such a pay item applies, shall be measured under the appropriate items in the Price Schedule and valued at a rate of nil (R0,00). The rate of nil shall be valid irrespective of any change in the quantities during the execution of the Contract. 3.3 The Tenderer shall fill in a rate against all items where the words “rate only” appears in the amount column. The intention is that, although no work is foreseen under such item and no quantities are consequently given in the quantity column, the tendered rate shall apply should work under this item be actually required. 3.4 Except where rates only are required, the Tenderer shall insert all amounts to be included in his total tendered price in the “Amount” column and show the corresponding total tendered price. 3.5 The tenderer shall n 3.6 All rates and sums of money quoted in the Price Schedule shall be in rands and whole cents. Fractions of a cent shall be discarded. 3.7 All prices and rates entered in the Price Schedule must be excluding VAT. VAT will be added last on the summary page of the Price Schedule. 3.8 Should excessively high unit prices be tendered, such prices may be of sufficient importance to warrant rejection of a tender by the Employer. Page 3 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data C2.2 BILL OF QUANTITIES ITEM LI/SC DESCRIPTION UNIT QUANTITY R200,000 or less RATE AMOUNT SERIES 0 : GENERAL 1 SECTION 001 : GENERAL REQUIREMENTS AND CHARGES B001.01 Preliminary and general charges: B001.01.01 B001.01.01. 01 B001.01.01. 02 Fixed Charges: % R 200,000 Rate Only More than R200,000 up to and including R650,000 % R 650,000 Rate Only B001.01.01. 03 More than R650,000 up to and including R2,000,000 % R 2,000,000 Rate Only B001.01.01. 04 B001.01.01. 05 B001.01.01. 06 B001.01.01. 07 B001.01.01. 08 B001.01.01. 08 More than R2,000,000 up to and including R4,000,000 More than R4,000,000 up to and including R6,500,000 More than R6,500,000 up to and including R13,000,000 More than R13,000,000 up to and including R40,000,000 More than R40,000,000 up to and including R130,000,000 More than R130,000,000 up to and including R150,000,000 Time-related charges for work to the value of (excluding General Requirements and Charges) % R 4,000,000 Rate Only % R 6,500,000 Rate Only % R 13,000,000 Rate Only % R 40,000,000 Rate Only % R 130,000,000 Rate Only % R 150,000,000 Rate Only month 1 Rate Only month 1 Rate Only month 2 Rate Only month 2 Rate Only month 4 Rate Only month 6 Rate Only month 12 Rate Only month 24 Rate Only m³ 1000 pe 1 pe 1 pe 1 pd 1 B001.01.02 B001.01.02. 01 B001.01.02. 02 B001.01.02. 03 B001.01.01. 04 B001.01.01. 05 B001.01.01. 06 B001.01.01. 07 B001.01.01. 08 001.03 B001.04 B001.04.01 B001.04.02 B001.04.03 B001.04.04 B001.04.04. 01 R200,000 or less More than R200,000 up to and including R650,000 More than R650,000 up to and including R2,000,000 More than R2,000,000 up to and including R4,000,000 More than R4,000,000 up to and including R6,500,000 More than R6,500,000 up to and including R13,000,000 More than R13,000,000 up to and including R40,000,000 More than R40,000,000 up to and including R130,000,000 Excavate by hand to expose existing services and backfill Compliance with the Occupational Health and Safety Act and applicable Regulations Compilation of a Health and Safety Plan Provision of a Health and Safety File Implementation of Occupation Health and Safety Plan Provision of Construction Supervisors: Part Time Page 4 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data B001.04.04. 02 B001.04.05 B001.04.05. 01 B001.04.05. 02 B001.04.06 Full Time pm 1 Part Time pd 1 Full Time pm 1 Health and Safety Training pd 10 p 10 pe 1 month 12 Provision of a Safety Officer: B001.05 Provision of Personal Protective Clothing and Equipment Provision of Safety Fences, Signs and Barricades Community Liaison Officer B001.05.01 Monthly Wage B001.04.07 B001.04.08 B001.05.02 B001.06 B001.07 B001.09 Percentage on item B001.05.01 for charges and profit Supply, erection of the name board and removal after completion of the contract Provision for administration of local emerging contractors and nominated/selected sub-contractors Training of targeted labourers Page 5 % No 5 No 20 Prov Sum 1 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC B001.10 B001.10. DESCRIPTION UNIT QUANTITY Dayworks Expenditure on Dayworks items (eg wages paid to work and invoiced sum of cost of material delivered on site) Labour Prov Sum 1 B001.10.01 LI Unskilled workers Person/day 10 B001.10.02 LI Skilled workers (Artisans) Person/day 30 B001.10.03 Operators and drivers (where measured separately) Sum 1 B001.10.04 Foremen Rate/day 2 B001.10.05 Others (specify) Rate/day 2 t.km 10 h 1,000 h 500 - (i) (Specify type and mass) - (ii) etc (for other types and masses) Compressors: - (i) (Specify capacity and number of tools) - (ii) etc (for other compressors and tools) Trucks: h 2,000 h 1,500 h 2,000 h 1,500 - (i) (Specify type, and capacity) h 5,000 - (ii) etc (for other trucks) h 2,500 - (i) (Specify load capacity) km 10,000 - (ii) etc (for other) Cost of materials delivered to site (specify) Cost of Survey in terms of Land Survey Act. Trigonometrically survey and boundary pegs - locate and record Trigonometrically survey and boundary pegs - protect and reestablish Trigonometrical survey and boundary pegs placed Compliance with the Environmental Management Plan (C3.9) km 5,000 Prov Sum 1 Sum 1 Sum 1 No 3300 l/sum 1 B001.10.06 B001.10.07 B001.10.08 B001.10.09 B001.10.10 B001.10.11 B001.11 B001.11.01 B001.11.02 B001.11.03 001.12 TOTAL Constructional Plant Lowbed transport of plant to and from the site Back-acting excavators: - (i) (Specify type, power and mass) - (ii) etc (for other back-acting excavators) Compactors: RATE Light delivery vehicles: DIVISION A - SECTION 001 : GENERAL REQUIREMENTS AND CHARGES Page 6 50,000 AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QUANTITY RATE AMOUNT l/sum Pe l/sum Pe l/sum Pe l/sum Pe l/sum Pe l/sum Pe 1 100,000 100,000 1 100,000 100,000 1 100,000 100,000 1 2,500,000 2,500,000 SERIES 0 : GENERAL B002 SECTION 002 : ENGINEERS'S ACCOMMODATION B002.01 Services: B002.01.01 Services for offices and laboratories B002.01.02 B002.02 B002.03 Services for ablution facilities on Site for the Engineer's Site staff Treatment and maintenance of areas surrounding offices and laboratories B002.06 Office and laboratory accommodation Provision of survey equipment and assistants Office for the Construction & Materials Manger PROVISIONAL SUMS B002.06.01 Sums stated provisionally by the Engineer B002.04 B002.05 B002.06.02 B002.06.03 B002.06.04 B002.06.05 B002.07 Third party inspection of pipes, fittings and valves Special testing of materials by an approved independent laboratory Overhead charges and profit on Items B002.06.01 to B002.06.03 above Design of concrete mixes by a specialist organization appointed by the Engineer PIPE JACKING AND BORING Overhead charges and profit on item B002.07 TOTAL Prov Sum Prov Sum % Prov. Sum Prov Sum % DIVISION A - SECTION 002: ENGINEERS'S ACCOMMODATION Page 7 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC 101.01 LI 101.01.02 101.02 LI 101.02.01 LI 101.02.02 101.03 101.03.01 101.03.02 101.04 101.04.01 101.04.02 LI QUANTITY Areas m² 1000 Strips (3m wide) m 56000 No 30 No 5 No 30 No 5 Strips (3m wide on pipeline route) m 500 Areas not classified as strips m² 500 Concrete Kerbing / Kerbing combination m³ 100 Concrete or brick elements (reinforced or unreinforced) m³ 100 Cutting and removing large trees with girth: Exceeding 1 m and up to and including 2 m Exceeding 2 m and up to and including 3 m Grubbing and the removal of the stumps and roots of large trees with a girth: Exceeding 1 m and up to and including 2 m Exceeding 2 m and up to and including 3 m Reclearing areas (only on the written instructions of the Engineer) Removal and Disposal of specific elements 101.05 101.05.01 UNIT SERIES 1: ANCILLARY WORK SECTION 101: SITE CLEARING AND GRUBBING Clearing and grubbing: 101 101.01.01 DESCRIPTION LI 101.05.02 101.05.02.01 LI Foundations &floorslabs of dwellings m³ 100 101.05.02.02 LI Walls of dwellings m³ 50 101.05.03 LI Asphalt surfacing m² 40 TOTAL DIVISION A - SECTION 101: SITE CLEARING AND GRUBBING Page 8 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QUANTITY m 300 B102.02 SERIES 1: ANCILLARY WORK SECTION 102: ACCOMMODATION OF TRAFFIC Accommodation of traffic and maintenance of bypasses Earthworks for bypasses: B102.02.01 Shaping of bypasses m² 300 102.03 Gravel wearing courses for bypasses Standard bituminous surfacing of bypasses Existing roads used as bypasses Maintenance of surfacing and pavement layers of bitumen- surfaced bypasses and existing bitumensurfaced roads used as bypasses m³ 200 m² 200 prov/sum 1 m² 1 102.09 102.1 Traffic lights Temporary fencing and gates: prov/sum 1 102.10.01 Temporary fencing m 50 102.10.02 Temporary gates No 1 102.12 Provision of temporary bridges for maintaining access to properties: 102 B102.01 102.06 102.07 B102.08 102.12.01 LI Temporary pedestrian bridges No 200 102.12.02 LI No 100 No 50 No 50 Flagmen pd 80 102.14.02 Portable STOP and GO-RY signs No 4 102.14.03 Amber flicker lights Road signs, TR-series, 1 200 mm in diameter or 900 mm x 675 mm if rectangular Road signs, TW-series, 1 524 mm sides Danger plates and delineators (1000mm X 250mm) Traffic cones (500mm height) No 2 No 10 No 10 No 20 No 20 102.13.01 LI Temporary vehicular bridges Moving of temporary bridges to and their re-erection in entirely new positions: Temporary pedestrian bridges 102.13.02 LI Temporary vehicular bridges 102.13 102.14 B102.14.01 102.14.04 102.14.05 102.14.07 B102.14.09 102.15 102.15.01 102.15.04 102.15.05 102.15.07 B102.15.09 TOTAL Temporary traffic-control facilities: LI Re-use or removal of traffic control facilities: LI Flagmen Person/hour Road signs, TR-series, 1 200 mm in diameter or 900 mm x 675 mm if No rectangular Road signs, TW-series, 1 524 mm No sides Danger plates and delineators No ((1000mm X 250mm) Traffic cones (500mm height) No DIVISION A - SECTION 102: ACCOMMODATION OF TRAFFIC SERIES 1 : ANCILLARY WORK Page 9 5 5 5 10 10 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data 103.01 TOTAL SECTION 103 : OVERHAUL Overhaul on material hauled outside the defined free-haul boundaries (Free Haul 5 Km) DIVISION A - SECTION 103 : OVERHAUL Page 10 m³.km 25000 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QUANTITY SERIES 2: EARTHWORKS 202 SECTION 202: TRENCHING 202.01 Trench excavations: Up to 1,0 m wide 202.01.01 202.01.01.01 LI Up to 1,0 m deep m³ 31577 202.01.01.02 LI Over 1,0 m and up to 1,5 m deep m³ 10927 202.01.01.03 Over 1,5 m and up to 2,0 m deep m³ 4152 202.01.01.04 Over 2,0 m and up to 2,5 m deep m³ 16538 202.01.01.05 Over 2,5 m and up to 3,0 m deep m³ 1567 202.01.01.06 Over 3,0 m and up to 3,5 m deep m³ 29933 202.01.01.07 Over 3,5 m and up to 4,0 m deep m³ 16882 202.01.01.08 Over 4,0 m and up to 4,5 m deep m³ 5861 202.01.01.09 Over 4,5 m and up to 5,0 m deep m³ 1956 202.01.01.10 Over 5 m and up to 5,5 m deep m³ 185 202.01.01.11 Over 5,5 m and up to 6 m deep m³ 57 202.01.02 Over 1,0 m and up to 2,0 m wide 202.01.02.01 LI Up to 1,0 m deep m³ 33 202.01.02.02 LI Over 1,0 m and up to 1,5 m deep m³ 24 202.01.02.03 Over 1,5 m and up to 2,0 m deep m³ 18 202.01.02.04 Over 2,0 m and up to 2,5 m deep m³ 32 202.01.02.05 Over 2,5 m and up to 3,0 m deep m³ 18 202.01.02.06 Over 3,0 m and up to 3,5 m deep m³ 42 202.01.02.07 Over 3,5 m and up to 4,0 m deep m³ 150 202.01.02.08 Over 4,0 m and up to 4,5 m deep m³ 222 202.01.02.09 Over 4,5 m and up to 5,0 m deep m³ 58 202.01.01.11 Over 5,5 m and up to 6 m deep m³ 222 202.02 Extra over items 202.01, 202.03, 202.04 and 202.09 for excavating in: 202.02.01 202.02.02 202.02.03 202.02.04 Intermediate material Hard material Boulder Class 1 Boulder Class 2 m³ m³ m³ m³ 11964 47854 8000 5000 Excavations outside the normal trench profile Hand excavation (extra over item 202.01) The backfilling of trenches (excluding selected backfill around /and the pipe barrel) with material obtained from excavations Extra over items 202.06 and 202.13 for using backfill material obtained: From borrow areas From sources provided by Contractor m³ m³ 4900 2000 m³ 2190.8 m³ m³ 1095 1095 From Commercial sources Backfilling additional excavations in trench floor, using: Class 1:3:6/19 concrete Concrete aggregate, max size 38 mm m³ 2500 m³ m³ 1260 50 Subsurface drains in trench bottoms m 65000 202.03 202.04 LI 202.06 202.07 202.07.01 202.07.02 202.07.03 202.08 202.08.01 202.08.02 202.09 LI Page 11 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC 202.10 DESCRIPTION UNIT QUANTITY m³ 5000 m³ 5000 m² 1500 m³ 10000 Removal of spoil material To positions indicated on the Drawings or by the Engineer To dumping areas to be provided by the Contractor 202.10.01 202.10.02 202.11 Timbering and shoring left in excavation Extra over item 202.06 for additional compaction of backfill to 93% of modified AASHTO density in road reserves. (Test results to be supplied for additional compaction) Backfilling trenches with soilcrete 202.12 202.13 m³ 650 202.15 Reinstatement of bitumen surfaced roads (per instruction of the engineer ) m² 2500 B202.16 Services that intersect a trench No 100 B202.17 Services that adjoin a trench m 50 B202.18 Saw-cutting and removal of premix B202.18.01 Premix thickness up to 50mm m² 2200 B202.18.02 Premix thickness from 51mm up to 100mm m² 300 B202.18.03 Premix thickness from 101mm up to 150mm m² 1000 B202.18.04 Premix thickness from 151mm up to 200mm m² 1000 Hand excavation for trenches inside erven. Trench 750mm wide and 1500mm deep m 10000 B202.19 LI TOTAL DIVISION A - SECTION 202: TRENCHING Page 12 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QTY 302.01.01.01 LI SERIES 3: SEWERS SECTION 302: SEWERS: CONSTRUCTION Supplying and laying of sewer pipes Supplying, laying and jointing of sewer pipes (SANS 1601) irrespective of depth or width of trench: 110 mm uPVC Class 400 m 72375 302.01.01.02 LI 160 mm uPVC Class 400 m 52613 302.01.01.03 LI 200 mm uPVC Class 400 m 2700 302.01.01.04 LI 302.01 302.01.01 250 mm uPVC Class 400 m 3500 302.01.01.05 315 mm uPVC Class 400 m 1900 302.01.01.06 m 200 302.01.02.01 355 mm uPVC Class 400 Supplying, laying and jointing of sewer pipes (SANS 4427) irrespective of depth or width of trench: 300 mm HDPE (PE80,PN10) m 1000 302.01.02.02 350 mm HDPE (PE80,PN10) m 300 302.01.02.03 400 mm HDPE (PE80,PN10) m 100 302.01.02.04 450 mm HDPE (PE80,PN10) m 121 302.01.02.05 500 mm HDPE (PE80,PN10) m 1600 302.01.02.06 600 mm HDPE (PE80,PN10) m 420 302.02 Constructing of pipe bedding 302.01.02 302.02.01 LI Class B bedding for flexible pipes 302.02.01.01 LI 110 mm pipes m 52375 302.02.01.02 LI 160 mm pipes m 52613 302.02.01.03 LI 200 mm pipes m 2700 302.02.01.04 LI 250 mm pipes m 3500 302.02.01.05 300 mm pipes m 1900 302.02.01.06 350 mm pipes m 1103 302.02.01.07 400 mm pipes m 10 302.02.01.08 450 mm pipes m 10 302.02.01.09 500 mm pipes m 1600 302.02.01.10 600 mm pipes m 420 m3 50 302.04.01 Concrete encasing of pipes Extra over item 302.01 for supplying, installing and jointing with an approved method of coupling the following PVC-U pipe fittings in the main sewer lines Branch junctions: 302.04.01.01 110 mm dia off 160 mm dia No 1880 302.04.01.02 160 mm dia off 160 mm dia & bend No 540 302.04.01.03 160 mm dia off 200 mm dia No 370 302.04.01.04 110 mm dia off 250 mm dia No 5 302.04.04 200mm half channels cast in benching No 500 302.04.05 200mm x 200mm half channel branches No 250 302.03 302.04 LI Page 13 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION 302.06 Construction of vertical house connections (as per DWG 7515-S104) 302.06.01 Type A house connections: 302.06.01.01 LI 302.06.01.02 LI 302.06.01.03 302.06.01.04 302.06.01.05 302.06.02 Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3,0m in depth Exceeding 3m but not exceeding 3,5m in depth Type B house connections: Exceeding 2m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3m in depth Exceeding 3m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4m in depth 302.06.02.01 302.06.02.02 302.06.02.03 302.06.02.04 302.06.03 Type D house connections: 302.06.03.01 Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3,0m in depth Exceeding 3,0m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4,0m in depth Exceeding 4,0m but not exceeding 4,5m in depth 302.06.03.02 302.06.03.03 302.06.03.04 302.06.03.05 302.06.03.06 302.06.03.07 302.06.04 UNIT QTY No 1200 No 660 No 15 No 3 No 1 No 600 No 50 No 10 No 10 No 200 No 70 No 10 No 10 No 10 No 10 No 5 No 250 No 200 No 100 No 80 No 30 No 5 No 921 No 821 Type C house connections: 302.06.04.01 LI 302.06.04.02 Li 302.06.04.03 302.06.04.04 302.06.04.05 302.06.04.06 302.07 302.07.01 LI 302.07.02 LI Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3,0m in depth Exceeding 3m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4,0m in depth Construction of cleaning eyes (Lamp poles) (DWG 7515-S106) Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Page 14 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION 302.12.01 LI Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3,0m in depth Exceeding 3m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4,0m in depth Exceeding 4,0m but not exceeding 4,5m in depth Marker blocks Construction of manholes, up to 1,0m deep For sewers 300mm in diameter and smaller: Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3m in depth Exceeding 3m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4m in depth Exceeding 4m but not exceeding 4,5m in depth Exceeding 4,5m but not exceeding 5m in depth For sewers with diameters exceeding 300mm: Up to but not exceeding 1,5m in depth Exceeding 1,5m but not exceeding 2,0m in depth Exceeding 2,0m but not exceeding 2,5m in depth Exceeding 2,5m but not exceeding 3m in depth Exceeding 3m but not exceeding 3,5m in depth Exceeding 3,5m but not exceeding 4m in depth Exceeding 4m but not exceeding 4,5m in depth Exceeding 4,5m but not exceeding 5m in depth Extra over item 302.09 for the construction of manholes in excess of 1,0 m deep For sewers 300mm diameter and smaller Precast manhole sections for diameter 1250 mm Supplying and installing manhole covers and frames SANS 558 Type 4 circular 302.12.02 LI 302.12.03 LI 302.12.04 LI 302.07.03 302.07.04 302.07.05 302.07.06 302.07.07 302.08 302.09 302.09.01 302.09.01.01 302.09.01.02 302.09.01.03 302.09.01.04 302.09.01.05 302.09.01.06 302.09.01.07 302.09.01.08 302.09.02 302.09.02.01 302.09.02.02 302.09.02.03 302.09.02.04 302.09.02.05 302.09.02.06 302.09.02.07 302.09.02.08 302.10 302.10.01 302.10.01.01 302.12 SANS 558 Type 2A circular Precast concrete cover with type 2A CI frame Precast concrete cover with type 4 CI frame Page 15 UNIT QTY No 595 No 892 No 30 No 30 No 11 No 3300 No 3 No 125 No 213 No 259 No 244 No 108 No 41 No 10 No 1 No 3 No 18 No 16 No 18 No 17 No 2 No 1 No 200 No 1000 No 100 No 20 No 20 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data 302.12.05 302.12.05.01 302.13 302.13.01 302.13.02 Precast concrete cover with precast concrete frame: 560mm diameter heavy duty No 100 Extra over item 302.09 for the construction of house connections from manholes One-house connections No 150 No 30 No 150 Two-house connections Removal and reinstatement of water meters during installation of house connections and water connections 302.13.03 Supplying and placing selected backfill material around and up to 300mm above pipe barrels using 302.14 302.14.01 LI Excavated material m3 8000 302.14.02 LI Imported material m3 4000 302.16 Connecting to existing manholes 302.16.01 110 mm dia PVC-U 400 kPa No 10 302.16.02 160 mm dia PVC-U 400 kPa No 10 302.16.03 200 mm dia PVC-U 400 kPa No 10 302.16.04 250 mm dia PVC-U 400 kPa No 10 302.16.05 300mm HDPE No 1 302.16.06 350mm HDPE No 1 302.16.07 400mm HDPE No 1 302.16.08 450mm HDPE No 1 302.16.09 500mm HDPE No 1 302.16.10 600mm l HDPE No 2 302.16.11 700mm HDPE No 2 302.16.12 750mm HDPE No 2 Preliminary work prior to the construction of manhole on an existing pipeline 160 mm RC No 10 302.20. 302.20.01 302.20.02 200 mm RC No 10 302.20.03 355 mm RC No 10 302.21 Extra over sub-item 302.14.02 for using material obtained from sources provided by the Contractor m3 7350 TOTAL DIVISION A - SECTION 302: SEWERS: CONSTRUCTION Page 16 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QTY No 1070 SERIES 3: SEWERS SECTION 303: TESTING 303.01 Testing of manholes 303.02 Air testing of sewers 303.02.01 LI 110 mm pipes m 72375 303.02.02 LI 160 mm pipes m 52613 303.02.03 LI 200 mm pipes m 2700 303.02.04 LI 250 mm pipes m 3500 303.02.05 LI 300 mm pipes m 900 303.02.06 LI 350 mm pipes m 1103 303.02.07 LI 400 mm pipes m 10 303.02.08 LI 450 mm pipes m 10 303.02.09 LI 500 mm pipes m 1600 303.02.10 LI 600 mm pipes m 420 303.03 CCTV Camera Inspection 303.03.01 110 mm dia m 72375 303.03.02 160 mm dia m 52613 303.03.03 200 mm dia m 2700 303.03.04 250 mm dia m 3500 303.03.05 300 mm dia m 900 303.03.06 350 mm dia m 1103 303.03.07 400 mm dia m 10 303.03.08 450 mm dia m 10 303.03.09 500 mm dia and wider m 1600 303.03.10 600 mm dia and wider m 420 TOTAL DIVISION A - SECTION 303: TESTING Page 17 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QTY Single-sized 19mm crushed stone m3 1887 Geotextiles (Kaytech U24 or similar) m2 62886 RATE AMOUNT RATE AMOUNT SERIES 5: DRAINAGE AND EROSION PROTECTION SECTION 501: SUBSURFACE DRAINS AND DRAINAGE BLANKETS 501.01 501.01.02 Crushed stone LI 501.04 TOTAL DIVISION A - SECTION 501: DRAINAGE AND EROSION PROTECTION ITEM LI/SC DESCRIPTION UNIT QTY In solid rock (material which requires blasting) m3 1200 In all other classes of material m3 5000 505.02 Surface preparation for the beddings for Gabions m2 50 505.03 Gabions 505.03.01 Gabion: Gabion boxes (1,5 x 1,5 mesh wire) m3 200 505.05 Filter fabric for gabions and rip rap (Kay tech v24 or similar) m2 100 SERIES 5: EROSION PROTECTION SECTION 505: SUBSURFACE DRAINS AND DRAINAGE BLANKETS 505.01 LI 505.01.01 505.01.02 TOTAL LI Foundation trench excavation and backfilling DIVISION A - SECTION 505: SUB-SURFACE DRAINS AND DRAINAGE BLANKETS Page 18 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QTY LI/SC SECTION 001: GENERAL REQUIREMENTS AND CHARGES Excavate by hand to expose existing services, and backfill Provision of construction and materials manager m³ 250 001 001.03 B001.06 B001.09 TOTAL Prov 1 Sum Prov Training of targeted labourers 1 Sum DIVISION B – SECTION 001: GENERAL REQUIREMENTS AND CHARGES SERIES 1: ANCILLARY WORK 103 SECTION 103: OVERHAUL 103.01 Overhaul on material hauled outside the defined free-haul boundaries TOTAL 104 m³.km 60000 DIVISION B – SECTION 103: OVERHAUL SECTION 104: LANDSCAPING AND GRASSING 104.01 Trimming: 104.01.01 Machine trimming m² 3000 Hand trimming m² 50000 ha 1 m³ 200 m³ 200 ha 1 Planting of grass cut tings ha 1 Extra work for landscaping prov/sum 1 104.01.02 LI 104.03 Preparing areas for grassing and ground covers: 104.03.01 Scarifying 104.03.02 Topsoiling on the Site with; Topsoil obtained from the Site or borrow areas provided by the Employer Topsoil provided by the Contractor from other sources (including all haul) 104.03.02.01 104.03.02.02 104.03.05 Stockpiling of topsoil 104.04 Grassing: 104.04.01 LI 104.08 TOTAL DIVISION B: SECTION 104: LANDSCAPING AND GRASSING 105 SECTION 105: FENCING 105.01 SC Supply and erection of new fencing material: 105.01.01 SC Ordinary fences m 29399 105.01.02 SC Security fences m 1000 105.01.03 SC Concrete fences (1.8) m 200 105.01.04 SC Brick walls m 1000 105.01.05 SC Palisades m 1000 105.03 SC Moving of existing fences and gates(remove and reinstate) 105.03.01 SC Fences 105.03.01.02 SC Ordinary fences m 36500 105.03.01.02 SC Security fences m 130 Page 19 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION UNIT QTY 105.03.02 SC Gates No 40 105.04 SC Dismantling of existing fences m 20000 105.06 SC Provision of temporary fencing 105.06.01 SC m 150 B105.08 SC B105.08.01 SC Diamond mesh wire Allow for moving of existing fences and boundary walls: All types of wire fencing m 1500 B105.08.02 SC All types of brick walls including plaster walls m 500 B105.08.03 SC All types of concrete walls m 150 B105.08.04 SC All types of wrought iron fences m 450 B105.08.05 SC All types of palisades m 390 TOTAL DIVISION B - SECTION 105: FENCING m³ 2900 m³ 12370 m 52000 SERIES 2: EARTHWORKS 202 SECTION 202: EARTHWORKS 202.1 Removal of spoil material: 202.10.01 SC 202.10.02 SC To positions indicated on the Drawings or by the Engineer To dumping areas to be provided by the Contractor 202.2 Hand excavations of 450mm X 300mm trench and backfill inside erven for 20mm water pipe TOTAL SECTION 202: EARTHWORKS SERIES 3: SEWERS 302 SECTION 302: SEWERS: CONSTRUCTION 302.15 LI/SC Extra over item 302.14.01 screening material m³ 400 302.17 LI/SC Construction of anchor blocks on steep grades m³ 40 m 52000 No 1000 No 500 TOTAL SECTION 302: SEWERS - CONSTRUCTION SERIES 4: WATER RETICULATION AND WATER MAINS 402 SECTION 402: CONSTRUCTION 402.01 Supply, laying and joining of water pipes irrespective of depth 402.01.01 HDPE Type 4 402.01.01.01 20mm diameter pipe Extra over Item 402.01 for providing and installing fittings, valves and specials: 402.02 402.02.01 402.02.01.01 402.02.02 402.02.02.01 Flanged gate valves PN16 100mm diameter Vent-O- Mat RGX air valve PN16 or similar approved. 100mm diameter Page 20 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM 402.02.03 402.02.03.01 402.02.04 402.02.04.01 402.02.05 402.02.05.01 402.02.05.02 402.02.05.03 402.02.06 402.02.06.01 402.03 402.03.01 402.04 402.05 402.05.01 LI/SC DESCRIPTION UNIT QTY No 1000 No 500 No 1500 No 500 No 500 No 500 m³ 1000 m³ 1500 m³ 10000 CI scour tee. Table 16 SANS 1123 200mm diameter PN16 Wafer check non return valves 200mm diameter uPVC PN 16, bends 22,5 degrees, 200 mm diameter 45 degree, 200 mm diameter 90 degree, 200 mm diameter flanged spigot 200mm long 200mm diameter Encasement of pipes with: Class 15/19 concrete Providing thrust blocks using class 15/19 concrete Supplying and placing unscreened selected backfill material under, alongside and up to 200 mm above pipe barrels using: Excavated material 402.05.02 Imported material from sources provided by the Employer m³ 5000 402.05.03 Imported material from sources provided by the Contractor m³ 5000 402.06 Extra over item 402.05 for screening excavated material for selected backfill m³ 2500 No 150 No 150 No 150 No 100 No 500 m 52000 No 3300 No 3300 402.07 402.07.01 402.07.01.01 402.07.01.02 402.07.01.03 402.07.04 402.08 402.10 402.12.01 402.13.01 Valve chambers complete for – Flanged gate valves not exceeding 200 mm in dia: DN 200 PN16, Isolationg valve chamber DN 200 PN16, Non return valve chamber DN 200 PN16, Flow meter chamber Double air valve Marker blocks Sterilizing of pipelines Cut and fit 20mm diameter pipe to existing water supply Supply and install 20mm equal T-piece with Plascon or similar approved adaptor Page 21 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data ITEM LI/SC DESCRIPTION TOTAL DIVISION B - SECTION 402: CONSTRUCTION 403 SECTION 403: TESTING 403.01 Hydraulic field - testing of pipelines TOTAL UNIT QTY m 52000 No 3300 DIVISION B -SECTION 403: TESTING SERIES 8: SPECIFIC WORKS 805 SECTION 805: BUILDING WORK B805.13 Toilet structure complete as per DWG S7515 S105 with plumbing and fitting as shown TOTAL DIVISION B: SECTION 805: BUILDING WORK TOTAL DIVISION B – LOCAL EMERGING CONTRACTORS Page 22 RATE AMOUNT Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data SUMMARY OF SCHEDULES DIVISION A ITEM AMOUNT ('R) SERIES 0 001 General Requirements and Charges R 002 Engineers Accommodation R SERIES 1 101 Site Clearing and Grubbing R 102 Accommodation of Traffic R 103 Overhaul R SERIES 2 202 Trenching R SERIES 3 302 Construction R 303 Testing R SERIES 5 501 Subsurface Drains and Drainage Blankets R 505 Erosion Protection R TOTAL CONSTRUCTION COST (DIVISION A) R SIGNATURE OF PERSON AUTHORISED TO SIGN THE TENDER: ___________________________________ DATE: PARTICULARS OF PERSON AUTHORISED TO SIGN THE TENDER: Name: Tel No: ID No: BANK PARTICULARS: Account No: Bank: Branch Code: I hereby authorise National-Infra Project Managers (Pty) Ltd, to obtain a bank code with respect to the above-mentioned bank account through ABSA Bank as intermediary. SIGNED: TENDERER: Page 23 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data SUMMARY OF SCHEDULES DIVISION B ITEM AMOUNT ('R) SERIES 0 001 General Requirements and Charges R SERIES 1 103 Overhaul R 104 Landscaping and grassing R 105 Fencing R SERIES 2 202 Earthworks R SERIES 3 302 Construction R SERIES 4 402 Construction R SERIES 8 805 Building Work R TOTAL CONSTRUCTION COST (DIVISION B) R SIGNATURE OF PERSON AUTHORISED TO SIGN THE TENDER: ___________________________________ DATE: PARTICULARS OF PERSON AUTHORISED TO SIGN THE TENDER: Name: Tel No: ID No: BANK PARTICULARS: Account No: Bank: Branch Code: I hereby authorise National-Infra Project Managers (Pty) Ltd, to obtain a bank code with respect to the above-mentioned bank account through ABSA Bank as intermediary. SIGNED: TENDERER: Page 24 Contract No: SID WS 16 - 2014/15 Part C2: Pricing Data AMOUNT SUMMARY OF PRICE SCHEDULE R TOTAL DIVISION A R TOTAL DIVISION B R SUBTOTAL R Add 10% for contingencies on Subtotal R SUBTOTAL (DIVISION A + DIVISION B + Contingencies) R Add 14% VAT R CONTRACT PRICE CARRIED FORWARD TO FORM OF OFFER R SIGNATURE OF PERSON AUTHORISED TO SIGN THE TENDER: ___________________________________ DATE: PARTICULARS OF PERSON AUTHORISED TO SIGN THE TENDER: Name: Tel No: ID No: BANK PARTICULARS: Account No: Bank: Branch Code: I hereby authorise National-Infra Project Managers (Pty) Ltd, to obtain a bank code with respect to the above-mentioned bank account through ABSA Bank as intermediary. SIGNED: TENDERER: Page 25