Work declaration form Within the meaning of the Act respecting access to documents held by public bodies and the protection of personal information, the information identifying you is confidential. However, this information is essential for the processing of your file. Thus, the Department commits itself to restrict access to duly authorized people and to use and dispose of the confidential information in compliance with this Act. IDENTIFICATION AND WORK SYNTHESIS SECTION 1 : APPLICANT (Obligatory) Please inscribe the contact information of the person completing this form. The correspondence pertaining to the work report shall be sent and used for any additional information request. Name First name Client number Address Province City Country Postal code Fax Phone Ext. E-mail address SECTION 2 : OPERATORS (Obligatory) Please identify the operators as specified in the article 1 of the Mining tax act, c. I-0.4 and their percentage partnership for all the titles and work declared. 1. Name Client number Address Province City Country Postal code Fax Phone Ext. E-mail address Quebec enterprise number (NEQ) Percentage partnership 2. Name Client number Address Province City Country Postal code Fax Phone Ext. E-mail address Quebec enterprise number (NEQ) Percentage partnership SECTION 3 : PROPERTIES / PROJECTS (Obligatory) Please name the properties / projects associated with this declaration. Name Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers 2015-11-18 – Page 1 de 3 SECTION 4 : STATEMENT (Obligatory) As a mining right holder or his representative, you are responsible for all the information disclosed in this form. Select the appropriate box, write your name in block letters, the date and sign the statement. Statement of the mining right holder or his representative I hereby certify that all information provided in this form, its annexes and attached documents is accurate, complete and submitted once only. I acknowledge to be the holder of this or these mineral rights or his duly authorized representative. Name First name Date : / Year Signature : / month Day Do not forget to attach the maps, plans, reports and registers required by regulation. This form must be sent by mail only at the following address : Ministère des Ressources naturelles Service de la gestion des droits miniers 5700, 4e Avenue Ouest, local C-320 Québec (Québec) G1H 6R1 RESERVED TO THE MINISTÈRE No de requête : Ministère de l’Énergie et des Ressources naturelles Date de réception : Service de la gestion des droits miniers Initiales : 2015-11-18 – Page 2 de 3 SECTION 3 : WORK SYNTHESIS First, write the location of titles on the upper line and select the appropriate boxes. Then for each titles aimed in this statement, report here all the amounts declared in each annexes concerned and according to the nature of work performed. To do so, enter in the first column the title n° number, in the second column the number of corresponding hectares and, in the following columns, the amount reported according to the nature of work performed. Moreover, write at the end of each column and each line the total of costs as well as the great total. Location : Township Seigniory GP Mining title n° Nbre of Hectares N.T.S.leaflet GE GC Geophysical surveys Geological surveys Geochimical surveys FO EP DE AN EV AU Boring (drilling) Property examination Stripping/Excavating Sampling Technical assessement Other TOTAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TOTAL AMOUNT GREAT TOTAL Note : If the space is insufficient, print another page Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers 2015-11-18 – Page 3 de 3 ANNEXE 1 Geophysical, geological and geochemical surveys SECTION 1 : LINE CUTTING Describe briefly the type of lines (indicated, cut, staked, etc). Write the period (year, month, day) during which cutting was carried out, the number of kilometers covered and the spacing between the lines. Enter in the last column the corresponding cost. Then add all the expenses and enter the total amount in box entitled TOTAL (1). Where applicable, distribute this amount between the various surveys in the space reserved for this purpose in sections 2, 3 and 4. Nature of cutting Date(s) of performance from (year/month/day) to (year/month/day) Length in (km) Spacing between lines Cost $ + + + + + + + + + + = TOTAL (1) SECTION 2 : GEOPHYSICAL SURVEYS Describe the method used, the period (year, month, day) during which surveys were carried out, the number of kilometers covered, the spacing between reading points, the number of readings and finally, in the column entitled COST, expenses incurred for each surveys. Where applicable, enter the attributable amount to line cutting. Add the entered amounts and inscribe in box entitled TOTAL (2) the total sum of costs disbursed. This total must be deferred to section entitled "Identification and work synthesis" and distributed, by title, according to the nature of work. Method used Length in (km) Date(s) of performance from (year/month/day) to (year/month/day) Spacing between reading points (in meters) Interval Number Cost $ + + + + + + + + + + Montant attribuable pour la coupe de lignes = TOTAL (2) SECTION 3 : GEOLOGICAL SURVEYS Describe the method used , the period (year, month, day) during which surveys were carried out, the number of kilometers covered, the interval between traversings and finaly, in the column entitled COST, enter the expenses incurred for each surveys. Where applicable, enter the ascribable amount to line cutting. Add the entered amounts and inscribe in box entitled TOTAL (3) the total sum of costs disbursed This total must be deferred to section 3 in the zone entitled "Identification and work synthesis" and distributed, by title, according to the nature of work. Method used Date(s) of performance from (year/month/day) to (year/month/day) Surface (in km2) Interval between the traversings (in metrers) + + + + + + + + + + Montant attribuable pour la coupe de lignes TOTAL (3) Ministère de l’Énergie et des Ressources naturelles Cost $ Service de la gestion des droits miniers = Annexe 1 – 2015-11-18 – Page 1 de 2 SECTION 4 : GEOCHEMICAL SURVEYS Describe the method used , the period (year, month, day) during which surveys were carried out, the number of kilometers covered , the interval between sampling points, the number of samples and finaly, in the column entitled COST, enter the expenses incurred for each surveys. Where applicable, enter the attributable amount to line cutting. Add the entered amounts and inscribe in box entitled TOTAL (4) the total sum of costs disbursed. This total must be deferred to section 3 in the zone entitled "Identification and work synthesis" and distributed, by title, according to the nature of work. . Method used Date(s) of performance from (year/month/day) to (year/month/day) Length (in km) Interval between samples (in metrers) Interval Cost $ Number + + + + + + + + + + Amount attributable to line cutting TOTAL (4) = SECTION 5: EXPENSES INCURRED FOR LINE CUTTING AND SURVEYS Detail here the various expenses incurred for line cutting and surveys by describing, for example, the costs incurred for wages, housing, supplying, transportation, instruments rental, analyses, drawings, etc. Moreover, indicate for each ones the corresponding cost. Add all the entered amounts and inscribe the total in box entitled Total (5). Cost $ Description + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Caution, the total of this box must correspond to the total amount of previous TOTALS 2, 3 et 4. Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers TOTAL (5) = Annexe 1 – 2015-11-18 – Page 2 de 2 ANNEXE 2 BORING WORK (DRILLING) SECTION 1 : LABOUR COSTS List the name and address of the contractor in charge of carrying out the work program or the name and address of the personnel who participated in the work as well as the period (year, month, day) during which the work has been carried out . In the last column, inscribe the amounts disbursed for wages to the personnel or the cost disbursed to the contractor for the carrying out of work. Finally, add each costs and enter the total amount disbursed in box entitled TOTAL (1) Identification Name Date(s) of performance Address Wages or cost from (year/month/jday) to (year/month/day) $ + + + + + + + = TOTAL (1) SECTION 2 : TRANSPORTATION AND HOUSING OF PERSONNEL AND SUPPLYING COSTS Detail briefly the type of transportation, housing and supplying. Inscribe the costs incurred for each one such as expenses for truck or vehicle rental, accomodation, restaurant or grocery shopping, etc. Moreover, write for each means of transport the distance covered, in kilometers (km) from starting point to arrival point on the site, the number of people transported as well as the number of days of travelling . Then add each costs and enter the total amount disbursed in the box entitled TOTAL (2). Distance Description (in km) Nbre of people Nbre of days Cost $ + + + + + + + = TOTAL (2) SECTION 3 : SAMPLES ANALYSES Write the name of the laboratorie(s) who performed the samples analyses, the elements determined, the number of samples analyzed as well as the cost for each analysis. Add all the costs reported and enter the total amount in the box entitled TOTAL (3). Name of laboratory Elements determined Nbre of samples Cost $ + + + + + + + TOTAL (3) = SECTION 4 : OTHER COSTS Use this section to declare any other type of expenses incurred for drilling. Briefly describe the nature of expenses and enter the corresponding cost. Add each cost and enter the total amount in box entitled TOTAL (4) Description + + + + + TOTAL (4) Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Cost $ = Annexe 2 – 2015-11-18 – Page 1 de 2 GREAT TOTAL (TOTAL 1 + 2 + 3 + 4) Enter the total amount of expenses for boring work (drilling). This great total must be deferred to section 3 entitled "Identification and work synthesis" and distributed by title according to the nature of work. GREAT TOTAL (1 + 2 + 3 + 4) = SECTION 5: BORING WORK (DRILLING) DESCRIPTION PER MINING RIGHT In the following columns, list the number of titles and drill-holes on the land subject to the mining right as well as the overall length of the drill-holes in meters. Lastly, write the total number of meters of land drilled for all the titles in the box entitled OVERALL LENGTH OF DRILL-HOLES. Mining title n° Drill-holes n°on this title Total lenght of drill-holes on this title (in meters) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 TOTAL LENGTH OF DRILL-HOLES (IN METERS) Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Annexe 2 – 2015-11-18 – Page 2 de 2 ANNEXE 3 EXAMINATION OF ROCK OUTCROPS AND ERRATIC BOULDERS SECTION 1 : LABOUR COSTS List the name and address of the contractor in charge of carrying out the work program or the name and address of the personnel who participated in the work as well as the period (year, month, day) during which the work has been carried out . In the last column, inscribe the amounts disbursed for wages to the personnel or the cost disbursed to the contractor for the carrying out of work. Finally, add each costs and enter the total amount disbursed in box entitled TOTAL (1) Identification Name Date(s)of performance Address Wages or cost from (year/month/jday) to (year/month/day) $ + + + + + + + + = TOTAL (1) SECTION 2: TRANSPORTATION AND HOUSING OF PERSONNEL AND SUPPLYING COSTS Detail briefly the type of transportation, housing and supplying. Inscribe the costs incurred for each one such as expenses for truck or vehicle rental, accomodation, restaurant or grocery shopping, etc. Moreover, write for each means of transport the distance covered, in kilometers (km) from starting point to arrival point on the site, the number of people transported as well as the number of days of travelling . Then add each costs and enter the total amount disbursed in the box entitled TOTAL (2). Distance Description (in km) Nbre of people Nbre of days Cost $ + + + + + + + + TOTAL (2) = SECTION 3 : OTHERS COSTS Use this section to report any other type of expenses incurred in property examination. Briefly describe the nature of expenses and enter the corresponding cost. Finally, add each cost and enter the total amount in the box entitled TOTAL (3) Description + + + + + + + + + TOTAL (3) Cost $ = GREAT TOTAL (TOTAL 1 + 2 + 3) Enter the total amount of expenses incurred in property examination. This great total must be deferred to section 3 entitled "Identification and work synthesis" and distributed, by title, according to the nature of work. GREAT TOTAL (1 + 2 + 3) = Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Annexe 3 – 2015-11-18 – Page 1 de 1 ANNEXE 4 STRIPPING AND EXCAVATING WORK SECTION 1 : LABOUR COST List the name and address of the contractor in charge of carrying out the work program or the name and address of the personnel who participated in the work as well as the period (year, month, day) during which the work has been carried out . In the last column, inscribe the amounts disbursed for wages to the personnel or the cost disbursed to the contractor for the carrying out of work. Finally, add each costs and enter the total amount disbursed in box entitled TOTAL (1) Identification Name Date(s)of performance Address Wages or cost from (year/month/jday) to (year/month/day) $ + + + + + + = TOTAL (1) SECTION 2: TRANSPORTATION AND HOUSING OF PERSONNEL AND SUPPLYING COSTS Detail briefly the type of transportation, housing and supplying. Inscribe the costs incurred for each one such as expenses for truck or vehicle rental, accomodation, restaurant or grocery shopping, etc. Moreover, write for each means of transport the distance covered, in kilometers (km) from starting point to arrival point on the site, the number of people transported as well as the number of days of travelling . Then add each costs and enter the total amount disbursed in the box entitled TOTAL (2).. Distance Description (in km) Nber of people Nber of days Cost $ + + + + + + = TOTAL (2) SECTION 3: FREIGHT CHARGES AND TYPE OF MACHINERY USED AS WELL AS THE COST OF MACHINERY AND EQUIPMENT USED FRAIS DE TRANSPORT ET D’UTILISATION DE LA MACHINERIE ET DU MATÉRIEL ET TYPE DE MACHINERIE UTILISÉE Describe briefly the means of transport used to move the machinery and equipment on the site as well as the type (brand, model, etc.) of machinery used. Moreover, indicate, for each means of transport used, the distance covered, in kilometers (km) from starting point to arrival point on the site, the cost as well as the duration of utilization of this equipment in hours and the corresponding cost. Add horizontally the total cost of each means of transport. Then add vertically the total cost of transportation and utilization of the machinery. Lastly, indicate the total amount of incurred expenses in the box entitled TOTAL (3) Transport Description Distance (in km) + + + + Sub-total = Cost $ Use Hours Cost $ Cost$ + + + + + + + + + TOTAL (3) = Sub-total = SECTION 4 : OTHER COSTS Use this section to report any other type of expenses incurred for stripping and excavating work. Describe briefly the nature of expenses and enter the corresponding cost. Finally, add each cost then enter the total amount in the box entitled TOTAL (4). Description + + + + TOTAL (4) Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Cost $ = Annexe 4 – 2015-11-18 – Page 1 de 2 GREAT TOTAL (TOTAL 1 + 2 + 3 + 4) Write the total amount of expenses incurred for stripping and excavating work. This great total must be deferred to section 3 entitled "Identification and work synthesis" and distributed, by title, according to the nature of work GREAT TOTAL (1 + 2 + 3 + 4) = SECTION 5: DESCRIPTION OF STRIPPING AND EXCAVATING WORK PER MINING TITLE In the following columns, inscribe the number of each title subject to mining work and where applicable the stripped surface in square meters (m 2) or the bulk of soil or excavated rock in cubic meters (m3) on the parcel of land subject to the mining title and detail the dimensions of the surface covered. Lastly, in the last column, specify the type of land stripped or excavated. Mining titles n° Trench n° (in m3) Bulk excavated (in Soil Rock Nature of ground Dimensions m3) (rock, soil, clay, sand gravel, etc.) (in metres) Length Width Depht 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Annexe 4 – 2015-11-18 – Page 2 de 2 ANNEXE 5 SAMPLING AND ANALYTICAL WORK SECTION 1 : LABOUR COST List the name and address of the contractor in charge of carrying out the work program or the name and address of the personnel who participated in the work as well as the period (year, month, day) during which the work has been carried out . In the last column, inscribe the amounts disbursed for wages to the personnel or the cost disbursed to the contractor for the carrying out of work. Finally, add each costs and enter the total amount disbursed in box entitled TOTAL (1) Identification Name Date(s)of performance Address Wages or cost from (year/month/day) to (year/month/day) $ + + + + + + = TOTAL (1) SECTION 2: TRANSPORTATION AND HOUSING OF PERSONNEL AND SUPPLYING COSTS Detail briefly the type of transportation, housing and supplying. Inscribe the costs incurred for each one such as expenses for truck or vehicle rental, accomodation, restaurant or grocery shopping, etc. Moreover, write for each means of transport the distance covered, in kilometers (km) from starting point to arrival point on the site, the number of people transported as well as the number of days of travelling . Then add each costs and enter the total amount disbursed in the box entitled TOTAL (2).. Distance Description (in km) Nber of people Nber of days Cost $ + + + + + + = TOTAL (2) SECTION 3 : SAMPLING AND ANALYTICAL COST Write the name of the laboratory in charge of analyses, the elements determined, the number of samples analyzed as well as the total weight of samples in kilograms (Kg), the means of transport used to carry the samples and the distance covered in kilometers (Km). Then in the column entitled COST, write down the total amount disbursed for each analysis. Finally, add all these amounts and enter the total amount of expenses incurred for analysis in the box entitled TOTAL (3) Name of laboratory Elements determined Nber of samples Weight (in kg) Means of Distance transport (in km) Cost $ + + + + + + TOTAL (3) = SECTION 4 : OTHER COSTS Use this section to report any other type of expenses incurred for sampling and analytical work. Describe briefly the nature of expenses and enter the cost in the column entitled COST. Then add each cost and enter the total amount in box entitled TOTAL (4) Description + + + + + + TOTAL (4) Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Cost $ = Annexe 5 – 2015-11-18 – Page 1 de 2 GREAT TOTAL (TOTAL 1 + 2 + 3 + 4) Inscribe the amount of expenses disbursed for boring work (drilling). This great total must be differed to section 3 entitled « Identification and work synthesis » and distributed by title according to the nature of work. GREAT TOTAL (1 + 2 + 3 + 4) = SECTION 5: SAMPLING, PREPARATION AND ANALYTICAL METHOD Describe briefly the method used for sampling, preparing and analyzing the samples. Description SECTION 6: DISTRIBUTION OF NUMBER OF SAMPLES PER MINING TITLE In the following columns, list the number of each title subject to mining work and the number of samples found on the land parcel subject to the title. Mining title n° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Ministère de l’Énergie et des Ressources naturelles Number of samples collected Mining title n° Number of samples collected 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 79 Service de la gestion des droits miniers Annexe 5 – 2015-11-18 – Page 2 de 2 ANNEXE 6 TECHNICAL ASSESSEMENT OTHER TYPE(S) OF WORK SECTION 1 : SUMMARY WORK DESCRIPTION If you carried out a technical assessment or had it done or carried out other type of work (viability study, prospecting, land surveying, etc.), briefly describe the nature of this work and list the name of people or company who performed them. Moreover, inscribe the period (year, month, day) during which this work was performed. If during prospecting samples have been collected, complete annex 5. Date(s) of performance Description from (year/month/day) to (year/month/day) SECTION 2: COST DETAIL Use this section to detail the expenses incurred. Briefly describe their nature and enter the corresponding cost. Finally, add each cost and enter the total in the appropriate box. This total must be deferred to section 3 entitled "Identification and synthesis of work" and be distributed, by title, according to the nature of work. Description + + + + + + + + + + + + + + + + + + + TOTAL Ministère de l’Énergie et des Ressources naturelles Service de la gestion des droits miniers Cost $ = Annexe 6 – 2015-11-18 – Page 1 de 1