Data Mini Project TURN THIS PAPER IN TOO: Due: Create a

advertisement
Data Mini Project TURN THIS PAPER IN TOO:
Due:________________
1. Create a question that is multiple choices (3-5 choices). Survey at least 10 people and have them write their
answer and sign next to it (will also turn this in). Create a bar graph using the survey that identifies all
important information.
Ex: Which is your favorite baseball team of these choices: SF Giants, Oakland A’s, LA Dodgers?
MY QUESTION: __________________________________________________________________________
Important info in the bar graph: Titles at the bottom of the bars, title and numbers on the y-axis.
2. Create a question that has number answers. Survey at least 10 people (can be the same people) and have
them write in their answer and sign next to it (will also turn this in). Create a stem and leaf plot and a box
and whisker plot using this information. Identify all important information in the plots.
Ex: On average how many MINUTES a day do you spend brushing your teeth?
MY QUESTION:__________________________________________________________________________
Important info in the stem and leaf: words stem and leaf at the top, the number of answers matches the number
of leaves, items separated into appropriate stem and leaves
Important info in the box and whisker plot: lower extreme, upper extreme, lower quartile, upper quartile,
median, box and whiskers drawn. You should also find the interquartile range and the overall range as well (it will
not be in the picture, just listed).
Project Options: Powerpoint , Mini Poster (1 regular paper size with all displays on one), Large poster (with all
displays on one), book, other:____________ (must get permission)
Data Mini Project TURN THIS PAPER IN TOO:
Due:________________
1. Create a question that is multiple choices (3-5 choices). Survey at least 10 people and have them write their
answer and sign next to it (will also turn this in). Create a bar graph using the survey that identifies all
important information.
Ex: Which is your favorite baseball team of these choices: SF Giants, Oakland A’s, LA Dodgers?
MY QUESTION: __________________________________________________________________________
Important info in the bar graph: Titles at the bottom of the bars, title and numbers on the y-axis.
2. Create a question that has number answers. Survey at least 10 people (can be the same people) and have
them write in their answer and sign next to it (will also turn this in). Create a stem and leaf plot and a box
and whisker plot using this information. Identify all important information in the plots.
Ex: On average how many MINUTES a day do you spend brushing your teeth?
MY QUESTION:__________________________________________________________________________
Important info in the stem and leaf: words stem and leaf at the top, the number of answers matches the number
of leaves, items separated into appropriate stem and leaves
Important info in the box and whisker plot: lower extreme, upper extreme, lower quartile, upper quartile,
median, box and whiskers drawn. You should also find the interquartile range and the overall range as well (it will
not be in the picture, just listed).
Project Options: Powerpoint , Mini Poster (1 regular paper size with all displays on one), Large poster (with all
displays on one), book, other:____________ (must get permission)
Category
Neatness
1 points
The displays are hard to read. It looks put
together last minute. The project looks
sloppy and not up to grade level.
5 points
The entire project is legible. There are no
parts that are difficult to read. It looks as
though the student spent some time on it.
Few, if any, of the information is labeled
on the bar graph, stem and leaf plot or
box and whisker plot.
3 points
The displays are mostly easy to read. Some
parts may be somewhat harder to read than
others. Some parts look put together last
minute.
Some of the information is labeled on the bar
graph, stem and leaf plot and box and whisker
plot.
Key information
Correctness
The information in the data displays does
not match the information in the survey
(at least 2 displays are incorrect)
The information in the data displays matches
some of the information in the survey (at least
one display is incorrect)
The information in the data displays mostly
matches the information in the survey (some
mistakes may be present in one or more
displays)
Completion
Project is missing signatures for the
survey and/or has only 1 of the data
displays
Project is missing signatures for the survey
and/or has only 2 of the data displays
Project is not missing signatures and has all 3
data display types
Almost all of information is labeled on the
bar graph, stem and leaf plot and box and
whisker plot.
Total Score =____/20
Category
Neatness
1 points
The displays are hard to read. It looks put
together last minute. The project looks
sloppy and not up to grade level.
5 points
The entire project is legible. There are no
parts that are difficult to read. It looks as
though the student spent some time on it.
Few, if any, of the information is labeled
on the bar graph, stem and leaf plot or
box and whisker plot.
3 points
The displays are mostly easy to read. Some
parts may be somewhat harder to read than
others. Some parts look put together last
minute.
Some of the information is labeled on the bar
graph, stem and leaf plot and box and whisker
plot.
Key information
Correctness
The information in the data displays does
not match the information in the survey
(at least 2 displays are incorrect)
The information in the data displays matches
some of the information in the survey (at least
one display is incorrect)
The information in the data displays mostly
matches the information in the survey
(some mistakes may be present in one or
more displays)
Completion
Project is missing signatures for the
survey and/or has only 1 of the data
displays
Project is missing signatures for the survey
and/or has only 2 of the data displays
Project is not missing signatures and has all
3 data display types
Total Score =____/20
Almost all of information is labeled on the
bar graph, stem and leaf plot and box and
whisker plot.
Download