Four Laning Bridge across River Kosi including its approaches

advertisement
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CONTENTS
Chapter 1:
The Project……………………………………………………………………………………...02
1.1
Scope of Project……………………………………………………………………………….02
1.2
Project Details…………………………………………………..……………………………..03
1.2.1
Contract Details……………………………………………………………………...03
1.2.2
Scope Details…………………………………………………………………………04
Chapter 2:
The Concessionaire (O&M Operator).…………………………………………………….05
2.1
Scope of Work…………………………………………………………………………………05
2.1.1
Maintenance Management……………………………………………………….05
2.1.1.1 Highway Maintenance (Includes Guide & Afflux bunds)………….05
2.1.1.2 Project Property Management………………………………………….05
2.1.1.3 Incident Management…………………………………………………....05
2.1.1.4 Environment Management………………………………………………06
2.1.1.5 Engineering Improvement……………………………………………….06
2.2
Concessionaire Obligation Status…………………………………………………………07
2.2.1
Organization of Work……………………………………………………………….07
2.2.2
Contact Details………………………………………………………………………08
2.2.3
Equipment/Plant/Machinery………………………………………………………09
2.2.4
Provision for User Services……………………………………………………….…09
Chapter 3:
Highway Maintenance Management…………………………………………………….11
3.1
Highway Inspection Data……………………………………………………………………11
3.1.1
Maintenance Photographs………………………………………………………..12
Chapter 4:
Emergency Route Operations………………………………………………………………14
4.1
User Services & Accident Data………………………………………………………….....15
4.1.1
Ambulance Services…………………………………………………………….....15
4.1.2
Tow Away Crane Services…………………………………………………………15
4.1.3
Hydra Crane Services………………………………………………………………15
4.1.4
Fire Services……………………………………………………………………….....15
4.1.5
Round the Clock Route Patrol Services…………………………………………16
4.1.6
Incident Management Photos…………………………………………………….17
4.1.7
Accident Statistics………………………………………………………………......19
Page 1 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CHAPTER 1: THE PROJECT
National Highway No. 57 is one of the major arteries of the road network system in the State of
Bihar connecting Muzzafarpur City with Purnea. It traverses through the major district
headquarters of the state viz., Darbhanga and Forbesganj.
Nearly 10.635 Km. Project Highway section of NH-57, starts from Km. 148.550 near Tharia village
on Nirmali side and ends at 159.185 near Chandpipar village on Kishanpurside. Thus in order to
provide a better level of service to vehicular traffic it has been Aprided to augment the
capacity of NH-57 by constructing Kosi Bridge and its approaches between Ring Bund and
Eastern Embankment.
In order to channelize the water of Kosi River and to protect the Bridge and its approaches,
construction of Guide Bund perpendicular to the centre line of bridge and Afflux Bund joining
the edges of Guide Bund on the upstream side with Ring Bund on Western Side and Eastern
Embankment on Eastern Side.
1.1 SCOPE OF PROJECT:
This Project has been executed on the site, which is described in Project Site chapter of the
Concession Agreement. The scope of the project shall include performance and execution by
the
Concessionaire of
all
Design, Engineering, Financing, Procurement, Construction,
Completion, Operation and Maintenance of the Project Highway. It includes Improvement,
Operations, Maintenance, Rehabilitation and Strengthening of the existing missing link of NH-57
road and widening it to a 4-lane divided carriageway including Kosi Bridge and its approaches
from Km. 148.550 to Km. 159.185 in the State of Bihar on Annuity basis.
NHAI appointed M/s. Wilbur Smith Associates Inc in JV with Wilbur Smith Associates Pvt. Ltd., as
the Independent Consultant for the Project.
Page 2 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
1.2 PROJECT DETAILS
1.2.1. CONTRACT DETAILS
Project
Design, Construction, Finance, Operation and Maintenance of 4lane Bridge across River Kosi including its approaches & Guide
Bund & Afflux Bund from Km. 148.55 to Km. 159.185 on NH-57 on
Annuity Basis
State
Bihar
National Highway No.
NH – 57
Employer
National Highway Authority of India
Independent Consultant
Wilbur Smith Associates Inc in JV with Wilbur Smith Associates Pvt.
Ltd.,
Concessionaire
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Section
Km. 148.55 to 159.185
Length of the Project
10.635 Km
Length of Eastern side
Guide Bund
2.635 Km
Length of Western side
Guide Bund
2.884 Km
Length of Eastern side
Afflux Bund
7.773 Km
Length of Western side
Afflux Bund
7.925 Km
Concession Period
20 years
Construction Period
36 months
Extended Construction
Period
24 months
Project Completion Date
(Provisional)
08.02.2012
Concession Completion
Date
20 years commencing from commencement date (From 4th Apr’10
to 4th Apr’27)
Page 3 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
1.2.2. SCOPE DETAILS
S.No
Particulars
Details
1
Length of the Main
Bridge (4 Lane)
1.878 KM and 20.70 M width
Number of
foundations
40 nos.
Span Configuration
48.175x2 + 48.15x37
Type of super
structure
Additional work executed in COS which
does not comes under maintenance
Segmental pre cast Box
Girder
196 M paved shoulder
2
Length of Road
(Excluding Main
Bridge)
8.757 KM (7.25 M. x 2 widths
1.2 M Divider, 1.5 M Paved
Shoulder and 1.5 M earthen
shoulder both side of the
road)
Length of Guide
Bund
5.519 KM long (2.635 KM
eastern side and 2.884 KM at
western side)
400 M western side Guide Bund
3
15.698 KM long (7.773 KM at
eastern side and 7.925 at
western side)
400 M western side Afflux Bund
4
Length of Afflux
Bund
5
Median Openings
(Recommended)
3 nos.
6
Cattle Crossings
4 nos. (9.50m x 3.50m)
7
Toll Plaza (1 No.)
At chainage: 150+685
8
Service Road
At Asanpur - Khupa village
1 no.
1.415 KM
Page 4 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CHAPTER 2: THE CONCESSIONAIRE (O&M OPERATOR)
2.1 Scope of Work
The Concessionaire is involved in the operation and maintenance activity of the project stretch
along with other project facilities and services and is taking care of the following activities on
regular basis.
2.1.1Maintenance Management
The concessionaire is also administering the maintenance management of the project highway
and the other facilities through an experienced staffs located at the Maintenance Base Camp
building near Majhari chowk. Also, the maintenance management team monitors different
maintenance aspects (detailed below), through its mobile units patrolling on a continuous basis
throughout the project corridor. The maintenance team is primarily looking after the following
maintenance aspects as per the maintenance schedule laid down in the Annual Maintenance
Programme.
2.1.1.1 Highway Maintenance (Includes Guide & Afflux bunds)
The objective of (project) Highway Maintenance is to maintain the safety, durability and
functionality of the (project) highway throughout the concession period. This consists of routine
preventive and periodical maintenance for the corridor carriageway and project bridge along
with the facilities. Broadly, it will include maintenance of the carriageway, road furniture,
buildings, crust, shoulder, slopes, side drains and cross drainage works.
2.1.1.2 Project Property Management
The objective of Project Property Management is to preserve the inventories and investments in
the project road intact throughout the operation and maintenance phase. This includes
identification of encroachments and ribbon development, land acquisition as desired by NHAI,
enforcement of regulations, liaison with the connected authorities for the maintenance of
Project asset.
2.1.1.3 Incident Management
The Incident Management is aimed to take immediate response measures to any incident
occurring in the corridor within specified timelines by CA. Route patrol, surveillance, first aid,
basic ambulance assistance, tow away & Hydra crane and road safety upkeep.
Page 5 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
2.1.1.4 Environment Management
The objective of Environment Management is to preserve and protect the compatibility of the
road system with the environment. The activities related to this are project horticulture including
requisite planting and maintaining of existing trees, plants, shrubs and other suitable vegetation
in the median and right of way of the project.
2.1.1.5 Engineering Improvements
Engineering Improvement is aimed at enhancing the project functionalities, deteriorated over
time and rehabilitation of the project elements at specified intervals of time. This covers junction
improvements, providing crash barriers, resurfacing and management of access.
Page 6 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57
in the State of Bihar
2.2 Concessionaire’s Obligation Status
2.2.1. Organization of work
Page 7 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57
in the State of Bihar
2.2.2. Contact Details
Name
Designation
Location
Mobile No.
Mr. Raju Ranjan
Project Manager
Majhari Camp
7033894164
Mr. Kumar Brajendra
Highway Engineer
Majhari Camp
9661063702
Mr. Suman Singh
System Engineer
Majhari Camp
8862882930
Mr. Ramnath Ratnakar
Admin & Public Relations
Majhari Camp
9006741245
Mr. Akshaya Mallick
Accounts & Stores
Majhari Camp
9771627190
Mr. Shammi Kumar
Section Supervisor 1 (Highway)
Majhari Camp
8864040922
Mr. Neeraj Sharma
Section Supervisor 2 (Highway)
Majhari Camp
8969416668
Mr. Rajesh Singh
CRO/RPO 1
Mr. Rakesh Ran
CRO/RPO 2
Toll Plaza Building
9122551084
Mr. Sushant Kumar
CRO/RPO 3
Mr. Vivek Mishra
CRO/RPO 4
Page 8 of 20
KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
2.2.3. Equipment/Plant/Machinery
Name/Description of Equipment
No’s
Tow away Crane
1
Hydra Crane
1
Fire Tender
1
Remarks
2.2.4. Provision for User Services
a. Ambulance
Vehicle Type and Model
Staff Deployed
Date of
mobilization of
Vehicle
31st January 2012
Tata Winger - 2012

Paramedic = 03
BHR-01-AD-2771

Driver = 03
Remarks
b. Route Patrol Vehicles
Vehicle Type and Model
Staff Deployed
Mahindra Bolero Camper
 Route Patrol Officer = 03
- 2012
 Patrol Assistant = 03
BR-01-GC-1416
 Driver = 03
Date of
mobilization of
Vehicle
31st January 2012
c. Tow Away & Hydra Crane
Date of mobilization
Type & Capacity of Towing Vehicle
Type & Capacity of Hydra Vehicle
31st January 2012
TATA TRUCK MOUNTED TOW SYSTEM 7.5 MT
HR-67-7063
15 MT CRANE
DL-01M-4207
Page 9 of 20
Remarks
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
d. Toll Software/Equipment
Name of Equipment/Software
Date of Mobilization
Toll Management System
31st March 2012
Remarks
e. Status of Control Room/Emergency Contact Information
1) Help Line No. 9122551084(24 hours)
2) Help Line No. 9973673906(24 hours)
f. Establishment Contact Details
Name
Project Director,
NHAI
Team Leader,
IC
Concessionaire
/O&M Team
Name, Address
The Project Director,
National Highways Authority of India,
Project Implementation Unit,
H/o. Sh. S.N.Mishra, Ward No.10,
Professor Colony, Dighee West,
Darbhanga, Bihar - 846004
The Team Leader,
M/s. Wilbur Smith Associates Inc in JV
with Wilbur Smith Associates Pvt. Ltd.,
H/o. Sri Ram BahadurJha, Near
SantinathMahadevMandir, Behat,
P.O. Jhanjharpur, Dist. Madhubani,
Bihar - 847403
Kosi Bridge Infrastructure Co. Ltd.,
Majhari Camp, Majhari Village,
Hariyahi Post, Via Nirmali,
Dist. Supaul,
Bihar – 847452
Page 10 of 20
E-Mail Address
darbhanga@nhai.org
Telephone
Tel-Fax:
06272250194
moallemhossain1952
@gmail.com
Tel-Fax:
06273222166
kbicl@gammoninfra.
com
Tel:
9973673906
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CHAPTER3: HIGHWAY MAINTENANCE MANAGEMENT
3.1 HIGHWAY INSPECTION DATA
The details of daily observations of the maintenance team and the major actions taken by the
team for smooth and safe functionality of the project highway are tabulated and presented
below.
Date
1-June-14
4-June-14
5-June-14
6-June-14
7-June -14
8-June -14
9-June -14
10-June-14
11-June-14
12-June-14
15-June-14
18-June-14
19-June-14
20-June-14
21-June-14
23-June-14
26-June-14
27-June-14
28-June-14
29-June-14
30-June-14
1-June-14 to
31- June-14
Inspection and Major Maintenance work Details
Inspected the highway and made the following observations
Rain cut rectification at toll plaza. 150.600 to 150.900
Inspected the A1 A.B and made the following observations
.Rain cut rectification work at G.B A 2 side
Inspected the highway and made the following observations
Found toll plaza premises dusty.
Inspected the highway and made the following observations
Clearing debris material at ch.155.265 in L.H.S
Inspected the highway and made the following observations
Rain cut rectification in main carriageway @ Ch 150.185
Inspected the highway and made the following observations
Rectification work of damage apron @ Ch 1.200
Inspected the highway and made the following observations
Found Speed Limit Board Dusty
Inspected the highway and made the following observations.
Boulder receiving At Guide bund for Crating Work
Inspected the highway and made the following observations
Boulder Crating Work @ Ch 1.190.
Inspected the highway and made the following observations
Nylon Crating Work Of Damage Appron.
Inspected the highway and made the following observations
Rectification Work Of Damage Appron @ Ch 1.200
Inspected the A2 G.B and made the following observations
Rectification Of Damage Appron @ Ch 0.100
Inspected the highway and made the following observations
Boulder pitching disturbed at ch. 155.130 in L.H.S
Inspected the highway and made the following observations
Rain cut Rectification work at Ch 154.180
Inspected the highway and made the following observations
Rain cut Rectification work at Ch 154.180
Inspected the highway and made the following observations
Boulder Pitching Work at Down Stream guide Bund
Inspected the A1 afflux bund and made the following observations
Rain cut Rectification And Turfing work at 150.185
Inspected the highway and made the following observations
Soulder Dressing Afflux Country Side at Ch 5.400
Inspected the highway and made the following observations
Rectification of Rain cut And Turfing at C h 158.630
Inspected the highway and made the following observations
Boulder pitching work at Ch 0.800 A2 Gide Bund
Inspected the highway and made the following observations
Nylon Crating Of Damage Appron At Ch 0.080
Watering of plants in median and Avenue once a week
Page 11 of 20
Action Taken
Rectified
Rectified
Cleared
Cleared
Rectified
Rectified
Cleared
Received
Rectified
Rectified
Rectified
Rectified
Rectified
Rectified
Rectified
Completed
Rectified
Completed
Rectified
Rectified
Rectified
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
3.1.1. MAINTENANCE PHOTOGRAPHS
TURFING WORK IN DOWN STREAM
LEVELLING AND TURFIN OF RAIN CUT
VISIT OF DM FOR GUIDE BUND
RAIN CUT RECTIFICATION @ TOLL PLAZA
Page 12 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
RAIN CUT REPAIRING @ TOLL PLAZA
NYLON CRATING @ DOWN STREAM
BOULDER UNLOADING AT GUIDE BUND
BOULDER CRATING @ GUIDE BUND
Page 13 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CHAPTER 4: EMERGENCY ROUTE OPERATIONS
HIGHWAY ROUTE PATROL & INCIDENT MANAGEMENT VEHICLES
Page 14 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1 USER SERVICES AND ACCIDENT DATA
4.1.1. Ambulance Services
S. No
Description
Up to previous
month
During this
month
Cumulative till this
month
1
No. of calls attended
1
2
3
2
No. of assistance provided
1
2
3
3
No. of injured persons
rescued
1
2
3
4.1.2. Tow–away Crane Services
S. No
Description
Up to previous
month
During this
month
Cumulative till this
month
1
No. of calls received
1
0
1
2
No. of Services Provided
1
0
1
During this
month
Cumulative till this
month
4.1.3. Hydra Crane Services
S. No
Description
Up to previous
month
1
No. of calls received
0
2
No. of Services Provided
0
0
0
0
0
4.1.4. Fire Services
S. No
Description
Up to previous
month
During this
month
Cumulative till this
month
1
No. of calls received
0
0
0
2
No. of Services Provided
0
0
0
Page 15 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1.5. Round the Clock Route Patrol Services
S. No
Description
Up to previous
month
During this
month
Cumulative till this
month
1
No. of incidents observed
51
29
80
2
No. of dead animals
removed
8
6
14
3
No. of assistance provided
12
7
19
4
No. of incidents managed
57
33
80
Note: Nos. of Incidents managed included breakdown, illegal parking, wrong side driving,
dead animals removal and law enforcement etc.
Page 16 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1.6. Incident Management Photographs
Providing safety for break down vehicles
Assist to clear unauthorized Zone Parked vehicles
Page 17 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux
Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Dead Animal Removal
Debris Removal
Page 18 of 20
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH57 in the State of Bihar
4.1.7 Accident Statistics :
Name of PIU’s
: National Highways Authority of India DARBHANGA
Stretch
:Section of Muzaffarpur - Purnea [NH-57]
1)
2)
3)
4)
S.
No
1
2
Date
Stretch Chainage
State
District
Police Station
Time of
Accide
nt
8-06-14
02.50
PM
21-06-14
03.50
pM
: KM.148+550 to KM. 159+185
: BIHAR
: SUPAUL
:KISHANPUR & NIRMALI
5) Accident Data for the Month of June- 2014
6) National Highway No. 57
A
B
C
Accident
Location
Nature
of
Accide
nt
Classific
ation of
Acciden
t
Caus
es
2
3
2
3
150.100
L.H.S
149.300
L.H.S
D
E
F
G
H
Road
Features
Road
Geometry
Intersection
type of
crossing
Weather
condition
3
4
1
N/A
3
4
1
N/A
Page 19 of 20
Vehicle
Responsible
Fat
al
Grievo
us
Minor
Total
Men
Injured
No. of
Animal
Killed if
any
Help provided
by
Ambulance/Pri
vate vehicle
2
Motor
Cycle
0
0
1
1
0
RPV/Ambul
ance
2
Car
0
0
1
1
0
RPV/Ambul
ance
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH57 in the State of Bihar
CUMULATIVE STATEMENT: Calander Year 2014
SN
TYPE OF ACCIDENT
UP TO PREVIOUS MONTH
DURING THIS MONTH
UP TO THIS MONTH1
1
Fatal
0
0
0
2
Grievous Injury
0
0
0
3
Minor Injured
1
2
3
4
Non Injured
2
0
2
Total Accidents in this Month: FATAL=0, GRIEVOUS =0, MINOR =2
a.
b.
c.
d.
e.
f.
g.
h.
Urban/Rural and Details of surrounding Land use.
1. Over turning. 2. Head on collision 3. Rear End collision 4. Collision Brush/Side Wipe. 5. Left Turn collision. 6. Skidding 7. Right Turn Collision 8. Others (Pl.
Specific )
1. Fatal. 2. Grievous Injury 3. Minor Injured. 4. Non-Injury.
1. Drunken, 2. Over speeding, 3. Vehicle out of control, 4. Fault of driver of motor vehicle/cyclist/pedestrian/passenger, 5. Defect in mechanical
condition of motor vehicle/road condition, 6. Wrong side, 7. Tyre burst
1. Single lane, 2. Two lanes, 3.Three lanes or more without central divider (median), 4. Four lanes or more with central divider.
1. Straight road, 2. Slight Curve, 3. Curve, 4. Flat Road, 5. Gentle incline, 6. Steep incline, 7. Hump, 8. Dip
1. T-junction, 2. Y-junction, 3. Four arm junction, 4. Staggered junction, 5. Junction with more than 4 arms, 6. Round about junction, 7. Manned Rail
crossing. 9. Unmanned Rail crossing
1. Fine, 2. Mist/Fog, 3. Cloudy, 4-Light rain, 5. Heavy rain, 6. Hail/sleet, 7. Snow, 8. Strong Wind, 9. Dust Storm, 10. Very Hot, 11. Very Cold, 12. Other
extraordinary weather condition.
Note A: Causes of Accidents:1) Vehicle out of control, 2) Rain, 3) Tyre burst, 4) Drunken driving, 5) Over speeding vehicle, 6) Mechanical defect, 7) Electrical
defect, 8) Poor visibility (fog/dust), 9) Wrong side driving, 10) Others (specify) Note B: Fatal means death casualty.
Page 20 of 20
Download