EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO FINANCED BY THE EUROPEAN RETURN FUND (Report set out in Article 50, 2 (a) of Decision NO 575/2007/EC) Report submitted by the Responsible Authority of: the Republic of Latvia Date: 30.06.2010. Head of Responsible Authority State Secretary of the Ministry of the Interior I. Pētersone ___________________ 2 GENERAL INFORMATION TO BE PROVIDED BY THE RESPONSIBLE AUTHORITY ON EVALUATION EXPERTISE AND ON METHODOLOGY - Did you have recourse to an evaluation expertise to prepare this report? Yes/ No No - If yes, for what part (s) of this report? N/A - Please explain what kind of evaluation expertise you had resource to: *In-house evaluation expertise: N/A *External evaluation expertise: N/A 3 EVALUATION REPORT ON THE RESULTS AND IMPACTS OF ACTIONS CO-FINANCED BY THE EUROPEAN RETURN FUND CONTENTS 1. SUMMARY OF THE MULTI-ANNUAL PROGRAMME: ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE AND STRATEGY TO ACHIEVE THE OBJECTIVES (THIS SUMMARY IS NECESSARY FOR THE COMMISSION REPORT -THIS PART IS TO BE DELETED IF AVAILABLE OTHERWISE FOR ALL MS) 2. SUMMARY OF THE ANNUAL PROGRAMMES 2008 AND 2009 (EXCLUDING TECHNICAL ASSISTANCE MEASURES AND INFORMATION AND PUBLICITY) (THIS SUMMARY IS NECESSARY FOR THE COMMISSION REPORT -THIS PART IS TO BE DELETED IF AVAILABLE OTHERWISE FOR ALL MS) 3. IMPLEMENTATION OF THE PROGRAMMES IN THE "AWARDING BODY" MODE 4. IMPLEMENTATION OF THE PROGRAMMES IN THE "EXECUTING BODY" MODE 5. SUMMARY DESCRIPTION OF THE PROJECTS FUNDED IN THE "AWARDING BODY" MODE AND IN THE "EXECUTING BODY" MODE 6. TECHNICAL ASSISTANCE - INFORMATION AND PUBLICITY 7. ASSESSMENT OF THE IMPLEMENTATION OF THE ANNUAL PROGRAMMES 2008 AND 2009 8. OVERALL ASSESSMENT OF THE RESPONSIBLE AUTHORITY ON THE IMPLEMENTATION OF THE RF PROGRAMMES 2008 THROUGH 2009 4 Part I Summary of the Multi-annual Programme 2008-2013 ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE AND STRATEGY TO ACHIEVE THE OBJECTIVES 1. ANALYSIS QF REQUIREMENTS IN THE MEMBER STATE In this part the requirements of Latvia are described according to the approved MultiAnnual Programme (EC Decision (C2008)8798 of the 22nd December 2008) and the current situation. After joining the European Union and the Schengen Agreement, Latvia has fully embraced legislation, liberties and security, a basic principle of which is free movement of persons, which, in turn, is directly connected with immigration. It sets new tasks also to authorities involved in national migration processes and border security control in order to enable Latvia to act as partner in development of European Union migration policy and control. Due abolishment of border control on internal European Union borders, it is expected that there will be an increase in illegal immigration and cross-border crime from the European Union. After Latvia has joined the Schengen agreement, illegal immigrants located in the southern region of the European Union will be able to enter Latvia without significant obstructions. Above mentioned facts could imply an increased illegal immigration pressure on Latvia. Therefore, the State Border Guard will have to increase immigration control inside the country. To protect the Republic of Latvia and all European Union member states from influx of illegal immigrants, it is necessary to be already prepared for the predicted situation beforehand by developing an integrated return management system plan. In order to ensure security on external borders in line with the context of the EU security it is necessary to fulfil requirements regarding: - forced return operations that are realised by State Border Guard of Latvia as well as in cooperation with FRONTEX Agency; - facilitation of voluntary return and reintegration activities; - strengthening capacity of the relevant authorities involved in the return management sphere. In order to meet described requirements of Latvia following operational objectives were designed. In the light of predicted influx of illegal immigrants, as well as previous investments into the return sphere, it becomes clear that Latvia requires investments in several other areas. The following objectives regarding return management are set: 1. to create a strategic approach in Latvia regarding return management; 2. to implement necessary amendments to Latvian legislation regulating return conditions and procedures; 3. to improve and support sphere of illegal immigrants’ forced return; 4. to support development and implementation of voluntary return and reintegration activities; 5 5. 6. 7. 8. 9. 10. 11. to promote cooperation among authorities involved in the return sphere in Latvia and other EU Member states; to acquire the best practice in return management of other European Union member states; to improve the professional qualification of employees of authorities involved in the return sphere; to create a Register of persons; to renovate accommodation centres for apprehended persons and illegal immigrants; to obtain the latest information about flow trends of citizens of third countries through European Union researches; to create digital archive of cases of illegal immigrants. Achievement of the mentioned tasks is necessary for improved Latvian integrated return system to be in accordance with Community return standards that are stated in Directive of the European Parliament and of the Council on common standards and procedures in member states for returning illegally staying third-country nationals (Directive 2008/115/EC of 16 December 2008). 6 2. STRATEGY TO ACHIEVE THE OBJECTIVES In this part the strategy of Latvia are described according to the approved Multi-Annual Programme (EC Decision (C2008)8798 of 22nd December 2008) the current situation and strategic guidelines of the Fund adopted by the EC (EC Decision 2007/837/EC of 30 November 2007). Priority 1: Support for the gradual establishment of the common integrated border management system as regards checks on persons and the surveillance of the external borders Within the 1st Priority, Latvia planned to implement 3 aforementioned operational objectives of its set objectives. Objective No.1 to create strategic approach of Latvia to unified return management, including development of integrated return plan In order to enact fair and effective joint standards of return it was necessary to develop a joint integrated plan about development of return system. At the moment no project within the framework of this objective is implemented. Objective No. 3 to improve and support sphere of illegal immigrants’ forced return It is necessary to provide support for organisation and improvement of the sphere of illegal immigrants’ forced return that will facilitate development of return policy in Latvia in line with European Union standards. Due to the current situation it is also important for Latvia to participate in operations organised by FRONTEX Agency that are aimed at improvement of forced return sphere. It is essential to implement definite standards and international requirements within the sphere of return management. In order to improve and support sphere of illegal immigrants’ forced return it was necessary to create and develop digital archive of cases of illegal immigrants. Objective No. 4 to support development and implementation of voluntary return and reintegration activities Due to the insignificant number of illegal immigrants and asylum seekers, Latvia did not carry out systematic voluntary return activities and has not developed system of voluntary return, as well as system for monitoring and follow-up after voluntary return. In the view of the above-mentioned it was necessary to evaluate possibilities and experience of other countries in voluntary return and reintegration matters, and afterwards develop and implement voluntary return and reintegration programmes. Development and implementation of voluntary return programme and reintegration activities will be an innovative solution for Latvia, and will be applied in long-term perspective Priority 2: Support for the development and implementation of the national components of a European Surveillance System for the external borders and of a permanent European Patrol Network at the southern maritime borders of the EU Member States Within the 2nd Priority, Latvia planned to implement one of its aforementioned operational objectives. 7 Objective No.5 to promote cooperation in the return management sphere of authorities involved in the return sphere Latvia needed to get involved in removal activities and operations organised by FRONTEX Agency to improve cooperation and carry out return procedures. Participation in joint return operations could reduce administrative and financial burden in return management sphere. It was also necessary to strengthen cooperation of employees of competent state institutions with consular departments and immigration services of third countries in order to cooperate in collecting information about the country of origin or previous state of residence. At the moment State Border Guard of Latvia did not have possibility to realise joint return operations in collaboration with FRONTEX Agency. All forced return operations were organised just by State Border Guard and covered within 1st Priority. Priority 3: Support for the issuing of visas and the tackling of illegal immigration, including the detection of false or falsified documents by enhancing the activities organised by the consular and other services of the Member States in third countries N/A Priority 4: Support for the establishment of IT systems required for the implementation of the Community legal instruments in the field of external borders and visas Within the 4th Priority, Latvia planned to implement its 2 operational objectives set forth. Objective No.6 to acquire the best practice in return management of other European Union member states Considering the predicted increase of illegal immigration pressure, it is necessary prepare for potential future developments by looking upon experience of other countries in the sphere of integrated return management Objective No. 7 to improve the professional qualification of employees of authorities involved in the return sphere It is necessary to improve the qualification of employees involved in the return sphere, in order for them to be prepared for work with legal and practical aspects of return procedures. For this purpose, it is necessary to organise training courses, seminars and experience exchange visits. Language skills of employees of competent state institutions are also relatively poor (except for Russian), which is verified by Schengen evaluation reports that indicate poor knowledge of foreign languages. Priority 5: Support for effective and efficient application of relevant Community legal instruments in the field of external borders and visas, in particular the Schengen Borders Code and the European Code on Visas N/A 8 Finally, list the most important indicators set out in Part 3 of the Multi-Annual Programme 2008-2013 and the corresponding quantified/qualitative targets, broken down by Priority : Priority 1 Effective and better-coordinated return policy in Latvia; Forced return operations are successfully organised in Latvia; Digital archive of cases of illegal immigrants is created and developed; Voluntary return programmes and reintegration activities are initiated and successfully carried out in Latvia; Support is provided to returnees before their return to country of origin (information, material support) Accumulation of required data on issued voluntary return and forced return decisions is improved; Conditions of the accomodation of detained illegal immigrants are improved. Priority 2 Ensured successful involvement of competent institutions in activities of European Union; Improve professionalism of the officials of the State Border Guard in area of return; Improve cooperation with the officials of the competent authorities. Priority 3 N/A Priority 4 Obtained knowledge and other valuable information about the best practice of other countries in the return management sphere; Facilitation of work and improvement of effectiveness of competent employees. Priority 5 N/A 9 Part II SUMMARY OF THE ANNUAL PROGRAMMES 2008 AND 2009 (excluding Technical Assistance measures and Information and Publicity) 1. Summary of Actions under Priority 1 in the annual programmes, 2008, 2009 Actions to be implemented under the "awarding body" mode Action 1.1. ”Development of unified integrated plan about creation of return system” The aim of this action was to carry out research on current situation in return management sphere and developed integrated management models best suited for Latvia. The action was not implemented due to the fact that within the open call for proposals there was approved no project application. Action 1.3. “Support for development and implementation of voluntary return programmes” The aim of this action is to carry out research on current situation in the sphere of voluntary return and develop models for voluntary return best suited for Latvia as well as implement voluntary return system. Action 1.4. “Support for development and implementation of reintegration activities” The aim of this action is to carry out research on requirements of reintegration activities and develop models for reintegration best suited for Latvia as well as test developed models in practice in order to measure their effectiveness. It was also planned to realise return of returnees through reintegration activities that are considered to be the integral part of voluntary return that will motivate the potential returnees to use this chance. Given measures are necessary in order to start functioning of reintegration system in Latvia, according to regulations of EU, that in its turn will reduce the illegal immigration in the future and will give an opportunity to the returnees when returning to their countries of origin to be to able to provide themselves. Actions to be implemented under the "executing body" mode Action 1.2.1. “Support for organisation and improvement of forced return activities” The main aim of this action is to organise forced return operations and its directly connected to support organisation of forced return activities. 10 Action 1.2.2. “Creation and development of digital archive of cases of illegal immigrants” The aim of this action is to strengthen administrative capacity of the Office of Citizenship and Migration Affairs in order to provide fast decision making procedure and appropriate data handling security in the field of return by establishing digital documents file archive about persons who have contravened the conditions of immigration and residence permit. In order to achieve set aim there will be implemented multi-annual action, in the time period from Annual Programme 2009 till Annual Programme 2013. Digital archive will be integrated in Common Migration Information System and it will be possible to use it in other institutions of Latvia, such as State Border Guard, State Police, Foreign and Consular Service etc. 2. Summary of Actions under Priority 2 in the annual programmes, 2008, 2009 Actions to be implemented under the "awarding body" mode Action 2.2. “Consolidation of cooperation of employees involved in the return sphere with consular institutions and immigration services of third countries” The aim of this action is to organise experience exchange visits and seminars for employees involved in the return sphere in order to improve cooperation with third countries. As a result of implementation of this action it is planned to exchange with experience and to use information gained in the result of risk analysis with purpose to combat illegal immigration from appropriate third countries. The goal of this action is to activate mutual information exchange and effective collaboration with appropriate services involved in return management sphere of third countries. Within action 2.2. it is planned to organise seminars and experience exchange visits. Actions to be implemented under the "executing body" mode Action 2.1. “Participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX and European Union member states” The aim of this action was to organise participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX and European Union member states in order to realise forced return of illegal migrants to country of their origin, obtain needed experience, as well as practical skills in sphere of return of illegal immigrants by joint forced return measures. Until the end of 2007 there were no actions of such kind implemented. Support of this action is important because participation in joint return operations will reduce administrative and financial burden in forced return management sphere. Unfourtenately within the implementation period of the AP 2008 there were no FRONTEX Agency organised forced return activities where Latvia could participate until 30th June 2010. Considering the need of the State Border Guard of Latvia to Within Annual Programme 2008 this action was implemented in "awarding body" mode, but within Annual Programme 2009 – in "executing body" mode. Respective justification is provided within Annual Programme 2009. 11 perform forced return operations Management Committee of the Fund decided to introduce a new action 1.2.1. in the revised version of the AP 2008. Action 2.2. “Improving cooperation among the structures involved in return management, thus ensuring access to quality data” The aim of this action is to eliminate any obstacles in the return process of persons and improve the exchange of information with other Member States. As a result, the return process will be improved, and it will be attained that the agencies involved in return process have access to precise and unified information on the status of a person, thus facilitating unimpeded and unobstructed return of persons to their country of origin. In order to achieve the aim of this action, it is necessary to examine the existing data and develop recommendations on improving the processes of the exchange of data and on ensuring efficiency and quality. This, in case of need, would allow immediate updating of information in the Schengen Information System, when the information has already been updated into the National Entry Ban Database, thus guaranteeing unified information in both databases and decreasing mistake risk of the human factor. 3. N/A Summary of Actions under Priority 3 in the annual programmes, 2008, 2009 4. Summary of Actions under Priority 4 in the annual programmes 2008, 2009 Actions to be implemented under the "awarding body" mode Action 4.1. “Organisation of seminars/visits for employees of competent institutions regarding best practice in the sphere of return management” The aim of this action is to organise seminars and visits for obtaining of best practice of EU Member States in the sphere of return management in order to observe practice of these countries in issues of integrated return management. Implementation of action 4.1. will allow to be prepared for potential future development possibilities. Within this action it is planned to organise seminars, invite foreign experts in the sphere of identification of illegal immigrants in order to be able depending on a case to perform return or forced return of these persons. Action 4.2. “Seminars, education and training of employees involved in return process, regarding legal and practical aspects of return activities” The aim of this action is to organise training of employees involved in return process, regarding legal and practical aspects of return activities. Previously there was organised participation only in international foreign training project regarding return sphere. It was EU-financed ARGO programme training project “Training on forced return measure by airlifting” organized by Netherlands in 2005. The training gave practical knowledge of organisation of removal actions and Within Annual Programme 2008 this action was implemented in "awarding body" mode, but within Annual Programme 2009 – in "executing body" mode. Respective justification is provided within Annual Programme 2009. 12 experience of communication with authorities of target countries, as well important information for direct work with illegal immigrants uncommon for Latvia. Officials of State Border Guard Main Board Immigration Board and State Border Guard Riga Board Immigration Service attended this training project that consisted of theoretical and practical parts. Action 4.3. “Language courses for employees involved in the return sphere (English, French and Spanish, perhaps, also Arabic)” The aim of this action is to organise foreign language studies of employees involved in return process. Enhancement of language skills will ensure more qualified interviewing of foreigners, as well as will facilitate international collaboration in immigration sphere. Previously there were organised foreign language studies mostly oriented on development of English level skills. Such studies were organised within implementation of Schengen Facility programme. Nevertheless current situation still proves that knowledge level of foreign languages should be improved. That is why within framework of action 4.3. there is planned to organise studies of following languages – English, French and Spanish, perhaps, also Arabic. Actions to be implemented under the "executing body" mode Action 4.2. “Seminars, education and training of employees of state institutions involved in return process, regarding legal and practical aspects of return activities” The aim of this action is to promote development in return area in order to improve the professional level of employees involved in return sphere and to apply the best return systems models of European Union Member States. Within framework of this action it is planned to carry out different seminars on experience exchange for officers of the State Border Guard of Latvia on best practices in the management of return in Poland. As benefits of implementation of this action could be named obtaining of best practice of Member States in the field of illegal immigrants return and forced return as well as implementation of readmission treaty; obtaining of best practice of Member States in the field of processing of return documentation, in the case of airlines information; obtaining of best practice of the actions connected to escort of Third-countries national. Action 4.3. “Language courses for employees of state institutions involved in the return sphere (English, French and Spanish, perhaps, also Arabic)” The aim of this action is to organise foreign language courses for employees involved in return sphere. Improvement of language skills will ensure more qualified work approach, facilitate international collaboration in immigration sphere, ensure faster obtaining of information about the illegal travellers, as well as improve work Within Annual Programme 2008 this action was implemented in "awarding body" mode, but within Annual Programme 2009 – in "executing body" mode. Respective justification is provided within Annual Programme 2009. 13 with foreign institutions, practice in the identification of illegal immigrants, negotiations, and quality of execution of documentation. 5. N/A Summary of Actions under Priority 5 in the annual programmes 2008, 2009 6. Any significant change to the Actions of the programmes over the period from 2008 to 2009 (revisions of Annual programmes and revisions of the financial breakdown lower than 10%) The Annual Programme 2008 for the European Return Fund was revised twice. First revision of the programme was initiated due to the situation that within the framework of the action 1.1.“Development of unified integrated plan about creation of return system” there has been approved no project application. Within the framework of the action 1.3.“Support for development and implementation of voluntary return programmes”, action 1.4.“Support for development and implementation of reintegration activities”, action 2.2.“Consolidation of cooperation of employees involved in the return sphere with consular institutions and immigration services of third countries” and action 4.2. “Seminars, education and training of employees of state institutions involved in return process, regarding legal and practical aspects of return activities” there have been approved the project applications whereby financing was below the sums announced in accordance with the Open Call for proposals. Considering the above mentioned, the available financing was reallocated to the action 2.1.“Participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX”, action 4.1.“Organisation of seminars/visits for employees of competent institutions regarding best practice in the sphere of return management” and action 4.3.“Language courses for employees of state institutions involved in the return sphere (English, French and Spanish, perhaps, also Arabic)” according to decision made by the Management Committee of the Fund. Second revision of the programme was initiated due to the fact that the State Border Guard as authority responsible for implementation of the project No. EAF/2008/1 “Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” within framework of Action 2.1. of Annual Programme 2008, informed the Responsible Authority that during the period of the implementation of the 2008 Annual Programme there was no FRONTEX organised forced return activity and FRONTEX agency is not planning any forced return operation where Latvia could participate until the end of the eligibility period (30th June 2010).. Following the situation and taking into account that the need arose for the State Border Guard to perform forced return operations, the State Border Guard proposed to organise forced return activities foreseen within action 1.2. “Support for development, organisation and improvement of forced return activities, including those in collaboration with FRONTEX agency” of the Multi-Annual Programme of the Fund. In the view of the above-mentioned situation in the revised version of 2008 Annual programme a new action 1.2.1. “Support for organisation and improvement of forced return activities” was introduced. 14 Additionally following the implementation of the projects approved within the Annual Programme 2008 some savings had occurred. By the decision of the Management Committee of the Fund the savings in amount of 51 596 EUR were reallocated to the action 1.2.1. “Support for organisation and improvement of forced return activities”. The Annual Programme 2009 for the European Return Fund was revised considering the following. First, Action 2.1. “Participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX and European Union member states” was eliminated from the list of actions under implementation of the Annual Programme 2009. Financial resources of the Action 2.1. amounting 60 000 EUR were reallocated to the Action 1.2.1. “Support for organisation and improvement of forced return activities”. Second, it is planned to join together measures and financial resources foreseen within Action 4.1. “Organisation of seminars/visits for employees of competent institutions regarding best practice in the sphere of return management” and Action 4.2. “Seminars, education and training of employees involved in return process, regarding legal and practical aspects of return activities”. 15 Part III IMPLEMENTATION OF THE PROGRAMMES IN THE "AWARDING BODY" MODE Did you implement the 2008 and 2009 programmes in the "awarding body" mode (as defined in Article 7 (2) of Commission Decision 2008/458/EC of 5.3.2008 - the European Return Fund Implementing Rules), at least for part of the programmes? Yes/No: Yes If Yes, fill in this part. If No, do not fill in Part III and go to Part IV (Implementation of the programmes in the executing body mode). III.l - Share of the overall EU contribution to the programmes granted in the "awarding body" mode from 2008 to 2009 For each programme year from 2008 to 2009, enter the share of the overall EU contribution to the programme (excluding the EU contribution for technical assistance) which was granted in the "awarding body" mode (in percentage, no decimal). - Programme 2008: 75% - Programme 2009: III.2 - 75% Calls for proposals For each programme year from 2008 to 2009, please provide the number and calls for proposals organised for the implementation of the annual programmes in the "awarding body" mode. - Programme 2008: 1 - Programme 2009: 1 III.3 - Proposals received, selected and funded after calls for proposals Number of Proposals received Projects selected Projects funded Programme 2008 5 5 5 Programme 2009* 0 0 0 TOTAL 20082009** 5 5 5 16 * The deadline for submission of project applications within call for proposals in the "awarding body" mode is 7th July 2010 and at the cut-off date of the report no project application have been received. ** This number is foreseen to change following the closure of the open call for proposals in the "awarding body" mode. Have all projects selected for funding after calls for proposals been funded? Yes/No: Yes (Annual Programme 2008) If No, explain why: N/A III.4 - Projects funded in the "awarding body" mode without a call for proposals N/A III.5 - Total number of projects funded in the "awarding body" mode in the programmes 2008 and 2009 Number of. . . Projects funded after calls for proposals (see table III.3) Projects funded without a call for proposals (see table III.4) TOTAL Projects funded in the "awarding body" mode Programme Programme 2008 2009* TOTAL 20082009** 5 0 5 0 0 0 5 0 5 * Open call for proposals is under the process. It is foreseen that evaluation of the submitted projects will last approximately 3 months, and if project applications will correspond to evaluation criteria, projects will be approved and grant agreements (or similar agreements with Competent Authorities) will be signed. ** This number will change after approval of project within call for proposals in the "awarding body" mode. 17 Part IV IMPLEMENTATION OF THE PROGRAMMES IN THE "EXECUTING BODY" MODE Did you implement the 2008 and 2009 programmes in the "executing body" mode (as defined in Article 8 of Commission Decision 2008/458/EC of 5.3.2008 - the European Return Fund Implementing Rules), at least for part of the programmes? Yes/No: Yes If Yes, fill in this section If No, do not fill in Part IV and go to Part V (Summary description of the projects funded in the "awarding body mode" and in the "executing body" mode, 2008 through 2009). IV.l - Share of the overall EU contribution to the programmes granted in the "executing body" mode from 2008 to 2009 For each programme year from 2008 to 2009, enter the share of the overall EU contribution to the programme (excluding the EU contribution for technical assistance) which was granted in the "executing body" mode (in percentage, no decimal). - Programme 2008: 75 % - Programme 2009: 75 % IV.2 - Calls for expression of interest or for proposals or similar selection method For each programme year from 2008 to 2009, please provide the number of calls for expression of interest or for proposals or similar organised for the implementation of the yearly RF programmes in the "executing body" mode - Programme 2008: 1 - Programme 2009: 2 IV.3 - Proposals received, selected and funded after calls for expression of interest, call for proposals or similar selection method in the "executing body" mode Number of... Proposals received Projects selected Programme 2008 1 1 Programme 2009* 4 0 TOTAL 20082009** 5 1 18 Projects funded 1 0 1 * At the cut-off date of the report project applications within call for proposals in the „executing body” mode have been received and project evaluation procedure have been launched. After evaluation results there will be known number of selected and funded projects. ** This number will change after evaluation and approval of received project applications within call for proposals in the "executing body" mode. Have all projects selected for funding after calls for expression of interest, call for proposals, or similar been funded? Yes/No: Yes - If No, explain why : N/A IV.4 - Projects funded in the "executing body" mode without a call for for expression of interest or for proposals or similar N/A IV.5 - Total number of projects funded in the "executing body" mode in the programmes 2008 and 2009 Number of... Projects funded after calls for expression of interest, calls for proposals, or similar selection method(see table IV.3) Projects funded without such calls (see table IV.4) TOTAL Projects funded in the "executing body" mode Programme 2008 Programme 2009* TOTAL 20082009** 1 0 1 0 0 0 1 0 1 *Afterwards project evaluation will take place and it is foreseen that evaluation of the submitted projects will last approximately 3 months, and if project applications will correspond to evaluation criteria, projects will be approved and grant agreements (or similar agreements with Competent Authorities) will be signed. ** This number will change after approval of project within call for proposals in the "awarding body" mode. 19 Part V SUMMARY DESCRIPTION OF THE PROJECTS FUNDED IN THE "AWARDING BODY" MODE AND IN THE "EXECUTING BODY" MODE 2008 – 2009 1. Summary description of the projects funded under Priority 1 in the annual programmes, 2008 through 2009 In the "awarding body" mode Within the framework of the AP 2008 the following project was approved: No.EAF/2008/6 Preparation of return and reintegration system in Latvia The project foresees development of return and reintegration system in Latvian, and it is part of a complex of measures which are planned to be implemented during 2009 with the aim to increase the efficiency of relevant authorities of Latvia in issues of return by increasing employees' skills and improving their cooperation with responsible services of other countries. The project will provide development of return system policy in line with Latvian national interests, by identifying the situation and then developing management models regarding return issues, especially the voluntary return and reintegration. Within framework of 2008 Annual Programme there was open call for proposals where several actions were announced. Within open call for proposals there were identified strands corresponding to each of the actions and thus allowing an applicant to answer one, several or all of the strands. Thus project No.EAF/2008/6 corresponds to Actions 1.3, 1.4., 2.2. and 4.1. In the "executing body" mode N/A 2. Summary description of the projects funded under Priority 2 in the "executing body" mode in the annual programmes, 2008 through 2009 In the "awarding body" mode N/A In the "executing body" mode Within the framework of the AP 2008 the following project was approved: No.EAF/2008/1 Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states The aim of the project is to raise administrative capacity of the authority responsible for immigration control and illegal immigrants return, by providing it with the necessary highly skilled and trained staff who are trained in accordance with the specific requirements of the direct service duties. Within the project illegal immigrants return measures (approximately 8 operations) will be organized in the framework of 2009, and as a result it is planned to improve professional skills and abilities of 11 the State Border Guard officials. 20 3. Summary description of the projects funded under Priority 3 in the annual programmes, 2008 through 2009 N/A 4. Summary description of the projects funded under Priority 4 in the annual programmes, 2008 through 2009 In the "awarding body" mode Within the framework of the AP 2008 the following project were approved: No.EAF/2008/2 Experience exchange on best practice in the return management sphere Within the project it is planned participation of the State Border Guard Immigration structural unit officials in foreign experience exchange seminar on best practices in return of illegal immigrants. The aim of the project is to raise administrative capacity of the authority responsible for immigration control and illegal immigrants return, by providing it with the necessary highly skilled and trained staff who are trained in accordance with the specific requirements of the direct service duties. Within the project experience exchange visit will be organized in the framework of 2009, and as a result it is planned to improve professional skills and abilities of 16 the State Border Guard officials. No.EAF/2008/3 Foreign language studies for State Boarder guards The aim of the project is to raise administrative capacity of the authority responsible for immigration control and illegal immigrants return, by providing it with the necessary highly skilled and trained staff who are trained in accordance with the specific requirements of the direct service duties. For this purpose within the project in 2009 there will be organized foreign language studies in Latvia and abroad (England, France and Spain) for 20 State Border Guard officials. No.EAF/2008/4 Training of employees of the Office of Citizenship and Migration Affairs The aim of the project is to promote cooperation with services of other countries in order to reduce the receipt of the information and decision-making period for persons who have violated conditions of entry and residence conditions. This will be achieved through English language training for staff of the OCMA, which is involved in solution of return issues of illegally travelling persons. In general, there will be achieved that in a shorter period of time there will be possible to take high quality decisions on persons who have violated conditions of entry and residence conditions, facilitating return of these persons to countries of their origin. No.EAF/2008/5 Seminars regarding legal and practical aspects of return activities The aim of the project is to raise administrative capacity of the authority responsible for immigration control and illegal immigrants return, by providing it with the necessary highly skilled and trained staff that is trained in accordance with the specific requirements of the direct service duties. 21 For this purpose within in the State Border Guard College (Rēzekne, Latvia) there will be organized 2 seminars regarding return sphere with involving of experts from Slovenia, Sweden, Finland, the Netherlands, Czech Republic, Poland and Denmark. In the "executing body" mode N/A 5. Summary description of the projects funded under Priority 5 in the annual programmes, 2008 through 2009 N/A 6. Summary description of the projects funded in the "awarding body" mode without a call for proposals, in the annual programmes 2008 through 2009 N/A 7. Summary description of the projects funded in the "executing body " mode without a call for expression of interest, a call for proposals or similar selection method, in the annual programmes 2008 through 2009 N/A 8. Explain any significant change to the distribution of the projects funded in the "awarding body" mode, by Priority and by Specific Priority, over the period from 2008 to 2009 When comparing projects funded under the “awarding body method” in AP2008 with projects funded under the “awarding body method” in AP2009 there is (almost) the same number of projects under each of the priorities and each of the sub priorities. Within the framework of AP 2008 the following actions were funded in the awarding body mode: 1.1., 1.3., 1.4., 2.2., 4.1., 4.2., 4.3. No applicant aplied for the implementation of the action 1.1. Within the framework of AP 2009 the following actions were implemented in the awarding body mode: 1.3. and 1.4. The rest actions were funded in the executing body mode. The funding was allocated for the actions implemented by the State Border Guard and the Office of Citizenship and Migration Affairs. 9. Explain any significant change to the distribution of the projects funded in the "executing body" mode, by Priority and by Specific Priority, over the period from 2008 to 2009 In the project No.EAF/2008/1 “Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” within framework of the Action 2.1. of the Priority 2 of the Annual Programme 2008, occurred the situation that during the period of the implementation of the 2008 Annual Programme (until 30th June 2010) there were no FRONTEX organised forced return activities where Latvia could participate (see description provided in the Point 6 of the Part 2 of the report). 22 In the view of mentioned, the project No.EAF/2008/1 “Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” was shifted under the Action 1.2.1 “Support for organisation and improvement of forced return activities”. In addition, following the implementation of the projects approved within the Annual Programme 2008 some savings have occurred. By the decision of the Management Committee of the Fund the savings in amount of 51 596 EUR have been reallocated to the project No.EAF/2008/1 ”Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” within the Action 1.2.1. under Priority 1. 4.1.action ”Organization of seminars/visits for employees of competent institutions regarding best practice in the sphere of return activities” under Priority 4, was combined with the 4.2.action „Seminars, education and training of employees involved in return process, regarding legal and practical aspects of return activities”. As a result, 4.1.action “Seminars, education and training of employees of state institutions involved in return process, regarding legal and practical aspects of return activities” was developed and included in the AP 2009. The actions were combined in order to improve and optimize the implementation of the actions. 10. Highlight any significant change (other than the distribution referred to under points 7 and 8) to the projects funded in the "awarding body" and "executing body" mode over the period from 2008 to 2009 N/A 11. Important projects funded in the annual programmes over the period from 2008 to 2009 2008 Annual Programme Project No.EAF/2008/1 “Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” The aim of the project is to raise administrative capacity of the authorities responsible for immigration control and illegal immigrants return, providing it with the necessary highly skilled and trained staff that is trained according to the specific requirements the direct service duties. In the framework of the project there was planned participation of employees of state institutions involved in the return sphere in forced return operations. Project No. EAF/2008/2 „Experience Exchange on best practice in the sphere of return management” The aim of this Project is to seminars and visits for obtaining of best practice of EU Member States in the sphere of return management in order to observe practice of these countries in issues of integrated return management. 2009 Annual Programme 23 Project “Creation and development of digital archive of cases of illegal immigrants” The aim of this project is to strengthen administrative capacity of the Office of Citizenship and Migration Affairs in order to provide fast decision making procedure and appropriate data handling security in the field of return, to establish digital documents file archive about persons who have contravened the conditions of immigration and residence permit. As this digital archive will be integrated in Common Migration Information System, it will be possible to use it also in other institutions of Latvia, such as State Border Guard, State Police, Foreign and Consular Service etc. Project “Support for organisation and improvement of forced return activities” The aim of this Project is to perform forced return operations as well as aggregate information on illegal immigration from the Third-countries, to facilitate the decrease of pressure of illegal immigration of EU member states. 12. Description of one "success story", among all the projects funded in the annual programmes over the period from 2008 to 2009 Due to careful and well balanced programming, all the projects funded in the annual programmes are successful. Within the framework of the AP 2008 the following project were approved: No.EAF/2008/4 Training of employees of the Office of Citizenship and Migration Affairs. The aim of the project was to promote cooperation with services of other countries in order to reduce the receipt of the information and decision-making period for persons who have violated conditions of entry and residence conditions. It was achieved through English language training for staff of the OCMA, that are involved in solution of return issues of illegally travelling persons. In general, it was achieved that in a shorter period of time it would be possible to take high quality decisions on persons who have violated conditions of entry and residence conditions, facilitating return of these persons to countries of their origin. 13. Description of one "failure", among all the projects funded in the annual programmes over the period from 2008 to 2009 Due to the global financial crisis, as well as following national budget constraints, there was a risk that some of the projects could not be possible to implement. However, Latvian government secured the necessary financial resources to ensure smooth implementation of the annual programmes. Part VI 24 TECHNICAL ASSISTANCE INFORMATION AND PUBLICITY 1. Technical assistance Implementation of the following activities has been provided by technical assistance financing available to the Responsible Authority within the framework of the Fund: bearing of remuneration and travel expenditures for Responsible Authority employees; evaluation of Project applications received within the framework of the Annual Programme 2007/2008, bearing remuneration costs of Project application Evaluation Commission members. To provide for the aforesaid the Responsible Authority concluded management contracts with Project application Evaluation Commission members on additional responsibilities performed within the Project application Evaluation Commission; annual publicity campaign, wherewith the potential beneficiaries of financing were presented with the Fund planning documentation, supported priorities and activities, as well as information about the Fund compliance provisions and the Project selection procedure; quality preparation of documentation related to implementation of the Fund using service of translation agencies. 2. Information and Publicity - Information and publicity activities by the Responsible Authority The Responsible Authority has drafted guidelines for publicity and visual identity measures, which include requirements for Competent Authorities on publicity and visual identity measures to be taken depending on specifics of the project. The main examples - information boards, labels on the acquired equipment, posters in the training premises and Fund logo on the training materials, information and communication material, information events, websites and press releases. According to the requirements of Article 33 (2)(a) of the implementing rules the Responsible Authority has organized 2 annual information activities (01.08.2008. and 28.05.2010.) with participation of the institutions involved in the implementation of the Fund with aim to give the information on the launch of multiannual programme, the actions set for receiving financing within the Fund, the amount of financing allocated for implementation of the actions; information on the annual programmes regarding the actions to be supported from within the framework of annual programme concerned and also the information on the achievements of the implementation of the previous annual programme. The expenditure related to the annual information activity will be covered from the financial means of the technical assistance. 25 Also the names of the Final beneficiaries of the Fund as well as the names of the Competent Authorities, names of the approved projects as well as the information on the Union funding and public funding allocated to implementation of the approved projects was published in the official home page of the Responsible Authority according to the requirements of Article 33 (2)(b) of the implementing rules. - Information and publicity activities by the final beneficiaries Project Information and publicity activities No.EAF/2008/1 „Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” - No.EAF/2008/2 „Experience exchange on best practice in the return management sphere” No.EAF/2008/3 „Foreign language studies for State Boarder guards” No.EAF/2008/4 „Training of employees of the Office of Citizenship and Migration Affairs” No.EAF/2008/5 „Seminars regarding legal and practical aspects of return activities” No.EAF/2008/6 „Preparation of return and reintegration system in Latvia” Seminar handouts Information board Press releases Information boards Press releases Information boards Press releases Seminar handouts Information boards Press releases Research paper Booklets Information boards Press release Part VII ASSESSMENT OF IMPLEMENTATION OF THE ANNUAL PROGRAMMES 26 2008 AND 2009 VII.1 Assessment of the implementation of the 2008 Annual Programme 1. Has the 2008 programme been implemented as originally planned and broadly in line with the programme schedule? On the whole the Annual Programme 2008 has been implemented as originally planned. Nevertheless the programme was revised twice due to such changes as results of the open call for proposals, savings within approved projects and shifting of one project under a different Priority. 2 . Have you encountered problems on implementation of the 2008 annual programme? If so, what measures did you take? All in all no major problems have been encountered while implementing the Annual Programme 2008. If problems occurred, they were addressed through consultation process with the Management Committee and Commission’s Desk Officer of the Fund. 3. Has a revision of the 2008 programme by the Commission been necessary? If so, what were the main changes? Yes, there was necessary revision of the Annual Programme 2008 by the Commission. The programme was revised twice. First revision was necessary due to the results of the open call for proposals. Second revision took place because of the savings within approved projects and its reallocation to another action as well as shifting of one project under a different Priority (See detailed description in the Point 6 of the Part 2 of the report). 4. Have you implemented the 2008 programme (the case being, the revised programme) fully? (= all or nearly all actions set out in the programme approved by the Commission, or in the revised programme approved by the Commission, could be implemented by the end of this programme) The revised Annual Programme 2008 can be considered as fully implemented. The end of the eligibility period is 30th June 2010. 5. Have the expected quantitative and qualitative results of the 2008 programme -as set out in the programme / revised programme approved by the Commission -been achieved at the end of this programme? Yes, generally the expected quantitative and qualitative results of the Annual programme 2008 as set out in the revised programme approved by the Commission are achieved at the end of the programme. 6. In the light of the implementation of the 2008 programme, do you consider that the distribution of funding between the actions was appropriate? Were the actions set out in the programme you submitted to the Commission appropriate? On the whole distributions of funding between the actions as also actions set out in the programme submitted to the Commission were appropriate. There have also been minor changes that are reflected in the revised versions (No.1 and No.2) of the Annual Programme 2008 (See detailed description in the Point 6 of the Part 2 of the report). 27 VII.2. Assessment of the implementation of the 2009 Annual Programme 1. Has the 2009 programme been implemented as originally planned and broadly in line with the programme schedule? The Annual Programme 2009 is under implementation at the cut-off date of the report. By now it is being implemented as originally planned. Nevertheless the revised version of the programme is being prepared at the moment due to elimination of one action from the list of actions under implementation as well as joining of two actions in one. 2 . Have you encountered problems on implementation of the 2009 annual programme? If so, what measures did you take? At the moment no major problems have been encountered while implementing the programme. If problems occurred, they were addressed through consultation process with the Management Committee and Commission’s Desk Officer of the Fund. 3. Has a revision of the 2009 programme by the Commission been necessary? If so, what were the main changes? Currently the revised version of the programme is being prepared due to elimination of one action from the list of actions under implementation as well as joining of two actions in one (See detailed description in the Point 6 of the Part 2 of the report). 4. Have you implemented the 2009 programme (the case being, the revised programme) fully? (= all or nearly all actions set out in the programme approved by the Commission, or in the revised programme approved by the Commission, could be implemented by the end of this programme) The Annual Programme 2009 is under implementation at the cut-off date of the report. The end of the eligibility period is 30th June 2011. 5. Have the expected quantitative and qualitative results of the 2009 programme -as set out in the programme / revised programme approved by the Commission -been achieved at the end of this programme? The Annual Programme 2009 is under implementation at the cut-off date of the report. We expect quantitative and qualitative results of the Annual Programme 2009 to be achieved. 6. In the light of the implementation of the 2009 programme, do you consider that the distribution of funding between the actions was appropriate? Were the actions set out in the programme you submitted to the Commission appropriate? The Annual Programme 2009 is under implementation at the cut-off date of the report. It will be known at end of the eligibility period (30th June 2011), if distribution of funding between the actions as well as actions set out in the programme submitted to the Commission were appropriate. VII.3. The Management and Control System for the Fund and the implementation of the Annual Programme 2008 through 2009 28 1. Has the Management and Control System of the European Return Fund which you designed in 2008, been efficient for the implementation of the annual programmes so far? The Management and Control System of the European Return Fund submitted to the European Commission on 28th September 2007 was effective and it was applied till 1st January 2010. However, in 2009 Law on management of funds established within the framework of the General programme “Solidarity and Management of Migration Flows” came into force and reorganisation in the Responsible Authority took place. In the result the Management and Control System of the European Return Fund was updated and the revised version of the document submitted to the European Commission on 22nd April 2010. 2. Please list the changes you have made in the Management and Control System of the European Return Fund which you designed in 2007-8, bearing in mind the experiences gained/ lessons learned during the implementation of the annual programmes 2008 - 2009 The list of changes in the revised Management and Control System of the European Return Fund: included reference to the Law on management of funds established within the framework of the General programme “Solidarity and Management of Migration Flows” (in force since 29th April 2009), which defines rights and responsibilities of the authorities involved in management of the funds and final beneficiaries of the funds, as well as other issues connected to the management of the funds. In accordance with the point 2 of the Article 6 of the Law on management of the funds, the Responsible Authority, the Audit Authority, the Certifying Authority and the Payment Authority, and if necessary, the Delegated Authority, as well as duties and rights of the above mentioned authorities are defined by the Cabinet of Ministers; perfomed editorial changes in the descriptions regarding the Responsible Authority, the Certifying Authority and the Audit Authority; updated part of the document regarding implementation of technical assistance project of the Responsible Authority; updated part “Monitoring of the projects implemented by the final beneficiaries” – in the project application there is included logical framework matrix in which project aims, actions and indicators of successful implementation of the project applications are defined; part “Irregularities, corrections and recoveries” is updated and supplemented with terms of submission of irregularities ; part “Information management” is updated in general, as well as annexes of the Management and Control System are updated and new annexes with organization charts are attached. Part VIII 29 OVERALL ASSESSMENT OF THE RESPONSIBLE AUTHORITY ON THE IMPLEMENTATION OF THE PROGRAMMES 2008 – 2009 VIII.1 What is your overall assessment of the implementation of the European Return Fund in your Member State from 2008 to 2009? At the moment implementation of the actions within the programmes 2008-2009 of the European Return Fund are in the accordance with provisions of internal and external normative acts and there are not any relevant deviations identified that could harm implementation of the objectives in the eligibility terms of programmes. VIII.2 1. Taking into account the overall implementation of the European Return Fund in your Member State from 2008 to 2009, what is your preliminary assessment in relation to the following aspects of the European Return Fund on the following aspects? Relevance of the programme's priorities and actions to the national situation Please describe how relevant the programme's objectives are overall to the problems and needs identified. Has there been an evolution which required a reshaping of the intervention? Funds objectives at the EU level are relevant, therefore at the moment the Responsible Authority do not consider it appropriate to make any changes. In general the programme’s objectives are developed in accordance with problems and needs identified in the Multi-Annual programme for the European Return Fund. However there were following evolutions which required reshaping and intervention: Introduction of action 1.2.1. “Support for organisation and improvement of forced return activities” within AP 2008 (detailed description in the Point 6 of the Part 2 of the report) and shifting of project No.EAF/2008/1 “Participation of employees of state institutions involved in the return sphere in forced return activity and operation organised by FRONTEX and European Union member states” from Action 2.1. „Participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX and European Union member states” to the Action 1.2.1. The State Border Guard as authority responsible for implementation of the project “Participation of employees of state institutions involved in the return sphere in forced return activities and operation organised by FRONTEX and European Union member states” within framework of Action 2.1. of Annual Programme 2008, has officially informed that during the period of the implementation of the 2008 Annual Programme there is not FRONTEX organised forced return activities and FRONTEX agency is not planning any forced return operations where Latvia could participate until 30th June 2010. The need arose for the State Border Guard to perform forced return operations. Following a situation analysis the State Border Guard came to the conclusion that the most appropriate would be to organise forced return activities without involvement of FRONTEX Agency. Such kind of activities are foreseen within action 1.2. “Support for development, 30 organisation and improvement of forced return activities, including those in collaboration with FRONTEX agency” of the Multi-Annual Programme of the Fund. In order to ensure effective implementation of the programme and to achieve the results and in order to meet the set objectives in the revised version of 2008 annual programme a new action 1.2.1. “Support for organization and improvement of forced return activities” was introduced in order to improve and optimize implementation of the actions. Introduction within AP 2009 of action 1.2.2. “Creation and development of digital archive of cases of illegal immigrant”, which is in compliance with Article 4(3) (a) “enhancement of the capacity of competent authorities to take high quality return decisions as quickly as possible” of the Decision No.575/2007/EC of the European Parliament and of the Council of 23 May 2007 establishing the European Return Fund for the period 2008 to 2013 as part of the General Programme “Solidarity and management of migration flows” and action 1.2. “Support for development, organisation and improvement of forced return activities, including those in collaboration with FRONTEX agency” of the Multi-Annual Programme for the European Return Fund. Earlier this action was not presented in MAP. In the MultiAnnual Programme (p. 22) there are presented main actions to be introduced and during the development of annual programmes and evaluating actions to be included in the annual programmes there is possibility to include an additional action among the already approved actions. Additionally, there are introduced two new indicators under the section “Indicator according to MAP” in the revised Annual programme 2009. (page 6). 2. Effectiveness of the programme Please highlight the key results of the programme overall and the extent to which the desired results and objectives (as set out in the multiannual programme strategy) been attained. Are the effects resulting from the intervention consistent with its objectives? In the Multi-annual programme there are set the following objectives in Latvia regarding return management: 1. to create a strategic approach in Latvia in unified return management, including development of integrated return plan; 2. to bring necessary amendments to Latvian legislation regulating return conditions and procedures; 3. to improve and support sphere of illegal immigrants’ forced return; 4. to support development and implementation of voluntary return and reintegration activities; 5. to promote cooperation in return management sphere of authorities involved in the return sphere; 6. to acquire the best practice in return management of other European Union member states; 7. to improve the professional qualification of employees of authorities involved in the return sphere; 8. to create a Register of persons; 9. to improve the readmission agreement sphere; 31 10. to renovate accommodation centres for apprehended persons and illegal immigrants; 11. to obtain the latest information about flow trends of citizens of third countries through European Union researches. During the implementation process of the Annual programmes 2008 – 2009 respective MAP objectives were tackled and activity results achieved with some minor changes and changes in emphases on needs. 1. While launching both forced return actions , the Responsible Authority concluded, that it was not appropriate to implement 2 different actions that in general had 1 goal, because the only difference between two actions was the method how to manage forced return; 2. As to Action 1.2.2. “Creation and development of digital archive of cases of illegal immigrants” it will provide continuation for the Transition Facility project "Improvement of Circulation, Processing and Safekeeping of Immigration Case Files", which Office of Citizenship and Migration Affairs implemented from November 2007 to December 2008. This action will take steps to implement the recommendations regarding data security set forth in the Action Plan which was developed within the framework of the above mentioned Transition Facility project." It is planned to include approximately 25 000 – 30 000 files of persons who are in the archive of the Office of Citizenship and Migration Affairs. The implementation of the project within the framework of the Action 1.2.2. (AP 2009) was started in August 2010, therefore the concrete results will be achieved by June 2011. 3. Efficiency of the programme Please estimate the cost of the management of the European Return Fund so far and whether in your opinion the programme's objectives are being developed at a reasonable (i.e. planned) cost. The programme’s objectives are being developed at a reasonable cost taking into account the economical situation in the given planning period. Of course, deviations from planned costs are taking place because of the constantly changing and recently very unstable global economical situation. Management costs as within the 2008 programme implementation as well as within the 2009 programme implementation have been and are commensurate and reasonable without any unsubstantiated raise of costs. According to the Article 16 2(a) of the Commission Decision No 575/2007/EC of the European Parliament and of the Council of 23 May 2007 establishing the European Return Fund for the period 2008 to 2013 as part of the General programme “Solidarity and Management of Migration Flows” and repealing Council Decision 2004/904/EC, the amount set aside for technical assistance under each annual programme may not exceed 7% of the total annual amount of co-financing allocated to that Member State plus 30 000 EUR. 4. Complementarity Please indicate any issues you have had with establishing the complementarity and/or synergies with other programmes and/por EC financial instruments such 32 as the other Funds of the General Programme, the Thematic Programme on Asylum and Migration and/or the Structural Funds The national budget of the Republic of Latvia provides funds for direct functioning of institutions involved in asylum matters, however, it does not provide funds for development and improvement of these functions. The Fund investment is intended to be used for improvement of the return sphere in particular. As to objectives set in the list of operational objectives in chapter 2.2. of the Multiannual programme for the European Return Fund”: Objective 8 “To create a Register of persons” – in late 2007, Transition Facility project “Improvement of Immigration Register Documents’ Circulation, Processing and Safekeeping” was initiated. It includes preliminary tasks contributing to development of Register of persons. At the current moment financial funds are looked for purpose of continuation of this project, but this objective will not be supported within the Fund; Objective 10 “To renovate accommodation centres for apprehended persons and illegal immigrants” – Latvia plans to fund the renovation of Olaine illegal immigrants’ accommodation centre and creation of Daugavpils and Vilaka illegal immigrants’ and asylum seekers’ centres from the national budget until the end of 2011; Objectives No.2 “To bring necessary amendments to Latvian legislation regulating return conditions and procedures”, No.9 “To improve the readmission agreement sphere” and No.11 “To obtain the latest information about flow trends of citizens of third countries through European Union researches” are not supported by now; Allocated national budget funding will continue to be used in realisation of 20062009 activities of the Latvian Unified asylum and migration management system development programme as far as they do not overlap with actions supported from the Fund. It is planned to allocate from state budget national co-financing for implementation of approved actions, as well as for maintenance of established or purchased objects. Fund financing will not overlap with financing of state budget or other programme of the European Union, but only provides complementarity. In order to avoid any possibility for overlapping or double financing, there are established mechanisms in Latvia that are being applied in the different stages of management of the Funds – at the planning stage (the Management Committee of the Fund), project’s selection stage and project’s implementation controlling stage. Within the framework of the European Return Fund the implementation of some of the projects launched in other funds is proceeding (follow-up projects). For example, the action 1.2.2.that was implemented within the framework of RF was previously launched within the framework of the Transition Facility project “Improvement of Immigration Register Documents’ Circulation, Processing and Safekeeping”. Added value Please indicate how you perceive the programme's added value in comparison with existing national programmes/policies at national, regional and local level, and in relation to the national budget in the area of intervention of the European Return Fund. 5. 33 Taking into account the comparatively new EU requirements which have come to force with the Directive of the European Parliament and of the Council on common standards and procedures in member states for returning illegally staying thirdcountry nationals (Directive 2008/115/EC of 16 December 2008), the European Return Fund has a significant added value to the national programmes and resources for meeting the respective requirements set in the Directive. With assistance of the European Return Fund the input of non-governmental organisations towards the persons and processes involved in the Return field has been significantly strengthened. The Fund helps to develop and improve the situation in return sphere in Latvia. Projects that cover implementation of the voluntary return actions and reintegration actions are planned and implemented according to the EC policy documents. VIII.3. Any suggestions / recommendations for improvements in the regulatory framework (basic act and implementing rules) and the Commission guidance documents which would help you to streamline and improve the annual programming exercise in general? On 14th June 2010 in Brussels took place workshop on the possible modifications to the implementing rules of the four Funds. In the framework of this workshop all Member states provided its opinions on necessary changes in the Implementation rules. European Commission plans to update and adopt the document till the end of this year. Additionally it is planned to update the Manual on the eligibility rules. As for the Basic act, European Commission foresees inappropriate time-frame for amending procedures in respect to the General programme “Solidarity and Management of Migration flows” 2007-2013. Following the implementation of the funds, the general recomendation for future programming action would be to aply the best aproach indentified under one fund also to others. Thus it would be useful if the recommendations would be horizontally related to all programmes under all Funds, if considered relevant. VIII.4. Any suggestions / recommendations for improvements in the regulatory framework (basic act and implementing rules) and the Commission guidance documents which would help you to streamline and improve the implementation of the actions / projects and the control mechanisms on the actions/ projects? Please see analysis provided in the point VIII.3 of the Part VIII of this document. VIII. 5. Any suggestions / recommendations for improvements in terms of the guidance and support by the Commission to the Member States on the implementation of the programming exercise and the management and control system? Please see analysis provided in the point VIII.3 of the Part VIII of this document.