BOREHOLE COMPLETION REPORT To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368 WATER POINT INFORMATION 1. IDENTIFICATION AND LOCATION DATA Type of water point: (X) Borehole: ( ) Dug well: Identification: Project I.D. No. DWD 40225 Location: Longitude E: Latitude: N/S: 463163 ( ) Augered shallow well: 232993 Altitude(m): District: Apac County: Kwania Sub-county: Inomo Parish: Abedmot Village: Baradu Water point: Baradu BH Water point ownership: ( ) Private: (X) Communal: ( ) Institutional Water point use: (X) Domestic ( ) Irrigation: ( ) Livestock: Water point abandoned: ( ) Low yield: ( ) water quality: ( ) ( ) Industrial: Technical: Date abandoned: 2. SITESELECTION DATA Site by: Organization: International Lifeline Fund Title: Name of person: Eyangu Abdalatif Hydro Officer Date sited: 24/09/2013 Seismic: Method of site selection: Resistivity: Other, specify: X Electromagnetic: None: Attach site selection results 3. CONSTRUCTION DATA Contractor: International Lifeline Fund Drilled by: Name of person: Title: Method of construction: Senior Drilling Officer (X) Air rotary ( ) Cable tool: ( ) Mud rotary: ( ) Augered: ( ) Dug: ( ) Other, specify: Date for completion of construction: 05/11/2013 Total well depth at date of completion (m): Water well diameter: Oyaro Francis Nicholas mm: 114 39.55 From: 0 To: mm: From: To: mm: From: To: mm: From: To: Permanent casing/well ring diameter: mm: Permanent casing/well ring material: 39.53m 125 (X) PVC: ( ) Mild steel: ( ) Concrete: ( ) Bricks: ( ) Other: Borehole sealing: ( ) None: (X) Cement: ( ) Bentonite: ( ) Other, Filter slot size & intervals: mm: 1 From: 23m To: 24.5m mm: 1 From: 28.5m To: 37m mm: From: To: Borehole filters: (X) Gravel pack: ( ) Natural pack: Well development: Duration (hrs) Method of development: (X) Air lift: 4 ( ) Bailed: ( ) Compressed air ( ) Other (specify) 1 of 4 BOREHOLE COMPLETION REPORT To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368 4. INSTALLATION DATA Type of pump: ( ) Submersible pump: ( ) Centrifugal pump: (X) Hand pump: ( ) Bucket : ( ) Other Date of pump installation: day/month/year: Name of pump: 29/11/2013 UIII Modify Hand Pump Pump installation/intake depth: 33m Riser pipe material: ( ) Galvanized iron: Riser pipe diameter: 61 Pumping rod material: ( ) Galvanized iron: Pumping rod diameter: 12 0.8m3/h Pump capacity: m b.g.l. ( ) Stainless steel: (X) PVC: (X) Stainless steel: ( ) Wire: ( ) other mm ( ) other mm 5. HYDROGEOLOGICAL DATA Depth to bedrock: m b.g.l.: 21 m Overall geological setting: Brown top soil, Laterite, Clay, Quartz, Quartzite, Gneiss. Lithology: (m b.g.l.) From: From: From: 0m 6m 21m To: To: To: From: 36.5 To: From: 6m 21m 36.5m 39.53 Description: Brown top soil, laterit Moist brownish clay Quartz, Quartzite Fresh and hard Gneiss rock To: Water strike, Aquifer and yield: Water strike (m.b.g.l) 24,28m Yield m3/h 2 Aquifer Quartz, Quartzite HYDRO CHEMICAL DATA 6. HYDROCHEMICAL DATA Date of sampling: day/month/year: Sampling method :( X) Pumping: ( ) Air-lift sampling :( ) Bucket: Sample preservation: ( ) None: ( ) Acid: (X) Other: Samples analyzed: Name: : Organization Parameter Unit Turbidity FTU Temp. (Time of sampling) Conductivity pH Tot. alkalinity (CaC03) Hardness (CaC03) Calcium (Ca2+) Magnesium (Mg2+) Sodium (Na+) Potassium (K+) Carbonate (C03+) Bicarbonate (HC03) Sulphate (S042) Chloride (Cl) Nitrate (N03) Ammonium (NH4+) Tot. Iron (Fe2+ + Fe3+) Manganese (Mn2+) Fluoride (F) Free Carbon dioxide (C02) Tot. dissolved solids oC Result Date Field/Lab uS/cm --mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l 2 of 4 BOREHOLE COMPLETION REPORT To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368 Faecal Coli no/100ml 00 07/05/2014 7. YIELD TEST, FLOW AND WATER LEVEL DATA Test carried out by: Organization: International Lifeline Fund Title: Eyangu Abdalatif Hydro Officer Date of test: 19/11/2013 A. Step pumping test :( ) Yes / Step 1 2 3 4 Name: Field Yield (m3/h) _________ _________ _________ _________ Duration of test: 2 hrs. 40 ( X ) No Draw down (m) ___________ ___________ ___________ ___________ Spec. Capacity (m3/h/m) ____________ ____________ ____________ ____________ B. Constant discharge :( X ) Yes / ( ) No Average discharge during test (m3/h) 1.2 Static Water Level, SWL (m.b.g.l) 8.88 Date measured 19/11/2013 Pumping water level (m b.g.l) 24.61 Drawdown (m) 15.73 2 Transmissivity (m /day) 0.03 3 Spec. Capacity (m /h/m) Hydro-fracturing: ( ) Yes / (X) No. If yes day/month/year C. Natural flow: ( ) Yes (X) No D. Air Lift test: (X) No ( ) Yes mines 0.08 Attach pumping test results. 8. OTHER INFORMATION (include information not catered for in the above sections) 3 of 4 BOREHOLE COMPLETION REPORT To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368 9. DETAILS OF ORGANIZATION SUBMITTING DATA Name: INTERNATIONAL LIFELINE FUND. Address: P.O BOX 70 ADOL POLINO ROAD LIRA, UGANDA. Telephone Number: +256 (0) 778 828 634. Fax No: E-mail: mwangome@lifelinefund.org Name of responsible officer: Title: MWANGOME NGUJO. WASH PROGRAM MANAGER. Signature: Date of data submission: 26/May/2014 Stamp of organization 4 of 4