WATER POINT INFORMATION

advertisement
BOREHOLE COMPLETION REPORT
To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368
WATER POINT INFORMATION
1. IDENTIFICATION AND LOCATION DATA
Type of water point:
(X) Borehole:
( ) Dug well:
Identification: Project I.D. No.
DWD 40225
Location: Longitude E:
Latitude: N/S:
463163
( ) Augered shallow well:
232993
Altitude(m):
District:
Apac
County:
Kwania
Sub-county:
Inomo
Parish:
Abedmot
Village:
Baradu
Water point:
Baradu BH
Water point ownership:
( ) Private:
(X) Communal:
( ) Institutional
Water point use:
(X) Domestic
( ) Irrigation:
( ) Livestock:
Water point abandoned:
( ) Low yield:
( ) water quality: ( )
( ) Industrial:
Technical:
Date abandoned:
2. SITESELECTION DATA
Site by: Organization:
International Lifeline Fund
Title:
Name of person:
Eyangu Abdalatif
Hydro Officer
Date sited:
24/09/2013
Seismic:
Method of site selection:
Resistivity:
Other, specify:
X
Electromagnetic:
None:
Attach site selection results
3. CONSTRUCTION DATA
Contractor: International Lifeline Fund Drilled by: Name of person:
Title:
Method of construction:
Senior Drilling Officer
(X) Air rotary
( ) Cable tool:
( ) Mud rotary:
( ) Augered:
( ) Dug:
( ) Other, specify:
Date for completion of construction:
05/11/2013
Total well depth at date of completion (m):
Water well diameter:
Oyaro Francis Nicholas
mm:
114
39.55
From:
0
To:
mm:
From:
To:
mm:
From:
To:
mm:
From:
To:
Permanent casing/well ring diameter: mm:
Permanent casing/well ring material:
39.53m
125
(X) PVC:
( ) Mild steel:
( ) Concrete:
( ) Bricks:
( ) Other:
Borehole sealing:
( ) None:
(X) Cement:
( ) Bentonite:
( ) Other,
Filter slot size & intervals: mm:
1
From:
23m
To:
24.5m
mm:
1
From:
28.5m
To:
37m
mm:
From:
To:
Borehole filters:
(X) Gravel pack: ( ) Natural pack:
Well development:
Duration (hrs)
Method of development:
(X) Air lift:
4
( ) Bailed:
( ) Compressed air
( ) Other (specify)
1 of 4
BOREHOLE COMPLETION REPORT
To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368
4. INSTALLATION DATA
Type of pump:
( ) Submersible pump:
( ) Centrifugal pump:
(X) Hand pump:
( ) Bucket :
( ) Other
Date of pump installation: day/month/year:
Name of pump:
29/11/2013
UIII Modify Hand Pump
Pump installation/intake depth:
33m
Riser pipe material:
( ) Galvanized iron:
Riser pipe diameter:
61
Pumping rod material:
( ) Galvanized iron:
Pumping rod diameter:
12
0.8m3/h
Pump capacity:
m b.g.l.
( ) Stainless steel:
(X) PVC:
(X) Stainless steel:
( ) Wire:
( ) other
mm
( ) other
mm
5. HYDROGEOLOGICAL DATA
Depth to bedrock: m b.g.l.:
21 m
Overall geological setting: Brown top soil, Laterite, Clay, Quartz, Quartzite, Gneiss.
Lithology:
(m b.g.l.)
From:
From:
From:
0m
6m
21m
To:
To:
To:
From:
36.5
To:
From:
6m
21m
36.5m
39.53
Description:
Brown top soil, laterit
Moist brownish clay
Quartz, Quartzite
Fresh and hard Gneiss rock
To:
Water strike, Aquifer and yield:
Water strike (m.b.g.l)
24,28m
Yield m3/h
2
Aquifer
Quartz, Quartzite
HYDRO CHEMICAL DATA
6. HYDROCHEMICAL DATA
Date of sampling: day/month/year:
Sampling method :( X) Pumping: ( ) Air-lift sampling :( ) Bucket:
Sample preservation: ( ) None: ( ) Acid: (X) Other:
Samples analyzed: Name:
: Organization
Parameter
Unit
Turbidity
FTU
Temp. (Time of sampling)
Conductivity
pH
Tot. alkalinity (CaC03)
Hardness (CaC03)
Calcium (Ca2+)
Magnesium (Mg2+)
Sodium (Na+)
Potassium (K+)
Carbonate (C03+)
Bicarbonate (HC03)
Sulphate (S042)
Chloride (Cl)
Nitrate (N03)
Ammonium (NH4+)
Tot. Iron (Fe2+ + Fe3+)
Manganese (Mn2+)
Fluoride (F)
Free Carbon dioxide (C02)
Tot. dissolved solids
oC
Result
Date
Field/Lab
uS/cm
--mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
2 of 4
BOREHOLE COMPLETION REPORT
To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368
Faecal Coli
no/100ml
00
07/05/2014
7. YIELD TEST, FLOW AND WATER LEVEL DATA
Test carried out by: Organization: International Lifeline Fund
Title:
Eyangu Abdalatif
Hydro Officer
Date of test:
19/11/2013
A. Step pumping test :( ) Yes /
Step
1
2
3
4
Name:
Field
Yield (m3/h)
_________
_________
_________
_________
Duration of test:
2
hrs.
40
( X ) No
Draw down (m)
___________
___________
___________
___________
Spec. Capacity (m3/h/m)
____________
____________
____________
____________
B. Constant discharge :( X ) Yes /
( ) No
Average discharge during test (m3/h)
1.2
Static Water Level, SWL (m.b.g.l)
8.88
Date measured
19/11/2013
Pumping water level (m b.g.l)
24.61
Drawdown (m)
15.73
2
Transmissivity (m /day)
0.03
3
Spec. Capacity (m /h/m)
Hydro-fracturing: ( ) Yes /
(X) No. If yes day/month/year
C. Natural flow: ( ) Yes
(X) No
D. Air Lift test:
(X) No
( ) Yes
mines
0.08
Attach pumping test results.
8.
OTHER INFORMATION (include information not catered for in the above sections)
3 of 4
BOREHOLE COMPLETION REPORT
To be submitted to: WRMD, Plot 12 Mpigi Road, P.O. Box 19 Entebbe, Phone: 041 321342, Fax: 041 321368
9. DETAILS OF ORGANIZATION SUBMITTING DATA
Name:
INTERNATIONAL LIFELINE FUND.
Address:
P.O BOX 70 ADOL POLINO ROAD LIRA, UGANDA.
Telephone Number:
+256 (0) 778 828 634.
Fax No:
E-mail:
mwangome@lifelinefund.org
Name of responsible officer:
Title:
MWANGOME NGUJO.
WASH PROGRAM MANAGER.
Signature:
Date of data submission:
26/May/2014
Stamp of organization
4 of 4