Short-term Growth Plan REVISED DRAFT Coventry & Warwickshire £17.1bn of 40,380 goods & services produced in 2011 businesses 14% of all 399,500 employees employment is within the manufacturing sector £507m was One tenth of all automotive jobs in the UK are in the Coventry & Warwickshire area spent by Coventry & Warwickshire businesses on R&D activity in 2010 (far higher than surrounding areas) FOREWARD The message from Central Government could not be clearer. Local Enterprise Partnerships (LEPs) are central to driving forward growth in England. LEPs are proving to be highly successful in understanding and articulating the needs and issues of their local economies, and providing the leadership to drive positive change. Sir Peter Rigby Lord Heseltine’s recent review – “No Stone Unturned” – highlighted the key role that LEPs CWLEP Chairman, and Chairman & could play in stimulating and supporting Chief Executive of SCH sustainable economic growth, and significant untapped potential if provided the right resources. The Government’s response to this report in the 2012 Autumn Statement was hugely positive. Growth-related spending will be devolved to local areas from 2015, under the strategic leadership and guidance of LEPs. To support this enhanced role and increased responsibility of LEPs, the Government is providing core funding to ensure that LEPs have the full capacity and capability to deliver. The Coventry & Warwickshire Local Enterprise Partnership (CWLEP) is well-placed to rise to this challenge. The CWLEP has now been established as a company limited by guarantee, agreed a clear constitution, strengthened the Board, and developed a more strategic focus to its work. We have also built up a strong and highly capable Executive Delivery Team, providing the range of skills and resources we need to meet this enhanced agenda from Government head-on. The CWLEP is building on the good work and real progress that has been made over the past two years, and is ready and able to drive the local economy forward. The private sector in the area has also been leading work in developing a fresh and forward looking economic narrative and identity for Coventry and Warwickshire which focusses on its numerous assets and strengths to raise its profile and promote the opportunities it offers. The narrative leads on innovation and enterprise particularly linked to its two successful universities; its economic relationships with Birmingham and towns such as Stratford upon Avon plus its one hour link to London and building on the success of events and conferences as a growing part of the economy. Businesses across the area have come together in a new and exciting approach to place leadership to promote and bring this narrative to life as Coventry and Warwickshire Champions, under the strategic direction of the CWLEP. 3|Page The economy of Coventry & Warwickshire is also primed to exploit the new opportunities that are coming, and will help lead UK Plc. back to strong and sustainable growth. Not only have we a long and successful history in manufacturing and engineering, we are recognised today the world over for our strengths in advanced manufacturing – particular but certainly not exclusively - designing and building motor vehicles. We will continue to lead the world in the next wave of motor manufacturing, with identified global strengths in low carbon vehicles and intelligent mobility; along with strong and competitive digital media sector which is increasingly seeing overlaps and synergies with manufacturing. This Interim Growth Plan details both the actions that the CWLEP is taking now to help support and facilitate the growth of the economy, and the steps we are taking to develop our longer-term, comprehensive Strategic Plan for Growth over the coming year to meet the challenge set by Government. Sir Peter Rigby February 2013 4|Page PART A: STRATEGIC OVERVIEW Introduction The Coventry & Warwickshire Local Enterprise Partnership (CWLEP) has produced this Interim Growth Plan as a short-term strategy to provide an immediate focus and structure to the enormous amount of work and activity the CWLEP will be undertaking over the next 12-24 months (2013-2015). The context in which the CWLEP now operates is substantially different to the one that existed when it was first established and published its initial 5-year Strategy. The CWLEP recognises the need to establish a revised strategy, but two key issues mean that it is not appropriate for a comprehensive plan to be completed at this time. These are: Following Lord Heseltine’s review – “No Stone Unturned” – and the 2012 Autumn Statement, the Government has written to Local Enterprise Partnerships detailing its proposals to devolve a significant amount of growth-related spending to local areas. This funding will be dependent on a longer-term Strategic Plan for Growth being established by LEPs. The Government expects these to be detailed, evidenced based plans and has allocated funding to LEPs to ensure that they are sufficiently resourced to develop them. Guidance on what these Strategic Plans should cover will be available in the Spring. The recent expression of interest to Government for a City Deal covering Coventry, all of Warwickshire and the Borough of Hinckley & Bosworth has been accepted, and we will now start detailed work and negotiation with Government over the year to develop a strong, effective and empowered City Deal proposal. Given these two issues, it was felt that this Interim Plan should be produced. This sets out the shorter-term actions that the CWLEP will be undertaking over the next 12-24 months, details the steps that will be taken to develop the Strategic Plan for Growth for submission in late 2013, and explains how the CWLEP will utilise its resources (both financial and staff resources) to deliver this Interim Plan. The Coventry & Warwickshire Economy The CWLEP area is home to over 40,000 businesses, together employing nearly 400,000 people, and generates some £17bn a year in economic output (known as Gross Value Added (GVA)). Overall, the Coventry & Warwickshire economy performs in line with the national economy. Before the recession, the area experienced growth rates on a par with England as a whole; since the recession, it has seen a reduction in activity in line with the national average. Over the past 10 years, Coventry & Warwickshire has seen higher rates of growth 5|Page than much of the Midland area, although the county has seen substantially stronger growth than the city in this period. A key characteristic of the Coventry & Warwickshire economy is the relative size of our manufacturing and engineering sector. 14% of the workforce in our economy is employed in Manufacturing, compared to an average of just 10.5% nationally. Our manufacturing sector has been less affected by the sustained downturn than in the national economy [source: TBR Observatory], and many of our leading businesses in this sector are seeing strong (if not record) levels of growth despite the current economic climate. While a number of areas of the UK can claim to have a strong manufacturing base, research undertaken for the CWLEP has identified a number of specific elements of this sector that the Coventry & Warwickshire area can genuinely claim to be world leading. Work undertaken by Breeze Strategy benchmarked our performance on a range of key business sectors against national and global competitor areas. The research found that with the combination of companies, assets & research establishments, labour market and wider offer of the local economy, Coventry and Warwickshire can be considered to be one of the top places in the world in: The research, design and development of low carbon vehicles Automobile manufacturing (particularly research and development) Motorsports (as part of a wider Motorsport Valley, incorporating Northamptonshire and Oxfordshire) – particularly focussing on innovation and new technology Computer Gaming and Serious Gaming Intelligent Mobility – R&D and testing of new, innovative technologies in this field The Coventry & Warwickshire economy also has incredibly strong R&D assets (both from our two universities, and a number of research bodies – including WMG & the Manufacturing Technology Centre at Ansty (both Catapult Centres for Advanced Manufacturing) and MIRA. The economy is also home to a significant amount of innovation activity. Research undertaken by the Centre for Cities for the CWLEP has found that the level of R&D expenditure in Coventry & Warwickshire was substantially higher than our neighbouring LEP areas (expenditure of £507m in 2010 compared to £157m in Birmingham & Solihull and £236m in Leicester & Leicestershire). These clear strengths in business sectors that are at the cutting edge of new technologies, and a high degree of innovation and R&D activity within the local area offer huge opportunities for economic growth. The Coventry & Warwickshire economy can help drive an export-led, production-based recovery in the UK, and play a key role in the Government’s aspiration to re-balance the economy. However, as with all economies, there exist a number of areas for improvement or barriers that need overcoming to help unleash this potential to the maximum – particularly when 6|Page focussing on more specific and niche business sectors. Through significant engagement and consultation with our businesses and key intermediary organisations over the past two years, the CWLEP has identified a key set of issues that need to be improved or overcome if we are to create a strong environment where our business base will flourish and grow. These are: Skills – ensuring that education and training providers are effectively meeting the needs of businesses Infrastructure – ensuring that the Coventry & Warwickshire area provides the right quantity and quality of employment land, in the right locations, with the right supporting infrastructure (i.e. transport, broadband, etc.) to meet the needs of our growing businesses and sectors. Access to Finance – helping our business community find the resources to support and facilitate their growth aspirations. Targeted support to enable growth – providing focussed and tailored local support to those companies (particularly SMEs) that have growth ambitions and potential, and that with effective and timely interventions could create a step-change in economic growth in the area. Clear focus on the need to expand and strengthen support for innovation activity within our business base. Promoting the area – the need to provide a stronger narrative and clearer “offer” to companies locally, nationally and globally to attract and retain new investment and develop international recognition of Coventry & Warwickshire. The CWLEP regards these issues as key “enablers of growth”, which if effectively tackled, we will create a supportive environment within which our key priority sectors – and the broader business base – will prosper and grow. Through this approach, we will achieve the CWLEP’s vision: “By 2018, through strong private-public sector collaboration, Coventry & Warwickshire will be globally regarded as a centre of excellence for advanced manufacturing and engineering, with strong and innovative business and R&D base and a highly skilled and flexible workforce.” The key objectives underpinning this vision and the work of the CWLEP are to: Drive economic growth in the area Help remove barriers to growth Help create new (high value) jobs Co-ordinate activity to maximise impact 7|Page How the Plan / Vision will be delivered The CWLEP’s focus is on creating the best possible environment for growth it can. We believe that if we can enhance the key enablers of growth, and remove any barriers or unnecessary hurdles that businesses face, the private sector will do the “heavy lifting” and undertake the necessary investment and activity that will bring strong, sustainable jobs-led growth to the Coventry & Warwickshire area. Put simply, we want to make it as easy as possible for a business to start, locate, grow and prosper in our area. The work of the CWLEP is therefore structured around these key enablers of growth, under the clear direction of the CWLEP Board. A number of business led groups have been established to more clearly understand how improvements could be made or barriers removed, and to provide strategic and operational leadership to the various partner organisations and agencies that can deliver these changes. In addition, we think it is vital to ensure that our work in these areas is constantly informed by the needs and issues being faced by business across the area, particularly those that are in our priority sectors that will be key to our growth now and in the future. We have therefore established three sector focussed groups to provide this role, covering High Value Manufacturing, the Low Carbon Sector, and the more diverse – but critically important – SME business community. The CWLEP Board, and these Business Groups, are supported by a strong Executive Team, which can effectively mobilise and shape the significant delivery capacity that exists within agencies and organisations involved in the CWLEP to deliver this strategy. A virtual Programme Office has been established within this Executive Team to help inform, oversee and monitor the progress the range of projects and actions that are detailed in the Delivery Plan below. This strategic approach is detailed in Figure 1 below. It should be stressed that the CWLEP does not aim to be a direct delivery body in its own right, or seek to replace or duplicate the work of other organisations. Rather, it provides strategic leadership to shape and influence the work of others to meet the needs of our business community and create the best conditions for growth that we can. The CWLEP will use any resources that it has to add value or to “oil the wheels” for change as necessary. It will also work pro-actively with surrounding LEPs (or those with shared interests) to bring forward relevant activities and initiatives. The Action Plan below presents a high level picture of how the CWLEP is deploying its resources, alongside those of all our constituent members. 8|Page Figure 1: Strategic Approach of CWLEP CWLEP Board Executive Team Programme Office Key enablers of growth Skills Business Group Access to Finance Business Group Planning Business Group Transport Business Group Inward Investment Business Group 9|Page Key sectors SME Business Group Low Carbon Business Group High Value Manufacturing Business Group PART B: ACTION PLAN The following Action Plan for the CWLEP is structured around the key enablers of growth that have been identified above. These will be constantly reviewed and refined by our sector based Business Groups to ensure that they are fully aligned with growing our strategic sectors. The plan sets out the key actions and deliverables that will be undertaken through the CWLEP over the next 12-24 months, detailing who has lead responsibility for them, how progress will be measured, and how (if appropriate) CWLEP resources are being deployed to support their delivery. Skills Activity Targets / Outputs Lead responsibility Commission research into skill needs of engineering businesses Report produced by March 2013 with information and case studies to inform future work Report produced by March 2013 Workshop to explore findings to detail required work and further actions – April 2013 Skills Business Group (supported by the High Value Manufacturing Group) Plan produced by March Work with the Leicester & Leicestershire LEP to develop (and then implement) a Skills Priorities Plan for the MIRA Technology Park Enterprise Zone Develop an Apprentice 10 | P a g e How progress will be monitored & reported Skills Business Group will monitor activity and report findings to LEP Board CWLEP resource input Cross Border Delivery Partnership & Skills Business Group Skills Business Group will monitor activity, detail required actions and report to LEP Board No direct funding from CWLEP Skills Business Group Skills Business Group will £14,000 of funding £28,000 of funding from CWLEP Activity Targets / Outputs Plan for the CWLEP area 2013 with clear targets as to how we will promote and increase the take-up of apprentices Undertake a detailed audit of skills activities being delivered across the LEP area, to inform and shape future Skills Plan and negotiations with respect to the City Deal Review good practice from elsewhere (nationally and internationally) to inform future Skills Plan and City Deal negotiations Undertake detailed review of physical accessibility of learning and employment opportunities to inform both Skills Plans and the work of our Transport Audit complete by May 2013 11 | P a g e Lead responsibility How progress will be monitored & reported oversee development. CWLEP Programme Office will monitor implementation of the Plan Skills Business Group will oversee the work, and identify key messages for CWLEP Board. CWLEP resource input Review completed by June Skills Business Group 2013 Skills Business Group to oversee work and identify key messages for CWLEP Board. Tbc Review completed by August 2013 Skills Business Group to oversee work and convene workshops with other relevant Business Groups to review key findings. Tbc Skills Business Group Skills Business Group (with support from Transport Business Group and SME Business Group) allocated from Skills Funding Agency to the CWLEP Tbc Activity Business Group Work with Central Government to negotiate proposals for devolution of adult skills funding in line with our City Deal proposal to support the growth of our Advanced Manufacturing & Engineering Sector 12 | P a g e Targets / Outputs Lead responsibility How progress will be monitored & reported CWLEP resource input Conclude a successful City Deal agreement with Government by Nov 2013 Undertake a range of activities to shape an inform our negotiations – March – Oct 2013 City Deal Steering Group City Deal Steering Group will report progress to CWLEP Board Tbc Skills Business Group Infrastructure Planning & Development Activity Targets / Outputs Agree and publish a planning protocol, covering all planning authorities in C&W Published protocol, setting Planning Business Group out what planning authorities will do to help deal with applications quickly and efficiently to bring about growth. Develop an interactive map of key development sites Production of map on CWLEP website showing road infrastructure, land allocations, designations and sites available for development. Producing a protocol for statutory consultees to be endorsed by the LEP board, consulted upon and sent to DCLG as a Setting a protocol for statutory consultees to engage them in the growth agenda 13 | P a g e Lead responsibility Planning Business Group Planning Business Group How progress will be monitored & reported The Protocol has been adopted by all of the constituent authorities. The Chief Planner of each of the LPAs will meet quarterly to review the success of the protocol and report back to the Planning Business Group and onto the board. Planning Group provide operational steer and mapping by April 2013, CWLEP Programme Office will monitor and report progress to Board Planning Business Group will produce the protocol by April 2013 and run a consultation exercise throughout May 2013. CWLEP resource input Tbc Consultation Event arrangement. PR/Marketing Activity Targets / Outputs Lead responsibility How progress will be monitored & reported Progress will be reported to the board as part of the groups update. Planning Business Group to produce the model by July 2013 and present to the Programme Office to report progress to board. Both Councils resolve to determine the planning application and refer to Secretary of State CWLEP resource input Coventry City Council Programme Office will monitor progress and report to CWLEP Board as appropriate Funding from CWLEP RGF Infrastructure Investment Fund to be allocated (subject to due diligence) Coventry City Council Programme Office will monitor progress and Funding from CWLEP RGF Infrastructure Investment proposal for implementation Modelling the benefits of growth Coventry & Warwickshire Gateway Friargate Whitley 14 | P a g e Exploring the wider benefits of growth and modelling those benefits for use by developers, agents and planners. Planning Application Determined by Coventry City Council (resolved to grant permission in December 2012) and Warwick District Council (due to consider in March 2013) To support public realm works required to enable development to proceed [add expected key milestones of project] Undertake transport improvement works to Planning Business Group Coventry City Council and Warwick District Council PR/Marketing, Visual Display and publication. Preparation, submission, and supporting determination of the planning application. Delivery of the scheme in due course. Activity MIRA Technology Park Targets / Outputs Lead responsibility improve access to site [add expected key milestones of project] Successful development of MIRA the Technology Park Enterprise Zone [add expected key milestones of project] How progress will be monitored & reported report to CWLEP Board as appropriate CWLEP resource input Programme Office will monitor progress and report to CWLEP Board as appropriate No direct funding from CWLEP How progress will be monitored & reported Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate. Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate CWLEP resource input Fund to be allocated (subject to due diligence) Transport Activity Targets / Outputs Lead responsibility Toll Bar Island works Improved transport flow in known bottle-neck, helping to facilitate development and growth in surrounding area Improved infrastructure on congested motorway junction, easing pressure on local road network and enabling further development and growth Highways Agency, Coventry City Council, Warwickshire County Council M40 Junction 12 15 | P a g e Highways Agency and Warwickshire County Council No direct funding from CWLEP Funding from CWLEP RGF Infrastructure Investment Fund to be allocated (subject to due diligence) Activity M40 Junction 14 NUCKLE Phase 1 16 | P a g e Targets / Outputs Lead responsibility in the area Improved infrastructure Warwickshire County on a congested local road Council network which adversely impacts on congestion / safety issues on M40 Junction 14. Scheme will facilitate improved access to both Warwick and Leamington Town Centres, along with a number of existing employment sites in the area Improved rail link Coventry City Council between Nuneaton and Coventry, with the creation of two new stations at Arena and Bermuda and improved train frequencies. Scheme to be completed by December 2014, with at least 2 trains running per How progress will be monitored & reported CWLEP resource input Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate No direct CWLEP funding Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate No direct funding from CWLEP Activity NUCKLE Phase 2 Establish Local Transport Body for Coventry & Warwickshire Development of a full prioritised programme of investment for devolved 17 | P a g e Targets / Outputs hour by December 2015. Improved rail link between Coventry and Leamington, with a new station at Kenilworth. Funding secured by Dec 2013. If New Station Fund bid is successful then scheme open by summer 2015 Shadow LTB operational by end of February 2013. LTB Assurance Framework to be submitted to DFT by end of February 2013. Provisional list of Major Transport Schemes for the period 2015-19 to be submitted to DFT by end of July 2013. Submission of programme to DfT for July 2013 Lead responsibility How progress will be monitored & reported CWLEP resource input Warwickshire County Council (working closely with Coventry City Council and Network Rail) Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate No direct funding from CWLEP Transport Business Group Progress of the LTB will be reported to the CWLEP Board N/a Local Transport Body Progress of the LTB will be reported to the CWLEP Board Use of LEP capacity funding from DfT to support scheme appraisal Activity major scheme funding (2015-19). Early development of ‘shovel ready’ and short to medium term deliverable transport schemes which can be applied to funding opportunities Full engagement with emerging transport strategies and proposals, including aviation, rail, highway and cross-LEP strategy 18 | P a g e Targets / Outputs Lead responsibility How progress will be monitored & reported CWLEP resource input and monitoring Hold a workshop with Jacobs Consultancy by end of April 2013 with priority schemes identified (building on CWLEP Transport Priorities, March 2012) with costings by July 2013 Production of a comprehensive high level connectivity strategy by end of 2013 Coventry City Council, Warwickshire County Council & Centro Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate Transport Business Group Project will be monitored by the Programme Office and reported to the CWLEP Board as appropriate Potential ‘top-up’ funding to support free consultancy offer from Jacobs Consultancy Access to Finance Activity Targets / Outputs Creating Accessibility Creating a virtual suite of resources for businesses to access information on finance and funding. Will include the use of web portals, apps and social media £1 million worth of loans up to £30k each for small business to access as part of gap financing. Expectation that it will grow and be matched with further ERDF resources Loans to small Business Grants to SMEs 19 | P a g e Lead responsibility Access to Finance Group How progress will be monitored & reported Progress will be monitored by the Access to Finance Group at its bi-monthly meetings. CWLEP resource input Access to Finance Group/CWRT Progress will be monitored by CCC and WCC , and performance information will be presented to the Access to Finance Group quarterly Growing places £250k initially before 31st March 2013. A further £750k is committed from GP resources to grow the scheme. Up to £500k has been earmarked from WCC resources. ERDF Priority 2 – no further LEP resource required Delivery of 180 jobs through Coventry City investment of £1.8million into Council SME’s. Intervention rates vary between 5-30% depending on the location of businesses in assisted and non-assisted areas. A partnership grants panel is in place, chaired by Coventry City Council as the Accountable Body. It meets monthly to consider grant applications and review the pipeline opportunities. Summary is reported to Programme Office who will report to CWLEP Board Small financial and expert professionals to implement the ideas and directives of the LEP Members. Activity Targets / Outputs Grants and Loans to Large Businesses £6.785 million in loans to strategically important projects. £4 million in grant Up to £30million generated in private investment Infrastructure Fund Friargate Bridge M40 Junction 12 improvements Whitley Business Park (North Gateway) improvements 20 | P a g e Lead responsibility Coventry City Council How progress will be monitored & reported Progress will be reported to the LEP Board. Monitored by Coventry City Council. CWLEP resource input Progress will be reported to the LEP Board. Monitored by Coventry City Council. Kick started with £22.5million RGF, opportunity to grow and invest further resources from RGF4 and GP2 £10.8million Growing Places Targeted Business Support Activity Targets / Outputs Lead responsibility Coventry & Warwickshire Enterprise & Business Growth Package 405 new businesses created by 2015 490 businesses assisted to improve their performance by 2015 660 new jobs to be created by 2015 120 new business startups by March 2016 400 businesses assisted to grow by March 2016 Create or safeguard 500 jobs by March 2016 Report completed February 2013 Workshop to discuss findings with key partners – March 2013 Undertake activities to shape and inform City Deal negotiations & Coventry City Council Rural Growth Network Innovation Study 21 | P a g e How progress will be monitored & reported Progress will be reported to the SME Business Group, and performance monitored by the Programme Office CWLEP resource input Warwickshire County Council Progress will be reported to the SME Business Group, and performance monitored by the Programme Office No direct CWLEP resources. £2.4m of funding from DEFRA. University of Warwick SME Business Group and High Value Manufacturing Group to work together to explore how recommendations can be implemented Report cost of £25k funded by range of partners. Costs for implementation tbc. No direct CWLEP resources. £3.3m of funding from ERDF. Activity Identify, target and build strong relationships with the key growth companies in Coventry & Warwickshire Business Engagement, Communications and Co-ordination Strategy 22 | P a g e Targets / Outputs Lead responsibility proposals – April-Oct 2013 Complete High Growth SME Business Group Business Research project (working closely with the by March 2013. Access to Finance Group) Undertake workshop in March 2013 to explore findings from research to inform future business support delivery. Explore visual ways to map and promote the high growth potential within our area – Spring 2013 Develop strong relationships with key companies through Strategic Business Relationship Managers Inform and engage the wider business community about the CW LEP programme of activity, Led by the FSB & Chamber of Commerce, supported by the SME Business Group How progress will be monitored & reported CWLEP resource input SME Business Group will monitor progress and update Programme Office and CWLEP Board as appropriate £7,500 from LEP Capacity Fund Round 2 (plus match funding from Warwickshire County Council) for High Growth Research Project RGF funding to be utilised to employ Strategic Business Relationship Managers Through delivery of events and activity that engage, inform and educate the business community in Coventry & Warwickshire £45,000 plus match funding of resources from FSB, Chamber of Commerce and others. Activity Targets / Outputs Lead responsibility How progress will be monitored & reported CWLEP resource input Led by the FSB & Chamber of Commerce, supported by the SME Business Group Initially, in phase 1, through the development of a Regulation Project Action Plan specific to CWLEP that identifies activities and outcomes for phase 2. Development of a marketing and communications strategy that promotes registration to the CSW procurement portal; along with £20,000 funded from BRDA (Better Regulation Delivery Office) research and successes. Engage the business community in the direction and success of the CW LEP by utilising business input, assets and competences. Better Business for All – Regulation project Procurement Project 23 | P a g e Engage the business community in continuing to understand the barriers to successful enterprise growth and job creation. Generate a local partnership between businesses and regulatory services, that promotes growth by reducing the regulatory burden on businesses. To identify and promote the opportunities for SME’s doing business with the public sector in the sub-region (CSW), and with the CWLEP key Led by the FSB & Chamber of Commerce, supported by the SME Business Group £5,000 plus match funding of resources from FSB, Chamber of Commerce and others. Activity Targets / Outputs Lead responsibility infrastructure and development projects. Undertake research on supply chain networks and labour market pools of our companies (particularly SMEs) to better understand the connectivity within our economy 24 | P a g e Clearer understanding of the connectivity of firms within (and without) the CWLEP area Evidence to inform future strategic planning (particularly transport provision, housing and employment land) SME Business Group (supported by the Transport Business Group) How progress will be monitored & reported engagement activity with the developers of key infrastructure projects. Evidence and report developed, with workshop to explore and understand the implications. Key outcomes of this will feed into CWLEP Growth Plan CWLEP resource input Tbc Promoting the area Activity Targets / Outputs Lead responsibility Promote our key sectoral strengths to UKTI, and lobby to ensure that C&W is recognised as the primary location for Advanced Manufacturing & Engineering in the UK Submit “Surfacing the National Offer” questionnaire to UKTI by end of February 2013, and keep up to date. Hold at least 2 Industry Briefing Sessions a year for our key sectoral strengths for UKTI officials. Get lead UKTI officers for advanced manufacturing/ automotive sector to be based in C&W by April 2015. Completed February 2013 Formal launch with developers & agents in May 2013 Inward Investment Business Group (feeding into the City Deal work) Create a single Property Database for Coventry & Warwickshire, enabling on-line searches for available sites and properties for companies looking to locate in C&W 25 | P a g e Coventry City Council & Warwickshire County Council How progress will be monitored & reported Inward Investment group will oversee development CWLEP resource input Inward Investment Group will oversee development and report progress to CWLEP Board £4,000 from LEP Capacity Fund Round 2 Activity Targets / Outputs Lead responsibility Build on the “Story of Coventry of Warwickshire” using economic data and sectoral strengths to develop a clear, effective and visual “offer” to attract inward investment Commission work to produce and sharpen our PR/marketing material – Spring-Summer 2013. Agreed revised material by Sept 2013. Marketing materials and launch – Autumn 2013. Identify and then target key intermediaries and embassy officers Develop a target list of companies in our key sectors to approach and promote C&W Identify key global events/shows for our key strategic sectors and develop an engagement plan Agreed approach by August 2013, operational by September 2013 Inward Investment Business Group Targeted promotional activity to raise awareness of the key strengths of Coventry & Warwickshire Develop and agree single co-ordinated approach for investment enquiries 26 | P a g e How progress will be monitored & reported Inward Investment Business Group will update CWLEP Board as appropriate CWLEP resource input Inward Investment Business Group Inward Investment Group to monitor progress and report to CWLEP Board as required Tbc Inward Investment Business Group Inward Investment Business Group will update CWLEP Board as Utilising staff seconded to CWLEP Activity Targets / Outputs Lead responsibility How progress will be monitored & reported appropriate, and will work across other Business Groups as required. CWLEP resource input Develop and agree a coordinated and resourced after-care service Seek devolved control over after-care resources from UKTI for C&W area Hold an international event for the Intelligent Mobility sector by end of 2013 Evaluate this event look to develop second event in 2014 Engage 1200 companies around exporting in 2013, and raise awareness if exporting to a further 1000 companies p.a. Support 150 companies to develop an international Inward Investment Business Group (feeding into City Deal work) Inward Investment Business Group Inward Investment Business Group will update CWLEP Board as appropriate, and will work across other Business Groups as required. Tbc UKTI Local Trade Team (working closely with the Inward Investment Business Group) Inward Investment and SME Business Groups to work together to support and monitor activity. Tbc across CWLEP partners Develop a world leading aftercare service for inward investors to ensure that companies stay and continue to invest in the area Hold at least one major promotional event for our key strategic sectors a year Maximise linkages between inward investment, foreign owned companies, and existing international relationships to exploit & increase exporting 27 | P a g e Activity Targets / Outputs opportunities trade action plan in 2013 Support 56 companies to export for the first time, and 42 to increase their exporting in 2013 28 | P a g e Lead responsibility How progress will be monitored & reported CWLEP resource input Measuring Performance Implementation of the actions in this Delivery Plan will be monitored by the CWLEP’s Programme Office, and quarterly progress reports will be produced for the CWLEP Executive. The CWLEP Board will receive short Exception Reports at each meeting, along with a more detailed Annual report (which will also be published on the CWLEP’s website). The activities undertaken will produce a range of economic outcomes in the medium term, which can be expected to deliver improvements in the longer-term to a set of broader economic impact indicators. These outcome and impact indicators are detailed below. The CWLEP Programme Office will collate information on the economic outcomes of the various projects and activities undertaken, and present these in the Annual Reports. Broader performance changes in the key economic impact indicators will also be produced alongside these, although clearly it must be recognised that any changes are necessarily long-term and could take a number of years before discernible improvements can be seen. Outputs Outcomes Impacts The successful delivery of the various activities and projects detailed in the Delivery Plan The more immediate consequences of these activities. Key outcomes that will be measured are: The longer-term changes in the economic base resulting from the work of the CWLEP. Key indicators that will be monitored are: New jobs created Jobs safeguarded Employment land created Number of new apprentices Programme Office Update Reports to CWLEP Board 29 | P a g e CWLEP Annual Reports Gross Value Added (GVA) % growth in employment % growth in number of businesses New business start-up rate Figure 2: Trend & current performance of Key Impact Indicators % year on year GVA growth Productivity compared to England benchmark (100) 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% -1.0% -2.0% -3.0% 105 100 95 90 85 2007-08 2008-09 2009-10 2010-11 2009 2010 2011 Coventry and Warwickshire Leicester and Leicestershire Coventry and Warwickshire Leicester and Leicestershire Oxfordshire England Oxfordshire England % Year on year growth in business numbers 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 5.0% % year on year growth in employment 2006-072007-082008-092009-102010-112011-12 0.0% -1.0% 0.0% -2.0% -5.0% -3.0% -10.0% -4.0% 30 | -15.0% 2008 Page Coventry and Warwickshire New business birth rate 12.0% 10.0% 8.0% 6.0% 4.0% 2.0% 0.0% -5.0% England Coventry and Warwickshire England Coventry & Warwickshire LEP England PART C: DEVELOPMENT OF STRATEGIC GROWTH PLAN & CITY DEAL A major focus of the work and attention of the CWLEP over the next 12 months will be the detailed development of the full Growth Plan for Coventry & Warwickshire, and the negotiation of a City Deal with Government to support the development of this plan through requesting additional powers, responsibilities and policy changes by Whitehall. The Growth Plan and City Deal proposal will require further research and detailed analysis to fully understand the problems and barriers facing the local economy and the steps that can be taken locally and nationally to overcome these; to work through the policy implications and forecast impacts of proposed activities to support growth; and to develop new governance and delivery arrangements to enable us to achieve our aims and objectives. The following presents a high level overview to the timetable for the Growth Plan and City Deal (as far as currently understood), and key anticipated milestones in this process. March 20th - UK Budget and expected Government response to Heseltine Review End of March – guidance on Growth Plans published by Government April? – details on City Deal Core Package announced? March-May – further research on key areas of interest April-June – Identification of pipeline projects and investments (with a particular focus on future EU funding) May-June – analysis of policy implications and stakeholder engagement/consultation July – presentation of City Deal proposal to “Ad-Hoc Ministerial Group” Summer – detailed guidance on EU funding programmes to LEPs (along with potential provisional funding allocations) June-September – development of prioritisation criteria and impact appraisal for pipeline projects and investments July-October – negotiation of City Deal implementation plans with Government Autumn – agreement of revised Governance arrangements and proposed financing plans September-October – public consultation on draft Growth Plan November/December – formal sign-off of City Deal with Government 31 | P a g e December – submission of CWLEP Growth Plan to Government Winter 2013/14 – prioritisation and appraisal of pipeline projects and investments April 2014? Start of City Deal activities Summer 2014? Start of new EU Funding programme April 2015? Devolution of growth related spending from Government to LEPs? 32 | P a g e