ADDITIONAL CONSTRUCTION OF BRANCH BUILDING AT BHEL , RAMACHANDRAPURAM , MEDAK DISTRICT STATE BANK OF HYDERABAD PREMISES DEPT, 2ND FLOOR, HYBANK TOWERS, GUNFOUNDRY, HYDERABAD-500001 TENDER SCHEDULE Part II - PRICE BID CONSULTANTS: SUNNY ASSOCIATES 1-8-703/7 TO 9/1, 2ND FLOOR, ADJ. SHANKARMUTT NALLAKUNTA, HYDERABAD -500044 9390606628 The Deputy General Manager, Premises Department, STATE BANK OF HYDERABAD, 2nd Floor, Methodist Complex, ABIDS, HYDERABAD 500001 SCHEDULE OF QUANTITIES FOR ADDITIONAL CONSTRUCTION OF BRANCH BUILDING AT BHEL, RAMACHANDRAPURAM, MEDAK DISTRICT Sl.N o 1 Item Anti Termite Treatment Unit Qty Sqm 335.00 Cu m 285.00 Cu m 307.00 Providing Ant termite treatment as per IS 6315 (Part - 2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc and Overheads & Contractors profit complete for finished item of work as per the approval of the Engineer-in-Charge. Measurement will be paid as per Plinth Area The agency shall be PCAI member with minimum of 10 years experience and shall give guarantee in the prescribed proforma annexed in the tender document. (only floor area measurements would be considered) 2 Earth Work in excavation Earth work in excavation for foundations for buildings in all types of soils and depositing on the bank for all lifts and with an initial lead of 10.0 m upto a depth of 3.0 including all operational, incidental, labour charges such as shoring, sheeting, planking. Strutting, over heads etc., including all for the complete finished item of work. 3 Filling with good earth Filling with available good earth and carted gravel from out side in trenches,sides of foundations and basement for all leads in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water & Gravel to work site and all operational, incidental, labor charges,seignorage charges hire charges of T&P , including cutting, loading, unloading, Consolidation Charges, Compaction Factor,watering etc., complete for fnished item of work Rate Amount 4 Concrete Works a PCC 1:4:8 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work including curing. b RCC 1:2:4 Supply and placing of the Design Mix Concrete M 15 grade corresponding to IS 456 with minimum cement content of 320kgs per 1 cum of concrete (any plus or minus variation in the cement consumption as per mix design is allowed) using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, excluding centering and shuttering but including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,and Overheads & Contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work for the following works (i) Locker Room flooring (ii) Locker Room RCC walls c M 20 grade Concrete Cu m Cu m Cu m 74.00 16.75 35.00 Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 340kgs per 1 cum of concrete (any plus or minus variation in the cement consumption as per mix design is allowed) using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, excluding centering and shuttering but including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,and Overheads & Contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work for the following (i) For footings under colums and RCC walls (ii) For Pedestals (iii) Plinth beams (iv) Columns (v) Roof beam (vi) Roof Slab (vii) Lintels & Bresummers d Chajjas Cu m Cu m Cu m Cu m Cu m Cu m Cu m Sqm 46.00 8.50 19.00 10.00 42.00 44.00 1.00 13.00 Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 340kgs per 1 cum of concrete (any plus or minus variation in the cement consumption as per mix design is allowed) using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., & all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing, 12 mm thick plastering etc., and Overheads & Contractors profit complete and also including cost of steel and its fabrication charges for finished item of work. 5 Masonary Works a CRS Masonary Coursed Rubble Stone masonry in CM (1:6) prop: (Cement: Sand) 2nd sort using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including bond stone of 24 x 24 x 39 cm, labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc., and Overheads & Contractors profit complete for finished item of work in foundation and basement. b 230 thk. Brick Work Cu m 48.00 Cu m 51.00 Sqm 18.00 First Class brick work in CM 1:6 in super structure for 230 mm thk walls including cost & conveyance of all materials, labour charges, seigniorage charges, scaffolding and curing etc., and Overheads & Contractors profit all complete c 115 thk. Brick wall -do- as 230 thk. brick work but for 115 thk. brick wall 6 Plastering a RCC Works (internal & external works) Plastering both internal and external to Verticals and ceiling for walls, columns, beams and roof etc., with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer in - charge etc., and Overheads & Contractors profit complete for finished item of work. Sqm 825.00 b Masonary Works (internal and External works) Plastering both internal and exteranal to walls with 15mm thick in two coats with base coat of 10mm thick in CM (1:5) and top coat of 5mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer in - charge etc., and Overheads & Contractors profit complete for finished item of work. Sqm 480.00 7 Joinery a Doors Sqm 8.50 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters (ANAND/RAAVILA/KUTTY/STANDARD/SUBHDW AR/ITP) of 35 mm thick single shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides Veener ply with external lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 nos MS Z hold fasts of size 230 mm x 40 mm x 5mm including cost of ISI marked aluminium fixtures of 6 Nos butt hinges 150mm long , 1 No. aldrop 300mm x 16 mm dia, 2 Nos tower bolts of 300 mm x 12 mm dia at top , 2 Nos 150 mm long handles , 2 Nos heavy duty door stoppers and 2 Nos rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including Overheads & Contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) b Windows Supply and fixing of aluminium glazed sliding windows 2 track with aluminium anodised sections of 63.5x38.1x1.5 mm and panel filling with 5mm thick saint gobain plain glass including rubber beeding, standard accessories like rollers, handles etc., for sliding windows including cost of supply and fixing of aluminium grill with F channel fixing to window frame etc., complete and as directed by Engineer-in-charge/Architect. The rate to include MS grill with a weight of 15 kgs per Sqm Sqm 21.75 c Ventilators Sqm 2.50 Sqm 112.50 -similar to above- but with top hung model 8 Flooring a Cement Flooring 15 mm thk. Flooring in CM 1:3 finished with floating coat of neat cement including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and Overheads & Contractors profit complete for finished item of work. b Vitrified flooring: Flooring / treads with vitrified polished floor tiles of 1st quality and make as approved by Engineer-incharge of size not less than 598 mm x 598 mm x 8mm thickness and colours of choice of engineer with borders and design as per the approved flooring pattern as directed by the Engineer-In Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and Overheads & Contractors profit complete for finished item of work. (Basic rate of tile is Rs.65/- per Sft) Sqm 210.00 9 Water Proofing Providing impervious coat to exposed RCC roof slab surface with cement concrete 1:2:4 screed mixed with water proofing compound conplast WP 90 of M/s. fosroc or its approved equivalent as per manufacturers and as proved by the Engineer-incharge over the roof terraces after applying a bounding coat of polymer bounding agent NITOBOND of M/s.Fosroc maked with approved equivalent mixed with cement slurry of / litre for 6 square metres at all hights for Filling undulation / depression and maintatining gradient towards rain water pipes for easy fiow of water using 10mm maximum size graded stone aggregates, mixing in mechanical mixture laid to required levels slopes, and thickness, compacting, finishing, necessary curing ect,. complete as specified and directed by engineer- in- charge including lining at regularular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and Overheads & Contractors profit complete for finished item of work. Sqm 360.00 10 Centering & Shuttering Providing and Fixing centring and shuttering for beams, slabs, footing, pedestals, Rcc walls etc., in Steel centering , Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc for all RCC works including keeping in place securely as per IS 456 recommendation to all RCC surfaces. The rate to include bracing all the pipes with rods etc., as required at site, including sales & other taxes on all materials and operational, incidental, and labour charges for keeping the shuttering at place, lift charges, rendering the plates with waste oil etc., and Overheads & Contractors profit complete for finished item of work. Sqm 1200.00 11 Reinforcement Steel Supplying, fitting and placing Fe-415 bar reinforcement in RCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and Overheads & Contractors profit, taxes etc., all complete for finished item of work . Note: The rate to include welding for connecting old and new reinforcement of RCC walls / Beams/ Slabs with that of old reinforcement of RCC Walls/ Beams / Slabs MT 24.75 12 Painting a Plastic emulsion Painting with Acrylic Exterior emulsion (Asian/Berger/Nerolac) to exterior faces of new walls two coat of approved make shade and colour over primer coat with cement primer water based interior Gr-I (Asian/Berger/Nerolac) including cost and conveyance of materials like Acrylic Exterior paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Acrylic Exterior etc., and Overheads & Contractors profit complete for finished item of work (APSS No.910, 911&1201) in all floors. Sqm 1100.00 b Altek Supply and application of two coats of Altek/Neon Super fine, one coat of Altek/Sai coat/Neon water based cement primer and two coats of Altek Flora/Neon Super track for ceiling and internal walls (emulsion paint) including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and Overheads & Contractors profit complete for finished item of work Sqm 270.00 13 Rain Water Down Take Pipes Rm 12.00 Cu m 30.00 Supplying and fitting 150 mm dia PVC down take pipe including bends, half bends, extensions etc., making holes at the appropriate place in RCC for Rain Water 14 Dismantling & Chasing of walls Dismantling the following items with mechanical and means including making the surfaces levelled to the desired as per the engineer incharge, in RCC, Brick, CRS etc., as per the side condition. Cutting by welding the exposed reinforcement bar and carting the waste to the unobjectionable area. The rate to include all the consumables, rental for equipments needed, labour centring, shuttering, and props, including labour cost, profit etc., The dismantling to include making all the surfaces ready to connect all the new RCC, Brick and CRS works all complete Total DISCOUNT Percentage) IN ANY(Express in terms of Net Total Signature of Agency with Seal