SPECIFIERS WORKSHOP ON THE MAINTENANCE AND REPAIR OF MEDIEVAL TOWN WALLS DRIMNAGH CASTLE, Long Mile Road, Dublin 12 Wednesday 8th October 2014 Instructor: Lisa Edden, Structural Engineer Stonemason: Pat McAfee, experienced in conservation works and works to town walls. Pat will also be on hand to answer questions on particular issues regarding practical repairs and both the organising and programming of works. TIME 9.00AM 9.30AM ACTIVITY Registration in the Great Hall Welcome and introduction Town walls, their archaeology and significance The story the walls tell and importance today Town ditches and what they may contain The conservation plan and its importance for town walls 10.00AM What’s wrong with this wall / monument? LOCATION & LECTURER Great Hall Liam Mannix, IWTN Great Hall Lisa Edden Overview of typical issues The importance of maintenance Is this a maintenance issue or something more drastic? 10.40AM Tea / coffee Crypt under great Hall 11.00AM Town walls and their surrounds as a habitat Dr. Janice Fuller, Ecologist Flora on walls and what to look out for Bats, birds, and insects Legislation - wildlife act, etc 11.40AM 12.20AM Legislation and permissions for works to a National Monument Risk assessment and other health and safety issues Plant growth and programming plant control Containment / removal of undesirable plant growth Catherine Desmond Marc Ritchie, DAHG Lisa Edden Great Hall Mechanisms of deterioration When to re-point, minimum intervention, local repairs Hot lime mortars / clay mortars Treatment of wall tops Historical profiles, Effective weathering, aesthetics of repairs 1.00PM Lunch Crypt under Great Hall 1.45PM Tour of Drimnagh grounds to look at walls and see samples of deterioration, cracks, and repair practice Walk around grounds Understanding wall foundations and protecting them Erosion of pointing and damage to stones at wall bases Repairs to wall bases Lime mortar mixes for various repairs Local rebuilding – honest versus aesthetic repairs Engineer L. Edden Stone Mason P. McAfee Weathering details to wall tops Practical plant removal tips 3.10PM Specifications for: vegetation removal / lime mortar including hot lime mortar updates/ protection of works 4.15PM 4.30PM Mortar analysis H&S issues Temporary works Access Timing of works and phasing of projects Summary, questions and answers Finish Great Hall Lisa Edden