Green Business Centre Inspections Green Dragon Environmental Standard 2006 Assessment Report Scope of audit Contact Name Address Tel Fax E-mail G.D. ref number Neath Port Talbot College All the College functions within Wales Colin Heffey Neath Port Talbot College, Dwr-y-Felin Road, Neath. SA10 7RF 01639 648000 Site description and Neath Port Talbot College is the only Further Education activities provider in the Neath Port Talbot County Borough Council area. The College offers a range of courses including: Adult Learning; Building Engineering Services; Business Tourism and Management; Catering, Bakery & Hospitality; Computing & IT; Construction and Built Environment; Creative, Visual & Performing Arts; Engineering; Health, Social & Childcare; Horticulture; Hairdressing & Beauty Therapy; Mathematics & Science; Sport & Public Services; Pre-Vocational Studies; and Social Studies & Languages. The courses are provided over eight campuses: Neath Campus; Afan Campus; Coleg Pontardawe; Queen Street Centre; Twyn yr Hydd House; Construction Training Centre, Maesteg; Building Crafts Training Centre (Llansamlet); and the Llandarcy Campus. Standard assessed Visit Date Assessment Type Level assessed Assessment duration Green Dragon 26th March 2012 Initial Assessment Level 2 1.5 days (includes pre- & post-assessment times as well as time on site) Lead Assessor (J Griffiths) Other assessor Recommendation Level 2 Next certification visit 12 months Assessor’s declaration I am satisfied that sufficient clauses of the Green Dragon Environmental Standard:2006 were examined during the assessment in order to reach the above recommendation. Further comments See overleaf Date 3 April 2012 Further Comments It is implicit that in taking part in this Green Dragon inspection, and in acceptance of this report, your organisation (the client) acknowledges that it is required to be compliant with relevant environmental legislation and to manage pollution risks as applicable to your organisation. Whilst the Inspectors have reviewed compliance with legislation and have carried out an assessment of how your organisation manages risks associated with pollution, this has only been carried out by sample and you must therefore understand that there is therefore no guarantee that your organisation is compliant with all relevant legislation or that all pollution risks are adequately managed. You must also understand that legal compliance and the management of pollution risks remain at all times the responsibility of your organisation. Acceptance of this report by the client signifies that all such issues have been disclosed as part of the inspection process and agreement that any such non-compliance or incidents occurring after this visit will be notified to the Green Business Centre auditor. Green Dragon criteria assessed during the audit Level 1: Commitment to Environmental Management Level 2: Understanding Environmental Responsibilities Level 3: Managing Environmental Impacts Level 4: Environmental Management Programme Level 5: Continual environmental improvement A. Responsibility and Resources B. Environmental Review C. Environmental Policy D. Environmental Monitoring E. Improvement Plan A. Register of Legal and other requirements B. Managing legal compliance C. Emergency Preparedness D. Communication & Competence E. Environmental Records A. Environmental Aspects Register B. Evaluation of Environmental Aspects C. Control of Environmental Aspects D. Pollution Prevention Plan A. Training B. Environmental Manual C. Control of Documents E. Objectives and Targets F. Monitoring Environmental Performance G. Carbon Dioxide Data Collection H. Environmental Statement A. B. C. D. E. Reducing Greenhouse Gas Emissions F. Environmental Report Internal Audit Programme Management Review Addressing Sustainability Supply Chain D. System Procedures E. System Monitoring F. Carbon Dioxide Data Collection Summary of Findings Issues outstanding from previous visit(s) where applicable Issues closed during this visit Conclusions of visit, references to nonconformances, reasons for assessment recommendation. Green Dragon Clause reference The auditor recommends Neath Port Talbot College for Green Dragon Level 2. This is the first time the College has been audited. However, the College was able to demonstrate an ongoing commitment to continual environmental improvement. Monitoring of key environmental indicators is being undertaken and progress has been made in diverting waste from landfill (recycling waste bins are being located across the College), energy consumption is being benchmarked against best practice, and staff from the Vice Principal to technicians had a good understanding of environmental issues relating to their activities. The organisation is well placed to move up to Green Dragon Level 3/4 should they wish to do so with a draft Aspects Register having been completed. Further opportunities for improvement have been identified later in the report. If any minor non-conformances were recorded, these must be closed within the time specified by the auditor within the report or by the next audit. Please note if these are not addressed before your next reassessment, it will result in the failure of your assessment. Observations may also have been noted which may have been areas where good environmental practices have been implemented within the organisation or opportunities for improvement. Level 1 A Level 2 D iii Level 1 B ii Level 1 C Level 1 D i Observation – The College Facilities & Estates manager (Colin Heffey) is responsible for implementing and maintaining the Environmental Management System. The Vice Principal, Keith Booker, is responsible for signing key documents. Observation - It was noted that a Sustainability Management Group is in place and has been running for a number of years and is chaired by the Vice Principal (VP). Observation – An Environmental Review of the College’s operations has been completed. Observation – An Environmental Policy has been completed which meets the requirements of the Green Dragon Standard and is signed and dated by the VP. Observation – Electricity, gas and water metering is undertaken from half hourly meters. Waste streams have started to be monitored. Staff transport mileage has started to be monitored through expenses claims. The College should start to calculate the percentage of waste recycled and monitor direct public transport, College vehicle and rented vehicle usage. Level 1 E Observation – Objectives and Targets have been produced for the College. Observation – A Register of Environmental Legislation has been completed by the organisation. The organisation should register with Netregs to receive free legislative updates which can be incorporated into the Register. Level 2 A & B Observation – An emergency preparedness plan has been compiled highlighting possible emergency situations. The plan should provide links to the different control measures operated by the different departments where relevant. The Neath College Drainage Plan was made available during the audit. The College should ensure that drainage plans are available for the different sites. Spill kits have started to be located around the College in locations where there is a pollution risk. All pollution risks must be assessed and appropriate spillage kits purchased. Level 2 C Observation – A Green Dragon file has started to be compiled of key Environmental Management System documents. Level 2 E Minor non-conformance – Staff induction process does not currently include reference to environmental issues. The staff intranet site was being updated with environmental issues for staff. However, it was not available for viewing during the audit. The student handbook included reference to environmental issues. Level 2 D Minor non-conformance – A waste oil storage IBC was located next to a storm water drain with outfall pipe located directly over the drain. There was no secondary containment. It could present a pollution risk. Waste fluorescent strip lights were stored in a works office used by staff. If broken, the lights contain hazardous mercury powder. Waste segregation at the waste compound behind the construction building could be improved. Some energy efficient lighting was stored with metal waste. Paint tins were stored on a wooden pallet in the open. Signage for the skips had been removed. On the ground near to the waste compound, there were some waste items. Observation - COSHH files were checked during the audit. Some were updated and well maintained. Others were not. There should be a standard procedure across the College for maintenance of the COSHH files. Level 2 C ii Level 2 B i Observation - Asbestos identification was not formally listed in the items on the pre-contract questionnaire. On those that were seen during the audit, it was included but not as information specifically required. Level 2 C i Observation - Waste transfer/consignment note retention was sampled. Most were being retained. However, it was unclear whether all were being maintained and whether Waste Carrier Registration details were being verified for all waste streams. Some hazardous waste/Part E declarations were being retained. A waste compliance and monitoring table had started to be compiled. All waste streams should be listed according to EWCs and include validity of waste carrier registrations for waste carriers. Maintenance was being undertaken on HVAC and refrigeration units. However, there was no inventory of units/size and types of coolant gas making it hard to assess whether legal compliance was being maintained. Hazardous waste producer registrations were in place for five campuses.