Republika ng Pilipinas KAGAWARAN NG PAGAWAIN AT LANSANGANG PAMBAYAN South Cotabato District Engineering Office Koronadal City, South Cotabato September 18, 2015 INVITATION TO BID 1. The DPWH-South Cotabato District Engineering Office, through the Periodic/Special Maintenance GAA 2015 and CY-2015 Routine Maintenance Activities and CY 2015 Repair/Rehabilitation and Construction of Farm – to- Market Roads (Batch 12) FMR Projects, intends to bid out the project listed below. Bids received in excess of the ABC shall be automatically rejected at bid opening. 1. Contract ID Contract name/Location 15MG0070 Resurfacing of Unpaved Road Shoulder along Cotabato-Marbel Road, Km. 1729+500- Km. 1732+000 Source of Funds Project Cost/Allocation Approved Budget for the Contract (ABC) Contract Duration Scope of Works Routine Maintenance GAA 2015 P 1,000,000.00 P 1,000,000.00 2. Contract ID Contract name/Location 15MG0071 Repair/Rehab./Replacement of Damage Concrete Along Midsayap-Marbel Road, Km. 1769+070-Km. 1776+900 (Intermittent); Surallah- Lake Sebu-Maitum Road, Km. 1755+100-Km. 1758+900 (intermittent),Cotabato-Marbel Road, Km.1710+837.80-Km.1711+337.80 (Intermittent), Tantangan and Lake Sebu, South Cotabato Source of Funds Project Cost/Allocation Approved Budget for the Contract (ABC) Contract Duration Scope of Works Routine Maintenance GAA 2015 P 1,000,000.00 P 1,000,000.00 3. Contract ID Contract name/Location 15MG0072 Concreting of Sitio Sto. Niño, Brgy. Carpenter Hill FMR, Carpenter Hill, Koronadal City, South Cotabato Source of Funds Project Cost/Allocation Approved Budget for the Contract (ABC) Contract Duration Scope of Works FY 2014 RA 10633 continuing Regular 2014 Continuing P 5,000,000.00 P 4,975,000.00 15 C.D Regravelling 60 C.D Reblocking 75 C.D Concreting of Road 2. The Department of Public Works and Highways now invites bids for the above-mentioned projects. Bidders should have completed, within (10) years from the date of submission and receipt of bids, a single contract similar to the Project, equivalent to at least fifty percent (50%) of the ABC. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II, Instruction to Bidders. 3. Bidding will be conducted through an open competitive bidding procedures using non-discretionary pass/fail criterion as specified in the Revised IRR, RA 9184, otherwise known as “The Government Procurement Act”. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least seventy five percent (75%) interest or outstanding capital stock belonging to citizens of the Philippines. 4. Contractors/applicants who are interested in the DPWH civil works are required to register prior to the set schedule of submission of bid while those already registered shall keep their records current and updated. Contractor’s eligibility to bid in the project will be determined using DPWH Contractor Profile Eligibility Process (CPEP) and subject to further post-qualification. Information on registration can be obtained at DPWH website www.dpwh.gov.ph or at the Department of Public Works and Highways, South Cotabato District Engineering Office, Koronadal City from Monday to Friday between 8:00 A.M. to 5:00 P.M. 5. A complete set of Bidding Documents maybe purchased by interested bidders from the address below and upon payment of a non-refundable fee for Bidding Documents in the amount of Php 1,000.00 each for Item Nos. 1 & 2 and Php 5,000.00 for Item No. 3. It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the DPWH, provided that the bidders shall pay the fee for the Bidding Documents not later than the submission of their bids. 6. The DPWH – South Cotabato District Engineering Office will hold a Pre-Bid Conference on September 28, 2015, 2:00 P.M. at the Conference Hall, DPWH-SCDEO, Alunan Avenue, Koronadal City, which shall be open only to all interested parties who have purchased the Bidding Documents. 7. Interested bidders may obtain further information from the Department of Public Works and Highways, South Cotabato District Engineering Office, Alunan Avenue, Koronadal City and inspect the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M. 8. To afford sufficient time to update Contractors’ records in the Civil Works Registry (CWR), all Prospective Bidders shall submit their Class “A” Documents and Financial Statements at least seven (7) calendar days and their Technical Documents (Completed/On-going projects) at least fifteen (15) calendar days before the deadline for submission of opening of bids to the DPWH-Civil Works Registry (D.O. NO. 3, Series of 2015 – Prescribing the Minimum Period for the Submission of Legal, Technical and Financial Documents to the DPWH – Civil Works Registry). 9. Bids must be delivered on or before October 12, 2015, on or before 10:00 A.M. at the Conference Room, DPWH-SCDEO, Alunan Avenue, Koronadal City. All bids must be accompanied by a bid security in any acceptable forms and in the amount stated in ITB Clause 18.1. Bids will be opened at 2:00 P.M. on the same day, in the presence of the bidder’s representatives who choose to attend at the aforesaid address. Late bids shall not be accepted. 10. The DPWH – South Cotabato District Engineering Office, Koronadal City, reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award without thereby incurring any liability to the affected bidder/s. 11. For further information, please refer to: ANGEL A. BURGOS, JR. Engineer III Head, BAC Secretariat DPWH-SCDEO, Alunan Avenue, Koronadal City, South Cotabato Tel. No. (083)228-3200 loc. 77634 BERNARDO D. HAMBALA Engineer III BAC- Vice Chairman Noted By: EDDIE M. AMIR District Engineer BAC-09/21pub Republic of the Philippines Department of Public Works And Highways OFFICE OF THE DISTRICT ENGINEER South Cotabato District Engineering Office Koronadal City, South Cotabato September 18, 2015 FORM NR 002 Region/District Office Project/Contract ID Project/Contract Name : XII/ South Cotabato District Engineering Office : 15MG0070 : Resurfacing of Unpaved Road Shoulder along Cotabato-Marbel Road, Km. 1729+500Km. 1732+000 Project Location : South Cotabato Contract Duration (CD) : 15C.D. Approved Budget for the Contract (ABC) = P 1,000,000.00 Name of Newspaper for this Advertisement: DPWH Website/ PhilGEPS Date of Advertisement : September 21, 2015 Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City Cost of Bid Documents : P 1,000.00 Major Categories of Work Unit of Measure MRB Km Dimension Cost of Estimates or each Major Category of Work 2.50 Similar Major Categories of Work P 1,000,000.00 RRG MAJOR CATEGORIES OF WORK TABLE Code BCD BCC BCS BCP BIH BIL BRB BRC BRR BRS BRP FHG FHD FHP FHN FHR FHW Category of Description Bridges-Construction-Bailey Bridges-Construction-Concrete Bridges-Construction Steel Bridges-Construction-With Bored Pile Buildings/Industrial Plant-HIGH Rise Buildings/Industrial Plant-LOW Rise Bridges-Rehabilitation-Bailey Bridges-Rehabilitation-Concrete Bridges-Rehabilitation-Retrofitting Bridges-Rehabilitation-Steel Bridges-Rehabilitation-With Bored Piles Flood Control/Hydraulics/Dredging Flood Control/Hydraulics/Dams Flood Control/Hydraulics/Pumping Station Flood Control/Hydraulics/Drainage Flood Control/Hydraulics/River Control Flood Control/Hydraulics/Water Supply Implementing Office Signature: Dimension Unit of Measure Lm Lm Lm Lm Stories Stories Lm Lm Lm Lm Lm Lm Lm Unit Lm Lm Lm BERNARDO D. HAMBALA Engineer III BAC- Vice Chairman Code MBG MFC MRB PHC PHW RCA RCG RCP RRA RRG RRP TEA TEP TES TEG FEN Category of Work Description Maintenance Buildings Maintenance Flood Control Maintenance Roads and Bridges Ports/Harbors-Causeway Ports/Harbors-Wharf Roads/New Construction-Asphalt Roads-New Construction-Gravel Roads-New Construction-PCCP Roads-Rehabilitation-Asphalt Roads-Rehabilitation-Gravel Roads-Rehabilitation-PCCP Traffic-Engineering-Signage Traffic-Engineering-Pavement Markings Traffic Engineering-Signalization Traffic Engineering Guardrails Perimeter Fence Date : 09/18/15 Dimension Unit of Measure Stories Cm Km Km Lm km km km km km km pieces lm set lin.m. Sq.m. Republic of the Philippines Department of Public Works And Highways OFFICE OF THE DISTRICT ENGINEER South Cotabato District Engineering Office Koronadal City, South Cotabato September 18, 2015 FORM NR 002 Region/District Office Project/Contract ID Project/Contract Name : XII/ South Cotabato District Engineering Office : 15MG0071 : Repair/Rehab./Replacement of Damage Concrete Along Midsayap-Marbel Road, Km. 1769+070- Km. 1776+900 (Intermittent); Surallah- Lake Sebu-Maitum Road, Km. 1755+100- Km. 1758+900 (intermittent), Cotabato-Marbel Road, Km. 1710+837.80Km. 1711+337.80 (Intermittent), Project Location : Tantangan, and Lake Sebu, South Cotabato Contract Duration (CD) : 60C.D. Approved Budget for the Contract (ABC) = P 1,000,000.00 Name of Newspaper for this Advertisement: DPWH Website/ PhilGEPS Date of Advertisement : September 21, 2015 Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City Cost of Bid Documents : P 1,000.00 Major Categories of Work Unit of Measure MRB Km Dimension Cost of Estimates or each Major Category of Work 0.09 Similar Major Categories of Work P 1,000,000.00 RRP MAJOR CATEGORIES OF WORK TABLE Code BCD BCC BCS BCP BIH BIL BRB BRC BRR BRS BRP FHG FHD FHP FHN FHR FHW Category of Description Bridges-Construction-Bailey Bridges-Construction-Concrete Bridges-Construction Steel Bridges-Construction-With Bored Pile Buildings/Industrial Plant-HIGH Rise Buildings/Industrial Plant-LOW Rise Bridges-Rehabilitation-Bailey Bridges-Rehabilitation-Concrete Bridges-Rehabilitation-Retrofitting Bridges-Rehabilitation-Steel Bridges-Rehabilitation-With Bored Piles Flood Control/Hydraulics/Dredging Flood Control/Hydraulics/Dams Flood Control/Hydraulics/Pumping Station Flood Control/Hydraulics/Drainage Flood Control/Hydraulics/River Control Flood Control/Hydraulics/Water Supply Implementing Office Signature: Dimension Unit of Measure Lm Lm Lm Lm Stories Stories Lm Lm Lm Lm Lm Lm Lm Unit Lm Lm Lm BERNARDO D. HAMBALA Engineer III BAC- Vice Chairman Code MBG MFC MRB PHC PHW RCA RCG RCP RRA RRG RRP TEA TEP TES TEG FEN Category of Work Description Maintenance Buildings Maintenance Flood Control Maintenance Roads and Bridges Ports/Harbors-Causeway Ports/Harbors-Wharf Roads/New Construction-Asphalt Roads-New Construction-Gravel Roads-New Construction-PCCP Roads-Rehabilitation-Asphalt Roads-Rehabilitation-Gravel Roads-Rehabilitation-PCCP Traffic-Engineering-Signage Traffic-Engineering-Pavement Markings Traffic Engineering-Signalization Traffic Engineering Guardrails Perimeter Fence Date : 09/18/15 Dimension Unit of Measure Stories Cm Km Km Lm km km km km km km pieces lm set lin.m. Sq.m. Republic of the Philippines Department of Public Works And Highways OFFICE OF THE DISTRICT ENGINEER South Cotabato District Engineering Office Koronadal City, South Cotabato September 18, 2015 FORM NR 002 Region/District Office Project/Contract ID Project/Contract Name : XII/ South Cotabato District Engineering Office : 15MG0072 : Concreting of Sitio Sto. Niño, Brgy. Carpenter Hill FMR, Carpenter Hill, Koronadal City, South Cotabato Project Location : South Cotabato Contract Duration (CD) : 75C.D Approved Budget for the Contract (ABC) = P 4,975,000.00 Name of Newspaper for this Advertisement: DPWH Website/PhilGEPS Date of Advertisement : September 21, 2015 Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City Cost of Bid Documents : P 5,000.00 Major Categories of Work Unit of Measure RCP Km Dimension Cost of Estimates or each Major Category of Work 0.490 Similar Major Categories of Work P 4,975,000.00 RRP MAJOR CATEGORIES OF WORK TABLE Code BCD BCC BCS BCP BIH BIL BRB BRC BRR BRS BRP FHG FHD FHP FHN FHR FHW Category of Description Bridges-Construction-Bailey Bridges-Construction-Concrete Bridges-Construction Steel Bridges-Construction-With Bored Pile Buildings/Industrial Plant-HIGH Rise Buildings/Industrial Plant-LOW Rise Bridges-Rehabilitation-Bailey Bridges-Rehabilitation-Concrete Bridges-Rehabilitation-Retrofitting Bridges-Rehabilitation-Steel Bridges-Rehabilitation-With Bored Piles Flood Control/Hydraulics/Dredging Flood Control/Hydraulics/Dams Flood Control/Hydraulics/Pumping Station Flood Control/Hydraulics/Drainage Flood Control/Hydraulics/River Control Flood Control/Hydraulics/Water Supply Implementing Office Signature: Dimension Unit of Measure Lm Lm Lm Lm Stories Stories Lm Lm Lm Lm Lm Lm Lm Unit Lm Lm Lm BERNARDO D. HAMBALA Engineer III BAC- Vice Chairman Code MBG MFC MRB PHC PHW RCA RCG RCP RRA RRG RRP TEA TEP TES TEG FEN Category of Work Description Maintenance Buildings Maintenance Flood Control Maintenance Roads and Bridges Ports/Harbors-Causeway Ports/Harbors-Wharf Roads/New Construction-Asphalt Roads-New Construction-Gravel Roads-New Construction-PCCP Roads-Rehabilitation-Asphalt Roads-Rehabilitation-Gravel Roads-Rehabilitation-PCCP Traffic-Engineering-Signage Traffic-Engineering-Pavement Markings Traffic Engineering-Signalization Traffic Engineering Guardrails Perimeter Fence Date : 09/18/15 Dimension Unit of Measure Stories Cm Km Km Lm km km km km km km pieces lm set lin.m. Sq.m.