invitation to bid

advertisement
Republika ng Pilipinas
KAGAWARAN NG PAGAWAIN AT LANSANGANG PAMBAYAN
South Cotabato District Engineering Office
Koronadal City, South Cotabato
September 18, 2015
INVITATION TO BID
1.
The DPWH-South Cotabato District Engineering Office, through the Periodic/Special Maintenance
GAA
2015 and CY-2015 Routine Maintenance Activities and CY 2015 Repair/Rehabilitation and
Construction
of Farm – to- Market Roads (Batch 12) FMR Projects, intends to bid out the
project listed below. Bids
received in
excess of the ABC
shall be automatically
rejected at bid opening.
1. Contract ID
Contract name/Location
15MG0070
Resurfacing of Unpaved Road Shoulder along Cotabato-Marbel
Road, Km. 1729+500- Km. 1732+000
Source of Funds
Project Cost/Allocation
Approved Budget for the
Contract (ABC)
Contract Duration
Scope of Works
Routine Maintenance GAA 2015
P 1,000,000.00
P 1,000,000.00
2. Contract ID
Contract name/Location
15MG0071
Repair/Rehab./Replacement of Damage Concrete Along
Midsayap-Marbel Road, Km. 1769+070-Km. 1776+900
(Intermittent); Surallah- Lake Sebu-Maitum Road, Km.
1755+100-Km. 1758+900 (intermittent),Cotabato-Marbel
Road,
Km.1710+837.80-Km.1711+337.80
(Intermittent),
Tantangan and Lake Sebu, South Cotabato
Source of Funds
Project Cost/Allocation
Approved Budget for the
Contract (ABC)
Contract Duration
Scope of Works
Routine Maintenance GAA 2015
P 1,000,000.00
P 1,000,000.00
3. Contract ID
Contract name/Location
15MG0072
Concreting of Sitio Sto. Niño, Brgy. Carpenter Hill FMR,
Carpenter Hill, Koronadal City, South Cotabato
Source of Funds
Project Cost/Allocation
Approved Budget for the
Contract (ABC)
Contract Duration
Scope of Works
FY 2014 RA 10633 continuing Regular 2014 Continuing
P 5,000,000.00
P 4,975,000.00
15 C.D
Regravelling
60 C.D
Reblocking
75 C.D
Concreting of Road
2.
The Department of Public Works and Highways now invites bids for the above-mentioned projects.
Bidders should have completed, within (10) years from the date of submission and receipt of bids, a
single contract similar to the Project, equivalent to at least fifty percent (50%) of the ABC. The
description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II,
Instruction to Bidders.
3.
Bidding will be conducted through an open competitive bidding procedures using non-discretionary
pass/fail criterion as specified in the Revised IRR, RA 9184, otherwise known as
“The Government Procurement Act”.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least
seventy five percent (75%) interest or outstanding capital stock belonging to citizens of the
Philippines.
4.
Contractors/applicants who are interested in the DPWH civil works are required to register prior to the
set schedule of submission of bid while those already registered shall keep their records current and
updated. Contractor’s eligibility to bid in the project will be determined using DPWH Contractor Profile
Eligibility Process (CPEP) and subject to further post-qualification. Information on registration can be
obtained at DPWH website www.dpwh.gov.ph or at the Department of Public Works and Highways,
South Cotabato District Engineering Office, Koronadal City from Monday to Friday between 8:00 A.M.
to 5:00 P.M.
5.
A complete set of Bidding Documents maybe purchased by interested bidders from the address below
and upon payment of a non-refundable fee for Bidding Documents in the amount of Php 1,000.00
each for Item Nos. 1 & 2 and Php 5,000.00 for Item No. 3.
It may also be downloaded free of charge from the website of the Philippine Government Electronic
Procurement System (PhilGEPS) and the website of the DPWH, provided that the bidders shall pay the
fee for the Bidding Documents not later than the submission of their bids.
6.
The DPWH – South Cotabato District Engineering Office will hold a Pre-Bid Conference on
September 28, 2015, 2:00 P.M. at the Conference Hall, DPWH-SCDEO, Alunan Avenue, Koronadal
City, which shall be open only to all interested parties who have purchased the Bidding Documents.
7.
Interested bidders may obtain further information from the Department of Public Works and
Highways, South Cotabato District Engineering Office, Alunan Avenue, Koronadal City and inspect the
Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M.
8.
To afford sufficient time to update Contractors’ records in the Civil Works Registry (CWR), all
Prospective Bidders shall submit their Class “A” Documents and Financial Statements at least
seven (7) calendar days and their Technical Documents (Completed/On-going projects) at
least fifteen (15) calendar days before the deadline for submission of opening of bids to
the DPWH-Civil Works Registry (D.O. NO. 3, Series of 2015 – Prescribing the Minimum Period for
the Submission of Legal, Technical and Financial Documents to the DPWH – Civil Works Registry).
9.
Bids must be delivered on or before October 12, 2015, on or before 10:00 A.M. at the Conference
Room, DPWH-SCDEO, Alunan Avenue, Koronadal City. All bids must be accompanied by a bid security
in any acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened at 2:00 P.M. on the same day, in the presence of the bidder’s
representatives who choose to attend at the aforesaid address. Late bids shall not be accepted.
10.
The DPWH – South Cotabato District Engineering Office, Koronadal City, reserves the right to accept
or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract
award without thereby incurring any liability to the affected bidder/s.
11.
For further information, please refer to:
ANGEL A. BURGOS, JR.
Engineer III
Head, BAC Secretariat
DPWH-SCDEO, Alunan Avenue,
Koronadal City, South Cotabato
Tel. No. (083)228-3200 loc. 77634
BERNARDO D. HAMBALA
Engineer III
BAC- Vice Chairman
Noted By:
EDDIE M. AMIR
District Engineer
BAC-09/21pub
Republic of the Philippines
Department of Public Works And Highways
OFFICE OF THE DISTRICT ENGINEER
South Cotabato District Engineering Office
Koronadal City, South Cotabato
September 18, 2015
FORM NR 002
Region/District Office
Project/Contract ID
Project/Contract Name
: XII/ South Cotabato District Engineering Office
: 15MG0070
: Resurfacing of Unpaved Road Shoulder along Cotabato-Marbel Road, Km. 1729+500Km. 1732+000
Project Location
: South Cotabato
Contract Duration (CD)
: 15C.D.
Approved Budget for the Contract (ABC) = P 1,000,000.00
Name of Newspaper for this Advertisement: DPWH Website/ PhilGEPS
Date of Advertisement
: September 21, 2015
Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City
Cost of Bid Documents
: P 1,000.00
Major Categories of
Work
Unit of
Measure
MRB
Km
Dimension
Cost of Estimates or
each
Major Category of
Work
2.50
Similar Major Categories
of Work
P 1,000,000.00
RRG
MAJOR CATEGORIES OF WORK TABLE
Code
BCD
BCC
BCS
BCP
BIH
BIL
BRB
BRC
BRR
BRS
BRP
FHG
FHD
FHP
FHN
FHR
FHW
Category of Description
Bridges-Construction-Bailey
Bridges-Construction-Concrete
Bridges-Construction Steel
Bridges-Construction-With Bored Pile
Buildings/Industrial Plant-HIGH Rise
Buildings/Industrial Plant-LOW Rise
Bridges-Rehabilitation-Bailey
Bridges-Rehabilitation-Concrete
Bridges-Rehabilitation-Retrofitting
Bridges-Rehabilitation-Steel
Bridges-Rehabilitation-With Bored Piles
Flood Control/Hydraulics/Dredging
Flood Control/Hydraulics/Dams
Flood Control/Hydraulics/Pumping Station
Flood Control/Hydraulics/Drainage
Flood Control/Hydraulics/River Control
Flood Control/Hydraulics/Water Supply
Implementing Office Signature:
Dimension
Unit of
Measure
Lm
Lm
Lm
Lm
Stories
Stories
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Unit
Lm
Lm
Lm
BERNARDO D. HAMBALA
Engineer III
BAC- Vice Chairman
Code
MBG
MFC
MRB
PHC
PHW
RCA
RCG
RCP
RRA
RRG
RRP
TEA
TEP
TES
TEG
FEN
Category of Work
Description
Maintenance Buildings
Maintenance Flood Control
Maintenance Roads and Bridges
Ports/Harbors-Causeway
Ports/Harbors-Wharf
Roads/New Construction-Asphalt
Roads-New Construction-Gravel
Roads-New Construction-PCCP
Roads-Rehabilitation-Asphalt
Roads-Rehabilitation-Gravel
Roads-Rehabilitation-PCCP
Traffic-Engineering-Signage
Traffic-Engineering-Pavement Markings
Traffic Engineering-Signalization
Traffic Engineering Guardrails
Perimeter Fence
Date : 09/18/15
Dimension
Unit of
Measure
Stories
Cm
Km
Km
Lm
km
km
km
km
km
km
pieces
lm
set
lin.m.
Sq.m.
Republic of the Philippines
Department of Public Works And Highways
OFFICE OF THE DISTRICT ENGINEER
South Cotabato District Engineering Office
Koronadal City, South Cotabato
September 18, 2015
FORM NR 002
Region/District Office
Project/Contract ID
Project/Contract Name
: XII/ South Cotabato District Engineering Office
: 15MG0071
: Repair/Rehab./Replacement of Damage Concrete Along Midsayap-Marbel Road, Km.
1769+070- Km. 1776+900 (Intermittent); Surallah- Lake Sebu-Maitum Road, Km.
1755+100- Km. 1758+900 (intermittent), Cotabato-Marbel Road, Km. 1710+837.80Km. 1711+337.80 (Intermittent),
Project Location
: Tantangan, and Lake Sebu, South Cotabato
Contract Duration (CD)
: 60C.D.
Approved Budget for the Contract (ABC) = P 1,000,000.00
Name of Newspaper for this Advertisement: DPWH Website/ PhilGEPS
Date of Advertisement
: September 21, 2015
Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City
Cost of Bid Documents
: P 1,000.00
Major Categories of
Work
Unit of
Measure
MRB
Km
Dimension
Cost of Estimates or
each
Major Category of
Work
0.09
Similar Major Categories
of Work
P 1,000,000.00
RRP
MAJOR CATEGORIES OF WORK TABLE
Code
BCD
BCC
BCS
BCP
BIH
BIL
BRB
BRC
BRR
BRS
BRP
FHG
FHD
FHP
FHN
FHR
FHW
Category of Description
Bridges-Construction-Bailey
Bridges-Construction-Concrete
Bridges-Construction Steel
Bridges-Construction-With Bored Pile
Buildings/Industrial Plant-HIGH Rise
Buildings/Industrial Plant-LOW Rise
Bridges-Rehabilitation-Bailey
Bridges-Rehabilitation-Concrete
Bridges-Rehabilitation-Retrofitting
Bridges-Rehabilitation-Steel
Bridges-Rehabilitation-With Bored Piles
Flood Control/Hydraulics/Dredging
Flood Control/Hydraulics/Dams
Flood Control/Hydraulics/Pumping Station
Flood Control/Hydraulics/Drainage
Flood Control/Hydraulics/River Control
Flood Control/Hydraulics/Water Supply
Implementing Office Signature:
Dimension
Unit of
Measure
Lm
Lm
Lm
Lm
Stories
Stories
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Unit
Lm
Lm
Lm
BERNARDO D. HAMBALA
Engineer III
BAC- Vice Chairman
Code
MBG
MFC
MRB
PHC
PHW
RCA
RCG
RCP
RRA
RRG
RRP
TEA
TEP
TES
TEG
FEN
Category of Work
Description
Maintenance Buildings
Maintenance Flood Control
Maintenance Roads and Bridges
Ports/Harbors-Causeway
Ports/Harbors-Wharf
Roads/New Construction-Asphalt
Roads-New Construction-Gravel
Roads-New Construction-PCCP
Roads-Rehabilitation-Asphalt
Roads-Rehabilitation-Gravel
Roads-Rehabilitation-PCCP
Traffic-Engineering-Signage
Traffic-Engineering-Pavement Markings
Traffic Engineering-Signalization
Traffic Engineering Guardrails
Perimeter Fence
Date : 09/18/15
Dimension
Unit of
Measure
Stories
Cm
Km
Km
Lm
km
km
km
km
km
km
pieces
lm
set
lin.m.
Sq.m.
Republic of the Philippines
Department of Public Works And Highways
OFFICE OF THE DISTRICT ENGINEER
South Cotabato District Engineering Office
Koronadal City, South Cotabato
September 18, 2015
FORM NR 002
Region/District Office
Project/Contract ID
Project/Contract Name
: XII/ South Cotabato District Engineering Office
: 15MG0072
: Concreting of Sitio Sto. Niño, Brgy. Carpenter Hill FMR, Carpenter Hill, Koronadal City,
South Cotabato
Project Location
: South Cotabato
Contract Duration (CD)
: 75C.D
Approved Budget for the Contract (ABC) = P 4,975,000.00
Name of Newspaper for this Advertisement: DPWH Website/PhilGEPS
Date of Advertisement
: September 21, 2015
Issuance of Bidding Documents : September 21- October 12, 2015 at the BAC Office, DPWH, Koronadal City
Cost of Bid Documents
: P 5,000.00
Major Categories of
Work
Unit of
Measure
RCP
Km
Dimension
Cost of Estimates or
each
Major Category of
Work
0.490
Similar Major Categories
of Work
P 4,975,000.00
RRP
MAJOR CATEGORIES OF WORK TABLE
Code
BCD
BCC
BCS
BCP
BIH
BIL
BRB
BRC
BRR
BRS
BRP
FHG
FHD
FHP
FHN
FHR
FHW
Category of Description
Bridges-Construction-Bailey
Bridges-Construction-Concrete
Bridges-Construction Steel
Bridges-Construction-With Bored Pile
Buildings/Industrial Plant-HIGH Rise
Buildings/Industrial Plant-LOW Rise
Bridges-Rehabilitation-Bailey
Bridges-Rehabilitation-Concrete
Bridges-Rehabilitation-Retrofitting
Bridges-Rehabilitation-Steel
Bridges-Rehabilitation-With Bored Piles
Flood Control/Hydraulics/Dredging
Flood Control/Hydraulics/Dams
Flood Control/Hydraulics/Pumping Station
Flood Control/Hydraulics/Drainage
Flood Control/Hydraulics/River Control
Flood Control/Hydraulics/Water Supply
Implementing Office Signature:
Dimension
Unit of
Measure
Lm
Lm
Lm
Lm
Stories
Stories
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Unit
Lm
Lm
Lm
BERNARDO D. HAMBALA
Engineer III
BAC- Vice Chairman
Code
MBG
MFC
MRB
PHC
PHW
RCA
RCG
RCP
RRA
RRG
RRP
TEA
TEP
TES
TEG
FEN
Category of Work
Description
Maintenance Buildings
Maintenance Flood Control
Maintenance Roads and Bridges
Ports/Harbors-Causeway
Ports/Harbors-Wharf
Roads/New Construction-Asphalt
Roads-New Construction-Gravel
Roads-New Construction-PCCP
Roads-Rehabilitation-Asphalt
Roads-Rehabilitation-Gravel
Roads-Rehabilitation-PCCP
Traffic-Engineering-Signage
Traffic-Engineering-Pavement Markings
Traffic Engineering-Signalization
Traffic Engineering Guardrails
Perimeter Fence
Date : 09/18/15
Dimension
Unit of
Measure
Stories
Cm
Km
Km
Lm
km
km
km
km
km
km
pieces
lm
set
lin.m.
Sq.m.
Download