Risk Assessment - Health, Safety and Emergency Management

advertisement
Health, Safety and Emergency Management (HSEM)
Risk Assessment (RA)
HSEM assistance with the RA process is available. Please allow a 5 day turnaround for feedback.
Activity / Task / Location:
Date:
Developed by:
Approved By:
Hazard Identification
Risk
Assessment
Control
Residual
Risk
Assessment
Version 2.1
Uncontrolled document when printed
Date Finalised
6. Personal Protective Equipment (PPE) eg: gloves, goggles
to implement the
5. Administrative eg: Safe Work Procedure, training;
changes
4. Engineering eg: guarding, separation, redesign;
Risk Score
3. Isolate eg: enclosures, restricted access;
Likelihood
2. Substitute eg: replace with less hazardous process, material
Consequence
Risk Score
Likelihood
Potential Hazards
Consequence
Activity
1. Eliminate, eg: eliminate task, remove hazard
Who is responsible
Risk Control Measures
Health and Safety
Page 1 of 2
Health, Safety and Emergency Management (HSEM)
Risk Assessment (RA)
Health & Safety Risk Matrix
DETERMINING THE RISK LEVEL: Risk Level = Consequence Level x Likelihood Level
Maximum Foreseeable Exposure: For each risk, select the expected Consequence Level and the expected Likelihood Level assuming controls are either not in place or
controls fail.
Residual Risk Exposure: For each risk, select the expected Consequence Level and the expected Likelihood Level given the type and effectiveness of the controls that are in
place.Risk Response: Apply the appropriate response based on the assessed Risk Level
LIKELIHOOD DESCRIPTION
LIKELIHOOD
The event may occur
only in exceptional
circumstances
IMPACTS
Not expected but the
event may occur at
some time
The event could occur
at some time
The event is expected to occur or
has occurred and is continuing to
impact
Likelihood Level
Health and Safety
Rare
Fatality
Unlikely
Possible
Critical
Permanent Partial Disability
Serious injury or illness.
Lost time injury >10 days
Injury or illness requiring medical
treatment
Consequence Level
Significant/extensive injury or
illness.
Major
Almost Certain
High
Moderate
Minor
Likely
Extreme
Permanent Total Disability
CONSEQUENCE DESCRIPTION
The event will probably
occur in most
circumstances
Medium
Low
Lost time injury <10 days
Injury or illness requiring First Aid
treatment
Insignificant
No lost time injury days
RISK MANAGEMENT ACTION
RISK LEVEL
Extreme
High
Medium
Low
Version 2.1
RESPONSE
Immediate action required to reduce exposure. A detailed mitigation plan must be developed, implemented and monitored by senior management to reduce the risk to as low as reasonably
practicable.
A mitigation plan shall be developed and authorised by area manager or supervisor to reduce the risk to as low as reasonably practicable. The effectiveness of risk control strategies shall be
monitored and reported to management and relevant committee.
A mitigation plan shall be developed. Control strategies are implemented and periodically monitored.
Manage by documented routine processes and procedures, monitor periodically to determine situation changes which may affect the risk
Uncontrolled document when printed
Health and Safety
Page 2 of 2
Download