Final Agenda

advertisement
Draft Agenda
Wednesday March 30th, 2010 2-4 pm: PERF Board Meeting(34F01)
DAY 1 : Thursday March 31st
Time
Area
Objectives
Interests
Contents
8h
8h30
Registration and Continental Breakfast – Lobby and Espace Cocktail
Welcome to TOTAL Coupole including safety rules and agenda review
9h
Introductions and PERF Overview
SESSION 1 : Identification and technical understanding of sources of risks
9h30
Characterization of atmospheric Better understanding of PM
pollutants – Formation of secondary pollutants
particulate matter
10h00
VOC emissions – TBD
VOC quantification
To 10h40
BREAK - Espace Cocktail
10h40
Optical Gas Imaging: EU position
11h10
11H40
12H50
12H50
1h10
1h30
confirmed speaker Comments
or contacted
Bertrand
DE Congres A/B
NADAILLAC, TOTAL
Todd RIRIE, BP,
Chair
Christian SEIGNEUR,
CEREA
Pete
Roberts, Title by Friday
CONCAWE
New strategy Francois LEOTOING,
of
risk TOTAL
management
Environment
and
water Techniques comparison to Case study on a Ben
Kampala,
management:
optimizing
our assess impacts
E&P site
TOTAL
methods of impacts assessment
– LUNCH BREAK – including PERF business review (update on current projects and proposal)- Espace Cocktail
Monitoring environmental risks in Evolution of process risks
CCS process
CCS
Frederique
MICHAUD, TOTAL
TBD New technologies risks
Evolution of process risks
CCS
Shell
Or Statoil ?
TBD New technologies risks
Evolution of process risks
CCS
GEOGREEN
Pierre LE THIEZ non
available
Time
Area
Objectives
SESSION 2: Management of environmental risks
2h00
Sharing
practices:
Total
– Case study
Environmental Risk Estimation - ERE Methodology
Interests
Contents
Tolerance
F. PERIE or
Implementation P.
MICHELIER,
TOTAL
Andrew Glickman,
CHEVRON
2h20
Environmental Risk Management – Case study
Chevron
Methodology
To 3h
3h
BREAK - Espace Cocktail
Sharing practices on environmental Case study
risk management methodology
Methodology
3h30
Sharing practices on environmental Case study
risk management methodology
Methodology
4h
Panel Discussions : 1 representative Identify and understand Gaps
by Oil and Gas company
gaps
+/Environmental Risk Management
Post – macondo: measures in terms
of reducing both probability and
impact of potential threats
Traditional risk analysis versus
decision analysis
ADJOURNEMENT AND RECEPTION
4h40
5h10
5h30
confirmed speaker Potential experts to
or contact
contact or
Comments
-
ExxonMobil
-
Joan Wales, BP
Total, Chevron, BP, And Statoil ?
ExxonMobil,
Peter COLLINSON,
BP
James Cunningham,
RTI
DAY 2 : Friday April 1st
Time
Area
Objectives
Interests
Contents
8h
Continental Breakfast - Espace Cocktail
8h15
Welcome , day 1 feedbacks and agenda review
SESSION 2 continuation: Management of environmental risks
8h30
The dangers of confusing hazard Regulation OSPAR area
and risk in international regulations Methodology
9h00
9h30
9h50
To 10h30
10h30
Ben
SHELL
11h30
Overview of existing technologies Define technical aspects
and best practices in early leak
detection
Early leak detection SensorsPipelines
GOWLAND,
Dr Mansor Kashir,
Saudi Aramco
Ronald Richa and
Karim
Essemiani,
VEOLIA Water
Ibrahim
Nassar,
Saudi Aramco
Risk assessment model on legacy oil
pits
BREAK - Espace Cocktail
Prevention of soil pollution
Guidelines
CO2 Soil Gas Survey Method for
Identification of Free Phase
Hydrocarbons in Groundwater
11h50
F. PERIE, TOTAL
Groundwater protection program
and the use of risk assessment
analyses
Water Risk Assessment
Regulation
Water Impact Index
11h00
confirmed speaker Potential experts to
or contact)
contact or
Comments
Sandrine DEMEURE,
TOTAL Petro
Mr. Ali Shamrani,
Saudi Aramco
Guidelines
Jean
TOTAL
GRENIER,
Imogene BLIGNAUT,
DCU
Congres A/B
Time
Area
RESEARCH DISCUSSIONS
12H10
Organization of discussions
Maybe 5-6 groups of 8 people:
Objectives
Interests
Contents
confirmed speaker Potential experts to
or contact
contact or
Comments
Split up attendance into GROUP 1 : Air Emissions concerns: fate, modeling, monitoring,
workgroups (16 people effects on health (Catherine JUERY)
max)
GROUP 2: Emerging technology risks – CCS: Monitoring, risk
estimation, Impacts (F.MICHAUD)
GROUP 3: Environmental Risk Management methodologies –
its limits? Parallel upstream/downstream? confidence ?
acceptability level? (F.PERIE)
GROUP 4: Water Modeling and Monitoring tools – new
potential ways to prove non hazardous emission in the
environment (TBD)how to validate new methods and models ?
GROUP 5 : Prevention measures and management (S.
DEMEURE) – A detailler
GROUP 6: depending on the attendance (if more than 40) and
the meeting
12h20
1h
LUNCH BREAK - Espace Cocktail
Brainstorming by workgroups
2h30
2h45
BREAK – Preparation Report Out - Espace Cocktail
Report Out
10 min by workgroup
Next steps
Sign-up sheet
Summarization of research needs
ADJOURNMENT OF THE MEETING
4h
4h30
Topic, Objectives, Approach/Deliverables
Arguments, Interested companies
4 F 01 –10 F 06 –10 Plan 1 reporter by
G 06 –34 F 01
workgroup
+ 2 in conf room
Download