CHEHALIS BASIN LEAD ENTITY CONCEPTUAL PROJECT FORM Please provide as much information as you can. The highlighted sections are mandatory. PROJECT INFORMATION COMPLETE ALL MANDATORY HIGHLIGHTED SECTIONS Project Name Category: restoration/acquisition/combined Start/End Date (i.e., 6/2012-6-2013) (estimated) Description Project Location (latitude/longitude) Project Contact (name, phone) Lead Entity Coordinator Photos and Documents Please attach photographs, maps, supporting documents Chehalis Basin Management Unit (Management Units: Black River, Boistfort, Chehalis Mainstem, Cloquallum, Grays Harbor Estuary, HoquiamWishkah, Humptulips, Lincoln Creek, Newaukum, Satsop, Skookumchuck, South Bay, Wynoochee River) ACQUISITIONS / EASEMENTS / LEASES Nearshore or estuarine areas protected Streambank or riparian protected Upland protected Wetland areas protected ESTUARINE & NEARSHORE Beach nourishment Berm or Dike Removal or Modification Channel modification/ creation Contaminant removal and remediation Culvert modification - culvert imp. Culvert modification – culvert removal Culvert modification – culvert replacement Debris removal Groin removal or modification Hydrological manipulation Invasive species control Large wood placement Overwater structure removal / modification Physical exclusion Pollution control Reintroduction of native animals Revegetation Shoreline armor removal or modification Species habitat enhancement Substrate modification Topography restoration or creation FISH PASSAGE Bridge installed Culvert improvements / upgrades Culvert installed Fish ladder installed / improved Fish passage blockages removed or altered Chehalis Lead Entity Conceptual Project Form Fishway chutes or pools installed Number of miles upstream made accessible Road-crossing removal Rocked ford – road stream crossing Square miles of streambed made accessible 1 FISH SCREEN Fish screens installed or modified FLOODPLAIN RESTORATION Channel connectivity / rehabilitation / creation – floodplain restoration Site maintenance – floodplain restoration Wood Structures / Barriers # of Structures INSTREAM FLOW Irrigation practice improvement Water flow returned – stream Water leased/purchased INSTREAM HABITAT Beaver introduction Channel reconfiguration and connectivity Channel structure – deflectors / barbs Channel structure – large woody debris Channel structure – log weirs Channel structure – off-channel habitat Channel structure – rock weirs Channel structure – root wads Channel structure – wood structure / logjam Invasives weed control – instream Number of LWD structures placed in channel Sediment reduction – sediment control Streambank stabilization RIPARIAN HABITAT Conservation grazing management Fencing Forestry practices / stand management Livestock Water Development Livestock exclusion Plant removal / control Planting Water gap development UPLAND HABITAT Agriculture fencing Agriculture management Erosion control structures Fencing Invasives / weed control Planting Road abandonment and obliteration Road drainage system imp. / reconstruction Road reconstruction Road relocation Road stream crossing impr. (rocked ford) Slope stabilization Upland agriculture management Upland livestock management Vegetation / stand management Water development UPLAND WETLAND Invasives weed control – upland wetland Wetland – creation Wetland – improvement / enhancement Wetland – restoration Wetland upland – revegetation planting WATER QUALITY Nutrient enrichment – carcass analog (fish meal bricks) Nutrient enrichment – carcass placement Nutrient enrichment – fertilizer Refuse / debris removal Chehalis Lead Entity Conceptual Project Form Return flow cooling Sewage clean-up Toxin reduction 2 WETLANDS Upland wetland – improve / enhance Upland wetland –invasives weed control Upland wetland –revegetation / planting Upland wetland – wetland restoration Upland wetland creation Wetland plant removal / control Wetland planting CURRENT PROJECTS STATUS Completed Conceptual Construction completed Design completed Feasibility completed Feasibility pending Land acquisition completed Monitoring Permitting Completed Proposed HABITAT TYPE Estuary (River Delta) Instream N/A Nearshore (Beaches) Nearshore (Embayments) Nearshore (Rocky Coast) Riparian Rivers / Streams / Shorelines Upland Wetland LIMITING FACTORS Biological Processes Degraded habitat – channel structure and complexity Degraded habitat – estuarine and nearshore marine Degraded habitat – fish passage Degraded habitat – floodplain connectivity / function Degraded habitat – riparian areas / LWD recruitment Degraded habitat – stream flow Degraded habitat – stream substrate Degraded habitat – water quality Estuarine and nearshore habitat Lake Habitat Non-habitat Limiting Factors Unknown NEARSHORE PROJECT Applying for ESRP funds (y/n) ESRP (y/n) PSNERP (y/n) PRIMARY SPECIES BENEFITTING (CHOOSE ALL THAT APPLY) Bull Trout Chinook Chum Coho Cutthroat Kokanee Pink Rainbow Sockeye Steelhead CURRENT PROJECT PHASE Construction Design and Permitting Feasibility Chehalis Lead Entity Conceptual Project Form Land Protection Monitoring and Adaptive Management 3 SECONDARY SPECIES BENEFITTING Anchovy Bald Eagle Bull Trout (Secondary Spec.) Cascade Torrent Salamander Chinook (Secondary Species) Chum (Secondary Species) Coho (Secondary Species) Columbia Spotted Frog Cutthroat (Secondary Spec.) Dunn’s Salamander Eulachon Lake Chub Larch Mountain Salamander Leopard Dace Marbled Murrelet Margined Sculpin Mountain Sucker Northern Leopard Frog Olympic Mud Minnow Orca Oregon Spotted Frog Pacific Cod Pacific Hake Pacific Harbor Porpoise Pacific Herring Peregrine Falcon Pink (Secondary Species) Pygmy Whitefish River Lamprey Rockfish Rocky Mountain Tailed Frog Sand Lance Sea Otter Snowy Plover Sockeye (Secondary Species) Steelhead (Secondary Spec.) Steller Sea Lion Surf smelt Van Dyke’s salamander Walleye Pollock Western Toad REPORTING GROUPS 2009 Salmon Recovery Funding board Effectiveness Monitoring Project (y/n) Nearshore Number of Streams Water Typed Shovel Ready Streams Water-Typed ADDITIONAL PROJECT INFORMATION Goals and Objectives Budget, Funds, Expenses Property References Funding Source Partner Land Owner Project Manager Secondary Sponsor Chehalis Lead Entity Conceptual Project Form 4