HARRY LYLE Tunnelling Construction Manager/Superintendent Harry’s extensive production management experience in the tunnelling industry has taken him all over the world. He has extensive technical construction knowledge in all types of tunnel excavation, ground support and lining and his practical experience in delivering some of the largest and most complex tunnel projects in the world combine to make him uniquely qualified to manage the tunnel construction operations on site. He has worked as the General Superintendent on all four of the three-lane road tunnels that have been constructed in Australia. Harry has experience in soft-ground TBM and roadheader tunnelling, and has delivered in alliance relationships. Harry demonstrates strong leadership and always focuses on the education and training of his teams which keeps everyone safety focused. Capabilities Qualifications - Tunnel excavation techniques, including soft - John Holland Group Award in Safety Excellence ground TBM, soft-ground roadheader and 2002 and 2006 shallow-cover - Certificate IV in Workplace Safety - Ground support and lining - Industrial Relations - Occupational Health & Safety on large - Equal Employment Opportunities construction projects - 3wk Supervisory programme with the Institute of - Delivery of major underground tunnelling Builders projects - Multiple Leadership Programs Highly respected for his leadership and relationship skills, strong sense of how to Tunnelling structure the Experience workforce to deliver complex projects John Holland Construction Manager, Tunnelling Resourcing and deployment of men, plant Melbourne, Vic Harry was accountable for the successful delivery of our Australian based projects, and and equipment works closely with our Manager for Hong Kong and Singapore to provide operational 2012 – 2014 Work planning and coordination support to offshore projects. He also manages the M&E team which provides support for both projects and tenders. Airport Link & Northern Busway Brisbane, Qld 2007 – 2012 Value: $5b Project General Superintendent EastLink Melbourne, VIC 2004 – 2007 Value: $2.54b Regional General Superintendent, Tunnelling Harry provided constructability input into the tender for this twin tunnel project. When John Holland was awarded the tender, Harry took on the crucial role of Project General Superintendent assisting and advising all construction areas. A key focus for Harry on this Project was Industrial Relations and Workforce management. In this role, Harry provided constructability input into the design of 39km of toll road including twin three-lane, 1.6km tunnels comprising two tubes, each with three lanes of unidirectional traffic. As General Superintendent, Harry was responsible for directing all aspects of the underground construction activities and ensuring the highest safety standards were achieved. Lane Cove Tunnel Sydney, NSW 2004 Value: $1.1b Project General Superintendent Harry was General Superintendent for this multi roadheader type tunnel construction. His responsibilities included constructability input into the design and the coordination of the field activities for the construction of the tunnel and associated works. Kai Tak Transfer Scheme Hong Kong 2001 – 2004 Value: HK$392m General Superintendent Northside Storage Tunnel Sydney, NSW 1999 – 2001 Value: $450m General Superintendent CityLink Transurban CityLink Melbourne, VIC 1997 – 1998 Value: $1.8b General Superintendent SSDS St1 Paul Y Seli Joint Venture Hong Kong 1998 – 1999 Site Superintendent Heathrow Express Rail Link Balfour Beatty Civil Engineering Ltd 1994 – 1997 Tunnels Superintendent 1991 – 1994 1989 – 1991 1985 – 1987 1981 – 1985 1980 – 1981 1976 – 1980 Shift Boss – Balfour Beatty Civil Engineering Ltd Pit Boss – Trans-Manche Link (Channel Tunnel) Lead Miner / Pit Boss – Cairo Wastewater Contract, Egypt, Balfour Beatty Civil Engineering Miner – John Mowlems Ltd, England Leading Miner – Pyramid Civil Engineering Ltd, Hong Kong Miner – Various, England Responsible for coordinating the construction of 1.3km of 4.4. ID Drainage Tunnel using a Herrenknecht Slurry T.B.M. Additional responsibilities include the construction of 6 shafts, 600m of cut and cover tunnel and associated structures. Responsible for coordinating the construction of 20 km of sewage/stormwater tunnel, excavated simultaneously from two sites, with four TBM’s ranging in size from 3.8-6.5m diameter. Additional responsibilities included the supervision of construction of 2.4km of declines and chambers with roadheaders and the drill and blast excavation of four shafts and the coordination of supply of all materials and spoil removal by barge to a satellite site. Responsible for Coordinating three main sites during the construction of twin three-lane road tunnels. Excavation was conducted at five working faces with 300Kw road headers and drill and blast. Primary NATM type support followed by permanent lining using three CIFA full heading concrete lining forms. The work consisted of the construction of a 3.2m diameter tunnel using a hard rock Robbins TBM in fresh granite, full face grout treatment required during excavation and 360m of drill and blast for TBM Launch Chamber After the collapse of the Heathrow Rail tunnel, Harry was called in to recover the tunnel, make it safe and complete its construction. He took overall responsibility for labour and plant control to complete 8.5km of 5.7m diameter shield driven tunnel plus two underground stations, associated shafts, hand tunnels and crossover caverns. TUNNELLING SOLUTIONS provide a one stop shop of specialist knowledge to organisations and projects involved in the planning, procurement and delivery of Tunnelling Projects.