WILKINSBURG POLICE AREA RENOVATION PROJECT – SCOPE OF WORK ROLL CALL ROOM WALL ENCLOSURE OVER EXISTING PIPING - Item includes the cost of labor and materials required to purchase and install new 2”X4” or metal stud wall system complete with moisture resistant gypsum board, and (2) sets of double 18” x 80” BI-fold doors to enclose existing piping along wall. All seams on this wall shall be taped and covered with joint compound for a smooth finish. Contractor shall also apply a hard coat of plaster to the wall. SUSPENDED CEILING - Item includes the cost of labor and materials required to purchase and install new 2’X4’ Armstrong Directional textured Lay-in suspended ceiling tile (or approved equivalent) complete with Prelude 15/16” exposed Tee grid system. Item also includes the cost of labor and materials required to remove existing suspended ceiling and grid system and dispose of all materials. 2’x4’ FLOURESCENT LIGHTS AND WIRING.- Item includes the cost of labor and materials required to purchase and install new 2’X4’ recessed fluorescent light fixtures and new bulbs. Lights to be Lithonia Model No. 2RT8S or approved equivalent. Items also includes the cost of labor and materials required to remove all existing light fixtures, and dispose of properly. All wiring to panel box shall remain intact, unless visual evidence of corrosion and/or exposed wiring. All wiring not deemed to remain shall be replaced at no extra cost. VITRIFIED CLAY TILE FLOORING SYSTEM - Item includes the cost of labor and materials required to purchase and install new vitrified clay tile flooring system, complete with application of adhesive per manufacturer’s recommendations for installation. Item includes the cost of labor and materials required to purchase and install new cove base along all walls. Item also includes the cost of labor and materials required to remove existing Tile floor and dispose of all materials properly. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation. SERGEANTS ROOM PLASTER REPAIR - Item includes the cost of labor and materials required to sand and scrape existing chipped plaster away from wall, purchase and install new plaster on all areas and provide smooth transition between new work and existing work. SUSPENDED CEILING - Item includes the cost of labor and materials required to purchase and install new 2’X4’ Armstrong Directional textured Lay-in suspended ceiling tile (or approved equivalent) complete with Prelude 15/16” exposed Tee grid system. Item also includes the cost of labor and materials required to remove existing suspended ceiling and grid system and dispose of all materials. SERGEANTS WORK STATIONS - Item includes the cost of labor and materials required to purchase and install new countertop to be utilized as work stations as shown on plans. Borough officials shall determine style and exact dimensions of proposed countertop to be installed. 2’x4’ FLOURESCENT LIGHTS AND WIRING.- Item includes the cost of labor and materials required to purchase and install new 2’X4’ recessed fluorescent light fixtures and new bulbs. Lights to be Lithonia Model No. 2RT8S or approved equivalent. Items also includes the cost of labor and materials required to remove all existing light fixtures, and dispose of properly. All wiring to panel box shall remain intact, unless visual evidence of corrosion and/or exposed wiring. All wiring not deemed to remain shall be replaced at no extra cost. VITRIFIED CLAY TILE FLOORING SYSTEM - Item includes the cost of labor and materials required to purchase and install new vitrified clay tile flooring system, complete with application of adhesive per manufacturer’s recommendations for installation. Item includes the cost of labor and materials required to purchase and install new cove base along all walls. Item also includes the cost of labor and materials required to remove existing Tile floor and dispose of all materials properly. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation. JAIL CELL LOCK UP NEW WATER CLOSETS - Item includes the cost of labor and materials required to purchase and install a 3318 Retrofit unit by Cornerstone Institutional LLC. (or approved equivalent) in all Jail Cells as shown on plans. Item includes all valves and plumbing appurtenances for a complete installation. Item also includes the cost of labor and materials required to remove existing fixtures and dispose of all materials properly. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation 2’x4’ FLOURESCENT LIGHTS AND WIRING.- Item includes the cost of labor and materials required to purchase and install new 2’X4’ surface mounted fluorescent light fixtures and new bulbs. Lights to be Lithonia Model No. ES8X or approved equivalent. Items also includes the cost of labor and materials required to remove all existing light fixtures, and dispose of properly. All wiring to panel box shall remain intact, unless visual evidence of corrosion and/or exposed wiring. All wiring not deemed to remain shall be replaced at no extra cost. VENT COVERS – Item includes the cost of labor and materials required to purchase and install new security type vent covers by Kees Incorporated Model No. SEG-6 (or approved equivalent) in all jail cells. MEN’S LOCKER ROOM RENOVATIONS CEILING PLATE – Item includes the cost of labor and materials required to install a metal plate to cover access openings in ceiling of locker room. The plates must be able to be removed when required to gain access by screws or bolts. Contractor to submit detail of type of plate to be considered, and method of anchoring to ceiling. NEW SHOWERS – Item includes the cost of labor and materials required to install typical 3’X3’ metal shower stall by Harbor Supply Inc. Item No. SC-BW2 or approved equivalent complete with all appurtenances for a complete installation. NEW URINALS - Item includes the cost of labor and materials required to install Kohler Model #: 5016ER-0 (or approved equivalent) complete with flush valve and all appurtenances for a complete installation. NEW LAVATORY FIXTURES - Item includes the cost of labor and materials required to install Delta Model #: 2597LF-MPU (or approved equivalent) complete with all appurtenances for a complete installation VITRIFIED CLAY TILE FLOORING SYSTEM - Item includes the cost of labor and materials required to purchase and install new vitrified clay tile flooring system, complete with application of adhesive per manufacturer’s recommendations for installation. Item includes the cost of labor and materials required to purchase and install new cove base along all walls. Item also includes the cost of labor and materials required to remove existing Tile floor and dispose of all materials properly. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation WATER CLOSET PARTITIONS – Item includes the cost of labor and materials required to install typical metal stall partitions complete with all appurtenances for a complete installation. WOMEN’S LOCKER ROOM RENOVATIONS SHOWER – Item includes the cost of labor and materials required to install typical 3’X3’ metal shower stall by Harbor Supply Inc. Item No. SC-BW2 or approved equivalent complete with all appurtenances for a complete installation. NEW LAVATORY & FIXTURE - Item includes the cost of labor and materials required to install new Delta Model #: 2597LF-MPU (or approved equivalent) complete with all appurtenances for a complete installation VITRIFIED CLAY TILE FLOORING SYSTEM - Item includes the cost of labor and materials required to purchase and install new vitrified clay tile flooring system, complete with application of adhesive per manufacturer’s recommendations for installation. Item includes the cost of labor and materials required to purchase and install new cove base along all walls. Item also includes the cost of labor and materials required to remove existing Tile floor and dispose of all materials properly. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation SHELVING – Item includes the cost of installing new 3’ long by 16” wide ventilated wire shelving in locker room as shown on plans. Contractor shall install (3) shelves with a distance between the shelving as approved by Borough Official. HALLWAY – ELEVATOR TO C.I.D. ROOM SUSPENDED CEILING - Item includes the cost of labor and materials required to purchase and install new 2’X4’ Armstrong Directional textured Lay-in suspended ceiling tile (or approved equivalent). The existing grid system to remain, however contractor to paint all grid. Item also includes the cost of labor and materials required to remove existing suspended ceiling and dispose of all materials. 2’x4’ FLOURESCENT LIGHTS AND WIRING.- Item includes the cost of labor and materials required to purchase and install new 2’X4’ recessed fluorescent light fixtures and new bulbs. Lights to be Lithonia Model No. 2RT8S or approved equivalent. Items also includes the cost of labor and materials required to remove all existing light fixtures, and dispose of properly. All wiring to panel box shall remain intact, unless visual evidence of corrosion and/or exposed wiring. All wiring not deemed to remain shall be replaced at no extra cost. ALTERNATE BID C.I.D. ROOM RENOVATIONS WALL ENCLOSURE - Item includes the cost of labor and materials required to purchase and install new 2”X4” or metal stud wall system complete with moisture resistant gypsum board, and (2) sets of double 24” x 80” BI-fold doors to enclose existing HVAC unit along wall. All seams on this wall shall be taped and covered with joint compound for a smooth finish. Contractor shall also apply a hard coat of plaster to the wall. SUSPENDED CEILING - Item includes the cost of labor and materials required to purchase and install new 2’X4’ Armstrong Directional textured Lay-in suspended ceiling tile (or approved equivalent) complete with Prelude 15/16” exposed Tee grid system. Item also includes the cost of labor and materials required to remove existing suspended ceiling and grid system and dispose of all materials. VITRIFIED CLAY TILE FLOORING SYSTEM - Item includes the cost of labor and materials required to purchase and install new vitrified clay tile flooring system, complete with application of adhesive per manufacturer’s recommendations for installation. Item includes the cost of labor and materials required to purchase and install new cove base along all walls. Item also includes the cost of labor and materials required to remove existing Tile floor and dispose of all materials properly. 2’x4’ FLOURESCENT LIGHTS AND WIRING.- Item includes the cost of labor and materials required to purchase and install new 2’X4’ recessed fluorescent light fixtures and new bulbs. Lights to be Lithonia Model No. 2RT8S or approved equivalent. Items also includes the cost of labor and materials required to remove all existing light fixtures, and dispose of properly. All wiring to panel box shall remain intact, unless visual evidence of corrosion and/or exposed wiring. All wiring not deemed to remain shall be replaced at no extra cost. NEW ONE-WAY WINDOW – Item includes the cost of labor and materials required to purchase and install a 3’high x 4’ wide one way viewing fixed glass observation window as shown on plans. NEW DOORS - Item includes the cost of labor and materials required to purchase and install new doors and frames as shown on plans. PLASTER REPAIR - Item includes the cost of labor and materials required to sand and scrape existing chipped plaster away from wall, purchase and install new plaster on all areas and provide smooth transition between new work and existing work. PAINTING - Item includes the cost of labor and materials required to purchase and install (2) two coats of Sherwin Williams or equal) paint on walls in this area. Item shall also include the cost of labor and materials required for preparation work including but not limited to sanding, scraping, or filling all voids with joint compound as required for a proper installation ELECTRICAL - Item includes the cost of labor and materials required to purchase and install new wiring for internet service, cable, and electric service complete with all appurtenances including new breakers if required, for a complete installation. Item also includes the cost of labor and materials required to install electrical power strips to connect all equipment. All items located as per plans.