Materials for Field Survey and Field Measurement 1. Introduction about Field Survey and Measurement 9 students are divided into 3 groups. Each group is assigned one site in 300m*300m size to do the sustainable urban design. Student can do the field survey of urban morphology of their sites at any time, while the field measurements need to be conducted on March 1 from 14:00 to 16:00. Each group will take 1 set of TESTO 400 and 1 set of HOBO U12 to measure the climate parameters. 8 measurement points have been assigned for field measurement of each group. Each group need to spend 10 minutes at one point, and use 5 minutes to move to the next point. The total measurement time of 8 points is 2 hours. Details about the site location and measurement points can be referred to the following part. 2. Field Survey of Urban Morphology Table 1 Statistics of Urban Geometry and Urban Surface Properties Urban Geometry Urban Surface Properties Land Use Building Height (m) Podium Height (m) Aspect Ratio (%) Reference Web Sites: [1] http://hk.centamap.com/gc/home.aspx 中原地圖 [2] http://www.pland.gov.hk/pland_tc/index.html Planning Department Building Coverage Ratio (%) Green Area Ratio Building (%) Material Color 3. Field Measurement of Climatic Parameters Table 2 Record of Field Measurement Group XX TESTO 400 Site XXXX Start Time Measurement Points Air Temperature _TESTO (°C) RH_ TESTO (%) Wind Direction Wind Speed (m/s) POINT 1 POINT 2 …….. POINT 8 Wind Direction: Wind direction need to be measured manually. For example, southeast wind direction means wind came from southeast direction at that time. Students only need to record the start time and prevailing wind direction of each measurement point (fill in the green column in the table), and the climatic data such as air temperature, RH, wind speed measured will be recorded automatically by TESTO and Onset HOBO (HOBO is only used for backup, and it can only record air temperature and relative humidity data). The measured climatic data will be read out after the measurement through computer. Reference Websites: [1] http://www.testo-international.com/ TESTO Company [2] http://www.onsetcomp.com/products/data-loggers/U12-data-loggers Onset Company 4. Introduction of Measurement Sites and Time for 3 Groups 4.1 Site Metadata for Field Survey and Measurement (1) Google Earth File. Google Earth file “Measurement_0301.kmz” is provided. It includes the location and name of each site as well as the 8 measurement points of each site. It can be opened using Google Earth app of smart phone. Figure 1 Google Earth File Figure 2 Google Earth File Opened by Smart Phone (2) CAD & SketchUp File CAD and SketchUp files are provided in the attachment. Figure 3 CAD and SketchUp Files 4.2 Group 1 Site Number:1108 Location: Mong Kok Road – Nathan Road (旺角道 - 彌敦道) Figure 4 SITE_1108 Site Boundary and Measurement Points Figure 5 SITE_1108 Site Perspective 4.3 Group 2 Site Number: 1109 Location: Shan Tung Street – Nathan Road (山東街 - 彌敦道) Figure 6 SITE_1109 Site Boundary and Measurement Points Figure 7 SITE_1109 Perspective 4.4 Group 3 Site Number: 1110 Location: Dundas Street – Nathan Road (登打士街 - 彌敦道) Figure 8 SITE_1110 Site Boundary and Measurement Points Figure 9 SITE_1110 Site Perspective