Materials for Field Survey and Field Measurement
1.
Introduction about Field Survey and Measurement
9 students are divided into 3 groups. Each group is assigned one site in 300m*300m size to do the sustainable urban design. Student can do the field survey of urban
morphology of their sites at any time, while the field measurements need to be conducted on March 1 from 14:00 to 16:00. Each group will take 1 set of TESTO 400
and 1 set of HOBO U12 to measure the climate parameters. 8 measurement points have been assigned for field measurement of each group. Each group need to
spend 10 minutes at one point, and use 5 minutes to move to the next point. The total measurement time of 8 points is 2 hours. Details about the site location and
measurement points can be referred to the following part.
2.
Field Survey of Urban Morphology
Table 1 Statistics of Urban Geometry and Urban Surface Properties
Urban Geometry
Urban Surface Properties
Land Use
Building
Height (m)
Podium
Height (m)
Aspect
Ratio (%)
Reference Web Sites:
[1] http://hk.centamap.com/gc/home.aspx 中原地圖
[2] http://www.pland.gov.hk/pland_tc/index.html Planning Department
Building
Coverage
Ratio (%)
Green Area Ratio Building
(%)
Material
Color
3.
Field Measurement of Climatic Parameters
Table 2 Record of Field Measurement
Group XX
TESTO 400
Site XXXX
Start Time
Measurement
Points
Air Temperature
_TESTO (°C)
RH_ TESTO
(%)
Wind
Direction
Wind Speed
(m/s)
POINT 1
POINT 2
……..
POINT 8
Wind Direction: Wind direction need to be measured manually. For example, southeast wind direction means wind came from southeast direction at that time.
Students only need to record the start time and prevailing wind direction of each measurement point (fill in the green column in the table), and the climatic data
such as air temperature, RH, wind speed measured will be recorded automatically by TESTO and Onset HOBO (HOBO is only used for backup, and it can only record
air temperature and relative humidity data). The measured climatic data will be read out after the measurement through computer.
Reference Websites:
[1] http://www.testo-international.com/ TESTO Company
[2] http://www.onsetcomp.com/products/data-loggers/U12-data-loggers Onset Company
4.
Introduction of Measurement Sites and Time for 3 Groups
4.1
Site Metadata for Field Survey and Measurement
(1)
Google Earth File.
Google Earth file “Measurement_0301.kmz” is provided. It includes the location and name of each
site as well as the 8 measurement points of each site. It can be opened using Google Earth app of
smart phone.
Figure 1 Google Earth File
Figure 2 Google Earth File Opened by Smart Phone
(2)
CAD & SketchUp File
CAD and SketchUp files are provided in the attachment.
Figure 3 CAD and SketchUp Files
4.2
Group 1
Site Number:1108 Location: Mong Kok Road – Nathan Road (旺角道 - 彌敦道)
Figure 4 SITE_1108 Site Boundary and Measurement Points
Figure 5 SITE_1108 Site Perspective
4.3
Group 2
Site Number: 1109 Location: Shan Tung Street – Nathan Road (山東街 - 彌敦道)
Figure 6 SITE_1109 Site Boundary and Measurement Points
Figure 7 SITE_1109 Perspective
4.4
Group 3
Site Number: 1110 Location: Dundas Street – Nathan Road (登打士街 - 彌敦道)
Figure 8 SITE_1110 Site Boundary and Measurement Points
Figure 9 SITE_1110 Site Perspective
Download