Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa PROGRESS ON REFORMS INITIATIVES AS ON 31-03-2015 S.No 1 1.1 Reforms Initiatives Current Status as on 31-03-2015 COMPONENTS OF THE CHARTER OF GOOD GOVERNANCE Local Govt Act, 2013 1.2 Right to Information Act 2013 Timeline Khyber Pakhtunkhwa Local Government Act 2013 enacted on 12th November 2013. Notification of section 120 extension to PATA issued on 22-08-2014. Promulgated on 04-11-2013 To make them aware about their role and responsibilities under the Khyber Pakhtunkhwa RTI Act, 2013 training workshops for Public Information Officers of various public bodies have already been conducted at the Divisional Headquarter’s of the province including D.I.Khan, Kohat, Peshawar, Mardan, Abbottabad and Mansehra. The Commission published pamphlets 25000 each both in urdu and English and is planning distribution to targeted population for awareness on RTI Law in the Province. The Commission has prepared two booklets, required under the law, one each for citizen guidance and for PIOs to understand their roles and responsibilities under the KP RTI Act, 2013. The KP RTI Commission launched its website (www.kprti.gov.pk) on 25th July 2014 for vibrant communication between the public and the commission and so far 478,226 visits have been made, (as per data till March 24, 2015) to the website including global visitors. The KP RTI Commission is set to launch a web portal soon that could be accessed from the Commission website through a link, wherein public can: submit online RTI request to PIO of concerned department, submit complaint with the KP RTI Commission. The web portal will enable every citizen to check his/her request/complaint status online. Implemented. Implemented and operational. The web portal in Chief Minister Secretariat is ready for inauguration. Page | 1 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 1.3 Right to Public Services Act, 2014 Timeline Complaints data w.e.f 23/12/2013 to 31/03/2015:- Total complaints received = 501 Complaints disposed-off = 387 Complaints in process = 114 Commission established. Interns recruited at each district level to collect data regarding delivery of services. 21 Distt Monitoring Assistant appointed and with all offices established and training imparted. Awareness campaign launched by installing billboards in the distt Social Welfare offices and via FM Radio in different districts. 06 awareness seminars held i.e 02 in Peshawar and one each in Haripur, PTC Hangu, Mardan and Swat. Consultant has been hired for preparation of Rules. So far the Commission has notified the following 19 services alongwith their time limit, designate officers and appellate authorities from districts:i. Birth/Death Registration ii. Issuance of Domicile Certificates iii. Registration of FIR/Daily Diary iv. Obtaining of “Fard” land document v. Approval of building plans/maps Plan of commercial building within the city wall. Plan of commercial building outside city wall. vi. Examination by a doctor in OPD vii. Examination by casualty Medical officer in emergency viii. Issuance of drug license ix. Issuance of Arms License Processing of Arms License till sending for verification to police. Verification of the applicant. Cartridge increase. x. Issuance of Driving License Learner Fresh Renewal Implemented. Page | 2 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline xi. Release of fund from Provincial Zakat Administration to Distt Zakat Committee. xii. Release of funds from Zakat Committee to Local Zakat Committees (Guzara Allowance etc) xiii. Jahez xiv. Educational Scholarships (Mora, Technical and Deeni Madris). xv. Issuance of Istehqaq Certificate (All the Mustahiqeen-e-Zakat) xvi. Disbursement of Zakat Fund to the Mustahiqeen. xvii. Water connection xviii. Supply of Clean Drinking Water xix. Disposal of Garbage/Solid Waste 15 official emails purchased from google for officers of the Commission in order to ensure efficacy and security of communication. Beta version of performance monitoring system ready. Website of the commission available at ww.rts.gkp.pk/rtsweb/ The Commission is receiving data for five services as per details given below:(Data from Oct to Feb 2014) Total Disposed off within Application stipulated period s FIR Service 1. 9317 9113 2. Fard Service 1658 1597 3. Domicile Service 40693 34351 4. Death/Birth Service 32165 26172 5. Building Plan 221 200 1.4 Ehtesab Commission Act Application delayed 204 61 6342 5993 21 Ehtesab Commission Act 2014 has been promulgated vide Notification No. PA/KP/2014/1180 dated 13-01-2014. Implemented. Page | 3 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Bungalow No. 21, Street-2, Sector G-2, Phase-II, Hayatabad has been hired and Ehtesab Commission has been housed in it. Federal Govt has handed over two courts in Hayatabad through PWD. The following Ehtesab Commissioners assumed their duties on 27.8.2014 and convened four meetings in the Directorate of Anti-Corruption Establishment and now Ehtesab Commission has become operationalized as a normal office in its rented building. 1. 2. 3. 4. 5. Timeline Justic (R) Hamid Farooq Durrani, Chief Ehtesab Commissioner. Col. (R) Abdul Wahid Jan Abbasis, Ehtesab Commissioner. Syeda Sarwat Jehan, Ex-Directoress Education. Ehtesab Commissioner. Sahibzada Khurshid, Ex-Distt: & Session Judge Ehtesab Commissioner. Mr. Mumtaz Ali Khan, Ex-Conroller, BISE, Islamabad Ehtesab Commissioner. The following individuals have been appointed against the positions in the Ehtesb Commission as noted against each; 1. Lt. Gen. (R) Muhammad Hamid Khan: 2. Director General. Syed Yahya Zahid Gillani: Prosecutor General. Services of ten staff members have been placed at the disposal of Ehtesab Commission so as to provide secretarial support. Assignment Account for the PMU Ehtesab Commission has been opened in the National Bank of Pakistan, Main Branch, Peshawar Cantt: but due to expiry of tenure of PMU no encashment has yet been made from that Account. A revised PC-I has been approved the PDWP for extension in tenure of PMU- Ehtesab Commission for another six month period till March 31, 2015. Now the PDWP extended the tenure of PMU till 30th June, 2015. Page | 4 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline One Police Station notified by the Home Department in the Commission premises. Framed Draft Ehtesab Commission Rules, 2014 have been forwarded to Law Department for legal vetting. The rules have also been shared with Mr. Babar Sattar, Constitutional Expert for his input. A case for creation of Ehtesab Commission Courts and police station(s) has been taken up with Home Department. Establishment of two courts have been notified by the Home Deptt on 19-12-2014. Draft Anti-Corruption strategy the first ever in the history of Khyber Pakhtunkhwa has been prepared and shared with experts for their inputs and is being refined, then the same will be placed before cabinet for approval. Amendment in the Ehtesab Commission Act has been made under which the Ehtesab Commission can now take-up cases dating back to 2004. Departments of HR, IT, Internal and External Audit and Prosecution functional with the exceptional of Investigation Wing which is being headed by Director HR on temporary basis. Complaint Status upto 20-03-2015 1. 2. 3. 4. 5. 6. 7. 8. Total No of Complaints Received Under verification Process Under correspondence with different Departments Return to Inquiry Under Investigation Pending Verifications Closed Further Proceedings Filed 165 47 44 07 05 --13 44 Page | 5 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 1.5 Conflict of Interest Law 1.6 Citizen Feed Model(CFM) Draft Law prepared. Published in the press and on website for feedback. Consultative workshops held. Law finalized in light of the feedback. Placed before the Cabinet. Cabinet constituted a committee for review of law. Two meetings of the committee held. 3rd meeting held on May 06, 2014. Bill of Conflict of Interest, has been tabled in the Provincial Assembly for assent of the Assembly. CFM being adopted across the province where the public offices are required to collect contact numbers of applicants who are randomly contacted for feedback on the quality of service they received. Back Timeline Will be enacted after assent of the Provincial assembly. Implemented. The following eight services have been selected for CFM: 1) Issuance of Domicile Certificate Responsible Officers DC and Commissioner 2) Registration of deeds Responsible Officers DC and Commissioner 3) Issuance of Character Certificate Responsible Officers DPO and RPO 4) Rescue 15 Responsible Officers DPO and RPO 5) Rescue 1122 Responsible Officer DG Rescue 1122 6) Mutation Deeds responsible officer DC and Commissioner 7) Death and Birth Certificate responsible officer DC and Commissioner 8) Health Emergency services responsible officer DC and Commissioner Page | 6 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Progress w.e.f 1-08-2013 to 28-02-2015 1.7 Khyber Pakhtunkhwa Public Procurement Regulatory Authority Act, 2013. 1.8 Establishment of KP Board of Investment & Trade: Services Applic ation Land Deeds Domicile Rescue 1122 7122 91773 19166 Rescue 15 Character Certificate Mutation Deeds Health Emergency Services Death/Birth Certificates 1264 13728 Citize ns Cont acted 3444 6 1882 8 Citize ns respo nded Corruption reported 25436 18567 1213 5 11674 4881 3234 2345 80465 1664 5 9850 67695 2553 2 20768 No corruption report received The Provincial Assembly of Khyber Pakhtunkhwa passed the Public Procurement Regulatory Authority Act on 16 Sep, 2013. The idea behind the establishment of KPPRA is to create an autonomous body capable of providing legal and regulatory framework to provincial departments and other public entities/ organizations for procurement. The overarching goal of KPPRA is to improve governance, management, transparency, accountability and quality of public procurement of goods, works and services. KPRA Procurement Rules notified. Human Resource manual approved by BoD. Web site is in process. Grievance Redressal Rules 2014 sent to Finance Deptt for vetting. Authority vetted Procurement manual on essential medicines for health deptt. The Government has established the Khyber Pakhtunkhwa BOIT to : Provide one-window operation facility to Investors. Implemented Operational Page | 7 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline - 1.9 Public Private Partnership Act 2014 Create enabling environment for investment. - Assist in developing a comprehensive public / private partnership policy. - Sub sector studies, develop concepts, brief and fact sheets. - Identify Sector Wise potential projects and prepare pre-feasibility reports of such projects where ever possible. - Hold conferences, seminars - Liaise proactively with the Banking Industry and State Bank of Pakistan to improve the deposit to loan ratio in the Province. Sectors of investment are :i. Tourism ii. Mines and Mineral iii. Energy and Power iv. Oil and Gas v. Industrial Sector vi. Transport vii. Agriculture viii. Housing Projects: i. Tourism 04 Projects ii. Local Government 01 Project iii. Transport 01 Project Passed by the Provincial Assembly on 21-03-2014 to develop a challenging business enabling environment for the potential sectors of the Provincial Economy. Public Private Partnership Unit (PPP Unit), alongwith PPP section, established in P&D Deptt: Additional nominees from Industries (BOIT), C&W, Irrigation, Energy & Power, Tourism and Sports Department were included as members of the PPP Unit. Sub-committee constituted for framing rules & procedures for further development. Rules (draft) disseminated to the stakeholder for comments/inputs. Law Deptt vetted the rules with the opinion that views/comments of the KPPRA may also be obtained thereof. Notified. Page | 8 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 1.10 Service Delivery i) Web-based market Checking and Price Control Mechanism. ii) AntiEncroachment Drives, measures against adulteration in drugs & food items and cleanliness campaign 1.11 Khyber Pakhtunkhwa Revenue Authority Timeline For operationalization of the Public Private Section/Cell, advertisement is published for hiring of consultant. A comprehensive web-based market checking and Price control mechanism has been implemented at district level throughout the Province. It includes inspection of the cases regarding Price Checking, Overcharging, Hoarding, Adulteration cases, Non display of price list. under the system the following data has been received from district administrations upto 20 January, 2015:- No of Inspections carried out: 203,310 - Overcharging Cases: 21,803 - Hoarding Cases: 68 - Adulteration cases: 22,913 - Fine Imposed: 59,718,603 - Imprisonment cases: 3,402 - Non Display of Price lists: 9,827 - Shops/Factories Sealed: 65 The Provincial Govt has adopted a proper mechanism regarding Anti- Encroachment Drives, measures against adulteration in drugs & food items and cleanliness campaign. The District Administration has been directed to have a check and balance in this regard. The following data has been received so far: - Encroachment removed: 3224 - Drugs confiscated cases: 450 - hospitals/Clinics checked/ Sealed: 470 - Un-Authorized Labs/Stores Sealed: 270 - Quack Apprehended: 64 The authority has been collecting the following taxes: - G ST on Services - Provincial Taxes (Property, Motor Vehicle, Excise duty, Professional, Hotel, Tobacco Cess etc). Senior Management appointed, subordinates staff appointment is expedited. Deputation policy on special pay packages has been approved. Deputation of officers Implemented and ongoing process. Implemented and ongoing process. Established functional Page | 9 and Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline from FBR is under process through Establishment Department. Drug and Food Regulation Act 2 2.1 2.2 2.3 To prevent spurious drugs, one, state of the art, Drug and Food Testing Laboratory is being established in Peshawar. 25 additional posts of Drug Inspectors and 05 Drug Analyst sanctioned. Drugs inspection Report: Act Passed - Number of shops inspected : 416 - Number of sample drawn : 158 - Number of substandard drugs: 02 - Number of Spurious : 01 - Number of shop sealed : 05 - Number of FIR lodged : 01 - Number of cases referred to PQCB : 29 - Case of illegal Advertisement : 00 - Case of expired drugs : 01 - Prosecution launched in Drug Court: 01 - Cases decided by Drug Court : 00 Food Inspection Report: - Number of samples taken: 795 - Confirmed: 419 - Adulterated: 365 - In progress: 20 Public Peace and Security/Home Department Online Registration of FIR Total FIR IDs 2773 Implemented www.kppolice.gov.pk Registered FIRs 314 Daily Diary (DD) Registered 1611 Cases filed 201 Awaited 638 Police To Victim Service – Toll Total Calls 1214 Implemented Free Number 0800-00400 Police Relevant 1005 Irrelevant 188 Tif 08 Media Hotline Calls 13 Automation of Special Branch MIS is being developed at HQR level to Completed connect all field offices linked through VPN (Virtual Private Network) with centralized database except Peshawar Cantt, Peshawar Secretariat, D.I. Khan, Malakand, Peshawar Rural, Peshawar Hayatabad and Kohistan. Page | 10 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 2.4 Reforms Initiatives Current Status as on 31-03-2015 Establishment of Forensic Labs (Peshawar & Swat) Timeline Australian Federal Police (AFP) refurbished 3 Laboratory in sections of FSL Peshawar and provided Peshawar is training. operational while in Swat to be functional The following sections are working: by June 2015. Semen & Serology Section, Narcotics Analysis section, suspected Vehicle Identification Section, Fire Arms & Tool Marks Section, Questionable Documents Section, Finger Print Bureau, Forensic Photography Section and Cyber Crime Section. 2.5 Establishment of School of Investigation 2.6 Establishment of School of Intelligence 2.7 Establishment Police Stations of Model FSL Malakand at Swat o Steal work contract awarded. o Civil work evaluation is in process. o International procurement is in process. o Letter of Agreement (LoA) signed for the training of technical staff at PFSA Lahore. 18 personals having science background have been trained. o UNDP will initiate procurement of services of a firm for conducting of feasibility study for FSL Peshawar. Building (Chowki No.06 Hayatabad) has Started functioning been notified and repair/refurbishment from 09-06-2014. work has completed. NGO Aitebaar is providing technical assistance by providing equipment and module development. Hiring of consultant for preparation of PC-I in process. Building (Old FRP Line Abbottabad) has Courses started. been identified. GIZ is providing technical assistance by refurbishing, providing equipment and helping in module development. PC-II approved in the DDWP meeting held on 25-09-2014. Model Police Stations i.e Gulbahar, Implemented. Faqirabad & University Town established and in operation. Model Police Station have been extended to 04 other districts i.e Mardan, Swabi, Charsadda and Nowshera. Salient Features: Page | 11 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Women Desk. Community Policing CCTV Cameras Giving Legal Advice Mandate o Intelligence collection o Operation o Registration and investigation of terrorism cases o Surveillance Established in 07 Region of Khyber Pakhtunkhwa. 50 dogs received. Retired Colonel appointed as In-charge of Unit. Character Certificates = 19861 Rescue 15 = 1887 Established in 70 Police stations. Due to shortage of strength establishment of Women Counters in all police stations is not possible at this stage. Merit based posting and transfer policy for tenure period has been adopted. Moharrars are being posted outside the police stations of their residence. Major Punishments (since Oct: 2013 to March 2015) - Removed 491 SP/DSP Insp SI ASI HC Const 08 04 38 34 42 365 - Other punishment 3997 DSP Insp SI ASI HC Const 04 27 245 237 291 3193 Opened in Police Lines of each District for running capacity building courses for police. A-1 and B-1 Exams (in service promotion exams) have been conducted by ETEA. Lower school exams being conducted by ETEA. Recruitment of junior Clerks through ETEA. Recruitment of 1875 constables through NTS completed. Timeline - 2.8 Establishment of Counter Terrorism Department (CTD) 2.9 Raising of Canine Units 2.10 Police Citizen Feedback System Women Counters at Police Stations 2.11 2.12 Posting of Moharrars according to the new improved criteria. 2.13 Action against corrupt police officials 2.14 Lines Schools 2.15 Outsourcing of recruitment and promotional exams to ETEA/NTS. Implemented Unit established. Implemented. Established. Implemented. Implemented. Operational. Ongoing process. Page | 12 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 2.16 Prisoners census of selected prisoners (Juvenile & Women) Census in completed. 2.17 Institutional Assessment of Prison Department Total four Prisons including two Central Prisons i.e Peshawar and Haripur and two District Prisons i.e Mardan and Buner have been surveyed as case study. Case study focuses on prison’s problems, prison staff capacity and reforms required. Case study undertaken by COFFEY International hired by DFID. Started functioning since 13-05-2014. Established at Police Station West Cantt. Provide assistance to General public in all issues relating to police service at one window. Dispute Resolution Counsels established through-out the province for solving petty nature problems amongst the citizens through the elders/notables of the area. Data monitoring of FIRs. 230458 FIRs have so far been documented throughout the Province. Monitoring Cell established in Home Department connected with all Districts prosecution offices except Kohistan. All FIRs lodged in 24 Districts for the year 2013 including Torghar is completed. While entry of FIRs for the year 2014 is in process. Security and challan stages of PMIS are in process. Online FIR, Police to victim service and complaint cell have been united to form one Complaint Redressal Cell. It will consist of SMS complaint facility on mobile number 0315-9007777 Detailed Cost Estimates (DCE) for Safe City Project Peshawar in preparation process. It will be a closed circuit surveillance system and after approval of PC-I/DCE work will start on the same. 2.18 Police Assistance Lines (PAL) 2.19 Dispute Mechanism 2.20 Prosecution Management Information System Resolution 2.21 2.22 Police Access Service Safe City Project Peshawar Peshawar Central Timeline Jail Implemented Implemented Established. Established. System in place since August 2013. Implemented. Inaugurated by HCM. Continuous process. In process. Page | 13 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 2.23 Peace Building and rule of Law Program under SDPF 2.24 High Security Prison Mardan 2.25 2.26 2.27 3. 3.1 Current Status as on 31-03-2015 Rule of Law Program under SDPF formally In process. approved by European Union (EU) and other Financial agreement Doner partners. between Provincial Govt and EU signed. District Prison Mardan has been converted to High Security Prison, having capacity of 3000 prisoners. Creation of prison security 836 posts created/sanctioned for prion force security force in Khyber Pakhtunkhwa De-Radicalization Program for 1241 beneficiaries got benefited in DREP KP Swat DREP in 04 central Prisons in process Prosecution Training One hundred prosecutioners trained (PreManagement service and service+ in service). prosecution coordination unit Prosecution Coordination Unit established in Peshawar. ELEMENTARY AND SECONDARY EDUCATION DEPARTMENT Independent Monitoring Unit (IMU). Timeline Completed. Created. Ongoing process. Ongoing process. Unit established for monitoring and data IMU operationalized. collection for all the 28000 schools in KP. Selection of 500 monitoring Assistants completed. Training of DMOs completed. Training of Monitoring Assistants completed. Operational from 1stWeek of February 2014. IMU inaugurated on 16-04-2014. Report for the Month of February 2015:Schools visited in February, 2015 are 15, 396 out of 15,875. Enrollment attendance Gap in April 24%, in May 21% in September 21%, in October 26%, November 21%, in December 2014 20% and in February 2015 21%. Non-teaching staff in the month of November were 24,868 wherein 17% were found absent. Teacher Absenteeism was 19% in May,20% in April, 16% in September, 18% in October, 17% in November, 17% in December, 2014 & 16% in February, 2015. Page | 14 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 289 schools were found illegally occupied either partially or wholly. 05% schools were found closed in the month of February. Toilet facility is not available in 11% schools. Electricity facility is not available in 33% schools. Boundary wall facility is not available in 10% schools. Drinking water facility is not available in 22% schools. 14000 teachers being recruited under the policy. 1130 posts of SSTs and 6960 posts of PSTs filled. 1740 posts of BPS-16 and above being filed through promotion. 925 cases cleared by PSB. 740 cases cleared by PSB and their promotion order will be issued shortly. 5515 posts were advertised and the case is in the process of recruitment. 2,300 clusters notified. Process for delegation of financial and administrative powers for cluster heads initiated. Summary sent back to Finance Deptt with reply of observations. Timeline - 3.2 School Based Teacher’s Recruitment Policy 3.3 School Clustering 3.4 Fast-track standardization of 400 Higher Secondary Schools (sports, libraries, labs) 3.5 Textbook Board Restructuring Implemented All posts will be filled by end of June, 2015. The idea of school clustering under reconsideration. To finalize the decision on the school clustering the Secretaries of both the departments will give new timeline. In the inception/initial phase work on 36 Civil work started on 36 schools. Higher Secondary schools with limited for amount of 4 lacks per school were allocated. Allocation procurement is to be These 36 Higher Secondary schools will be reflected in the coming reconsidered for improvement in the budget. implementation phase is well. Ordinance being revised. The restructuring case Consultant made presentation which is in the process of includes: approval from the Open up printing and textbook competent authority. development. Page | 15 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Open up and improve the textbook review process. Establish and implement a systematic process for collecting feedback about textbooks. Stop purchase of paper by the TBB for distribution to printers. Award printing contracts on a competitive basis. Add quality criteria to the PC-1 prepared for provision of free textbooks. Establish and maintain a TBB website. Revise/update the current TBB mandate. Establishment of Examination The idea was dropped after the decision of & Assessment Commission Ex-Chief Secretary and this activity was to be assigned to BISE, however this year E&SE is conducting 5th grade exam. - 3.6 3.7 3.8 3.9 The idea was dropped after the decision with Ex-Chief Secretary however universal assessment of grade 5th will be considered. Under process. Uniform Medium of Being implemented in phased manner by Uniform Medium of Instructions starting from Grade-I. instructions till Matric Books for class-I in English printed and across the province distributed. targeted in 5 years. Books for class-II in English have been printed and will be distributed in the coming session. Teachers have been trained accordingly. Uniform Medium of instruction for grade-II commenced from Academic session, 2015. Revamping of Elementary Recruitment of MD EEF and staff. Recruitment of Deputy Education Foundation The Directors are being recruited and will Director and other officers is in process. join soon. Recruitment of Deputy Directors and other officers is in progress. - EEF act amended. - BOD revised. 06-Rooms Primary Schools Policy adopted. Implemented th instead of 02-Rooms Summary approved on 24 January, 2014. PC-I approved by P&D Department. DDWP meeting held and PC-Is for individual schools approved. Work started on six room’s primary schools. Page | 16 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 3.10 Early Childhood Care and Education 3.11 Revamping of B.I.S.Es Current Status as on 31-03-2015 3.12 Stipend for Girl Students 3.13 Provision of Sports Facilities 3.14 Hard Area Allowance Introduced in 500 Schools in 05 districts. Additional one EC Room approved by PDWP and further approved by DDWP& funds transferred to Districts. Funds Transferred to PTCs. Amount transferred to 16 schools. Feasibility study completed and presented to the department. The review of recommendations referred back to the consultant for response on observations. Study completed, and will be presented to Secretary E&SE for decision. Total number of stipends given to girls students= 442030 Total amount of stipends given to girls students =530,436,000/- (53.04 M). Percent increase in enrollment due to stipends is about 2 %. Girl students without stipend In the month of March 2014, 14% of the total eligible students were reported without stipend. In May 2014, the figure raised to 20% due to start of new session. The figure dropped to 9% in the month of February 2015. The scheme has been launched to provide healthy environment for youth in schools through provision of sports facilities in high and higher schools across the province. 980 (High Schools + Higher Secondary Schools) 2013-14 1422 (remaining High Schools + Higher Secondary Schools) funds transferred to district accounts officer further it will be transferred to concern schools through PTCs 2639 (all middle schools) scheme discussed and approved 25-03-2015, minutes awaited. To attract female supervisory staff for posting in hilly and hard districts and to encourage them to perform duties there, additional allowance is paid to female education officers. Timeline Implemented Under process. Presentation to Secretary E&SE awaited. Implemented Initiative launched and completed. Implemented Page | 17 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 3.15 3.16 3.17 Reforms Initiatives Introduction of Education Voucher Scheme (EVS) Complaint Redressal System Tameer-e-School (Adopt a School) Current Status as on 31-03-2015 Female education Supervisors to get 50% of their basic Pay as additional allowance. On their posting in Kohistan, Battagram, Torghar, Dir Lower, Dir upper, Shangla and tank being hard and unattractive areas. Total numbers of beneficiary female supervisors are sixty six (66). Funds transferred and payment started. PC-I for financial year approved by PDWP. The scheme has been launched by the Minister for E&SE Department on 6th August, 2014. Pilot phase for IqraFarogh-e-Taleem Voucher Programme has been launched in Peshawar and 1429 vouchers are distributed in 19 schools of 5 UCs of Peshawar and it has been planned to launch it in 3 other districts i.e. D.I.Khan, Swat and Mansehra in the session 2014-15. Request for proposal for conduction of Quality Assurance Test (QAT) for the session 2014-15 been advertised on 09-11-2014 and shortlisting is in progress. Request for proposal for conduction of survey for next academic session i.e. 201516 been published in newspaper on 09-112014 and short listing is in progress. Complaints received under Complaint Redressal System : 850 Complaints addressed: 646 Percentage of complaints addressed: 76.0 Timeline Launched in Peshawar In progress for next session. Established Rolled out to whole province. Total 1069 schools have been uploaded on In progress. website from all districts of Khyber Pakhtunkhwa. Details of is given below:- Total fund raised Rs. = 26.0 M - Schools fully funded = 55 - Schools completed = 42 - Facilities fully funded = 68 - Facilities completed = 52 - Facilities in progress = 16 Page | 18 the Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 4. 4.1 4.2 4.3 Reforms Initiatives Current Status as on 31-03-2015 HIGHER EDUCATION DEPARTMENT Chief Minister Education Invested in BOK @10.25% Endowment fund (CMEEF) Inland scholarships =90% share (30) (Rs.500 millions) Foreign Scholarship =10% share(03) MoUs with the approved Institutions signed and made Advertisement on 10 June 2014. Interviews of Candidates by the scholarship committee of the Institutions as follows: i. COMSATS Abbottabad Scholarships awarded & funds transferred. ii. GIK Swabi scholarships approved and funds are being transferred. iii. UET,Peshawar, Interviews held and scholarships awarded/approved. iv. IM Sciences, Interviews held and scholarships awarded/approved. v. Quaid-e-Azam University, Islamabad, Interviews held and scholarships awarded/approved. vi. NUST, Islamabad= Interviews conducted & Recommendations will be received by last week of January. vii. COMSATS Islamabad by end of January 2015. viii. IBA & LUMS recommendation is awaited. Higher Education Endowment To assist and encourage students at college Fund (RS. 300 Million) level, the Higher Education Endowment Fund has been established. Profit: 30.75 million per annum. No of scholarships approved: 1456 No of scholarships awarded: 819 Rs. 7.4 million has been disbursed amongst 38 BS Colleges. Monthly stipend for un- Educated un-employed youth to get Rs. employed youth 2000 per month as allowance under the initiatives. Phase-I - Released amount Rs. 500 Million (for candidates securing their degrees w.e.f 01-7-2013 to 30-6-2014. - Implementation mechanism approved Timeline Continuous process. Implemented. Continuous process. Implemented Receipt and Scrutiny of data by 3rd week of March, 2015. Approval and award of Stipend for the Phase-II will be granted by April 2015. Page | 19 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline - Data Receipt & Scrutiny 5217 applications received and scrutinized, 3720 candidates stood eligible. - Approval by Stipend Management Committee 3720 candidates approved by the committee for Stipend. - Disbursement of Stipend via bank Transactions started. Phase-II - (for leftover candidates) - Advertisement in December 2014. - Closing date will be 1 month after advertisement. 5. 5.1 Health Department CM Special Initiative Provision of Free emergency services worth Rs.1.00 Billion - Operational in all Teaching and DHQs Hospitals Oversight Committees notified. 70% 0f the allocated budget spent during 2013-14 - Total Allocation: Rs.980.000 M - Total Expenditure: Rs.571.33 M - Balance on 30-06-2014 Rs.408.67 M Allocation for 2014-15 Rs.1.00 Billion Rs 1.00 Billion for Provision of emergency services approved from P&D. Administrative approval issued on 28/11/2014. Releases made to all tertiary care units(LRH,KTH,HMC,AMC,SMC and all District Head quarter Hospitals of the Province. Number of beneficiaries in hospitals Phase-I implemented Phase-II in process Funds released Number of beneficiaries in LRH Peshawar: 1438083 Number of beneficiaries in KTH Peshawar:691198 Number of beneficiaries in HMC Peshawar: 229500 Number of beneficiaries in ATH Abbotabad: 175000 Number of beneficiaries in MMM Teaching Hospital DI Khan: 10582 Number of beneficiaries in Sifat Ghayur Shaheed Memorial Hospital Peshawar: 217983 Page | 20 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 - 5.2 Establishment Of Insulin Bank Worth of (Rs. 25.00 Million) Timeline Number of beneficiaries in DHQ Hospital Battagram: 538 Number of beneficiaries in Govt: Maternity Hospital Pesh: 54891 Number of beneficiaries in King Abdullah Teaching Hospital Mansehra: 89719 Number of beneficiaries in Saidu Teaching Hospital Swat: 100622 Number of beneficiaries in MMCTH, Mardan: 444906 Number of beneficiaries in DHQ Teaching Batkhela: 445432 Number of beneficiaries in DHQ Chitral: 752 Number of beneficiaries in DHQ Bannu: 1378 Number of beneficiaries in BKMC Mardan: 85020 Number of beneficiaries in DHQ Charssada: 287134 Number of beneficiaries in ShaheedFarid Khan Hospital Hangu: 20067. Number of beneficiaries in DHQ UperDir: 57453 For treatment of diabetics free insulin banks were established in 10 hospitals. Scheme was launched with an amount of Rs.25 million with the following modalities: 8400 diabetic patients of type-I&II to be treated over a period of nine (09) months. 1530 beneficiaries (patients) registered and receiving insulin. 10 Hospitals include Lady Reading Hospital, Khyber Teaching Hospital, Hayatabad Medical Complex, Ayub Teaching Hospital, Kohat, D.I.Khan, Bannu, Swat, Mardan and Abbottabad. 750 patients were registered in 04 Teaching Hospitals (HMC, LRH, STH,ATH) till May, 2014. Till 8.7.2014 insulin purchased worth of Rs. 1.977 million. All Centers are connected through internet. Finance department will released amount from endowment fund after districts will submit report. Total Number of beneficiaries : 4700 Currently operational in 14 districts. It has been decided in the meeting of steering committee held on 21-01-2015 to extend it up to 24 districts, however minutes are still awaited. Page | 21 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 5.3 Reforms Initiatives Current Status as on 31-03-2015 Provision of Incentives for Maternal Health Services worth Rs. 300.00 Million 5.4 Provision of Incentive for Immunization Services worth of Rs. 200 Million To encourage women to attend health technicians during pregnancy and to improve mother and child health, the facility was launched. Rs.300 million allocated for the initiative. Rs 150 Million has been released to the account of MNCH Program for disbursement among the women for anti-natal, natal and post-natal care. The unit cost of Rs.2700/- per pregnancy is provide on the basis of 04 ante natal visits (Rs.300 per visit), one post-natal visit (Rs.500) and incentive for delivery (Rs.1000). The incentive will benefit around 1,03,323 mothers in 10 focused districts i.e. Chitral, Nowshera, Haripur, Bannu, Malakand, Swabi, Shangla, upper Dir, LakkiMarwat and Karak. Total Number of Beneficiaries:27787 Amount Disbursed: Rs. 16.8 M Complete online initiative, can be accessed at www.cminitiative-mnchkp.pk This initiative is focused on improving immunization coverage by providing incentives for properly immunization of children. Rs.1000/- will be the rate of unit cost for a child who have completed immunization against child diseases. The incentive package will benefit approximately 0.19 million children. The initiative is launched in 12 districts i.e. Battagram, Buner, Chitral, Nowshera, Lower Dir, Upper Dir, Hangu, Kohistan, LakkiMarwat, Shangla, Tank and Tor Ghar. Funds have been released and payment started. Funds released to district: 50,191,400 (50.2 M) Timeline Implemented Continuous process. Implemented Continuous process. Page | 22 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Expenditure incurred: 35,923,695 (35.9 M) Total Beneficiaries/vaccinated : 35923 Provision of free treatment The initiatives cover free treatment of Proposal to make the for critical illness worth of system online is in critical diseases i.e. Renal Transplant, Renal Rs. 500 Million process. Dialysis, Hepatitis, AIDs and Cancer. The facilities of Renal Transplant and Renal Dialysis are be available at Four (4) autonomous teaching hospitals i.e. Lady Reading Hospital, Khyber Teaching Hospital, Hayatabad Medical Complex, Ayub Teaching Hospital and 09 dialysis centers identified i.e Institute of kidney disease Hayatabad, KTH, LRH, Ayub Teaching Hospital Abbottabad, Mardan Medical Complex, KDA & LMH Kohat, Bannu Hospital, DI Khan Hospital, Saidu Group of Hospitals Swat. The initiative will benefit 4950 kidney patients (4900 Dialysis and 50 renal transplants). The facility will also cover Home treatment for Dialysis patient at the rate of Rs.7500/. Rs.50, 000/- per patient will be spent for renal transplant. Free Medicines for post-dialysis patients started. Post-renal and transplant patients started. Institution Building in the Health sector Health Foundation Act The subject Act has been vetted by the Law In process Department & will be submitted to Provincial Cabinet for meeting. Health Care Commission Act Passed from Provincial assembly on 13th Rules being prepared (Health Regulatory Authority January 2015. Act) Rules development is under process. CM KPK has approved a summary moved by Health Department wherein search & nomination council has been approved. - 5.5 5.6 5.7 Page | 23 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 5.8 Medical & Health Institution Reforms Act 5.9 Food Safety Authority Act Timeline On 25-03-2015 for interim arrangements Hospital Directors & Medical Directors has been nominated. Further for interim HRA has been designated as Health Care Commission and it is directed to continue till the formulation of rules. Activity report for the Month of March, 2015. Total No. of private HCF visited:488 Total No. of HCF sealed: 177 Notices/ warning issued: 122 Application received for Reg; 2,476 Fine Imposed: Rs 3,15000/Passed by Provincial assembly on Rules being prepared 13thJanuary 2015. Zero draft of rules has been framed. CM KPK has approved a summary moved by Health Department wherein search & nomination council has been approved. On 25-03-2015 for interim arrangements Hospital Directors & Medical Directors has been nominated for Autonomous Health Institutions. Further as per Health Department notification autonomy has been extended to KGNTH Bannu, MMMTH DI Khan, Mardan Medical Complex Mardan&Saidu Teaching Hospital Swat. Passed by Provincial Assembly. Provincial Assembly has sent the approved Act A committee headed by DG Health Services for Printing to Law has been constituted for framing of rules. Deptt. A meeting has been held under the chairmanship of SSH Health Department for nominations of non-official members of the Food Safety Authority. Salient feature:- To ensure the provision of pure, safe and healthy food to the population throughout the Province. - The West Pakistan Pure food ordinance 1960 was promulgated to organize authoritative and efficient body to be Page | 24 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 5.10 5.11 5.12 5.13 5.14 5.15 Reforms Initiatives Current Status as on 31-03-2015 established to control and regulate food business and ensure food safety through professional expertise and effective administration. - Law was need in post 18th Amendment Scenario. - Authority is not constituted; SOG has moved file but ACS has not given approval. Khyber Pakhtunkhwa Human Passed by Provincial Assembly Organ & Transplantation Act After 18thconstitutional amendment and abolishment of concurrent legislative list it is the need of the province to review/revisit the “the Transplantation of Human organs and tissue act 2009 of the Federal govt. A comprehensive law on the subject was prepared it provide a base for establishment of Khyber “Pakhtunkhwa medical transplantation regulatory authority”. Committee has been formed to frame rules for act. Khyber Pakhtunkhwa Passed by Provincial Assembly on 09-01Protection of Breast Feeding 2015. and Child Nutrition Act Khyber Pakhtunkhwa Injured passed by Provincial Assembly on 04-12Persons (Medical Aid) Act 2014 District Health Management District Health Coordination Composition of Boards and ToRs finalized Boards (DHCB) ToRs approved Timeline Provincial Assembly has sent approved Act to Law Deptt for Printing. Human organ transplant authority is in process of constitution. Rules being prepared Rules development is in process. Rules development in process. Will be notified once Local Govt. system is in place. Primary Health Care & e- Health Mother & Child Health 24/7 services MCH operational in 46 out of Completed. Services 46 BHUs under PPHI/SRSP. Out of 46 BHU (MCH) centers 26 are providing outreach facilities. Mobile Health Services Launched in 17 Districts By PPHI/SRSP. Completed. A team comprising of women medical officer/ultrasound facilities in a vehicle are visiting the remote areas and providing ante-natal and post-natal facilities to the community. Page | 25 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 5.16 Dengue Outbreak 5.17 e-Health in HMC on analogy of Shoukat Khanum Hospital 5.18 Drug & Food Laboratories Testing Work-plan shared with all districts Implementation started. Meeting conducted with MPAs and DHOs & Vector MS of Malakand Division i.e. high risk Integrated Control PC-1 prepared Districts. and is in process of Training of trainers (ToT) completed in all approval high risk Districts. Awareness and Social Mobilization started, IEC material distributed. SIRS material dispatched to Districts. Larvicidals Sachets disbursed to high risk Union councils, 25000 sachets donated by MERLIN NGO. 14 Entomologists recruited. Dengue (Part of integrated vector control program ADP Scheme). PC-I prepared Summary Sent to Chief Minister for non- ADP Scheme was regretted by the Competent scheme Authority PC-II approved by PDWP on 25thFebruary, 2014. Progress report of Drug Inspectors From 0106-2014 to 31-12-2014 - 5.19 Timeline To be established in Swat, D.I.Khan and Abbottabad. Total shops inspected: 3316 Samples drawn: 1931 Substandard: 25 Spurious: 12 Shop sealed: 30 FIR: 13 Cases referred to PQCB: 313 Cases of illegal advertisement: 03 Cases of expired drugs: 06 Prosecution launched in Drug court:117 Cases decided by drug court : 04 Imprisonment/Fine by drug courts: Rs1,20,000/- Health Workforce Health Workforce Doctors (Recruitment of Doctors, Health Deptt has appointed 256 MOs (BS 17) Nurses and Technicians) on contract basis for a period of one year in Completed December, 2013. Fresh contract of one year Page | 26 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 has been granted to 345 MOs (BS 17) Adhoc employees. Health Department has advertised 258 seats of Medical officer, and appointment letters were issued till date. 400 BPS-17 posts of doctors are recently advertised through KPK, PSC. NTS Test has been conducted for recruitment of 400 numbers of MOs BPS-17 interviews will be held shortly. Interviews are in progress for recruitment of 400 numbers of District Specialists. 5.20 6. 6.1 Independent Monitoring Unit Timeline Nurses - 257 appointed through PSC - Appointed on Adhoc basis. - 171 out of 349 were Permanent through PSC. NOC for Adhoc extension of Female charge Nurses from PSC received as follows; - FCN 126 - Male Nurses 32 - Pending in commission - Female charge Nurses(FCN)=226 Posts - Fresh requisition to PSC on 26-01-2015 for 283 Posts of FCN. Technicians - 300 posts were vacant in KP in different categories of Technicians. - 95% were appointed and the rest of 5% were either court cases or unavailability of HR. Recruitment in process Under process E-Governance New Web portal with interactive and dynamic interface with citizens RTI Portal is completed and ready for inauguration. Training has been provided to 15 departments and user names and passwords have been handed over to focal persons. Ready for launch. Page | 27 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 6.2 Reforms Initiatives Current Status as on 31-03-2015 Public Grievances Redressal System 6.3 Online Admission Schools/Colleges to HS 6.4 e-Showcasing of Industrial and Regional Products & Services of KP 6.5 Prison Management Information System/Bio- Metric verification system for Prisoners. 6.6 Citizens Facilitation Centers Timeline Short code 8889 is integrated and is Launched in functional for general public. education and Launched for Education on 25th September, Health. 2014. Will be launched in Consultation with Police and Revenue LG&RDD soon. Department is in process for quick launching of the system for their departments. Note for Chief Secretary has been moved by the department for rolling out of the system to all departments. Situational analysis i.e examination of Will be ready by next existing data of Colleges, Higher Secondary session. Schools and Higher Education Deptt completed. To be funded from ADP Scheme “ICT Facilitation Center”. Inception report has been approved. e-Showcasing of regional products via Launched. website www.eshowcasekp.gov.pk MoU is ready to be About 400 firms registered, so far. signed between Website launched. ST&IT and Sarhad Display center established in Govt Technical Chamber of Teachers Training Centre Phase-VII Commerce. Hayatabad. Display Centre now being visited by producers and industrialists. Re-survey of the Firms has been started for technical support on the web portal. Seminar for promotional campaign held with SIDB. Completed in Peshawar and Haripur Jail. Ready for Survey of 16 jails completed. inauguration in Human Resource has been deployed in the Peshawar, Mardan respective Jails. and Haripur. Software installation has been completed. Bannu and D.I Khan Prisons in progress. One window operation for services delivery MoU with NADRA such as NIC, Domicile, Arms & Driving signed. License etc. Consultative process 04 centres being established in Peshawar. with other PC-I for the scheme has been approved by departments is in final the PDWP. stage. Consultative meetings have been done with NADRA. Contract agreement has been draft and ready to be signed with NADRA. Page | 28 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 6.7 Reforms Initiatives Current Status as on 31-03-2015 Timeline Tele Centers 6.8 E-Recruitment 6.9 Automation of Arms License 6.10 District e-Services -Domicile 6.11 IT Excellence Center 6.12 e-Procurement 6.13 Traffic Control and Monitoring System Peshawar District A USF (Universal Services Fund) Ministry of IT and NADRA Project. A total of 73 Sites to be established mostly in un-served and SemiServed areas. Site identification and provision of land by the Provincial Government. Construction and operation of the centers for initial 3 years by USF Ministry of IT. Will be embedded in new Web Portal. Review of recruitment policies is in process and development of portal is completed and is in testing phase. Launched in Peshawar only for Government Servants. Extension of the facility to common public upon proper inauguration. Server Room Established in Home Department. Printing of cards at Arms Sector has been started successfully. Issuance of cards at DC Office has been started. Deliberation between Home and ST&IT Departments on process re- engineering and reduction of the number of steps involved is in process. ST&IT Deptt has moved a summary to Chief Secretary on process re-engineering for the grant of domicile. Running successfully in Peshawar since 2008. 315 students and 80 Govt. officials trained. Will be rolled out to all Divisions of Khyber Pakhtunkhwa Revised PC-I for seven centers has been approved. Survey of the 73 identified sites completed. Action on part of Federal Govt awaited. Ready to launch. Launched. District wise implementation will be started soon. Issues with Home Deptt to be resolved. One functional and six additional centers in universities being established. MoU with CISCO has been signed. MoU with Oracle will be signed soon. The system will be ready till June, 2015. Revised PC-I approved. To be funded from ADP Scheme “ICT Facilitation Center”. Contract has been awarded for development of e-Procurement portal. Cost of the project is 59.6 million. Installation of surveillance cameras at 40 sites of Peshawar completed. Ready for inauguration in Police Station Gulbahar Peshawar. Page | 29 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 6.14 Provincial Data center ICT Policy and Planning for KP 7. 7.1 7.2 7.3 7.4 Master Control Room established in Traffic Police Headquarters Gulbahar. Smart devices (PDAs) handed over to some traffic wardens in Peshawar. Cost of the project is 254.46 million. Data Centre Established. Email service has been started. Official emails will be circulated across the provincial government departments. Wireless hotspot internet has been successfully deployed at Secretariat. IP telephoning has been installed at department’s Secretaries offices. ICT Policy and Master Planning for 05 years has been prepared and approved by the Chief Minister, Khyber Pakhtunkhwa. Local Govt and Rural Development Department Delimitation Process Gazzette Notification of delimitation of Local Councils in 26 Districts issued on 10-03-2014. Election Rules Gazzettee Notification of Khyber Pakhtunkhwa Local Councils (Conduct of Election) Rules issued with necessary amendment in consultation with Election Commission of Pakistan. e-Tendering System at all E-Tendering system has been implemented at all Local Councils, Local area authorities in Local Councils in Khyber District offices of Directorate General of Pakhtunkhwa LGE&RDD. Centralized and online system for enlistment/renewal of contractors. Online automatic Tender Form Generation and secure submission with security codes. Available at website www.lgkp.gov.pk Rules after devolution Rules of Business being drafted for: o District governments. o Town Municipals Administration. o Village/neighborhood councils. Bye laws for conduct of meetings at Local Councils being draft Timeline Ready for launch. SOPs prepared. Data of 12 departments have been uploaded in the data centers. ICT Policy and Master Planning for 05 years has been prepared and approved by the provincial cabinet. Implemented. Implemented Implemented By the end of April, 2015. Page | 30 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 7.5 Reforms Initiatives Current Status as on 31-03-2015 Website for Local Government Department 7.6 Transparency in recruitment 7.7 Beautification of Peshawar 7.8 Ring Road missing link An interactive website for the department is developed and is available at www.lgkp.gov.pk Interactive websites for subordinate offices also available at: www.pda.gkp.pk www.gda.gkp.pk www.sdda.gkp.pk www.mda.gkp.pk www.igkp.gov.pk/igs Introduction of NTS for recruitment against the vacancies in Local Council Board and all Local Area Development Authorities. Establishment of vigilance committee at Provincial and Divisional levels to ensure quality of project and curb corruption. Full implementation and compliance of Right to Public Services and Right to Public Information Acts. The beautification of Peshawar will be carried out through outsourcing. The following works have been identified: Rehabilitation/development of green belts both side of GT Road Peshawar. Pavement and fixing barbed wire 12 Standard Wire Gauge (SWG) fencing on GT Road Peshawar. Pavement marking in reflective thermoplastic paint from Motorway exit to Suri Pull on GT Road and from KFC to Phase-III Chowk. Improvement and repair of GT Road Peshawar from Motorway exit to PhaseIII Chowk. Construction of Northern Section from Charsadda Road to Pajjagi Road (Expenditure 166.297 M against allocation of 1279M) Timeline Implemented. Implemented Shortlisting consultants process. In Progress (March 2015). of under In Progress (2016-17). Page | 31 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Construction of Northern Section from Pajagi Road to Warsak Road (Expenditure of 365 M against allocation of 4273M). Construction of northern Section from In Progress (2015-16). Warsak Road to Nasir Bagh Road (Expenditure of 50 M against allocation of 2800 M) The Water and Sanitation Services Peshawar Implemented. (WSSP) has been established and has taken the water and sanitation tasks from MCP, UTC and PDA from 15th September, 2014. 7.9 7.10 7.11 7.13 Improvement of Municipal Services specially cleanliness and sanitation in Local Councils Launching of full-fledged To ensure safe and swift passage for commuters drive against all types of & pedestrians, anti-encroachment drives were encroachments in KPK launched. Anti-encroachment drives undertaken in cooperation with security agencies and district administration Drives led to the vacation of land allotted to graveyard and unauthorized extension of shops in the bazaar. Introduction of Reforms in All possible measures for economy in the the Revenue Department of expenses has been taken and significant Local Councils increase in the own financial sources has been achieved by awarding various contracts of the Local Councils for the financial year 2013-14 through competitive and transparent manner. Water and Sanitation Improvement project Income from Local Taxes 2013- 1327.461 14 M Income from Local Taxes 2014- 1747.661 15 M Increase over 2013-14 420.200 M Percentage increase 31.65% Improvement and rehabilitation of 18 Tube wells in UC-17 & 25 in Town-I Peshawar. Improvement and rehabilitation of 22 Tube wells in UC-24 & 30 in Town-I Peshawar. Rehabilitation of primary and secondary drains having total length of 2250 meters and 4400 meters. Implemented. Implemented. Implemented Page | 32 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 7.14 WSSC’s at Headquarters 8. Current Status as on 31-03-2015 06 Companies identified for Divisional Headquarters MC’s with an estimated cost of 5 billion. Registration under process with SECP. REVENUE & ESTATE DEPARTMENT Divisional 8.1 Reforms in Districts Revenue Administration 8.2 Computerization Record of Land Timeline Prescribed fee & taxes displayed in “Patwar Khana’s”, Tehsil offices, Sub-registrar offices and Addl: Assistant Commissioner Revenue “Patwaris” shifted to respective “Patwar Halqas” Fee/tax will be deposited in the bank/treasury via challan/deposition voucher by the seller or buyer. Operational in districts Peshawar, Mardan, Abbottabad & D.I.Khan Operational. Data entry in process o Data Entry Status District Total Data Data Mauz Entry in Entry as process complete d Peshawar 190 -190 Abbottaba 248 14 234 d Mardan 176 --176 D.I.Khan 390 07 186 Bannu 234 08 57 Kohat 145 10 26 Over all 1383 39 969 total o Mauza wise overall scanning Report Pesha Total complet Remaining warRHZ 190 ed 190 -Mutati 190 RHZ on Abbottabad Mutati RHZ on 345 Mutati 345 RHZ on Mardan RHZRHZ 176 RHZ Mutation Mutati 176 on D.I. Khan 176 14 284 --- 97 345 176 176 ----- Page | 33 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 RHZ Mutati on Bannu RHZ Mutati on Kohat RHZ Mutati on Buner RHZ Mutati on 8.3 390 390 337 --- 53 390 234 234 209 --- 25 234 145 145 145 ---- --145 167 167 167 --- --167 Timeline D-GIS status Mardan District Total Massavis 2405 Scaned 2405 Disciplinary proceedings Sept-2013 to January, 2015 initiated against Revenue Punishment Staff Patwa ri Kanun go Naib Tehsil Tehsil dar dar Dismissed 02 02 02 --- 01 01 09 10 07 01 04 06 Exonerated 03 --Other ----Punishment July to December 2014: 01 02 01 10 Suspended U/inquiry 8.4 Recovery/receipt position Fee/Tax 8.5 FD Total %ag Estimate Receipt e Land 79,000,00 23,162,80 29.3 2014-15 Tax/AIT 0 0 2 Registration 100,000,0 52,413,63 52.4 Fee 00 6 1 Mutation 1,430,000, 889,263,7 62.1 Fee 000 84 9 Stamp Duty 740,000,0 345,890,9 46.7 CVT 350,000,0 134,281,9 38.3 00 88 4 00 25 7 2,699,000, 1,445,013, 53.5 Total 000 133 4 Judicial cases in various Name Case Previ Tota Deci Bala of s ous l ded nce Revenue Courts Court Initia Case Cas SMBR 18 02 20 17 03 ted s es durin Membe 133 223 356 103 253 g r-I Membe 370 445 815 242 573 2014 r-II Ongoing process. Page | 34 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline The Board of Revenue has been awarded the job assignment of updation/revision of valuation table of all districts in Khyber Pakhtunkhwa. So far 16 districts valuation tables have been completed and remaining 10 districts are in progress. 8.6 Updating/Revision of valuation Table of all Districts in Khyber Pakhtunkhwa 9. 9.1 INFORMATION, PUBLIC RELATION AND CULTURE DEPARTMENT Journalist Endowment Fund The fund established with the seed money of 64 million for the Journalists getting injured and suffering loss of life in various incidences. The Provincial Assembly approved the act and the Govt Stationary and Printing Department published the Act on 04-042014. So far an amount of Rs. 4.085 million has been accrued out of which 1.15 million has been approved for journalists for medical treatment. Media/Publicity Cell PC-I approved. Total cost of the project is 250 million. 130 million already released by Finance Department during 2014-15. Department will open Assignment account. Mr. Najiullah Khattak has been appointed as Media Advisor Print and Electronic Media Bill The Provincial Cabinet has approved the draft Khyber Pakhtunkhwa Censorship of Motion Pictures (Films, CDs, Videos, Stages Dramas and Shows) Bill, 2015. For inclusion of certain amendments proposed by Mufti Fazal Ghafoor MPA the case is still under process. 9.2 9.3 Seventy seven (77) newspapers have been registered and Rs. 1.74 million have generated. Twelve (12) advertisement agencies have also been registered. ENERGY AND POWER DEPARTMENT Khyber Pakhtunkhwa press, newspaper, news agencies and books registration Act 2013 10. 10.1 Machai HPP 2.6 MW Mardan Physical work in progress Progress got delayed due to transmission In progress. Established. In progress. Implemented. Completion by end of 31st June, 2015. line issues with NTC (Federal Govt.). Page | 35 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline (Late: 2015) 10.2 Ranolia Kohistan HPP 17 MW Physical work in progress Progress got delayed due to transmission line issues with NTC (Federal Govt.). 10.3 Daral Khwar 36 MW Swat Physical work in progress Was April, Completion by 31st June, 2015. (Late: Was April, 2015) Completion by 31st March, 2015. 10.4 Lawi 69 MW Chitral and Matiltan 84 MW Swat 10.5 Koto Hydel Power Project (40 MW) Tender floated Financial bid of Lawi 69 MW was opened on February 27, 2014 whereas that of Matiltan 84 MW was opened on March 12, 2014. Bids evaluated, summary moved to Chief Minister for signing of contract. Peshawar High Court has decided both the Writ Petitions in favor of Govt of KP. Approval of Matalthan HPP, Lawi HPP is pending before CDWP. 3 member Committee formed by CDWP to resolve the issue. Management consultant selected Tender floated for EPC contractor. Revised PC-1 submitted due to cost increase. Status is pending Contract awarded. Completion by June, 2018. Will be put for PDWP on 25/3/2015 10.6 Jabori 10.2MW Manshera Karora 11.8 MW Shangla Management consultant selected Tender awarded for EPC contractor. Contract awarded. Physical work in progress CM to inaugurate on 29/3/2015 Completion by June, 10.7 Sharmai Dir-150 MW Shushai-Zhendoli Chitral 144 MW Shogosin Chitral -132 MW Approved by ECNEC on Dec 31, 2013 PPP mode TOR for hiring of consultant was discussed in 2018. In progress. DCSC meeting dated 20-3-2014. Energy Apex Committee meeting was held on 2/6/2014. As per decision of the Committee these projects will be carried out in private Sector. It has been decided by Energy Apex Committee that all the three project will be constructed through private sector. Page | 36 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline The Bids have been floated in the press Only two bids were received, and that only 10.8 Micro Hydel- Power stations UC/Village level and community run in Northern Districts of KP. 10.9 Feasibility of 3 more sites (Swat & Chitral) i. Torcamp-GodubarHPP Distt Chitral 409 MW. ii. Kari-Muskhur HPP Distt Chitral 446 MW. iii. GabralKalam HPP Distt Swat 110 MW. 10.10 Award of study for providing Electricity from Pehur Hydel Station (18 MW) to Gadoon Industrial Estate. 10.11 KP Oil & Gas Company for Shurmai Dir HPP which will be evaluated by 20th December, 2014. Shushgai HPP and Shogin HPP will be readvertised. Contracts not finalized for Shurmai, Dir, technical vetting is in progress 356 sites identified with capacity of 35.5 MW Bids received for Consultant and contractor. The contract has been awarded. The ground breaking ceremony has been performed on 7.8.2014. 180 Feasibility studies completed and community mobilized. 12 districts covered and 6 contractors have been hired Will be initiated with capacity of 950 MW during 2013-14 Advertisement being published for selection of consultant. DCSC opened technical proposal in its meeting held on 20-3-2014 Financial bids opened on 4th December, 2014 Status pending due to an inquiry ordered by the CS office. DCSC opened technical bids, evaluation of bids done Due to no competition, DCSC decided to readvertise. Contract has been awarded to a firm Bridge Factor on 29th July 2014. CEO notified Board constituted Signing of Production Share Agreement with OPL in process. Negotiation with KUFPEC for Paharpur Block Number of JVs in offing Company fully functional and hiring in process. Meetings underway with various companies. Seven meetings of BOD already held. 207 sites to be completed by Sept. 2015 Rest will be completed by 31st Dec 2017 Contract was to be awarded by 31th March, 2015 but now pending due to an inquiry Contract awarded Study to be completed by May 2015 For getting share in Pezu Bannu and Baratai Block, talks were held with OGDCL. For purchasing shares in oil producing fields (2% shares in Tall Block) in KP, talks are in progress with the POF, POF is seeking Page | 37 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 10.12 Establishment of Oil Refinery Process initiated Three sites identified i.e., Shakardara, Krappa and KhushalGarh PSO team visited the site and report is 10.13 Joint Development agreement for construction of two projects. i.e Lower Palas Kohistan 665 MW Lower Spatgah Kohistan 496 MW awaited. PSO has lost interest in the project and CM with MOL Pakistan and they showed interest in development of Refinery. Modalities not finalized. PSO forwarded pre-feasibility study and the same is under evaluation by the Deptt. MoU with PSO stand expired and will be placed before Apex Committee whether to extend MoU or otherwise. It has been decided to construct the Oil Refinery in private sector. MOU extension has been requested for one year MOU signed on 24th December 2012 PPP mode project. Cost of both projects: US $ 3 Bln The project was initiated by Federal Government. Draft JDA of one project i.e. Lower Spatgah is received and under scrutiny by Department. MOU expired on Dec. 31st, 2014 approval of Federal Government. Investment in Pezu (2.5% shares with OGDCL) and Barati ( 5% shares with MOL)blocks has been made. Agreement signed. Purchase of 10 % shares in Marwat block is in process with OPL. OPL is seeking approval of Federal Government. KPOGCL is vigorously pursuing the matter with concerned companies. Deptt has received pre-feasibility report from PSO. PSO has been asked to prepare bankable feasibility report. Due to massive cost on setting up refinery through private sector. It has been decided that refinery will be built at Krappa District Karak and Power Plant will be established at Khusal Garh. Comments on draft JDA have been conveyed to WAPDA Energy & Power Department is vigorously pursuing signing JDA with Federal Government. Page | 38 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 10.14 11 11.1 of Solar Electrification of P&D block in Civil Secretariat Solar Electrification hundred villages Request for extension of MOU has been filed by the private investor Management Consultant (MC) for phase-I has been hired. Management Consultant for Phase-II of the Project have been finalized. PC-1 pending for Phase 1 (100 villages) due to increase in cost MC and contractor hired Physical work in progress INDUSTRIES, COMMERCE AND TECHNICAL EDUCATION DEPARTMENT TEVTA fully operationalized Private Sector led TEVTA launched in Khyber as autonomous body Pakhtunkhwa for skill development of youth. Summary regarding notification of TEVTA approved and issued on 17-04-2014. Concerned Rules and regulations under process. Timeline JDA will be signed soon. Time line cannot be given as the meeting will be fixed by Ministry of Water and Power/WAPDA. Status pending due to the expiry of the MOU Tech Bids for Management Consultant and Contractor for PhaseII is has been completed. EPC contract for Phase-I will be awarded after revision of PC-I by April, 2015 as the bids were quite higher than approved PC-I cost. To be completed by 30th May, 2015 Implemented. TEVTA Act, 2014 is on table of the Khyber 11.2 Institutional Committees institutions) Management (for all 73 Pakhtunkhwa Provincial Assembly. Delegation of Power and Financial Rules of KP-TEVTA approved by the Chief Minister, KPK but not yet notified due to enactment. Ordinance 2014 has been circulated to all institutions for Notification of institutes Management Committees (IMCs). Institutes Management Committees will be operationalized after its constitution. Nomination of 10 IMCs completed and will be notified after Page | 39 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 11.3 11.4 Reforms Initiatives Current Status as on 31-03-2015 Timeline Adoption of National Vocational Qualification Framework A meeting held with GiZ including all TEVTAs Competency based Trainings A meeting held with GiZ, NAVTTC and all and NAVTTC implementation. for facilitation and Equipment for implementation of Competency Based Curriculum is being supplied by the GIZ and will be implemented / adopted in 04 Women Vocational Institutes upto 01-032015. New Assessment will be implemented after notification of NVTS and implementation of Competency Based Curriculum. TOT has been selected and training will be started w.e.f. May, 2015. Launched. Handed over to TEVTA for management Stake Holders for facilitation. Duration of trainings is from six months to one year. Trainings will be started on pilot basis in institutions. 11.5 New Assessment System A meeting held with GiZ, NAVTTC and all Stake Holders for facilitation. Spade work under process 11.6 Enhancing instructional skills( Four Institutions for ToT) In process. Two institutions already established. 11.7 Skill Development Programme (Rs. 100 million) Skill Development Programme with a total enactment of KPTEVTA Act, 2014. Final meeting was held and Draft was shared by the NAVTTC with KP-TEVTA in Dec, 2014 and will be adopted as and when notified by NAVTTC Islamabad. cost of Rs. 100 million launched to train 500 youth. 500 trainees have been selected and will be imparted free training in different modern vocational and technical traders in wellreputed national institutes. Page | 40 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 11.8 11.9 Reforms Initiatives Current Status as on 31-03-2015 MASAADA Interest Free Micro Credit Scheme worth Rs. 1.0 billion: Summary has been approved by the Chief Youth Challenge Project: (120 Million) Fund 11.10 12 12.1 Scheme dropped Funds returned to Finance Department 31/1/2015 was the last date for submission of applications. Launched. Status pending P&D requested for reappropriation of funds on 17/3/2015 Launched. Rs. 1.3 disbursed 23/3/2015 Establishment of 1st ever Technology University in Khyber Pakhtunkhwa COMMUNICATION & WORKS DEPARTMENT Hiring Of Consultants Consultants are being hired for all new schemes, costing more than Rs 100 Million (limit increased). In progress Khud Kafalat Scheme: 11.12 Minister, KPK on 09-09-2014, to divert funds of Rs. 1 billion reserved for Masaada to Khud Kafalat Scheme. Under the initiative technical and financial facilitation will be available to the skilled youth interested in starting demand driven commercially viable projects. The youth will submit their project proposals which will be evaluated by the committee for its viability and practicability. Will be implemented in collaboration with SMEDA and will cover youth between the age of 18-30 years. Youth Challenge Fund Project launched with a total cost of Rs. 120 million for issuance of interest free loans to skilled youth and establishment of their own businesses. 6 month diploma a prerequisite for eligibility Chairman Technical Board currently verifying applications. To overcome the present day energy crises through alternate energy resources the scheme with a total cost of Rs. 300 million was launched. Funds were not utilized P&D department requested to reappropriate funds to Khud Khifalat Scheme The Scheme with a total cost of Rs. 2 billion has been launched to overcome unemployment and generate economic activities in the Province through provision of interest free loans. Loan will range from Rs.50,000/- to 200,000/- for a period of 03 years. The scheme is formally approved. Being managed by TEVTA Roshni Scheme (A Soft Term Financing Scheme For Solar Energy) worth Rs. 300 Mn. 11.11 Timeline Billion as of Implemented. Shortlisting of consultants completed. Page | 41 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 125 PC-IIs of Road & Building Sector approved. RFP invited for approved PC-IIs. Site/Scope of work not identified for 03 schemes of Building Sector (ADP No. 77, 80 & 97). Technical Evaluation completed for 16 schemes. Financial Evaluation completed for 114 schemes. Combined Evaluation completed for 106 schemes. Consultants Selected for 106 Schemes. LOI/LOA issued to consultants for 106 schemes of Roads & Bridges (94), Buildings (08), Higher Edu; (01) and Health (03). 178 PC-IIs for Large Projects submitted for approval to client departments. 96 PC-Is for Small Projects submitted for approval to client departments. 25 PC-IIs’ and 210 PC-Is’ are still pending with client departments for approval. 32 PC-Is (ADP No. 796, 794, 796, 801, 812, 816, 818, 833, 834, 835, 836, 837, 838, 839, 841, 842, 843, 844, 845, 846, 848, 850, 851, 852, 853, 855, 863, 874, 881, 887, 922 & 977) of Road Sector approved. 2 PC-I (ADP No. 79 & 103) of Building Sector approved. Tenders floated against approved PC-Is. 12.2 Web –Based Tender Form Downloading Web based tender form downloading system created. Executive Engineers will upload BOQ and NIT and the bidder will be able to download tender form from his office. The system has been uploaded for test run. The Executive Engineer, Head Clerks and concern staff were trained. Operationalized. www.cwd.org.pk Page | 42 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Divisional Officers imparted preliminary training to contractors at district level. The system has been operational since 25/08/2013. 12.3 Approved and notified. Market Rate System (MRS) Existing system of Composite schedule of Rates (CSR) discarded. A committee was formed under the Chairmanship of Secretary C&W Department. 1600 construction items were collected from the market and verified. The complete MRS has been prepared, analyzed, compared with Punjab rates and was submitted to Finance Department on 15/08/2013. Finance Department issued approval vide SO (Dev-IV)/ FD/CSR/4-16/2012-13 dated 10/09/2013. MRS document will be updated by BiAnnually in a year. 12.4 Item Rate 12.5 Standard Contract Document for Consultant 13 13.1 The Competent Authority has already approved its implementation. Implemented. Vetted and circulated. A committee was constituted under the chairmanship of the Managing Director PKHA for re-drafting consultant agreement. Law department had resubmitted the vetted Consultant Agreement vide letter No. ALDi/Legis5(7)95 dated 26/11/2013. The Finance Department circulated it among all Departments. SOCIAL WELFARE, SPECIAL EDUCATION AND WOMEN EMPOWERMENT DEPARTMENT Establishment of Center of MoU signed with CHEF International and has C&W Division-II Excellence for Special started capacity building of staff of SW Peshawar has yet to Education. Scheme for construction of additional start work after portion was approved by DDWP at total cost completion of UN Convention on the Right of Rs.26.00 million on 15.12.2014 to meet financial bids. of Person with Disability additional requirements. The portion will be (UNCRPD) ARTICLE 24. A scheme for construction of additional completed upto 30th portion and strengthening of the Special Page | 43 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 13.2 Reforms Initiatives Current Status as on 31-03-2015 Formulation of Provincial Special Education Policy. UN Convention ARTICLE 24: (UNCRPD) 13.3 Up gradation of Special education schools (from Primary to High and High to Higher Secondary Levels). UN Convention ARTICLE 24: (UNCRPD) 13.4 Establishment of Special Education and Rehabilitation Sciences Department at the University of Peshawar UN Convention ARTICLE 24& 26: 13.5 (UNCRPD) Affiliation of Special Education Schools to General Education Boards. Education Complex Hayatabad to convert it to the excellent centre for Special Education has been included in the ADP 2014-15. Team Constituted with two deliberation sessions conducted. Draft Policy prepared in Phase 1. Consultation meetings and amendments to be finalized in phase-II. Last consultative Workshop was held in the Area Study Centre Peshawar which was attended by different stakeholders to share their inputs Draft Policy has been prepared and a meeting is being called of the concerned to further examine then Policy before approval of the competent authority. Up-gradation of schools included in the next ADP 2014-15. Two Schools one at Peshawar and one at Kohat have been upgraded. The CM has approved upgradation of Deaf & Dumb School for Girls at Yakatoot Peshawar and fresh SNEs. Rest of schools is upto Primary level and first them would be upgraded to middle level and then to Secondary levels in coming years. As agreed with the KMU, the Physiotherapist/officers of Special Institutes/schools running in Peshawar, Mardan, Kohat, Dera Ismail Khan and Abbottabad having the required qualifications will join KMU for further capacity buildings in the next session. Director Special Education Complex finalizing the concept paper. Status Analysis of the current situation of Special education schools is completed. Meeting with Elementary & Secondary Education Deptt& BISE Peshawar was held on 21.03.2014. Timeline June, 2016 as per approved PC-1. Draft Policy was made. In pursuance to decision of the meeting held on Feb 04, 2015 in the office of the Secretary, SW, the Director, SW has been asked to hold workshop of all stakeholders to further refine the policy. Up-gradation of one school at Haripur was approved by PDWP. C&W Division Haripur has started civil work to be completed upto 30th June, 2016. Continuous process. After up-gradation of Deaf school Yakatoot the same will be affiliated with BISE Peshawar during current year 2015. Page | 44 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 13.6 Reforms Initiatives Launching Comprehensive Sensitization campaign. UN Convention ARTICLE 8: 13.7 13.8 (UNCRPD) Current Status as on 31-03-2015 Timeline Two Schools one at Peshawar and one at Kohat have been affiliated with the respective BISE. 5 Institutes have been affiliated with the Boards of General Education in out of 39 schools. Affiliation of other Special Education Institutes will be made after their upgradationto Secondary levels. Team formed. Resource mobilization and content finalization under process. Campaign has been launched and functions have been arranged in district Peshawar, Swat, Mardan, Swabi , Abbottabad . A distribution ceremony of Tricycles and Wheel Chairs with sensitization/ awareness component was held 4 districts. Continue. Revised Rules of Business for Vetted and circulated to all concerned. Department. NGOs Clean-up/ Regulation Committee working on new Law. Initiative. There is no provision of de-registering an NGO in present Registration Act. Clean up operation completed. Total registered NGO/VBOs = 4000 Active NGOs/VBOs = 1583 Non-Active NGOs/VBOs = 2100 13.9 Amendment in Law of Provincial Council for Social Welfare. 13.10 Amendments in Law for Provincial Council for Rehabilitation of Disabled Persons (PCRDP). 13.11 Capacity Employees. building The department has decided to implement same Law instead of further amendments. Finalized Redrafted Voluntary Social Welfare Agencies (Registration & Control) Bill, 2014 & has been submitted to Law Department for vetting on 12th March, 2015. Decided. The Law Department has advised that Draft Law prepared Disabled Person (Employment and and sent to Law Rehabilitation) Ordinance, 1981 duly Department for amended in 2012 is a comprehensive law and vetting. if the Administrative Department intends to improve the said law then propose amendments in the said law accordingly and forward to the Law Department for vetting. of Malakand Division selected as a pilot project. 7 Officers have been Committee notified under the Chairmanship nominated for of Deputy Secretary, Zakat with the TORs to Capacity Building Training Course in Page | 45 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 13.12 discuss with field officers the training Japan scheduled in modules and completes the task. April, 2015. Modules orientation & Implementation will JICA is conducting be Phase wise. special training for Draft Module prepared. employees of Special Education Institutes. Scanning of Industrial Scanning of all Industrial Training Centers Completed. Training Centers. (ITCs) in Process. 32 centers were closed due to poor performance/non-functional. Purchase of Brail Printing Revised PC-1 was approved on 03.03.2015 at Will be purchased upto Press a total cost of Rs.7.500 million. 30.06.2015. Purchasing is in progress. 13.13 13.14 13.15 13.16 14 Current Status as on 31-03-2015 Formulation of Foundation Khyber Pakhtunkhwa Foundation for for Deserving Widows and Deserving Widows and Special Persons has Special Persons. been established under the Provincial Act 2014. Various meetings of Board of Directors were held. Rs.250 million was released by FD as endowment fund to the Foundation. Chief Minister has approved merging of TanzeemLissail-e-WalMahroom with the Foundation. Draft amended bill has been submitted for approval for legalization of merging of the Tanzeem. Policy for Women Draft Policy prepared. Empowerment Child Marriage Restraint Bill Draft bill prepared. Timeline Establishment of Khyber Pakhtunkhwa Foundation for Deserving Widows and Special Persons by 30.06.15. Rules of the Foundation are being prepared in light of Foundation Act. Office hiring is also in progress. The Chief Minister, Khyber Pakhtunkhwa has approved the Women Policy and the department has notified the said policy to all concerned for further necessary action at their end. Draft Bill has been forwarded to the Islamic Ideology Council for their comments/views. Response is still awaited. AUQAF, RELIGIOUS & MINORITY AFFAIRS DEPARTMENT Page | 46 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 14.1 Khyber Pakhtunkhwa The bill has been approved by the Provincial Completed Charitable & Religious Trusts Cabinet in its meeting held on 30-12-2013 as Bill, 2013. conveyed by minutes dated 28th Jan, 2014. Governor, Khyber Pakhtunkhwa has approvedthe Bill for its legislation in the Provincial Assembly. Introduction notice was received from Law Department which was further sent to Minister for Auqaf, Hajj & Religious Affairs Department for signature. The bill has been tabled for discussion in Provincial Assembly, Khyber Pakhtunkhwa. However, the department has been informed telephonically that the bill has not been approved. The bill has now been passed by the Provincial Assembly in its session held on 2910-2014 and assented to by the Governor Khyber Pakhtunkhwa on 12-11-2014.The bill was published by the provincial Assembly. Constitution of High Powered A high powered committee has been Matter is being Committee for taking back constituted, headed by Additional Chief vigorously pursued. possession of Auqaf Secretary (P&D). Keeping in view the Properties. First meeting of the committee was held on nature of task exact 19-12-2013. timeline. In light of the minutes of the above said meeting case to case issues are taken up at department and district administration level. Department has been continuously asking district administration for their support and taking over of illegal possession and is trying its best for the same. Following actions on minutes are initiated; Issues regarding 17 different auqaf properties in 7 district of Khyber Pakhtunkhwa are under way for resolution. District wise details are as follows. 14.2 Current Status as on 31-03-2015 District Peshawar Charsadd Abbottab a dd Mansehr a Mardan Bannu D.I. Khan Resolve Unresolve d d 3 2 2 0 1 0 0 1 1 1 0 1 0 1 Timeline Subjudice d 2 1 1 1 0 0 0 Page | 47 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Total 14.3 14.4 14.5 15 15.1 15.2 7 6 Timeline 5 MINORITY AFFAIRS Khyber Pakhtunkhwa The Bill has been approved by the Provincial Protection of Communal Cabinet. Properties of Minorities Bill, Governor, Khyber Pakhtunkhwa has 2013. approved the Bill for its legislation in the Provincial Assembly. Introduction notice was received from Law Department which was further sent to Chief Minister, Khyber Pakhtunkhwa for signature. The bill has been passed Provincial Assembly and published dated 22.12.2015. Khyber Pakhtunkhwa Evacuee The Bill has been approved by the Provincial Trust Properties Cabinet. (Management & Disposal) Governor, Khyber Pakhtunkhwa has Bill, 2013. approved the Bill for its legislation in the Provincial Assembly. Introduction notice was received from Law Department which was further sent to Chief Minister, Khyber Pakhtunkhwa for signature. The bill has been passed by Provincial Assembly and published dated 24.12.2015. Khyber Pakhtunkhwa Hindu The Bill has been approved by the Provincial Disposition of Hindu Cabinet. Disposition of Property Bill, Governor, Khyber Pakhtunkhwa has 2013. approved the Bill for its legislation in the Provincial Assembly. Introduction notice was received from Law Department which was further sent to Chief Minister, Khyber Pakhtunkhwa for signature. The bill has been sent to Provincial Assembly for discussion. However the department has been informed telephonically that the bill has not been approved yet which will be discussed in the next assembly session. POPULATION WELFARE DEPARTMENT Formulation of Population Recommendations for Population Policy Policy Khyber Pakhtunkhwa consolidated and incorporated in the draft policy prepared by the Population Welfare Department, KP. Draft Policy refined by the consultant hired by UNFPA. Improvement of Service Delivery Family Welfare Centers Improved Qualification Criteria finalized and (FWC) submitted for the approval of Secretary PWD. Task completed. Bill passed. The bill was deferred by the provincial Assembly in its sitting held on January 5, 2015. The policy circulated to various related Secretaries, Govt. of Khyber Pakhtunkhwa, for comments. Reform Implemented. Page | 48 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 15.3 15.4 15.5 15.6 Reforms Initiatives Current Status as on 31-03-2015 Timeline Improved Qualification Improved qualification criteria for Basic FWW Criteria, with relaxation for Training notified. special hard areas for induction in Basic Training course of Family Welfare Workers (FWW). Reproductive Health Services Specialized training Program for WMOs and Reform Implemented. Centers Type 'A' (RHSC ‘A’) other staff included in Annual Work Plan of RH Specific advance training UNFPA 2014. for WMOs and other technical Letter of understanding (LoU) signed with staff for job enrichment. UNFPA Funds transferred from UNFPA to the Department’s Account, Course and Trainers selected. Course completed in September, 2014. Mobile Service Units (MSU) i) Conversion of current Matter discussed with the Finance Reform Implemented WMO post on fixed pay of Department. MSU to BS-17 as a regular The fixed pay of WMOs of MSU increased Employee from Rs.25000 to Rs.50000 per month. Appointment Letters issued. ii) Creation of Additional post of FW Counselor BS11 to assist the WMO on analogy of other provinces Social Mobilizers Revision of Qualification criteria of Social Mobilizers to include Imams/ Khateebs, to get community support for FP/RH services. Summary drafted. Case taken up with Finance Department. Case Hiring of Imam/ Khateebs as Social Mobilizers Implementation under process and will be finalized by mid of April, 2015. of Project for the subject activity will be carried out in the 2015-16 due to limited time left to carry out the whole exercise. has been included as pilot project in Annual Work Plan 2014 of UNFPA which has been forwarded for approval. Letter of understanding (LoU) signed with UNFPA Initiative of Pilot Project of Imam/ Khateebs will be included in AWP, UNFPA, 2015 Increased Public Utilization of Family Planning (FP) and Reproductive Health Services through Quality improvement i) To maintain minimum Need Assessment completed. Reform implemented Family Planning standards Printing of Manual has been included in a 'Manual of National Annual Work Plan 2014 of UNFPA which has Standards of Family been forwarded for approval. Planning will be provided ' Letter of understanding (LoU) signed with to all stake holders UNFPA. Printed Material Received from UNFPA. Distribution Plan issued. Page | 49 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Manual for Family of National Standards for Family Planning being distributed. 15.7 15.8 15.9 15.10 ii) To improve Knowledge Refresher Training Plan for year 2014-15 has Reform Implemented and skills, Mandatory been approved by the Secretary (PWD). Refresher training shall be Funds for the training cost included in current provided to each service year’s budget. provider of the department at least every three years Strengthening of Training Institutes i) Strengthening of RTI Proposal of Research Cell formulated. Case under process Peshawar by Matter taken up with Finance Department for and will be finalized Establishment of creation of posts. byend of April, 2015. Research Cell to deal with The Proposal included in Integrated the task of Research. Development Strategy. ii) Accreditation of FWW Meeting held with the Secretary Medical Accreditation process diploma by the Medical Faculty on 15th April, 2014. being perused with the Faculty KP. The terms and condition were found Pakistan Nursing unsuitable for accreditation of Family Council. Welfare Workers Diploma. Inspection of Regional Case taken up with Pakistan Nursing Council Training institute by Inspection fee submitted approved by Pakistan Nursing Finance Department, KP. Council is expected by end of April, 2015. Reorganization of The Draft Proposal for Communication, Training Case under process Directorate General and Research wing has been developed. and will be finalized by Establishment of separate end of April, 2015. Communication, Training and research Wing in the Directorate General. Revival of Divisional Proposal under re-consideration in light of Revival of Divisional Directorate And new local government act, 2014. Directorates will be Strengthening of Tehsil Level initiated subject to Tier implementation of Local Government Act, 2014. Enhancing Access to FP/RH Proposal submitted to the Secretary, Reminder issued to services Department of Health, Government of KP. Secretary Health for Family Planning information Matter Taken up in the Provincial Technical issuing Instructions to and practical trainings to be Coordination Committee with Department of Department of Health. made part of training in all Health on 20th June, who agreed to send Public /Private sector Medics instructions to all health outlets. and Paramedics Teaching Institutions, health care outlets, hospitals, and Page | 50 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 15.11 16 16.1 Reforms Initiatives Current Status as on 31-03-2015 Maternity homes (including post abortion and postnatal family planning). Improve Coordination with Coordination Line Department especially formulated. Departments of Health. Constitution of Coordination Committee at village council level. Committee Timeline composition With establishment of Local Bodies, coordination committees will be constituted at village council level as and when the elected bodies are in place. SPORTS & TOURISM DEPARTMENT Jawan Marakaz Established in 7 Divisional HQs Events being held under Youth Advisory Boards. Activities being carried out in all districts. 16.2 Sports Stadiums 5 sites on state land cleared. Section-4 signed by District Administration and DG Sports 22 sites notified. 06 section 4 requests have been forwarded to the deputy commissioners for issuance. 03 sites to be re-identified DDWP dated 31-12-2014, 7/1/2015 and 19/1/2015 has approved 47 playgrounds The activities carried out by the 07 districts are being compiled and gist to be shared generally. Provincial Youth board still not constituted. An amount of Rs. 253.5 million released for play grounds out of CFY allocation of Rs.507.000m.DDWP of 45 sites PC-I held on 31-12-2014 and 19 sites clear handed over to C&W to start levelling, dressing etc.47 sites processed for playgrounds and almost 25 to 30 have to be cleared to cover four play grounds in Peshawar and 75 tehsils of 26 districts. and requested to provide funds to C&W to the tune of fifteen million each Page | 51 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 16.3 Talent Hunt Programme (2014) 16.4 Khanpur Lake Festival Started from January 25, 2014 and completed on 10th March 2014 with Rs. 20 Million grant from the Provincial Government. Phase I: search for players throughout the province (25 January – 31st, January 2014), completed. Phase II: camp Training (1st February – 08th, February, 2014), completed. Phase III: League Tournament (09th February – 10th March, 2014), Completed. Completed Last year 2013-14, 35 players selected by the respective head coaches in the provincial talent hunt to be utilized in inter provincial matches after certificate distribution Ceremony and a two weeks camp for final Completed. This year to be held in April/May. Launched Held on 21, 22, 23 February 2014 16.5 Second phase of Talent hunt for 19 play grounds i.e. Rs.285m. Additionally 15 sites more cleared and AA issued for execution for which Rs.225m required from other sectors saving of P&D. In a meeting under the chairmanship of CS the C&W departments will complete works on 42 grounds by 30/6/2015 Second phase of talent hut for cricket, hockey, football, volleyball, basketball and badminton is in final preparation out of Rs.20m for the purpose in ADP This year the program will be for under 16 players. Page | 52 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 16.6 Indus / Kabul Boat Cruise Timeline Ferry (Boat) launched in Indus River in D.I Khan. Ferry (Boat) launched in Khanpur Dam, Haripur. 16.7 Opening of Supat Lake/Meadows: 16.8 Development of Gabeen valley as a tourist resort 16.9 Development of Kumrat valley as a tourist resort Umbrella PC-I approved by PDWP at 09-10- 2013. PC-II of the scheme was approved by DDWP on 13-1-2014. PC-I of the individual scheme is pending with the C&W Department. Land acquisition at the district level is in process Umbrella PC-I approved by PDWP at 09-10- 2013. PC-II of the scheme was approved by DDWP on 13-1-2014. PC-I of the individual scheme is apporved Site approved and work underway Umbrella PC-I approved by PDWP at 09-10- 2013. PC-II of the scheme was approved by DDWP on 13-1-2014. PC-I of the individual scheme is pending with the C&W Department. 16.10 Log huts, Restaurants and skiing facilities at Malamjaba, swat. Umbrella PC-I approved by PDWP at 09-10- 2013. PC-II of the scheme was approved by DDWP on 13-1-2014. PC-I of the individual scheme is pending with the C&W Department Leasing agreement under inquiry by the Ehtesab Commission D.I Khan Cruise/ boat is refurbished and operationalized in collaboration with DC D.I.Khan. Operational in Khanpur, Haripur. DC Kohistan has deputed Tehsildar to finalize the sites for camping, trekking and construction of Rest House construction of Rest House. Sites approved and work underway TCKP has got 5 kanal plot at Kumrat Valley. And the DC Dir upper has been requested to hand over the site to C&W in consultation with local communities for Rest house. Status pending The facility has been offered through PPP mode for operationalization by the private sector through BOI&T to MS. SAMSUN at Rs. 12 million per annum with increase after of Page | 53 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 16.11 Rest Areas and Sign Boards Umbrella PC-I approved by PDWP at 09-10- 2013. PC-II of the scheme was approved by DDWP on 13-1-2014. PC-I of the individual scheme is pending with the C&W Department. Land acquisition at the district level is in process PC-1 not prepared as yet 16.12 Introduction of caravan culture Draft advertisement for purchase of two mobile caravan vehicles for placing in international press is under preparation and collaboration with CM Investment Cell. Not finalized ten percent each year. On 04 September the Agreement signed site being handed over however Forest department reservations are also being clarified who have reserve. Status pending due to an inquiry The detailed cost estimate and PC-I are still awaited from the C&W Department. The department is working to put sign boards on all archaeological, touristic and other significant sites. The department has moved another PC-I to do the scheme in components of less than Rs. 60m through DDWP after clearance from P&D as the total tourism initiatives is Rs. 300m. Status pending The locally fabricated caravan are being searched around the country to institutionalize caravan culture besides considering tourist coaches Page | 54 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 16.13 Opening of Batakundi Tourist Resort 16.14 Sports Equipment for KP 16.15 Sports Activities 16.16 Events Base of the tourist hostel laid Old huts of C&W transferred to TCKP are being restored. Works stopped due to extreme weather conditions. Work to be resumed by end of March, 2014. Equipment of sports worth Rs.25M are in the process of finalization for distribution at the grass root level Items purchased and being supplied Sports activities calendar for the female and male are being planned for the FY and an amount of Rs.25M is available for the purpose. Shandoor, kalash, broghul,cultural and festivals planned for 2014-15 and PC-I approved 17 17.1 17.2 17.3 MINES & MINERALS DEVELOPMENT DEPARTMENT Exploration and Development of Minerals Study for exploration and PC-II scheme “Study for Exploration and Management of Mineral in Management of mineral in Chitral” has been approved at a total cost of Rs. 10.90 million Chitral in 08-12-2014 The work under this project shall be outsourced. Expression of Interest for the assignment has been re-advertised for the third time on 25.02.2015, (as insufficient number of proposals / bids was received). Geo-chemical survey in Third phase has been completed. Mardan, Peshawar, Kohat Fourth phase is due for completion. Divisions Exploration of Coal Resources in Khyber Pakhtunkhwa PC-II scheme “Exploration of Coal Resources in Khyber Pakhtunkhwa” has been approved at a total cost of Rs. 52.00 million in 08-122014. The work under this project shall be outsourced. Expression of Interest for the assignment has been re-advertised for the Status pending Work to be restarted in April, 2015 Expected to be completed by end of summer 2015. To be completed by September, 2015 Distribution expected in April, 2015 Operational Shandoor festival expected in June, 2015 Kalash Spring in May, 2015 Bids / proposals have been opened on 25.03.2015 and under process of technical evaluation The scheme will be completed up to June, 2015. Bids / proposals have been opened on 25.03.2015 and under process of technical evaluation Page | 55 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 17.4 17.5 17.6 17.7 Reforms Initiatives Current Status as on 31-03-2015 third time on 25.02.2015, (as insufficient number of proposals / bids was received). Exploration License will be granted through competitive bidding. Prospect portfolio and bid document have been prepared and offered for competitive bidding through media on 18.02.2015 Encouraging private sector to follow up past geo-chemical anomalies and completion of Prospecting & mining studies by mining concessionaires 100 mining leases. Improvement in Regulatory Framework (Licensing Procedure) Establishment of Mineral Park PC-I scheme “Establishment of Mineral Park in Khyber Pakhtunkhwa in Khyber Pakhtunkhwa” has been approved at a total cost of Rs.4.375 million in 07-012015 Scheme shall be out-sourced for identification, procurement of suitable land, architecture design of building and sample collection. EoI was invited through newspaper i.e. Mashriq on 19.02.2015. Survey conducted to bring the All idle areas lease have been cancelled and idle areas of mining shall offered to investors through concessions into operation competitive bid once the ban is lifted (about 30 areas) Khyber Pakhtunkhwa Minerals Development Act 17.8 Marketing of Minerals Commencement of work on mining cadaster system Work on draft Khyber Pakhtunkhwa Minerals Development Act has been initiated. Sent to Law Department for vetting. Issue with Forest Department regarding royalty on mineral yet to be settled. As per Forest Ordinance 2002, Forest Department claimed royalty of minerals in forest zones whereas; collection of royalty on minerals is Minerals Department mandate. Basic information layers of GIS have been developed i.e. District boundary, geological, geo-chemical analysis of Khyber Pakhtunkhwa and known mineral occurrences information layer. Development of other information layers (i.e. up-dation of mining concessions data layer) is on-going process Department is facing acute shortage of experienced geologists as a complete batch of geologists retired from service in the period of 2012-15 Timeline Bids / proposals have been opened on 25.03.2015 and under process of technical evaluation Bids / proposals have been opened on 25.03.2015 and under process of technical evaluation Subject to the approval of Mineral Development Act by the Cabinet / Assembly Department has submitted draft Act with Law department to vet. On-going activity Page | 56 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 17.9 Study on prospects 50 Current Status as on 31-03-2015 minerals 17.10 Creation of Information Provision and Processing Cell at Peshawar (One window facility) 17.11 Road shows and exhibitions for marketing 17.12 Preparation of monitoring & reporting modules by existing monitoring and coordination team 17.13 Litigation and Legal Aspects Establishment of Legal Cell Delineation of 15 blocks in Chitral Delineation of 13 blocks in Malakand Delineation of 10 blocks in Hazara have been completed and offered for competitive bid through Expression of Interest in local and foreign print media and on website Six month extension (up to April 30, 2015) has been granted to consultancy work in respect of PC-1 Scheme “Institutional Strengthening of DGMM”. In discussion with BOI (Federal ) to make one window at Federal Level Minerals Development Department has participated in IRS road show in Dubai also in PDAC in Canada in March 2015 and for the first time mineral of the Khyber Pakhtunkhwa Province were show cased through outlet / stall at both venues, response of investors was encouraging Monitoring modules have been developed also 120 new posts of Mineral Guards etc, approved through SNE on regular budget. A PC-1 titled “Assessment Study & Establishment of Mines Monitoring and Surveillance Units in Mineral Bearing Areas of KP” has been approved at a total cost of Rs. 413.00 million on 28.01.2015 to carry on the mines / minerals monitoring work. Two litigation officers (Peshawar & Abbottabad) have been recruited on project posts in the scheme titled “Institutional Strengthening of DGMM” whereas; additional two posts of litigation officers (for Karak & Swat) have been included in the revised PC1 A MIS module (software) of “Case management system” has also been developed and presently under process of testing Safety and welfare of mine labors Timeline Last date for submission of technical bid / proposal is 30.03.2015 Work will be completed by April 2015. Running late Work will be completed upto June 2015. Department has taken initiatives to identify potential areas to be offered for investment in next IRS road show in UK & USA Admin Approval has not been yet due to Finance Department observations Recruitment of litigations officers shall be completed in June 2015 Page | 57 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 17.14 Work on coal model mine to continue in District Nowshera 17.15 Current Status as on 31-03-2015 PC-1 has been revised on 19.02.2015 with a total cost of Rs. 196.541 million, date of completion of the scheme is 30.06.2017 Project staff has been appointed Construction of site office almost (90% work) completed Survey for Coal Mine has been completed, location has been identified Agreement with lease holder (area where model coal mine to be established) have been signed and approved Finalization of consultation on Finalization of consultation on draft KP Mines draft KP Mines safety Act and safety Act and Minerals Development Act. Minerals Development Act. mining Website developed. Testing in progress Timeline On track Draft KP Mines Act has been completed and will be processed for approval of competent authority shortly. 17.16 Website for department Website will be launched in April, 2015. Implemented. Work would be completed in current fiscal year. Continued process. 17.17 17.18 New Mineral Policy for KP Establishment of five Dispensaries & two water supply schemes Launched on July 07, 2014. Appointment of staff, purchase of medicine, medical equipment’s etc for the Dispensaries has been completed. Work on Water supply schemes (Tube well) at Bampokha in District Buner is in progress by PHE Dept, whereas work on Tube well in Palo Dheri, Mardan will be completed in the current fiscal year. 17.19 Award of 500 scholarships to the children of the mines labor 78 numbers of scholarships has been awarded till up to now. Continued process. 17.20 Development of draft curriculum for the accredited diploma course in mining technology PC-I scheme Study for Establishment of School of Mines and Rescue Station” is under process. Draft curriculum shared with TEVTA for vetting. Work will be completed by June 2015. Strengthening of Mineral Testing Facilities and R&D Page | 58 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 17.21 Planning for strengthening of Testing Laboratory Current Status as on 31-03-2015 the Mineral 18 18.1 IRRIGATION DEPARTMENT Consultancy Services 18.2 Establishment of Complaint Cell 18.3 Establishment of Vigilance Committee 18.4 Establishment Group 18.5 Structural Reforms of Working Timeline Procurement of equipment under process and civil work (construction) is completed. Extension granted by DDWP, quotations were invited from interested bidders / parties through media also on website Work shall be completed by June, 2015. Consultancy services regarding construction supervision of the ADP schemes 2013-14 had been hired while for the ADP schemes 2014-15, award of consultancy is under process. Complaint Cell has been established since 26-06-2013 functioning in line with the Chief Minister’s Secretariat Complaint Cell. Vigilance Committee of the Irrigation Department comprising of senior officers has been notified since 28-06-2013. A working group has been constituted comprising of technocrats and legislators to suggest/recommend action plan for the department. Re-structuring has been carried out by relocating 2 Irrigation Divisions at District Charsadda. Construction of 15 No. small dams with financial outlay of Rs. 18000.00 million to bring 45000 acres of barren land under irrigation have been planned up to 2018. Work on 2 small dams i.e. Gadwalian dam Haripur (Rs. 848.21 M)(CCA 3700 acres) & Jalozai dam district Nowshera (Rs. 632.155 M) (CCA 900 acres) have been initiated. June 2018. Implemented Developmental Reforms 18.6 Construction of 15 Nos. Small Dams Gadwalian dam district Haripur (Physical progress is 70%), Jalozai dam district Nowshera (Physical progress is 35%) Page | 59 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Contract for 01 new approved ADP scheme i.e Shah Kaleem Dam Nowshera (Rs. 575.20 M) (CCA 900 acres) has been awarded. Contractor mobilized on site. Site camp/office established. Physical work on spillway & dam body has been started. Tender formalities of 01 new approved ADP schemes i.e Sitti Kali Dam Bannu (Rs. 779.749 M) (CCA 2600 acres) are under process. 18.7 Construction of 3 Nos. new major canals systems i. CRBC 1st Lift ii. PHLC iii. Siran Right Bank Canal 18.8 Construction of 20 Nos new small irrigation channels (To be copied from here) PC-I for CRBC (CCA 286,000 acres) is lying with Federal Govt. for want of approval and arrangement of funds Project Preparatory Technical Assistance (PPTA) for Pehur High Level Canal Extension Project (CCA 25105 acres) is under way by the Consultants of Asian Development Bank Construction of Siran Right Bank Canal Mansehra (CCA 12,000 acres) has been included in ADP 2014-15 and PC-I has been forwarded to Federal Govt. for approval of CDWP. Planning for 20 small irrigation channels involving financial outlay of Rs. 2400.00 million to bring an additional 20,000 acres under irrigation. In the current year ADP the following Small Irrigation Schemes have been approved by the PDWP. i. Construction of Bagh Dheri Flow Irrigation scheme Distt. Swat Rs. 821.187 Million” (ADP No. 1158). ii. Rehabilitation/Improvement of Leganai Civil Canal and Construction /Installation of Lift Irrigation Scheme in June 2018. June 2018. Work in progress Divided into 03 packages. Work on 01 Page | 60 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Distt. Buner” costing Rs. 84.89 million (ADP No. 1227). Timeline package is in progress while tenders for 02 packages are in process iii. Provision of Irrigation Channel in Kalkot Dir Upper costing Rs. 687.5 Million (ADP No.1232). iv. Umbrella project for “Construction/Improvement of new small Irrigation Schemes in Khyber Pakhtunkhwa costing Rs. 250.00 million (ADP No. 1248). Consultancy are in the process of award. Sub-works under this project are being approved on receipt of C.M directives 18.9 Improvement canal system existing A major project for rehabilitation of irrigation system has been started under PSDP with a cost of Rs. 8484.229 million. The full project would be completed by June 2018. 18.10 Operation and maintenance of 300 civil channels About 0.3 million acres land, presently under civil canals being deficient of irrigation due to lack of proper maintenance by financially weak beneficiaries. The department has planned to bring them into proper ambit for operation and maintenance with financial outlay of Rs. 6000 million A PC-I for Restoration of Damages Civil Channels under ADP No. 1253 amounting Rs. 458.00 million is under process of approval. June 2018 subject to the availability of financing. About 340 km existing flood protection embankments and 100 km new flood protection embankments are planned to be executed, involving financial outlay of Rs. 15,000 million for flood mitigation June 2018 subject to the availability of financing. 18.11 Comprehensive mitigation plan of flood Work will be executed on approval of PC-I Page | 61 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline The Provincial Govt. has initiated following protection structures from its own resources through its ADP 2014-15. i. Extension & Improvement of Spur No.18 on R/B of Indus River Distt. D.I.Khan (ADP No 1127) (Rs. 192.475 million) ii. Improvement/Extension of Guide Bund Tenders re-invited but the contractor challenged the same in court. for the Protection of Area between Guide Bund and upto Spur No.1 of Dera Darya Khan Bridge (ADP No. 1129) (Rs. Work in progress 647.40 million) iii. Flood Management of Shah Alam and Naguman Rivers Distt. Peshawar (ADP No. 1199) (Rs. 300.00 million) iv. Revamping of Jindi River Distt. Charsadda (ADP No. 1203) (Rs. 667.629 Work order issued. million) v. Construction of Flood Embankment on Right Side of Kabul River (Reach No. 1,2&3), Distt. Nowshera (ADP No. 1208, Tenders approved 1209, 1210) (Rs. 2773.48 million) vi. Construction of Flood Embankment of Kheshki to Nowshera Kalan on L/S of Kabul River Distt. Nowshera (ADP No.1211)(Rs. 955.13 million) vii. Improvement/Construction Irrigation Facilities and Work in progress of Flood Protection Works in Distt. Malakand (ADP No. 1226) (Rs.200.00 million) Work in progress Page | 62 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 viii. Timeline Improvement/Development of Irrigation Facilities and Construction of Causeway and Flood Protection Works in Distt. Swat (ADP No. 1228) (Rs. 985.30 million) ix. Improvement/Construction Irrigation Facilities of and Flood The PC-I approved in PDWP on 07-01-2015 Protection Works in Distt. Abbottabad, Haripur and Mansehra (ADP No. 1238) (Rs. 220.40 million) Work in progress x. Construction Structures of to Flood Protection minimize flood devastation in Khyber Pakhtunkhwa (ADP No. 1241)(Rs.750.00 million) xi. Flood Management of Panjkora River Work in progress and its Tributaries in Distt. Dir Lower and Upper (ADP No. 1252) (Rs. 499.39 million) Sub-works under this project are being approved on receipt of C.M directives Work in progress Page | 63 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 19 19.1 Reforms Initiatives Current Status as on 31-03-2015 Timeline TRANSPORT & MASS TRANSIT DEPARTMENT Institutional strengthening of the Transport Department. Implementation of Govt. decision to hand over all functions as per ROB. To decide fate of Driving License i-e either to hand over to Police Department or to retain it with Transport Department, a committee under chairmanship of the Senior Minster for Finance Constituted. It met on 02-04-2014, 07-04-2014 and 09-052014, decision awaited. Meeting with Chief Secretary was held on16-01-2015. Transport Department has established setup for issuance of Driving Licenses in 22 district of KPK. The HCM has approved the summary for inclusion of Diving License scheme In ADP 2014-15, and creation of post for the same through SNE to convert it to regular budget. PC-l of Driving License has accordingly approved by the PDWP on 02-10-2014. Fourteen (14) Posts of ADs & Fifteen (15) posts of MVEs created at District Level to strengthen the Transport Department. Recruitment process for the Position of MVEs completed and new appointees joined the positions. SRSC APPROVED service rule on 17-032014. In the light of recommendation of the PreFeasibility Study on MTS the Government decides to establish Peshawar Transport Company (PrTC) as well as KP Mass Transit Regularity Authority. Meeting for consideration of KP Mass Transit Regularity Authority Act (KPUMA) and function of PrTC held on 21-08-2014, 28- On vetting of Draft Mass Transit Act from Law Department the bill will be submitted to Legislature for approval. Similarly, AOA & MOA form Law Department summary for approval of HCM for establishing Peshawar Transport Company will be initiated. Page | 64 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 19.2 Computerization of Provincial Transport Authority (PTA) and Regional Transport Authorities (RTAs) 19.3 Introduction of Mass Transit System (MTS) Lead Partner: Urban Policy Unit (UPU), P&D Department. Associated Partner: Transport & Mass Transit Department. 08-2014, 02-09-2014, and 09-09-2014 in the UPU-P&DD. ADB consultant, under supervision of UPU-P&DD, has formulated the Draft Laws for establishing Mass Transit. Draft Act forwarded to Law Department on 21-10-2014 for vetting. Vetting is under process. Meetings in this regard were held in Law Department on 04-12-2014 & 12-122014. PDWP approved revised PC-l of the scheme Automation of Transport Department Computerization of Route Permits (CRP) on 25-02-2014. Procurement of Additional Secretary and equipment has been completed. Phase wise computerization of all the RTAs, on installation of M&E. O&M of ATD-CRP for PTA and RTA Peshawar is under process and computerized permits being issued at Peshawar. Provisional capital (Peshawar) has been computerized. Urban Policy Unit P&D Department is currently supervising/Leading the subject Mass Transit System and scheme is reflected under their respective sector in ADP 201415. An internal meeting on MTS was held on 15-01-2015 under chairmanship of the Secretary Transport with the lead partner i.e UPU & P&D. A Pre-Feasibility Study on Peshawar Mass Transit System (PMTS) by the CDIA/ADP completed in May 2014 under supervision of UPU-P&DD. Now for 2nd Phase ADB has approved US$ 1.6 million as grant for PPTA subject to the acceptance of GoKP and clearance of the same from EAD. Timeline RTA Mardan system is ready ( as reported by MIS Manager) and shall be inaugurated in April 2015 followed by Abbottabad (Late, January 2015) Remaining divisional headquarters will be computerized by end of CFY (Late, 3rd quarter) PPTA team is expected in July 2015 as reported by the UPU-P&D Deptt. Page | 65 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline UPU has endorsed the same and it has been submitted to EAD for onward submission to ADB. UPU-P&DD is under process to finalize the award on F/S on Peshawar Mass Transit System for advance preparatory activities before arrival of PPTA team. DCSC lastly met 10-12-2014 and decided to move summary as only one firm qualified in technical & financial evaluation. Meeting of Country Director ADB held with the HCM on 21-03-2015 at KP House Islamabad, to further look into BRT project. KPBOIT has also conducted Feasibility Study on rail corridor for BRT system at Peshawar. Presentation of final report was made to the HCM 23-12-2014. In the light of recommendation of the PreFeasibility Study on MTS the Government decided to establish Peshawar Transport Company (PrTC) as well as KP Mass Transit Regularity Authority. Meeting for consideration of KP Mass Transit Regularity Authority Act (KPUMA) and function of PrTC held on 21-08-2014, 2808-2014, 02-09-2014, and 09-09-2014 in the UPU-P&DD. The KPBOIT will take up case with Ministry of Railways for early meeting of HCM Khyber Pakhtunkhwa with Federal Minster of Railways for issuance of NOC, to further enter into construction phase. Draft Mass Transit Act has been prepared and forwarded to Law Deptt. for vetting on 21-10-2014 and subsequent meeting held on 04-12-2014,12-12-2014 and 26-01-2015. ADB consultant, under supervision of UPUP&DD, shall also finalize financial and HR details for Peshawar Transport Company. Page | 66 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Upon vetting from Law Deptt, the Act will be placed to the Cabinet for Legislation Upon finalization of financial & HR details, summary for approval of HCM will be submitted on April 2015 for creation of company. 19.4 Establishment of Transport Planning & Traffic Engineering unit (TPU) in Transport Department. 19.5 Establishment of Transport Complex at Peshawar After long consolation presentation and cost rationalization process PDWP finally approved the PC-l for Establishment of TPU on 15-05-2014. Minutes/approval from P&DD and concurrence from Finance Department has been issued in July 2014. Department has initiated summary for approval of special pay packages. Meeting on the same was held on under the chairmanship of the Special Secretary Establishment Department on 11-08-2014. Finance Department did not supported the special pay packages and summary was return back with comments that as and when the project policy/pay package is revised the case may be once again initiated. Scheme for Establishment of the Transport Complex is included in ADP 2014-15 PC-I submitted to P&DD. Pre PDWP meetings were held on 25, 26 and 29 Sep 2014 Recruitment process has been initiated to safe guard the time but shall only be finalize as per summary decision. Project will be converted on PPP mode as per the decision of meeting dated 16.01.2015 Page | 67 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline PC-I was considered by the PDWP on 28.10.2014. it was deferred for presentation to the Chief Secretary Khyber Pakhtunkhwa Presentation to Chief Secretary was mad on 16.1.2015 and it was decided to utili9ze the land for commercial purposes under PPP mode instead of utilizing it for office accommodation . A PPP model was submitted to P&DD and their comments/ recommendations are accordingly been considered for further entering into the PPP mode for commercial utilization of existing land. Will be introduced in new ADP as PPP scheme 20 20.1 20.2 20.3 PUBLIC HEALTH ENGINEERING DEPARTMENT Anti-Corruption Reforms Complaint Cell has started work since its establishment. Complaint Cell has been established at secretariat level. Hiring of Consultants PC-II for the umbrella schemes has been approved by P&D Department. Hiring of Consultants for ADP scheme 215/130248 and all other individual scheme has been finalized. 06 consultants firms have been appointed for feasibility study. Detail survey, design and preparation of PC-I for the above mentioned ADPs has been made. Consultants have prepared 350 PC-Is so far against the target 462 PC-Is. Standard Contract A committee was constituted under the Documents for Consultants chairmanship of the managing Director PKHA for redrafting of consultant Agreement. Law Department had resubmitted the vetted consultant Agreement vide letter No. ALD-I/Legis5 (7)95 dated 26-11-2013. Finance Department circulated it among all Departments. Implemented Ongoing schemes are being implemented under the new consultant supervision policy Circulated Implemented. Page | 68 and Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 20.4 Establishment Governance of Current Status as on 31-03-2015 ‘e’ 20.5 21 21.1 Market Rate System (MRS) AGRICULTURE DEPARTMENT Khyber Pakhtunkhwa Farm Services Centers Act, 2014 Establishment of Farm Services Centre will be carried out in all the districts of the province on public private partnership basis. Establishment of Khyber Pakhtunkhwa Farm Services Centers Board 21.2 Formulation of Khyber Pakhtunkhwa Agriculture policy (A Ten Year Perspective) In order to launch the new policy a following policy actions need to be implemented: Enhancing and strengthening the commodity chain for key commodities Agriculture zoning for development Creating accredited laboratory and inspection system for product certification Capacity development and registration of NGO/CSO service providers Rangeland development Website is launched Tenders uploaded on the website PC-1 for establishment of IT Cell in PHE department approved All the new PC-Is are based on MRS Timeline Website launched. www.phedkp.gov.pk Policy implemented Vetted from Law Department. Approved by Cabinet. Passed by provincial Assembly Passed by provincial Assembly Rules is resubmitted to Law Department after corrections on 12/3/2015. Submitted to working group for vetting and proposal in February, 2014. Meeting of all stakeholders was held on 17.11.2014. Comments of all HADs will be incorporated in draft policy. Final meeting of all stake holders held on 11/3/2015 (late was to be held in January, 2015). To be approved from Cabinet up to April 2015. Will be Passed from provincial Assembly upto June, 2015. Final meeting of all stake holders held on 11/3/2015 (late was to be held in January, 2015). Will be vetted from Law Department in April 2015( late was expected in March, 2015) Tentative date June, 2015. Page | 69 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 21.3 Formulation of Khyber Pakhtunkhwa Livestock policy key areas of livestock policy Disease surveillance and prevention Disease treatment Vaccine production Feed production and monitoring Extension services Breed improvement Livestock marketing Meat processing Government and private farm management Animal welfare Environmental protection Rangeland management Under Process with technical support of Firm Project (funded by USAID) for drafting of the same. Workshop of stakeholder was schedule to be held in October 2014, where Firm project (funded by USAID) but the same was postponed due to prevailing situation and Expert of Firm Project could not come to Peshawar. Further to mention that Firm Project was closed on 31.10.2014, however, it has been decided that Department will ensure and arrange a stakeholder meeting in January. FAO being approached for consultation Meeting of all stakeholders on 2/2/2015 (late was expected in January, 2015). Replies awaited from them. Meeting of all stakeholders on 2/2/2015 (late was expected in January, 2015) Khyber Pakhtunkhwa Pesticides Act, 2014 Approved by Cabinet. Request has been made to Provincial Assembly to withhold the same till finalization of issue of Federal Govt. On hold. The Federal Govt has also moved the same bill to National Assembly for approval. The bill will be processed/ passed after approval in National Assembly to avoid duplication/contradiction. Status Pending due to Federal law Approved by Cabinet. Request has been made to Provincial Assembly to withheld the same till finalization of issue of Federal Govt. Status pending due to Federal Law Tentative date June, 2015. 21.4 21.5 Establishment of Pesticides residue laboratory Provincial Center for Poisoning control will be established. Establishment of Provincial Agriculture Expert & Standardization Committee Khyber Pakhtunkhwa Seed Act, 2014 Establishment of Provincial Seed Current Status as on 31-03-2015 Timeline Tentative date June, 2015. Tentative date June, 2015. Page | 70 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 21.7 21.8 Timeline Certification Council has been envisaged in place of National Seed Certification Council. Establishment of Seed Certification & Registration Agency in place of Federal Seed Certification & Federal Seed Registration Agency. On hold. The Federal Govt has also moved the same bill to National Assembly for approval. The bill will be processed/ passed after approval in National Assembly to avoid duplication/contradiction. Khyber Pakhtunkhwa Market Act, 2014. After 18th amendment the Province has redrafted Market Act -2014, with Amendments in Khyber Pakhtunkhwa Market Act, 2007. However, the present Govt took a decision for designing of same for open Market Economy and Firm project was requested to assist technically in drafting of Act. Under Process with technical support of Firm Project (funded by USAID) for drafting of the same. Workshop of stakeholder was schedule to be held in October 2014, where Firm project (funded by USAID) but the same was postponed due to prevailing situation and Expert of Firm Project could not come to Peshawar. Further to mention that Firm Project is going to close on 31.10.2014. Stakeholders meeting held on 23/2/2015 (Late was to be held in January, 2015) Stakeholders meeting held on 23/2/2015 Khyber Pakhtunkhwa Plant Breeders Right Act, 2014. Provincial Gene Fund will be established and a 20% part of royalty from the 70% share of the institution so collected shall be deposited to the provincial gene fund for maintaining provincial plant genetic resources Establishment of halal meat certification facilities for importers & exporters of Province Approved by Cabinet. Request has been made to Provincial Assembly to withheld the same till finalization of issue of Federal Govt. On hold. The Federal Govt has also moved the same bill to National Assembly for approval. The bill will be processed/ passed after approval in National Assembly to avoid duplication/contradiction. . Status pending due to a Federal Law Tentative date June, 2015. The Concept was proposed in Multi Donor Trust Fund workshop to World Bank from 16 to 18 October, 2014. Summery in this connection is under process. Observations raised by P&D department on the summary Summary pending due to observations of the P&D department. 21.6 Current Status as on 31-03-2015 Tentative date is now July, 2015 ( Late, was February, 2015) Page | 71 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline Establishment of Halal Meat Certifying facilities in province. Creation of awareness regarding halal meat certification in the business communities Development of standards in accordance with international standards such as good manufacturing practices (GMP), good hygiene practices (GHP) and Hazard Analysis Control point (HACCP) Resubmitted to the P&D Department The Tentative date will be intimated after acceptance of Summery. 21.9 Procurement of 17 bulldozers Procurement of 17 bulldozers for reclamation of culturable waste land in Khyber Pakhtunkhwa to develop 8500 hectare Agriculture land to enhance productivity. 17 bulldozers procured. Implemented 21.10 Gomal Zam Dam’s Command Area Development and OnFarm Water Management for High Value and High Efficiency Agriculture Project (GZD-CADP) Project Steering Committee (PSC) notified on 26th August, 2014. Administrative Approval issued on 17th September, 2014. Notice for recruitment of project staff has been floated with 20th October, 2014 as the last date. For the interim period some of the staff has been recruited by the USAID from their own resources for the support of PMU over and above the agreed USAID share. Activity Agreement to be signed with USAID is pending. Note sent to ACS(P&D) after clarification of observations raised by Chief (Foreign AID) Pending due to observations of the P&D Department 163,000 acres to be additionally irrigated by Gomal Zam Dam June, 2017 Page | 72 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives 21.11 Establishment and Rehabilitation of Veterinary Institutions in Khyber Pakhtunkhwa 21.12 21.13 Establishment & operation of one hundred & fifty (150) Civil Veterinary Dispensaries in rented buildings. Reconstruct and Rehabilitate the damaged and dilapidated 30 Veterinary Institutions in Khyber Pakhtunkhwa Establishment of Carp Fish Hatchery at Swabi District for Management of Fisheries Resources in Tarbela and Khanpur Dams To produce fish seed for tarbeela and khanpur Dam To enhance Fish production of tarbela and Khanpur Reservoir through stocking of Fish seed Special Program for On Farm Water Management, Soil Conservation activities and provision of solar pumps in Khyber Pakhtunkhwa Timeline Approved by PDWP in meeting held on 3.12.2014. PC 1 cleared in DDWP on 29/1/2015 Pending with Finance Department for vetting June, 2017 Consultant hired and PC-2 to be submitted by April, 2015 PC-1 is under process June, 2017 Summary is under process for CM Pending upon approval of Summary Summary is under process for CM Pending upon approval of Summary i. 21.14 Water course lining / improvement = 825 ii. Water storage tank = 310 iii. Check dams/ Ponds /spurs/protection bunds/Spillways/inlet/ou tlet = 369 iv. Solar pumps = 55 Dates Processing Plant at DI Khan Current Status as on 31-03-2015 Page | 73 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No 21.15 22. 22.1 22.2 Reforms Initiatives (Provision of 50 Acres of land for establishment of Dates Processing Plant) Jaba Sheep Farming and wool processing Unit at Mansehra (Provision of 300 Acres of land for wool processing facilities) Food Department Amendment in food Laws / Rules Enhancement of registration, fee of carriage contractors, annual renewal fee of Food Grain license for dealers and flour mills and security / bank guarantee in order to safeguard the Govt. interest and enhance revenue. Current Status as on 31-03-2015 Timeline Summary is under process for CM On the recommendation of the working group various laws / rules have been reviewed by the sub committee of the working group. Though no major amendments have been recommended by the sub committee, however amendments in Sugar Cess Development Rules are under consideration in the Law Department. Beside arrangements are being made for capacity building of the staff. Kind of tax/ Fee / fine Registration free C-Class Contractors Renewal Fee for Registration free A-Class Contractors Renewal Fee for Registration free B-Class Contractors Renewal Fee for Registration free C-Class Contractors Food Grain License fee / Renewal fee (FG Dealers) Food Grain License fee / Renewal fee (Flourmills) Existing rate (Rs) 5000 Enhance d Rates (Rs) 10000 20,000 25,000 10000 15000 5000 7000 200 500 2500 5000 Pending upon approval of Summary Expected in a month time. Implemented Page | 74 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline 22.3 Augmentation of available storage capacity for wheat to ensure food security for the general public of the province Present available storage capacity of the province is 0.400 million tons. Efforts are being made to augment the storage capacity upto 0.6 million tonnes for which schemes have been approved for construction of new godowns in various districts of the province. Details of ongoing and new schemes is as follows:Ongoing Scheme. ADP No. 263/90103 264/100027 265/100029 266/110106 New Schemes Name of Scheme Construction of Food grain godowns in Dir Upper, Buner, Swabi and Kohat Construction of Foodgrain godowns in Bannu,Mardan, Mansehra, Battagram and Chitral, (Booni, Mastooj, Garam Chashma, Darosh Chitral) Establishment of Planning Cell in Food Directorate Reconstruction and rehabilitation of Earth Quake affected godowns in Districts of Battagram, Mansehra, and Abbottabad Cost (Rs in million) 550.930 383.515 28.523 141.220 Timeline for enhancing the overall storage capacity to the double of the present is June 2017 In Individual case the timeline has been given in each PC-1. The Godowns at Buner, Swabi and Kohat under ADP No.263/90103 have been completed and in Dir (U) purchase of land is disputed and subjudice. The Godowns at Battagram, Mansehra and Chitral under ADP No.264/100027 have been completed and PC-1 / Cost Estimates of Mardan and Bannu are under revision. The reconstruction / rehabilitation works of earthquake affected Godowns at Battagram, Mansehra and Abbottabad under ADP No.266/110106 have been completed. The purchase of land in Charsadda and Shangla under ADP No. 268/140601 and 269/140597 are Page | 75 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 ADP No. 267/1405 99 22.4 Provision of weighing stations in existing food grain godowns in the province Name of Scheme Cost (Rs in million) 1.739 Purchase of land for food grain godowns in District Tank 268/1406 Purchase of land 30.000 01 for food grain godowns in District Charsadda 269/1405 Purchase of land 20.000 97 for food grain godowns in District Shangla 270/1406 Purchase of land 14.132 00 for food grain godowns in District Chitral 271/1305 Provision of 91.052 36 weigh stations in existing food godowns in the province 272/1405 Construction of 35.922 93 Assistant Director Food Offices at Divisional level, Saidu Sharif, Mardan, Peshawar, Abbottabad Kohat, Bannu and D.I.Khan 273/1405 F/S and 132.676 95 construction of food grain godowns 4000 tons capacity in district Malakand at Sakhakot. In order to ensure transparency in the receipt and releases of wheat, weighing stations are being installed in the food grain godowns at the cost of Rs.91.052 million Timeline under process. Beside the schemes under ADP No.267/140599, 270/140600, 271/130536, 272/140593 and 273/140595 have been approved by the competent forum and administrative approval have been issued accordingly PDWP has cleared the scheme and completion is Page | 76 Reforms Implementation Cell (RIC) Office of the Chief Secretary Government of Khyber Pakhtunkhwa S.No Reforms Initiatives Current Status as on 31-03-2015 Timeline expected 2016 22.5 23. 23.1 Capacity building of staff and mass awareness campaign and provision of equipments In the field of Human Resource Development, program has been chalked out for capacity building of staff and also for awareness of the masses. Beside essential equipments are also to be provided to the staff for improving their efficiency for which an amount of Rs.60 million has been worked out for medium term target. Excise and Taxation Department Establishment Narcotics force of Anti- 23.2 Establishment of Facilitation Centres Regional level Tax at 23.3 Reliable IT infrastructure for Excise and Taxation Deptt New law for narcotics interdiction has been framed and referred to Law Deptt for vetting. PC-I is pending for approval of the PDWP. Peshawar: Land Acquisition finalized. Tender for construction issued by C&W Deptt. Abbottabad: Land Acquisition is under process. D.I.Khan: Possession of state land for construction of TFC is in process among Distt Administration, Board of Revenue and E&T Deptt. D.I.Khan: Land from open market has been procured under compulsory acquisition. PC-I of the scheme is pending with P&D Deptt for rationalization of building structure. An all-encompassing website of the Deptt has been fully functionalized which contains data of vehicles as well as immovable properties. An SMS service for vehicles verification on the pattern of E&T Punjab is under process. by June Judicial academy / UNIDO is being approached for the purpose In progress. In progress. In progress. Page | 77