ET-ASC WORKPLAN Joint ET-ASC/ET-ISA/Doc. 3/ANNEX 1 TEAM Commission WMO Commission for Aeronautical Meteorology (CAeM) Expert Team on Aviation, Science and Climate Start Date / End Date 1/10/2014 Stakeholders CAeM MG, VASAG, CAS, CBS, ICAO MET Panel June 2018 Team Name Organization / Country Chair / Co-chairs Herbert PUEMPEL Austrocontrol, Austria herbert.puempel@austrocontrol.at Core Members Cory DAVIS Robert RUTLEDGE Ping Wah LI MetService, New Zealand NOAA, USA Hong Kong Observatory, Hong Kong, China Tanzania Meteorological Agency, Tanzania Roshydromet, Russian Federation Met Office, United Kingdom Cory.davis@metservice.com robert.rutledge@noaa.gov pwli@hko.gov.hk Pascal WANIHA Anna IVANOVA Matthew HORT E-mail Pascal.waniha@meteo.go.tz ivanova@mecom.ru Matthew.hort@metoffice.gov.uk DESCRIPTION Objective Transfer from Science to Operations in areas of High-Impact weather, climate change and variability, aviation-centered Nowcasting &VSRF, Validation of methodologies, Cooperation with GFCS, CAS and CBS, Support to ICAO Met Panel for Roadmaps and Conops in coordination with ET-ISA, under guidance from CAeM MG. Theme leaders within the group will be responsible for specific issues. Background Newly established team, applied science focus, cooperation with NMHS and Research groups, GFCS, CAS, CBS, benefiting from VASAG experience. Terms of Reference a) To deal with issues of research and development related to road maps and concepts of operations for, inter alia, the World Area Forecast System, the International Airways Volcano Watch, and space weather, in close collaboration with the Inter-programme Coordination Team on Space Weather and the WMO-IUGG Volcanic Ash Scientific Advisory Group; b) To coordinate research and development activities in the area of nowcasting and very short-range forecasting in collaboration with the Commission for Atmospheric Sciences; c) To address issues related to the impacts of climate change and variability on aviation, including seasonal and interannual changes, in coordination with relevant bodies and programmes such as the Global Framework for Climate Services, the Global Dataprocessing and Forecasting System and the ICAO Committee on Aviation Environmental Protection; d) To coordinate research and development activities related to observing systems, including the detection and quantification of volcanic ash, lightning, wind shear and wake vortex conditions, in collaboration with relevant subsidiary bodies of the Commission for Instruments and Methods of Observation and the Commission for Basic Systems; e) To report regularly on progress to the president of the Commission. ET-ASC - Work Plan, Final-v02 Page 1 of 5 COMMUNICATION STRATEGIES Description Target Audience Delivery Method Frequency / Date Work Plan Management Group Mail, AeM Web site 6 monthly Chair General correspondence Partners &Stakeholders Mail As appropriate Chair, Theme leaders Team Meetings Combined with scientific workshops In collaboration with partners If possible yearly Chair, Theme leaders Reports Following scientific Workshops (general audience), for MG meetings Mail, Web site As appropriate Chair, Theme leaders Final Report CAeM-16 CAeM Doc. 1 x inter-sessional period Chair ET-ASC - Work Plan, Final-v02 Responsibility Page 2 of 5 ET-ASC WORKPLAN MILESTONES / WORKPLAN Milestone / Activity / Task ACTIVITY 1: ET TOR(s) Accountability Deliverables Dates INTEGRATION OF A/C WIND OBSERVATIONS, WXR AND SATELLITE DERIVED CLOUDINESS INTO REQUENTLY UPDATED HR LOCAL/SUB-REGIONAL NUMERICAL MODELS Milestone 1.1: Validation of AMDAR/ADS-B(C), Doppler winds, 3dWXR data Theme leader End 2015 Task 1.1: AMDAR data for enlarged TMA Theme leader with help from CBS Mid 2015 Task 1.2: ADS-B vs ADS-C Theme leader with help from CBS End 2015 Task 1.3: WXR Doppler winds and volume rainfall data Theme leader with help from CBS, SESAR 11.2 End 2015 Milestone 1.2: Validation of frequently updated HR models with data ingest Theme leader, Chair with help from CAS WG End 2016 Task 1.1: Identify suitable AMSP preferably within SESAR or similar ATM project to obtain data sets Chair, Theme Leader Q1 2015 Task 1.2: Obtain validation results from partner AMSP in close cooperation with CAS and ET-ISA Theme Leader Q1 2016 ACTIVITY 2: ADDRESSING THE TRANSITION FROM TRADITIONAL NOWCASTING TIME-RANGE (<2HRS) TO NWP-VSRF Milestone 2.1: Identify limits ( in terms of time and predictability) of traditional nowcasting of aviation-specific parameters and hazards Theme Leader and Chair, help from CAS Q2 2015 Task 2.1: Work by correspondence with relevant CAS ET´s and the scientific community Theme Leader and Chair, help from CAS Q1 2015 Task 2.2: Work by correspondence with WG on Numerical Experimentation (or follow-up WG) Theme Leader and Chair, help from CAS Q1 2015 Task 2.3: Define suitable time ranges for prediction of priority hazards Theme Leader , Chair Q3 2015 Milestone 3.1: Design a Composite Forecast System including transition period Chair, Theme Leader End 2017 Task 3.1: Identify suitable modeling solutions with help from CAS, WG on NE Chair, Theme Leader Mid 2015 ACTIVITY 3: Status COMPOSITE FORECAST SYSTEM ET-ASC - Work Plan, Final-v02 Page 3 of 5 OPEN Task 3.2: Identify workable transition method from Nowcast to NWP Theme Leader Mid 2016 Task 3.3: Develop Concept of Operations for Transition and Integration in $D WX Data Chair, Team (In coordination with ICAO Met Panel, ETISA) Mid 2017 (depending on ICAO progress) ACTIVITY 4: VALIDATION AND USE CASES FOR PROBABILISTIC MODEL OUTPUT Milestone 4.1: Identify valid probabilistic forecast schemes (from SESAR, CAS etc), relevant validation methodology Theme Leader, Chair, relevant WMO WG End 2015 Task 4.1: Test scheme for impact correlation with stakeholders, HMI experts and Human Factors experts Theme Leader, Chair, Team, ICAO Panel, SESAR Mid 2016-Early 2017 ACTIVITY 5: SUPPORT TO THE ONGOING DEVELOPMENT OF FORECASTS AND WARNINGS OF HIGH-IMPACT EVENTS Milestone 5.1: Interaction with VASAG , CAS, S&D storms, /aerosol modeling on development of integrated models ( including analysis of quantified ash loading) , including volcanology Team and Chair in cooperation with CAS, WAFS, SESAR, NextGen Mid-End 2017 Milestone 5.2: Cooperation with other scientific bodies and ICAO in prediction of transport and dissipation of hazardous aerososols (chemical/nuclear events) Team and Chair in cooperation with CAS, WAFS, SESAR, NextGen Mid-End 2017 Milestone 5.3: Cooperation with scientific bodies and ICAO in improved TC track & intensity forecasts Team and Chair in cooperation with CAS, WAFS, SESAR, NextGen Mid-End 2017 Milestone 5.4: Cooperation with WMO (ICTSW) and ICAO on Space Weather Concept of Operations (ToR, expectation management for global/regional centers) Team and Chair in cooperation with CAS, WAFS, SESAR, NextGen Mid-End 2017 Milestone 5.5: In cooperation with WAFS, SESAR, NextGen etc. validate and improve forecasts of High Level Engine Icing, severe Turbulence (including mountain, CB induced) Team and Chair in cooperation with CAS, WAFS, SESAR, NextGen Mid-End 2017 Tasks to be detailed in cooperation with partners. ACTIVITY 6: DEVELOPMENT OF IMPACT SCENARIOS FOR DIFFERENT CLIMATES AND REGIONS Milestone 6.1: Climate scenarios and their long-term impact ( demand, design of ground infrastructure, operating concepts) ET-ASC - Work Plan, Final-v02 Chair, Theme Leader Page 4 of 5 Mid 2016 Milestone 6.2: Development of high-impact weather scenarios driven or amplified by climate change and variability in different climate zones Chair, Theme Leader Task 6.1: Develop close ties to relevant scientific community ACTIVITY 7: COOPERATION WITH CBS Milestone 7.1: Cooperation on issues of RRR (rolling review of requirements for data, including aspects of quality, availability, fitness-for-purpose, representativity) Tasks 7.1: on demand ET-ASC - Work Plan, Final-v02 Page 5 of 5 Mid 2016-early 2017