CLARIFICATION MEETING 25 August 2014 Additional Notes for Invitation to Bid No. 2014/024 Supply and Installation of 250 Nos Rainwater Harvesting Systems in 50/55 villages of KIRIWATSAN I Project in Kiribati 1. TECHNICAL REQUIREMENTS Please refer to the attached drawing. 1. Rainwater tanks: Please provide a quote for both 6000 litres (a) and 5000 litres (b) tanks. The total number of tanks to be installed will only be 250, but given different site conditions either 6000 litres or 5000 litres may be selected. The reason is that the dimensions of each tank may differ, e.g. height of 5000 litres is higher than that of 6000 litres tank and the diameter is smaller than the 6000 litres tank so the benefit of using 5000 litres is to reduce the size of concrete water tank stand/platform and to save space. Items for connecting the water tanks: All tanks will be connected using Ø50mm equalized pipe (please refer drawing); There is no need for unions, as the tanks will be connected by the equalizer pipe; Please use “best quality Ø50mm ball valve. 2. Downpipe: It may be necessary to separate the first flush and transmission pipe from the downpipe. The first 100 tanks installed under this project installed the first flush at the bottom part of the inlet pipe. From the result of the assessment of the sites of each target village, an approximate number of downpipes needed for the 50 systems can be calculated. Depending on the size of the structure, whether a maneaba, church or private house, from 1 – 6 downpipes can be installed in one system. The Ø100mm bend and Tee fittings are going to be used for the transmission pipe. To connect downpipes with the gutter, a pre-fabricated gutter outlet may be needed at the top of each downpipe and should be properly riveted or screwed to the gutter and the downpipe. The joints should be well sealed. Transmission pipe: Transmission pipe is used to deliver the water from the downpipe to the inlet pipe. Either Ø100mm or Ø150mm can be used. First Flush: The First flush may installed at the bottom part of the inlet pipe. The materials needed for the first flush are: I. 2 PVC Ø100mm elbow 90 II. 1 PVC Ø100mm Tee III. 1 Ø100mm stainless steel gate valve IV. 2 PVC Ø100mm female socket Depending on the number of inlet pipes, 1 or more than one first flush can be installed. Inlet pipe: Inlet pipes are connected with the transmission pipes through Ø100mm elbow 90 fitting to deliver the water from the transmission pipe to the water tank. Depending on the size/height of the water tank, the height of the inlet pipe can be for 6000 litres around 1.7m and for 5000 litres 2.7m. Please note that about 0.3m of the inlet pipe will be installed below ground level connected with the transmission pipe with Ø100mm elbow 90. As you can see in the drawing, for five 5000 litres water tanks two inlet pipes will be installed, similarly two inlet pipes for the four 6000 litres water tanks two inlet pipes will be connected. The inlet pipes are connected to the transmission pipes independently. This is to have alternative in case one inlet pipe is broken. One inlet pipe needs 3 Ø100mm elbow 90. Please note the fittings needed to connect the first flush with the inlet pipe are mentioned above. 3. Construction of tank base platform The water tank base will have different size for the 5000 litres and 6000 litres. As you can see in the drawing for four 6000 litres the size of the platform is 10.1m X 3m and for the five 5000 litres the size is 9.15m X 2.31m. If 1 water tank is to be installed in one site then the dimensions of the platform can be calculated as follows: For 5000 litres: length = 0.3m + 1.71m + 0.3m=2.31m Width = 0.1m + 1.71m + 0.1m = 1.91m For 5000 litres: length = 0.3m + 2.4m + 0.3m=3m Width = 0.1m + 2.4m + 0.1m = 2.6m Please note if the water tanks to be installed are more than 1 then the spacing between the water tanks is be 0.1m 4. Stand post and tap fixing: This includes part of the system from the Ø50mm equalizer up to the water collection chamber. The collection chamber will be installed a bit farther from the water tanks as in the attached drawing in order to keep people who come to collect water away from the water tanks,. This could make fencing the water tanks easy (if communities want to erect fences). Depending on the number of water tanks, the equalizer pipe will be connected at two or one point by a 50X25 tee reducer fitting to the Ø25mm (or 20mm) delivery pipe line. To regulate the water that will be delivered to the tanks Ø25mm (or 20mm) gate valve has to be installed in the Ø25mm (or 20mm) pipeline. As the pipeline will be installed 200mm – 300mm below ground level, the valve must be installed in a 600mmX600mmX500mm manhole (please refer to the drawing). The Ø25mm (or20mm) pipe will be reduced to Ø15mm pipe using 25X15reducer. The PVC Ø15mm pipe will be connected to the Ø15mm GI pipe with a PVC Ø15mm female socket. Finally the brass tap will be connected with the GI pipe. The accessories may thus contain Ø15mm PVC pipe. As per the drawing, for four 6000 litres or five 5000 litres water tanks the accessories needed are: Item Description 1. 50X20 PVC tee reducer to connect the Ø25mm or 20mm pipe with Ø50mm equalizer. 2. Ø25mm or 20mm PVC pressure pipe Unit pcs Quantity 2 m 3. Ø25mm or 20mm ball valve (gate or ball valve). This is included in the BoQ as stainless steel marine, which is better in quality but a bit expensive Ø25mm or 20mm PVC pressure female socket to connect the above valve 600mmX600mmX500mm manhole to protect the valve. Manhole has to be made as per the drawing 25(20)X15 PVC reducer to connect the Ø25mm (or 20mm) pipe with the Ø15mm Ø15mm PVC pressure pipe pcs Depends on the site (can be determined from the site assessment 2 pcs 2 pcs 2 pcs 2 m Ø15mm PVC elbow 90 Ø15mm PVC female socket to connect the Ø15m GI pipe with the PVC. 200mm long Ø15mm GI pipe Ø15mm GI coupling to connect the Ø15mm GI with the Ø15mm brass tap Ø15mm brass tap 1m long Ø100mm PVC pipe to be filled by concrete for tap stand pcs pcs I would suggest 6m for each site (1 length pipe) 2 2 pcs pcs 2 2 pcs pcs 2 2 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Please note the above table is only to clarify the materials needed as per the drawing. The delivery pipe can be Ø25mm or Ø20mm, as it is recommended to use bigger diameter pipes to minimize the head loss due to friction, it may be necessary to use Ø25mm pipe. 5. Toolboxes: From each village only two water artisans will be trained and if it is decided to supply 1 box for each water artisan the total number supplied will be 100. 6. Unit Price Contract Please ensure to specify the unit price for the supply and installation of each tank as this will be paid per the number of units supplied and installed rather than on one lump sum payment of 250 tanks. 2. SEALED BIDS SEALED bids must be placed in the bid box /submitted at the reception in the UNICEF Pacific office: For Fiji 1. UNICEF Suva Office 5th Floor, Fiji Development Bank Building 360 Victoria Parade, Suva Fiji Attention: Christine Calo-oy Senior Supply Assistant or For Kiribati 2. UNICEF Kiribati Office Teaoraereke, Tarawa Kiribati Attention: Ms Nuzhat Shahzadi Chief of Field Office before latest 5.00 pm on Wednesday, 24 September 2014. 3. INSTRUCTIONS TO BIDDERS 1. MARKING AND RETURNING BIDS 1.1. SEALED BIDS must be securely closed in the bid envelope provided, or other suitable envelope, clearly MARKED on the outside with the BID NUMBER, and dispatched to arrive at the UNICEF office indicated NO LATER THAN the CLOSING TIME AND DATE. Bids received in any other manner will be INVALIDATED. 1.2. SEALED BIDS can also be sent by courier, clearly MARKED on the outside with the BID NUMBER, and to arrive at the UNICEF Office NO LATER THAN the CLOSING TIME AND DATE. 1.3. Bids received without the Bid number will be invalidated. 2. TIME FOR RECEIVING BIDS 2.1. Sealed Bids received prior to the stated closing time and date will be kept unopened. The Officer of the Bid Section will open Bids when the specified time has arrived and no Bid received thereafter will be considered. 2.2. UNICEF will accept no responsibility for the premature opening of a Bid which is not properly addressed or identified. 3. PUBLIC OPENING OF BID 3.1. Bidders, or their authorized representative, may attend the public opening of the Bid at the time, date and location specified. Bidders should note that the Bid Opening is the only time and place where information related to pricing from competitors is available. 4. REQUEST FOR INFORMATION 4.1. Any request for information regarding the specifications should be forwarded to the Contracting Officer who PREPARED the Bid, and NOT to the Bid Section. 5. ERROR IN BID 5.1. Bidders are expected to examine all Schedules and all Instructions pertaining to the work or Bid. Failure to do so will be at Bidders own risk. In case of errors in the extension price, unit price shall govern. 6. CORRECTIONS, MODIFICATION AND CHANGES FROM SPECIFICATION 6.1. Erasures or other corrections in the Bid must be explained and the signature of the Bidder shown alongside. 6.2. All changes to a Bid must be received prior to the closing time and date. It must be clearly indicated that it is a modification and supersedes the earlier Bid, or state the changes from the original Bid. 6.3. Whenever items offered are not exactly in compliance with specifications indicated in the Request for Proposal by UNICEF, or wherever alternatives are offered, it is the responsibility of the Bidder to provide full descriptions, specifications and documentation of such alternate items for consideration. 7. WITHDRAWAL 7.1. Bids may be withdrawn on written or faxed request received from Bidders prior to the opening time and date. Negligence on the part of the Bidder confers no right for the withdrawal of the Bid after it has been opened. 8. VALIDITY OF BIDS 8.1. Bids should be valid for a period of not less than 90 days after bid opening, unless otherwise specified in the Specific Terms and Conditions. Bidders are requested to indicate the validity period of their bid, as UNICEF may place additional orders against the lowest acceptable bid if requests for identical equipment are received from our field offices during the bid validity period. UNICEF may also request the validity period to be extended. 9. CURRENCY OF BIDS 9.1. Bids should be in either USD OR AUD currency. All bids will be converted to USD amount using the prevailing UN exchange rate for that particular month. 9.2. Failure to quote in the currency stated in the ITB document will invalidate the bid. 10. BID SECURITY Proposals shall be accompanied by a bid bond, in form of a Bank warranty in an amount equal to not less than two percent (2%) of the proposal, said deposit to be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within fourteen (14) days after the award. All bid securities shall be returned to the bidders promptly after award of contracts, and no later than ten (10) days after expiration of the holding period stated in the Notice to Bidders. Standard Form of Bid Bond is included in these specifications and shall be used. 10.1. If required in the ITB, the Bidder shall furnish as part of its Bid, in original form as specified in the ITB. 10.2. The Bid Security shall be in the amount specified in clause 10 and shall (a) at the bidder’s option, be in the form of either a letter of credit, or a bank guarantee from a banking institution, or a bond or surety issued by an insurance or bonding institution; (b) be issued by a reputable institution selected by the bidder and located in any country. If the institution issuing the bond or surety is located outside the Employer’s Country, it shall have a correspondent financial institution located in the Employer’s Country to make it enforceable. (c) be substantially in accordance with the form of Bid Security . (d) be payable promptly upon written demand by the UNICEF in case the conditions listed in ITB are invoked; (e) be submitted in its original form; copies shall not be accepted; (f) remain valid for a period of 28 days beyond the validity period of the bids, as extended, if applicable, in accordance with ITB . 10.3. The Bid Security of unsuccessful Bidders shall be returned as promptly as possible upon the successful Bidder’s furnishing of the performance security. 10.4. The Bid Security may be forfeited or the Bid–Securing Declaration executed: (a) if a Bidder withdraws its bid during the period of bid validity specified by the Bidder on the Bid Submission Sheet, except as provided in ITB . (b) if the Bidder does not accept the correction of its Bid Price pursuant to ITB . (c) if the successful Bidder fails within the specified time to: (i) sign the Contract; or (ii) furnish the required performance security . 11. PERFORMANCE BOND 11.1 The successful bidder, upon award of contract, shall furnish a performance bond in an amount equal to 10 percent (10 %) of the contract price. 11.2 The Performance Security Form should not be completed by the bidders at the time of their bid preparation. Only the successful Bidder will be required to provide performance security and bank guarantee in accordance with one of the forms indicated herein. 11.3 The performance bond shall be valid from the date of its establishment (when the contract is signed) until twelve (12) months after the completion of the contract as specified in the Contract. 11.4 In the event of the bidder's default in the performance of its obligations under the Contract, the UNICEF may draw such amount under the performance bond for its losses, damages, expenses, or other costs (or any part thereof) arising from or related to the bidders default. 11.5 UNICEF will release performance bond, without interest, after the expiration of the validity of the performance bond and completion of the contract, provided that the UNICEF is satisfied with the work carried out and if it l is in accordance with all the requirements of the Contract. 11.6 If the bidder fails to establish the performance bond required hereunder to be deposited within the required period specified above, UNICEF shall have the right to cancel the Contract. 12. INCOTERMS 12.1. Failure to quote in accordance with the requested INCOTERMS may result in invalidation of your bid. 13. SUPPLIER REGISTRATION AND EVALUATION 13.1. UNICEF is now part of the United Nations Global Marketplace (UNGM) (previously the UN Common Supplier Database.) Accordingly, all bidders must apply to become a UNICEF supplier and this must be done via the UNGM website at http://www.ungm.org. Following this application the UNGM informs the UNICEF Quality Assurance Supplier Evaluation Unit (SEU) automatically and a determination will be made as to whether the application will be accepted. The determination is based on relevance of the products to UNICEF, together with a financial assessment. 13.2. Simultaneously with application to UNGM, and unless this information has already been provided to UNICEF within the previous 12 months, bidders shall submit their most recent Audited Financial Statement and Quality System Certificate to the UNICEF Quality Assurance Supplier Evaluation Unit, UNICEF Plads, Freeport, DK-2100, Copenhagen, Denmark. This information will be used by UNICEF for evaluation and approval purposes before making an award. It is in the interest of the bidders to provide information as complete as possible, as awards will only be made to suppliers who meet UNICEFs supplier selection criteria. 14. COUNTRY OF ORIGIN 14.1. Items produced in countries other than that of the Bidder must be indicated, stating the country of origin. Bidders may be required to submit a Certificate of Origin of Goods issued by the Chamber of Commerce or other equivalent authority. 15. RIGHTS OF UNICEF 15.1. UNICEF reserves the right to INVALIDATE any Bid for reasons mentioned above, and, unless otherwise specified by UNICEF or by the Bidder, to accept any item in the Bid. 15.2. UNICEF reserves the right to INVALIDATE any Bid received from a Bidder who, in the opinion of UNICEF, is not in a position to perform the contract. 4. UNICEF STANDARD TERMS & CONDITIONS FOR SERVICE CONTRACTORS 1. Legal Status Contractor(s) is an independent Contractor and is not an employee of UNICEF. Contractor(s) is not a ‘staff member’ under the Staff Regulations of the United Nations or an ‘official’ for the purposes of the Convention of 13 February 1946 on the privileges and immunities of the United Nations. All employees of Contractor(s) remain as such while on UNICEF premises and for the duration of this Contract. Contractor(s) shall not have the legal authority to contractually bind UNICEF in any way beyond this agreement. 2. Contract Administration The contract will be issued by the Supply Section of UNICEF Pacific Office in the form of a Service contract based on agreed upon prices as specified in the Financial Bid. The Contract will be overseen by a designated UNICEF Supervising Officer. 3. Contract Modifications Any and all modifications to the Contract shall take the form of a written Amendment which shall be valid on the signature by the appointed official of both parties and shall be attached to this body Contract. 4. Termination of Contract The Contract may be terminated by either party before the expiry date of the agreement as stipulated in conditions of contract, save in the instance of breech of this agreement, whereupon the Contract shall terminate immediately. Non performance under the terms and conditions of the agreement including but not limited to failure at any point of the function procedure will result in breech of agreement. UNICEF may provide Contractor(s) with 30 days notice to perform after which point the agreement will be terminated. In the event of the agreement being terminated prior to its expiry date due to either notified termination or breech, the Contractor(s) shall be compensated on a pro rata basis for no more than the actual amount of work performed to the satisfaction of UNICEF. UNICEF retains the right to procure any, all or part of the services herein contracted from any source, on breech of this agreement. 5. Contractor(s) Company Modifications Where the Contractor(s) should change or alter the company name or where the Contractor(s) payment details change, including but not limited to change of account name, or location, UNICEF will take instruction from the Company designated signatory in writing as to those changes, and will act on that instruction alone. UNICEF will not accept any liability for any eventuality which may take place due to the implementation of the instructed change. 6. Taxation Section 7 of the Convention on the Privileges and Immunities of the United Nations provides, inter alia, that the UN, including its subsidiary organs, is exempt from all direct taxes and is exempt from customs duties in respect of articles imported or exported for its official use. Accordingly, the Contractor authorizes UNICEF to deduct from the Contractor’s invoice any amount representing such taxes or duties charged by the Contractor to UNCIEF. Payment of such corrected invoice amount shall constitute full payment by UNICEF. In the event any taxing authority refuses to recognize the UN exemption from such taxes, the Contractor shall immediately consult with UNICEF to determine a mutually acceptable procedure. Accordingly, the Contractor authorizes UNICEF to deduct from the Contractor’s invoice any amount representing such taxes, duties, or charges, unless the Contractor has consulted with UNICEF before the payment thereof and UNICEF has, in each instance, specifically authorized the Contractor to pay such taxes, duties, or charges under protest. In that event, the Contractor shall provide UNICEF with written evidence that payment of such taxes, duties or charges has been made and appropriately authorized. 7. Language The Contract will be executed in the English language. 8. Privileges and Immunities Nothing in or relating to the Contract shall be deemed a waiver, express or implied, of any of the privileges and immunities of the United Nations and its subsidiary organs, including UNICEF. Contractor Obligations: 9. Agreement Integrity The Contractor(s) shall neither seek nor accept instructions from any authority external to UNICEF in connection with the performance of the services under the contract. The Contractor(s) shall refrain from any action, which may adversely affect UNICEF and shall fulfill its commitments with fullest regard for the interests of UNICEF. 10. Confidentiality Any information received by Contractor(s) during the course of Contractor’s performance under the Contract which concerns UNICEF and/or the United Nations or any of its entities in any way whatsoever shall be kept in full confidence and shall not be revealed to any person, firm, organization or entity. 11. Use of UNICEF logo, name and emblem The Contractor(s) shall not advertise or otherwise make public the fact that it is a Contractor(s) of UNICEF, nor shall the Contractor(s), in any manner whatsoever, use the name, logo, or signature of UNICEF, or any abbreviation of the name of UNICEF in connection with its business or otherwise. 12. Prohibition of Advertising The Contractor(s) shall not advertise or otherwise make public that the Contractor(s) is furnishing goods or services to UNICEF without specific permission of UNICEF. 13. Title rights a) UNICEF shall be entitled to all proprietary rights including but not limited to patents, copyrights and trademarks, with regard to material which bears a direct relation to, or is used in consequence of the services provided to the organization by the Contractor(s). Materials include but are not limited to, information, images, logos, graphics, sounds, software, and documentation. At the request of UNICEF, the Contractor(s) shall assist in and take all necessary steps to execute all necessary documents, secure such proprietary rights and transfer them to UNICEF where applicable. On completion of each stage of the contract execution the title rights relating to contract deliverables will vest in UNICEF and on completion of the contract all outstanding title rights will vest in UNICEF. Adaptation or change made to the materials by the Contractor(s) does not affect title rights, regardless as to whether the change(s) was made under the terms and scope of this agreement or by independent act by the Contractor(s). b) Title to any equipment, supplies, documentation, property and information in any form which has been furnished by UNICEF shall rest with UNICEF and any such equipment, supplies, documentation, property and information shall be returned to UNICEF at the conclusion of the contract or when no longer required by the Contractor(s) in the execution of the appointed tasks, such equipment, supplies, documentation, property and information when returned to UNICEF, shall be in the same condition as when delivered to the Contractor(s), subject to normal wear and tear. Adaptation or change made to the equipment, supplies, documentation, property and information by the Contractor(s) does not affect title rights, regardless as to whether the change(s) was made under the terms and scope of this agreement or by independent act by the Contractor(s). 14. Assignment to Subcontractors The Contractor(s) shall not, except after obtaining the written consent of UNICEF assign, transfer, pledge or make other disposition of the Agreement or any of the Contractor(s) rights or obligations under the Agreement. Where such an Agreement is entered into, UNICEF shall be charged at the cost rate for the subcontractor services. Were Contractor(s) found to have received any profit from such an Agreement, such action would constitute breech of this Contract. 15. Contractor(s) Agents/Employees All Contractor(s) agents or employees assigned to UNICEF projects shall be named and identified prior to their assignment, this list shall be provided to the Supervising UNICEF Officer prior to the commencement of the Contract. Contractor(s) shall vouch for their professional ability. Contractor(s) will provide resumes of designated staff to UNICEF on request. Contractor(s) will provide prior written notice to UNICEF in the case that any agent/employee is reassigned from UNICEF projects, this notice shall include the name and relevant details of the proposed replacement. 16. Indemnification The Contractor(s) shall indemnify, hold and save harmless and defend at its own expense UNICEF, its officers, agents and employees from and against all suits, claims, demands and liability of any nature or kind, including costs and expenses, arising out of act or omissions of the Contractor(s) or its employees in the performance of this Agreement. 17. Safety Contractor(s) shall be solely responsible for complying with all relevant safety laws and regulations and for taking all necessary safety precautions in connection with the performance of the agreement in order to protect all persons and property. 18. Insurance Contractor(s) is fully responsible for arranging, at own expense, such life, health and other forms of insurance for Contractor(s) staff covering the period of service on behalf of UNICEF. The responsibility of the United Nations is limited solely to the payment of compensation under the conditions described in the Concept, Design and Prepress Reference Price List. 19. Payment Terms UNICEF shall on fulfillment of the Delivery Terms unless otherwise specified make payment within 30 days of receipt of the Contractor(s) invoice for the deliverables as specified in the Agreement. Unless authorized by UNICEF a separate invoice must be submitted in respect of each Purchase Order/work-order/contract where applicable. Each invoice shall indicate the identification number of the corresponding contract document. Proof of dispatch or delivery note certified by the UNICEF designated consignee(s) attesting to the delivery and satisfactory condition of articles or services (original and 1 copy) must be submitted with the invoice. UNICEF shall have a reasonable time which shall not exceed sixty (60) days after delivery of the deliverables inspect them and to reject and refuse acceptance of deliverable which do not conform to the Agreement, or accepted industry standards. Payment for goods/services/deliverables pursuant to the Agreement shall not be deemed an acceptance of the goods/services. 20. Limitation of Expenditure No increase in the total liability of UNICEF or in the price of supplies/services will be authorized or paid to the contractor unless such increase has been pre-approved in writing by UNICEF prior to delivery. 21. Time Requirements Contractor(s) will furnish UNICEF with a complete and detailed phased timeline for deliverables or contract document. This timeline will be strictly adhered to and cannot be subject to modification save in signed writing by the supervising UNICEF officer. Changes attributable to Contractor(s) will be subject to penalty provisions by UNICEF at the following rates: a. 1 to 7 days late - 2.5% of the billed amount b. 8 to 15 days late - 5% of the billed amount c. 16 to more days late - 10% of the billed amount The above deduction will be final and recourse will not be entertained. If the delay in delivery is due to causes, which are beyond the control of the Contractor(s), which UNICEF will determine on the basis of documentation and/or explanation submitted no deduction from the invoices will be made. 22. Inspection A. The contractor shall permit UNICEF’s authorized representative to have full access to all the facilities at all reasonable times to inspect the production of the work and shall provide assistance to the representatives for such inspection, including copies of any test results or quality control reports as may be necessary. B. UNICEF reserves the right to contract an agency to conduct pre-delivery inspection (third party inspection) at the Contractor’s premises prior to delivery. Such inspections, if conducted do not guarantee acceptability of the deliverables at final destination. C. Third party inspection will be for UNICEF’s account, but if any additional visits are required due to the Contractor’s fault any corresponding expenses will be covered by the Contractor(s). D. Contractor(s) alone is responsible for the quality of the products/services supplied irrespective of whether they have been inspected by UNICEF or its appointed representative. E. UNICEF reserves the right to use other contractors, if felt necessary, for completion of the contract without the consent of the Contractor 23. Priority The Contractor(s) agrees to give high priority to work contracted by UNICEF and shall adhere to all delivery dates specified in the contract. 24. Delivery Delivery shall be made to the specified address in Suva at Contractor(s) cost. Delivery charges for out of city destinations shall be as per actual rates paid supported by relevant receipts, subject to certification by UNICEF. 25. Additional Instructions All work not covered in the financial bid shall be approved in advance by UNICEF Supply Section in writing and will be part of the Agreement, Contract or Purchase Order. This writing will take the form of a Contract Amendment or a Contract Addition as suitable. Force Majeure: 26. Notice of Force Majeure If the Contractor(s) is rendered unable, wholly or in part, to perform its obligations and meet its responsibilities under this Agreement by reason of Force Majeure, the Contractor(s) shall give notice and full particulars in writing to UNICEF as soon as possible after the occurrence of any event constituting Force Majeure. In this Agreement, Force Majeure means acts of God, war (whether declared or not), industrial disturbances, acts of the public enemy, civil disturbances, invasion, revolution, insurrection or other acts of a similar nature or force not caused by nor within the control of either Party and which neither Party is able to overcome. 27. Suspension by Reason of Force Majeure The obligations and responsibilities of the Contractor(s) under this Agreement shall be suspended to the extent of its liability to perform them and for as long as such inability continues. During such suspension and in respect of work suspended, the Contractor(s) shall be entitled only to reimbursement by UNICEF against appropriate vouchers of the essential costs incurred prior to the occurrence of any cause constituting Force Majeure. The Contractor(s) shall, within fifteen (15) days of the occurrence of an event constituting Force Majeure, submit a statement to UNICEF of estimated expenditure prior of the period of suspension. 28. Termination by Reason of Force Majeure If, in UNICEF’s judgment, the Contractor(s) is rendered permanently unable, wholly or in part, to perform its obligations and meet its responsibilities under this Agreement by reason of Force Majeure, UNICEF shall have the right to suspend or terminate this Agreement on seven (7) days’ written notice. UNICEF agrees to exercises its judgment under this provision in a reasonable manner. 29. Notification of Other Changes in Conditions The Contractor(s) shall also notify UNICEF of any other changes in the conditions or the occurrence of any event, which interferes or threatens to interfere with its performance of the Agreement. On receipt of the notice required under this Section, UNICEF shall take such action as, in its sole discretion, it considers to be appropriate or necessary in the circumstances, including granting the Contractor(s) a reasonable extension of time in which to perform its obligations under the Agreement. UNICEF agrees to exercise its discretion under this provision in a reasonable manner. Miscellaneous 30. United Nations Privileges and Immunities Nothing in or relating to this Agreement shall be deemed a waiver, express or implied, of any of the privileges, and immunities of the United Nations and its subsidiary organs, including UNICEF, whether under the Contractor(s) on the Privileges and Immunities of the United Nations, or otherwise, and no provision of this Agreement shall be interpreted or applied in a manner, or to an extent, inconsistent with such privileges and immunities. 31. Arbitration Any controversy or claim arising out of or in connection with this Agreement or any breach thereof shall, unless it is settled by direct negotiation, be settled by the UNCITRAL Arbitration Rules as at present in force. The parties to the Agreement shall be bound by any arbitrations award rendered as a result of such arbitration as the final adjudication of such controversy or claim. 32. Officials not to Benefit The Contractor(s) represents and warrants that no official of UNICEF has been or shall be admitted by the Contractor(s) to a direct or indirect benefit arising from this Agreement such provision being a breach of an essential term of this Agreement. 33. Other Provisions These include Contractor(s) Obligations, Terms of Reference and the Agreed Rates, any and all additional Annexations, Appendix or Amendments, which are duly signed by both the parties and form part of the Agreement. 34. Relations between the Parties Nothing contained in the Agreement shall be construed as establishing a relation of master and servant or of principal and agent between UNICEF and the Contractor(s). The Contractor(s) shall have the legal status of an independent Contractor(s) vis-à-vis UNICEF. Neither the Contractor(s) nor its personnel shall be considered employees or agents of UNICEF or the United Nations. Unless otherwise provided in this Agreement, UNICEF shall not be liable for any claims of any kind against the Contractor(s) by third parties arising in connection with the performance of this Agreement. 35. Child Labour UNICEF fully subscribes to the Convention on the Rights of the Child and draws the attention of potential suppliers to Article 32 of the Convention which, inter alia, requires that a child shall be protected from performing any work that is likely to be hazardous or to interfere with the child’s education, or to be harmful to the child’s health or physical, mental, spiritual, moral or social development. The Contractor(s) represents and warrants that no child has been or is employed by the Contractor(s) or any of its affiliates. 36. Anti-Personnel mines UNICEF supports an international ban on the manufacture of anti-personnel mines. Antipersonnel mines have killed and maimed thousands of people, of whom a large proportion is children and women. Anti-personnel mines present a serious obstacle to the return of populations displaced from their residences by fighting around their villages and homes. UNICEF has, therefore, decided not to purchase products from companies that sell or manufacture anti-personnel mines or their components. The Contractor(s) represents and warrants that neither it nor any of its affiliates is in any way engaged in the research, development, production, distribution, or sale of anti-personnel mines. 37. Dealing with other United Nations Agencies The Contractor(s) is allowed, on its own initiative and/or if requested by other agencies of the United Nations, to extend similar services described herein to such agencies. The Contractor(s) is obliged to pass on to the appropriate agency any savings obtained due to bulk shipments and/or other arrangements the Contractor(s) may arrange.