Industrial Areas—Adjacent Development Code
Performance Criterion and Acceptable Solution
Performance Criteria
Acceptable Solutions
P1
A1.1
The level of risk to public safety, property and
the environment from technological hazards
(including fire, explosion and chemical
release) must be within acceptable limits
Note:
Level of risk can be determined using
methodology outlined in the Hazard and Risk
Assessment Planning Scheme Policy
Uses involving an increase in the number of
people on site are not within:
• 1,500m of a Major Hazard Facility
• 500m of a Heavy Industry Area
• 500m of an Extractive Industry Area
• 150m of a General Industry Area
OR
A1.2
Where uses are within the distances outlined
in A1.1, the level of risk from adjacent
industry is within acceptable limits
While every care is taken by Brisbane City Council to ensure the accuracy of this extract of the code,
Council make no representations or warranties about its accuracy, reliability or completeness and
disclaim all responsibility and all liability (including without limitation, liability in negligence) for all
expenses losses and damages (including direct and consequential damage) and costs that may be
incurred as a result of the document being inaccurate in any way and for any reason.
Printed on 6/02/2016
Download