Industrial Areas—Adjacent Development Code Performance Criterion and Acceptable Solution Performance Criteria Acceptable Solutions P1 A1.1 The level of risk to public safety, property and the environment from technological hazards (including fire, explosion and chemical release) must be within acceptable limits Note: Level of risk can be determined using methodology outlined in the Hazard and Risk Assessment Planning Scheme Policy Uses involving an increase in the number of people on site are not within: • 1,500m of a Major Hazard Facility • 500m of a Heavy Industry Area • 500m of an Extractive Industry Area • 150m of a General Industry Area OR A1.2 Where uses are within the distances outlined in A1.1, the level of risk from adjacent industry is within acceptable limits While every care is taken by Brisbane City Council to ensure the accuracy of this extract of the code, Council make no representations or warranties about its accuracy, reliability or completeness and disclaim all responsibility and all liability (including without limitation, liability in negligence) for all expenses losses and damages (including direct and consequential damage) and costs that may be incurred as a result of the document being inaccurate in any way and for any reason. Printed on 6/02/2016