Variation notice with introductory note Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013 Operator Name North West Galvanising Ltd Installation address Site 17 Campsie Real Estate Eglington Co Londonderry Permit number P0043/04A Variation number P0043/04A/V2 Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 1 of 7 Introductory note This introductory note does not form part of the Variation Notice The following Notice is issued under Regulation 17 of the Pollution Prevention and Control(Industrial Emissions) Regulations (Northern Ireland) 2013 (“the PPC (IE) Regulations”) to vary the conditions of a Permit issued under those Regulations to operate [part of] an installation carrying out one or more of the activities listed in Part 1 to Schedule 1 of those Regulations. The Notice comprises a Schedule containing conditions to be deleted and conditions to be added. The Notice is subject to the express conditions set out in the Schedule. It should be noted that aspects of the operation of the installation not regulated by those conditions are subject to the condition implied by Regulation 12(9) of the PPC(IE) Regulations, that the Operator shall use the best available techniques for preventing, or where that is not practicable, reducing emissions from the installation. Techniques include both the technology used and the way in which the installation is designed, built, maintained, operated and decommissioned. The enforcing authority for Part A installations in Northern Ireland is the Chief Industrial Pollution Inspector. Under Regulation 8(4), any function of the Chief Inspector may be delegated to any other Inspector appointed by the Department of the Environment and references to the Chief Inspector should be interpreted accordingly. Brief description of the changes introduced by this notice. Emission limit for zinc in to water applied after completion of improvement item 6.3. Superseded Licenses/Consents/Authorisations relating to this installation Holder Reference Number Date of Issue Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 2 of 7 Talking to us If you contact us about this variation, please quote the variation number. Confidentiality If this variation requires the Operator to provide information to the Chief Inspector, we will place the information onto the public registers in accordance with the requirements of the PPC (IE) Regulations. If the Operator considers that any information provided is commercially confidential, it may apply to the Chief Inspector to have such information withheld from the registers as provided in the PPC Regulations. To enable us to determine whether the information is commercially confidential, the Operator should clearly identify the information in question and should specify clear and precise reasons. Record of Changes The Status Log with this and any subsequent variation includes / will include summary details of the permit, variations up to that point in time and state whether a consolidated version of the Permit has been issued. Status Log Detail Date Application P0043/04A Schedule 4 Notice P0043/04A – FA001 Permit P0043/04A Received 04/05/04 14 June 2004 Variation Notice P0043/04A/V1 Determined 28/10/04 Effective Date 11/11/04 Effective Date 12/08/2013 Variation Notice P0043/04A/V2 Effective Date 31/03/2014 Comment Response on 25 June 2004 Issued by the Chief Inspector following a review of the Permit. Issued by the Chief Inspector. End of introductory note. Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 3 of 7 VARIATION NOTICE Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013 Permit Number P0043/04A Variation Notice Number P0043/04A/V2 The Chief Inspector in exercise of his powers under Regulation 17 of the Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, hereby varies the Permit Number P0043/04A, as held by, North West Galvanising Ltd (“the Operator”), whose Registered Office (or Principal Office) is Site 17 Campsie Real Estate Eglington Co. Londonderry Company registration number NI051861 To operate an Installation at Site 17 Campsie Real Estate Eglington Co. Londonderry subject to the conditions contained in the Schedule to this Notice. This Notice shall have effect from 31 March 2014 Signed Chief Inspector Date Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 4 of 7 SCHEDULE TO NOTICE CONDITIONS TO BE DELETED 1. Table 2.2.2.2 Table 2.2.2.2: Emission limits into water Release Parameter Value Monitoring point Requirement Quarterly spot W1 Suspended 50 mg/l sample solids Note 1 W1 pH 6 to 9 Quarterly spot sample Note 1 W1 Zinc (total) Note 2 Note 2 W1 VOG None Weekly Note 1 Notes To be tested in accordance with BS EN 872, or as agreed with the Chief Inspector To be tested in accordance with ISO 10523, or as agreed with the Chief Inspector To be tested in accordance with ISO 118850-1997 Environmental log to be kept to record visual assessment Note 1: To be sampled at manhole prior to discharge. Note 2: Emission limit and monitoring requirement to be determined by Chief Inspector after completion of improvement item 6.3. 2. Table 6.1 Table 6.1.: Improvement Programme Requirements Reference Requirement 6.1 The Operator shall determine the zinc content of “first flush” surface water arising from process building roofs and investigate the provision of facilities for its temporary storage and re-use. A report on the findings should be submitted to the Chief Inspector 6.2 The Operator shall assess the suitability of stack test port(s) and platform(s) (including access) for release points A1 and provide the Chief Inspector with a written proposal with timescale to comply with the requirements of Technical Guidance M1, to be agreed by the Chief Inspector 6.3 Monitoring of total zinc in spot samples from emission point W1 should be carried out monthly for six months and results forwarded to the Chief Inspector. The Operator shall permanently label locations used for sampling releases from discharge points listed in 6.4 Table 2.2.2.1 and 2.2.3.1 Date Within 6 months of the effective date of this Notice Within 12 months of the effective date of this Notice For 6 months from the effective date of this Notice Within 6 months of date of permit/variation notice. 3. Form W1 Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 5 of 7 CONDITIONS TO BE ADDED 1. Table 2.2.2.2 Table 2.2.2.2: Emission limits into water Release Parameter Value Monitoring Point requirement W1 Suspended 50 mg/l Quarterly spot sample Note 1 Solids W1 pH 6 to 9 Quarterly spot sample Note 1 W1 Total Zinc 7.5 mg/l Quarterly spot sample Note 1 W1 Visible oil and grease None Weekly Note 1 Notes To be tested in accordance with BS EN 872, or as agreed with the Chief Inspector To be tested in accordance with ISO 10523, or as agreed with the Chief Inspector To be tested in accordance with ISO 118850-1997 Environmental Log to be kept to record visual assessments Note 1: To be sampled at manhole prior to discharge. 2. Table 6.1 Table 6.1.: Improvement Programme Requirements Reference Requirement 6.1 The Operator shall determine the zinc content of “first flush” surface water arising from process building roofs and investigate the provision of facilities for its temporary storage and re-use. A report on the findings should be submitted to the Chief Inspector The Operator shall permanently label locations used for sampling releases from discharge points listed in 6.2 Table 2.2.2.1 and 2.2.3.1 Date Within 6 months of the effective date of this Notice Within 6 months of date of permit/variation notice. 3. Form W1 Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 6 of 7 W1 RELEASES INTO WATER Release Summary for North West Galvanising Ltd. Permit Number: P0043/04A Location: North West Galvanising Ltd, Campsie Real Estate, Eglington, Co. Londonderry Release Point: W1 Date Release Point Suspended Solids (mg/l) Oil or Grease pH Zinc (mg/l) Limit 50 None Visible 6.5 to 9 7.5 W1 Signed on behalf of the Operator ...................................................... Dated .............................. Note: A full monitoring report must accompany the release summary. Variation No: P0043/04A/V2 Effective date: 31/3/14 Q58/1 version 4 Page 7 of 7