the water drainage problems (a case study of imt

advertisement
The Water Drainage Problems (A Case Study Of IMT
Campus III Enugu)
TABLE OF CONTENTS
Title page
Approval page
Dedication
Acknowledge
Abstract
Table of content
List of table
CHAPTER ONE
1.0
Introduction
1.1
Importance of drainage
1.2
Objectives of study
CHAPTER TWO
2.0
Literature review
2.1
Types of drainage
2
2.2
Rational formula
2.3
Hydrological circle
2.4
Forms of waste water
2.5
Sources of water
CHAPTER THREE
3.0
Location of IMT campus 3 Enugu
3.1
Sources of waste water in campus3
3.2
Existing drainage systems
3.3
Best hydraulic design
CHAPTER FOUR
4.0
Discussion
4.1
Problems of water drainage and environmental impacts
4.2
Solution to the problems
4.3
Designing and constructional solution
3
CHAPTER FIVE
5.0
Recommendations
5.1
Conclusion
5.2
Bibliography
Reference
CHAPTER ONE
1.0
INTRODUCTION
Some aspects of Civil Engineering is devoted to the planning and construction
of facilities to drain the high ways or streets and carry run-offs.
Removal of surface water from the road or street is known as surface drainage;
drainage as distinct from plumbing is a system which collects waste products
from baths. Wash – basins, water closets and sinks together with rain and
discharges into public sewers, septic tanks, soakaways or cesspools.
The construction of drain is therefore principally concerned of the Manson. It
is accomplished by constructing the road so that it has a crown and by sloping
the shoulders and adjacent areas so as to control the flow of water either
4
towards existing natural drainage, such as open ditches, or into a storm
drainage system of catch basin and underground pipes. If a storm drainage
system is used as it would be with city streets, the design Engineer must give
consideration to the total area drainage unto the street, the maximum rate of
run-off expected, the duration of the design storm, the amount of ponding
allowable at each catchments area and the proposed spacing of catch basin
along the street. From this information the desired capacity of the individual
catch basin and the size of the underground piping network are calculated.
In designing facilities to carry run-offs from pavements, the Engineers must
determine the area to be drained, the maximum probable precipitation over the
drainage basin, the highest expected run-off rate, and then using this
information must calculate the required capacity of the drainage structure.
Generally designs are made adequate to accommodate not only the largest flow
ever recorded for that may be expected under the most adverse conditions for a
given number of years.
Factors considered in calculating the expected flow through a culvert opening
include the size, length and shape of the entrance and down stream end of the
5
conduit, the maximum allowable height of water at the entrance, and the water
level at the outlet.
There is a trend to use designs that permit drainage structure yard. Such
procedures permit better control of the work. For example with recast concrete
pipe section, it is often possible to avoid building small box culverts in the
field. Circular culverts of large diameter are now also constructed in the same
way.
1.1
IMPORTANCE OF WATER DRAINAGE
Water drainage as an elemental part of Civil Engineering Construction plays an
importance role which makes it very significant when it comes to the act of
practicing maintenance culture.
To this end in every construction process, drainage should be given due
consideration. In residential buildings, water drainage system is very
importance so as to get rid of waste water and storm water from the building
and thereby preventing the building from excessive dampness and by so doing
providing good maintenance for the building.
Aside the fact that drainage system in residential building prevents excessive
dampness, it also prevents excessive flooding.
6
Another area in construction where drainage system can highly be appreciated
is road and embankment construction. In road construction, water drainage are
primarily designed to prevent excessive flooding of the paved surface thereby
preventing wearing away of the surface and also make it more accessible
during and after storm.
In the light of all these significant roles played by water drainage system,
necessity has made it mandatory for any existing structure or proposed
structure to have a water drainage system.
Resolving a water drainage system involves a lot of activities especially where
the water drainage is to control excessive flooding or where it is to be designed
for water logged area. The designing water drainage system there is need to
anticipate the position of future structure erections so as not to hinder the
aesthetic nature of future construction process.
Another importance fact is that for good effective water drainage system to be
developed, there is need to construct a filter along the drainage channels
because of the retention capacity of the soil within the campus area. The soil
consist mostly later tic clay which has the ability to retain water for a long
period of time. As this will be detrimental to the life span of the water drainage
7
channel to be constructed, it is that masonry lining for the water drainage
channels be constructed also.
1.2
OBJECTIVE OF THE STUDY
The objectives of the study work shall cover all the vital aspect of the drainage
problems system. The first stage of this project work shall include the
reconnaissance survey of the area covered by the campus, nothing the land
scope and modal points ways, the effects of flood and erosion more prevalent,
the catchments area and tributaries of the storms water that constitute the major
part of the erosion and flood because it is quite noticeable that during the
raining seasons that most of the road leading to campus and within the campus
becomes in-accessible for motorists and part of the building, lecture rooms are
highly flooded.
The next is to found out which type of the drainage system exists and the
orientation, direction of the drainage channel.
8
Another objective where the study is going to lover is the type of hydraulic
drainage design, the study shall also highlight the serviceability and cost
effectiveness of the method adopted that is to say whether the design is made
of press-stressed concrete or in-site concrete.
On the reasonable part of it, this study shall highlight more on the solution to
this water drainage problems
*** INSTRUCTIONS ***
Please Read The Below Instructions Carefully.
******************************
HOW TO ORDER THIS COMPLETE MATERIAL
If you want to order the complete materials (Chapter One
to Five, Including Abstract, References, Questionnaires, Proposal (where
applicable)) of the above mentioned topic, please visit
www.freeplace.org and click on “Order” (i.e.
www.freeplace.org/order)
******************************
9
HOW TO BECOME OUR PARTNER
To become our partner, visit www.freeplace.org and click on
partnership.
******************************
TERMS OF USE
This Material is for Academic Research Purposes only. On no
account should you copy this material word for word. Copying
this material “Word for Word” is against our “Terms of Use”.
That you ordered this material shows you have agreed Our
‘Terms of Use’.
******************************
Better is not good enough, the best is yet to come!
Endeavour to be the best!!
10
Download