WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 STATEMENT OF COMMITMENT BY THE EXECUTIVE AUTHORITY According to the Municipal Systems Act, each Municipal Council must, within a prescribed period after its elected term, adopt a single, inclusive strategic plan for the development of the municipality. However, our Predecessor Council already adopted a draft IDP. We, in an endeavor to execute our political mandate, followed the path laid by them and adopted the draft IDP with amendments made considering the contract we made with the people of Waterberg during the local government elections. The tasks given to local government entail more demanding capabilities and performance. This means that we are not only expected to find the means for addressing traditional local government challenges of delivering basic services to the people, but we are supposed to find strategies and mechanisms that are potent enough to remove the many bottlenecks which stand in the way of sustainable development in a local jurisdiction. The IDP document that we adopted will serve as a blue-print that will gauge service delivery and timely implementation. The next five years will be fundamentally different regarding the kind of support that both national and provincial government spheres will be providing to municipalities. Different in that, it will be characterized by intensive intergovernmental collaboration, and of course hands-on support. To all my colleagues, both from the Political authority and the administrative arm, It is my understanding, that as we carry out this contract entered into with our people, we will appraise it with 100% ownership of all the things that were discussed and agreed upon, we will implement it with full preparedness to provide developmental support to all municipalities in the district. It is only when we are 100% committed that we stand a chance of realising these local government strategic priorities. One of the critical things we need to do in the next five years is to build and strengthen the capacity of newly elected mayors and councillors, particularly women. This objective is also consistent with building a democratic, non-racial and non-sexist South Africa. We should do so by putting in place targeted support programmes for our women mayors and councillors, and not rejoice at their failures. The success of the integrated development plan as enshrined herein caters also for development of infrastructure is dependant on the competencies of Councillors, municipal officials, and service providers 1 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Infrastructure is the cornerstone of social upliftment and economic development. In particular, fast tracking Infrastructure delivery will also contribute to the Accelerated Shared Growth Initiative for South Africa (ASGISA), and also assist in achieving the targeted economic growth rate of 6% through job creation as well as the establishment of well-serviced areas conducive for economic investment and development. On achieving the 6% growth, we need to sustain this by maintaining the infrastructure assets. We believe that we have built the basis for a national effort to achieve faster and shared economic growth. With this programme we can achieve our social objectives and we can more than meet the Millennium Development Goals. Our municipality has allocated sufficient funding to kick start a basis for the development of proper infrastructure in needy areas. Local Government as the custodian of community infrastructure such as roads, waste disposal sites, water and sanitation systems, and public facilities. Most importantly we will intensify assets management efforts in a sustainable manner to best serve the interests of communities and enable local economic development. 2 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 STATEMENT OF COMMITMENT BY MANAGEMENT The strategic plan as detailed herein is informed by the successes in the previous implementation and service delivery initiatives and seeks to provide a framework within which our municipality will address the remaining challenges as we enter the second decade of freedom. The overall thrust of our plan centres on building the capacity of the district municipality and the local municipalities to implement government’s development programmes. The interests of ordinary people in the district continue to inform the strategic institutional thrust of the district municipality. It is also a building block on what has been done since the inception of local government in 2000 and encompass a five year strategy for the future, with a firm focus on the mid-term planning. The refined vision and mission put additional emphasis on the following: Establishing the needs of communities through Inclusive and participatory processes Render effective, efficient and sustainable services Ensure a better life for all In this manner our municipality should make a meaningful contribution to government’s vision of our future embodied in vision 2014. Management and staff of the WDM recommit themselves to work tirelessly at enabling Council to realise the targets for 2014 that include the following: Reducing unemployment by half Reducing poverty by half Providing the skills required by the district economy Improving services to achieve a better life We will strive to do so informed by our municipality’s intention to play its role in “‘Building a people’s contract to create work and fight poverty ” . We will do so guided by the strategic objectives of the municipality which provide a guideline that we will follow as management and staff in executing Council’s mandate. Specific outputs, indicators and outcomes are central to fulfilling this mandate. All Service Business Units will be implementing their programmes on the basis of detailed action plans informed by the strategic plan.• 3 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 We will further ensure that Council’s obligation of community participation is structured in such a manner that ’all district stakeholders continue to support our municipality as we mobilise our people’s individual and collective efforts to implement government’s programmes at provincial and local level. This includes partnerships with the three spheres of government, civil society and the private sector. Our goal is to accelerate the shared growth initiative and invest in the life’s of our people a new age of hope We thank the sterling contribution of the predecessor Council, Mayoral Committee, all three spheres of government and parastatals, members of the public, business community and organs of civil society and our many stakeholders who have interacted with us and brought valuable insights to this strategic plan. Lastly, I thank the committed staff of WDM that continues to find joy in serving the people of the district. 4 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION A 5 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 1: INTRODUCTION AND BACKGROUND 6 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1. INTRODUCTION 1.1. CONSTITUTIONAL MANDATE Chapter 7 of the constitution Status of municipalities 151 (1) The local sphere of government consist of municipalities, which must be established for the whole territory of the republic. (2) The executive and legislative authority of a municipality is vested in its municipal council (3) A municipality has the right to govern, on its own initiative, the local government affairs of its community, subject to national and provincial legislation , as provided for in the constitution; Objects of local government 152 (1) The objects of local government are(a) (b) (c) (d) (e) To provide democratic and accountable government for local communities; To ensure the provision of service to communities in a sustainable manner; To promote social and economic development; To promote a safe and healthy environment; and To encourage the involvement of communities and community organizations in matters of local government Establishment of municipalities Section 155 provides for three categories of municipalities (a) Category A- Is a municipality that has exclusive municipal executive and legislative authority in its area. (b) Category B- Is a municipality that shares municipal executive and legislative authority in its area with a category C municipality within whose area it falls (All the locals viz. Mogalakwena, Lephalale, Thabazimbi, Modimolle, Bela-Bela and Mookgophong are classified within this category) 7 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 (c) Category C- Is a municipality that has municipal executive and legislative authority in an area that includes more than one municipality- (Waterberg District Municipality fall within this category) 1.2 MUNICIPAL FUNCTIONS AND POWERS Sections 156 of the Constitution, 8 of the Municipal systems Act and 86 of the structures act outline the powers and functions of the municipal 8 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key: ATP = Authority to perform PFM = Powers Performed by Municipality ESP = External Services Provider S78 = Section 78 Process in terms of Systems Act Complete SDA = Service Delivery Agreement in Place Functions of the district municipality according to the ATP Constitution, the Municipal Structures Act and Systems Act Air pollution Bulk supply of Electricity Bulk Water Supply Bulk sewage purification and main sewage disposal Cemeteries and Crematoria Municipal roads Education Fire-Fighting Services Local Economic Development Municipal Abbattoir Municipal Airports Municipal Health Services Municipal Transport Planning Municipal Public Works Municipal Planning Safety and Security Social development Sports, Arts and Culture Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes No No No PFM Yes No No No No Yes No Yes Yes Yes No Yes Yes Yes Yes No No Yes ESP other sphere Govt. No Yes Yes Yes No No No Yes No No No No No No No Yes Yes Yes or S78 SDA Personnel No No Yes No No No No Yes No No No Yes No No No No No No 0 0 0 0 0 1 0 3 0 1 1 2 0 0 1 of Yes No Yes Yes No No No Yes No Yes No No No No No No No No 9 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.3 COUNCIL COMPOSITION The District is allocated 33 seats. 32 Seats are filled and one vacancy exists. The Council comprises of 32 councillors of which 13 are directly elected and 19 indirectly elected. The councillors represented hereunder are reflected as from March 2006 MEMBERS OF COUNCIL EXECUTIVE MAYOR : Councillor P S Kekana SPEAKER : Councillor Y E Lorgat : Councillor M D Mabote MEMBERS OF THE MAYORAL COMMITTEE Councillor S J Madela Councillor R E Mothibi Councillor J M Rakgwale Councillor M J Makhafola Councillor S M Molekwa COUNCILLORS : Councillor A E Basson Councillor R M Kekana Councillor M M Lamola Councillor M E Lefawana Councillor V B Machine Councillor S K Makgae Councillor M J Makhafola 10 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Councillor L S Manamela Councillor M J Mashiane Councillor G S Matsietsa Councillor M P Modiba Councillor O O Modise Councillor M A D Monama Councillor R N Monene Councillor M L Moremi Councillor T P Mphahlele Councillor R M Radebe Councillor G M Seleka Councillor M A Sethlare Councillor P H Tsebe Councillor van Aswegen L W Councillor van Heerden J D Councillor Vreugdenburg J Councillor S A Sebolai Councillor N V Mashamaite 11 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 COUNCIL COMMITTEES SOCIAL SERVICES Chairperson: S M Molekwa Chairperson: R E Mothibi Chairperson: J Rakgwale Members: T P Mphahlele M L Moremi R M Kekana R M Radebe INFRASTRUCTURE Members: M A D Monama R N Monene J Vreugdenburg TRANSFORMATION & ADMINISTRATION Members: O O Modise G M Seleka V B Machine L S Manamela BUDGET & TREASURY Chairperson :S J Madela Members: M M Lamola A E Basson M P Modiba S K Makgae PLANNING & ECONOMIC DEVELOPMENT Chairperson: M.D Mabote Members: L W van Aswegen P H Tsebe M E Lefawana G S Matsietsa S A Sebolai GENDER, YOUTH, SPORTS, ARTS & CULTURE Chairperson: M J Makhafola Members: M J Mashiane 12 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 M A Setlhare J D van Heerden N V Mashamaite Chairperson: Speaker Cllr. Y. E. Lorgat PUBLIC PARTICIPATION Members: 1. R. M. Kekana 2.S.M. Molekwa 3.G.M.Seleka [Ms.] 4.O.O. Modise[Ms.] 5.M.L.Moremi[Ms.] 6.M.M.Lamola GEOGRAPHICAL NAMES COMMITTEE Chairperson: Speaker Members: Cllr. Y. E. Lorgat 1.J.Rakgwale 2.J.Vreugdenburg 3.R.M.Radebe [Ms.] 4.G.S.Matsietsa[Ms.] 5.M.A Setlhare [Ms.] 6.T.P.Mphahlele 13 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 2: ALIGNMENT AND HARMONISATION 14 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 2. INTEGRATED DEVELOPMENT PLANNING Development Planning is “… a participatory approach to integrate economic, sectoral, spatial, social, institutional, environmental and fiscal strategies in order to support the optimal allocation of scarce resources between sectors and geographical areas and across the population in a manner that provides sustainable growth, equity and the empowerment of the poor and the marginalized…”. (Forum for Effective Planning and Development1 (FEPD), 1995). Integrated Development Planning is a cooperative and continuous process that is undertaken by the Municipality and leads to the adoption of the Integrated Development Plan (IDP) and its annual revision based on new data and changing circumstances. The Municipality’s IDP is concerned with the allocation of public resources in the most effective and efficient way so as to provide a framework for community, economic, and environmentally sustainable development at the local level. The IDP has legal status. It is the instrument for the strategic management of the Municipality and decision-making by the Council. The IDP ensures a cooperative approach by the National, Provincial and Local spheres of government to develop and implement projects and programmes on a priority basis which will empower and benefit the community. Each sphere of government in South Africa has to see to the optimal allocation and application of resources for its area of jurisdiction. Development Planning is therefore an executive function as it has to be overseen by the highest political office at each sphere and should be ratified by the elected political representatives in that sphere. Development Planning has to determine the way in which each sphere sets its budget. Its influence should extend beyond that of government resources and it must serve to mobilize off-budget resources (State Owned Enterprises, private sector and NGOs). Development Plans also serve to inform the actions of a range of role players, so they have a broader role than merely establishing a one-to-one relationship with budgets. They should also serve to inspire and guide the self-action of communities and residents by presenting a clear vision for the area and long, medium and short-term development priorities and objectives. 1 FEDP was a government advisory body. 15 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Development Planning is a core part of the service delivery and development process. Service delivery and development cannot occur without identifying relevant actions, programming the activities and setting in place the requisite resources. The relevant actions are the ones that have the most impact on addressing poverty and growing the economy. They are sustainable and lead to long-term benefits for a particular area and its people. It is always a challenge to determine these relevant actions in the face of huge needs and limited resources. It requires formulating strategies that are innovative, inter-sectoral and spatially targeted. Development Planning is also central to any performance management system. The setting of development objectives and targets is the basis for measuring performance through appropriate monitoring and evaluation steps. Development Planning is therefore a part of an integrated system of planning and delivery and does not sit as an isolated process de-linked from the actual functioning of a municipality, province or the country. The IDP relationship between the three spheres of government can be illustrated as follows: 2.1 Local Government Sphere Development Planning in the Local Government sphere is conducted through the Integrated Development Planning instrument. Each municipality in terms of the Municipal Systems Act (2000) is responsible for formulating, adopting and implementing and Integrated Development Plan (IDP). The Mayor is 16 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 responsible for the IDP and it has to be adopted by the municipal council. Community participation and involvement is central to IDPs. Communities are encouraged to organize themselves and take care of their own development working together with government. Community/Ward based planning can be a useful way for making more structured inputs in the IDP process and for organizing community/ward based self-action. IDPs are not a mere collection of community needs or plans but are municipal-wide plans that have to take community needs into account together with wider strategic issues incorporating provincial and national priorities and strategies. Mediating these various interests the IDP should reflect the best possible development decisions and trade-offs that focus on viability and economic, social, environmental, financial and institutional sustainability. 2.2 Provincial Government Sphere Development planning in the provincial sphere occurs through the Provincial Growth & Development Strategies (PGDSs) that are driven by the Premier’s office and adopted by the provincial cabinet. Currently there is no national legislative framework that governs the formulation, adoption and implementation of PGDSs. Nevertheless in practice all provinces do formulate an overarching strategic framework. The PGDS should have effect over the entire province and therefore needs to be completed in consultation with municipalities and key provincial stakeholders. The PGDS and IDPs should be aligned so that a common strategic path is followed and there is complement in the way resources are allocated and in the way delivery occurs. 2.3 National Government Sphere Development Planning at national level occurs through the Medium Term Strategic Framework (MTSF). The MTSF is prepared by the Presidency and approved by the national Cabinet. Like the PGDS, the MTSF currently does not have a legal status. The influencing nature of the MTSF over the national budget is still limited. This will improve as the inter-sectoral, geographical and people-centred focus of the MTSF is deepened, and as institutional preparedness issues are addressed. Intergovernmental Planning, that is, the coordination of development planning across the three spheres of government is a critical area for improvement in order to realize the objective of optimal resource allocation and implementation for the state as a whole for the purpose of eradicating poverty and growing the economy. Enhanced development planning across government will contribute to the existing Planning Framework that includes the planning cycle which culminates in the MTSF and annual State of Nation Address. 17 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The IDP Hearing analysis together with an analysis of provincial capacities (and an analysis of District – Wide IDP Consultative Meetings) forms the basis of the Intergovernmental Planning support strategy that focuses on an action plan relevant to the context of the Limpopo Province and Waterberg District Municipalities. The strategic objectives of the support strategy are: 2.3.1. Entrench integrated development planning as an approach by improving the perceptions and understanding of key role players 2.3.2. Improve the capacity of municipalities to plan so that they develop realistic and creative strategies that ensures sustainable, integrated and targeted development spending and infrastructure investment in a municipal area, 2.3.3 Improve the capacity of municipalities to implement so that they ensure feasible and effective municipal operation, service delivery and development, monitoring, evaluation and review, 2.3.4 Improve provincial-municipal as well as inter-sectoral cooperation in prioritization, resource allocation and implementation, 2.3.5 Improve the capability of provincial government and districts to give effect to their constitutional and legal obligations to support municipalities, 2.3.6 Ensure the coordination and effective implementation of the various support initiatives, and 2.3.7 Support the municipalities that have no/very limited structural capacity with frame conditions and establishment processes. In order to strive towards a developmental state that will enhance service delivery and lives of people, the appropriate mechanisms and support will be required from all actors in government. Issues like alignment and programme linkages, communication in structures, support from national, to provincial and local (financial, procedural and human resources) and sector involvement in development planning all calls for integration at each level of government, horizontal and vertical. It is imperative that the support needs to be structured at various levels of national, provincial and local structures (political and technical) and the rules of engagement must be clearly communicated for all role players to know what role they are playing and how to play it effectively. 18 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 To further forge alignment across the three spheres of governance the following clusters has been established and meeting regularly except the infrastructure cluster and the structural arrangements are as depicted in table 1.1. below. These structures meet quarterly and discuss issues that provide content to the agenda of the District Intergovernmental Forum that is also held quarterly. Table 1.1: Structural arrangements for the District Clusters Technical Support Forum 7 MM & 3 DH from Clusters 3DH representing the 3 Clusters Social Cluster Constituted by: HOD-LM , DM Provincial sector depts. District Heads Provincial Level: Education Health and Social Development. Sports, Arts and Culture Correctional Services Safety & Security Labour Municipality Mayor’s Office Social Services Corporate Services PIMSS Economic Cluster Constituted by: HOD-LM, DM & Provincial sector depts. District Heads Provincial Level: Economic Development Environment and Tourism Agriculture Roads and Transport Municipality Level Planning and Economic Development Finance PIMSS Infrastructure Cluster Constituted by: HOD-LM , DM & Provincial Sector depts District Heads Provincial Level Public Works Local Government and Housing DWAF Municipality: Technical Services PIMSS 19 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 3: PERFORMANCE REPORTING 20 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 3.1 FUNCTIONAL SERVICE DELIVERY REPORTING Key Performance Area Department Good Governance and Public Participation Executive Mayor’s Office Reporting Level Detail Municipal Function Overall coordination of council activities Description of the Activity. Overall administration in the office of the Executive Mayor and to contribute to its effectiveness in leading the Institution. Promoting the culture of co-operative governance. Ensure Public Participation in Municipal issues. Enter into twinning agreement with Foreign Countries District Municipalities. Facilitate the District Learning Network. Co-ordinate Sports, Arts and Cultural activities. Facilitation of safety and security issues in the district. Ensuring maintenance of order during Council meetings. Co-ordinate Council Sub-Committee meetings. Compilation of agenda and render Secretarial Services to Mayoral Committee and Council. Co-ordination with communities and interaction with various stakeholders. The Strategic objectives of the above functions are as follows: 1. To ensure 60% of all public institutions and households within rural areas have access to communication facilities within 5 years. 2. To promote interdepartmental linkages and alignment both on a horizontal and vertical basis annually. 3. To improve the level of safety and security by reducing the incidents of identified crime by 8% within the District Municipality annually 4. To ensure 100% accessibility to schools for all learners and 50% decrease in the learner/educator and learner/classroom ratio within the next 5 years. 5. To ensure that 25% of young people’s talents are identified, nurtured and developed within 5 years. 6. To ensure effective co-ordination and management of sports within municipalities in a year. 7. Promotion and awareness of cultural diversity. 21 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Performance reporting Municipal Function Performance reporting Municipal Function Performance reporting The total number of personnel employed 8 Total number of Councillors 32 Number of Councillors on the Mayoral Committee 6 Number and type of Council and Committee Meetings Council Meetings o Ordinary o Special 4 5 Mayoral Committee Meetings o Ordinary o Special 3 5 Portfolio Committee Meetings o Finance Committee o Labour and Administration Committee o Planning & Economic Development Committee o Infrastructure Committee o Community Services 4 4 5 6 7 Media and communications District Communicators Forum met as planned Received positive reportage from media Bought airtime on radio for a number of advocacy programmes Communication Strategy reviewed and programme of action adopted by council Newsletter were distributed throughout the district Ward committee capacity building Capacity Building A total of 15 Trainers were Trained in Partnership with Planact. 22 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal Function Performance reporting Education, Sports, Arts and Culture (Sport Development) Establishment of Local Sport Councils. Hosted District O.R.Tambo Games in Modimolle with 876 Participants. Hosted the Provincial O.R.Tambo Games with ± 1 000 Participants. A number of players have been selected to play for the Provincial Team that will participate in National Games to be held during September 2007 in East London. Arts & Cultural Municipal Function Performance reporting Hosted Arts and Cultural Festival in Bakenberg ± 2 000 people attended in the Event. Special programmes Special projects (Highlights) Youth Development Facilitated the establishment of Youth Council’s in all six Local Municipalities. Established the District Youth Council. 1 (One) General Council Meeting was held. Domestic Workers / Farm Workers Domestic Workers Forums were held in all Local Municipalities. Hosted the District Domestic Workers Forum in Modimolle during November 2005. Free the Farm Dweller Campaign was held in Kroomdraai, ± 2 500 workers attended the event. Women Development The Launch of the South African Women in Dialogue (SAWID) held in Lephalale during November 2005. 23 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key Performance Area Financial viability and management Municipal Function Procurement (Supply Chain Management) Reporting Level Detail Overview The Finance Department's mission is to provide financial support and ensure that public funds are utilised efficiently, effectively and economically, thus improving the lives of the communities. Description of the Activity. The Finance Department comprises of the following divisions: Income Expenditure Reporting The Strategic objectives of the function are the following: Revenue management Expenditure management and Supply Chain Management Financial reporting Budget compilation and control Adherence to legislative requirements The key issues for 2005/06 were: Collect levies due to the District Establishment of the various Bid Committees Comply with the requirements of the Municipal Finance Management Act Regular reporting in terms of MFMA 24 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Performance reporting 1 Number and cost to employer of all financial personnel The total number of personnel employed Financial interns appointed 12 2 2 Debtor analysis: amount outstanding over 30, 60, 90 and 120 plus days: Abattoir 30 days 60 Days 90 Days 120 plus days R (000s) 172 1 3 32 3 Write off of debts: number and value of debts written off: One debt at the abattoir was written off during the year. 4 Regional Service Council (RSC) levies: Number and value of returns Total Establishment levy Total Services levy Levies collected for the current year 76 R (000s) 66 084 35 166 12 346 46 018 5 Creditor Payments: Creditors are paid within a period of 30 days. 25 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6 Supply Chain Management The Supply Chain Management Policy was approved during December 2006 and came into effect as from 1 January 2006. Details of Bid Adjudication Committee activities: Total number of Bid Adjudication Committee meetings held during the year Total number of bids considered Total number of bids approved Total value of bids awarded Bids awarded to PDIs - 100% owned - less then 100% owned 11 16 16 11 16 958 5 7 External Loans: No loans were taken up during the year Municipal Function Performance reporting GAMAP/GRAP The District converted to GAMAP/GRAP and aligned its accounting policy with Generally Accepted Municipal Accounting Practice/Generally Recognised Accounting Practice and the annual financial statements were prepared in this format. Municipal Function Performance reporting MFMA implementation The District was classified as a low capacity municipality. The implementation plan was reviewed regularly to monitor implementation. Municipal Function Performance reporting Municipal Function Performance reporting Governance Relations The Finance Portfolio Committee met regularly during the year to discuss matters relating to finances. Budget Reform Two financial interns were appointed in terms of the conditions of the Municipal Finance Management Grant. The interns are exposed to the following areas: Municipal legislative environment and policy 26 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal budgeting and policy Management budgeting and implementation Municipal Supply Chain Management 27 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key Performance Area Municipal function: Transformation and Organisational Development Reporting Level Detail Overview The department of Corporate Services provides an internal support service to the municipality in order to enable it to fulfil its constitutional mandate of providing sustainable services to the communities and ensuring socio-economic development. Description of the Activity The main functions of the department ( functional areas) are: Admin (HR, IT, other)(Corporate Services) Human resources management Administrative and auxiliary services Legal services During the year under review the department undertook several projects aimed at achieving the general objectives of the department. These projects and other activities undertaken by the department will be presented in this section of this report. The Strategic objectives of the departments are the following : Human resources To ensure adequate supply of the human resources in order to enable the municipality to discharge its constitutional mandate and legal obligations in the most effective, efficient, fair and transparent manner. To render economic, effective and efficient administration of the human resources of the municipality. To develop and provide work designs and organizational development services to the municipality. To promote sound labour relations and foster a peaceful working environment. To effectively and efficiently control and manage the performance of the staff of the organisation. To coordinate and administer the training and development of the officials and councillors to enable them to execute their roles and responsibilities in the most effective and efficient way. To ensure the occupational health and safety of the officials and councillors of the municipal Administrative and auxiliary services To provide general administrative and auxiliary support to the other functional areas of the municipality in order to ensure effective and efficient rendering of services. To ensure a healthy and safe working environment. 28 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 To provide state-of- the- art equipment, systems and machinery for service delivery. Legal services To ensure compliance with the legal and constitutional requirements and obligations. To protect the legal interests of the municipality. To ensure that the municipality performs its functions and exercises its powers within the parameters of the law. Performance Reprting Number of all municipal staff employed: Professional (Managers/Specialists) Field (Supervisors) Office (Clerical/Administrative) Non-professional Temporary staff Contract staff Total 15 0 33 16 4 14 82 Key appointments and staff turnover during the year: M M A Appointments Managers Assistant managers Senior officers Total 2 1 2 5 Staff turnover Managers Assistant managers Senior officers Total 0 1 1 2 29 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal Function Performance reporting Municipal Function Performance reporting Human resource management Reviewed workplace skills plan Implemented the Workplace Skills plan Awarded bursaries to officials Conducted training programmes for officials Administrative and auxiliary services Municipal Function Completed the shaded parking area project Completed the repair of the municipal building Municipal Function Performance reporting Conducted disciplinary hearings for 2 officials 30 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key Performance Area Economic Development Municipal Function: Economic Development and Planning Reporting Level Detail Overview Includes all activities associated with economic development and Planning initiatives. The department is involved in the stimulation and the promotion of economic growth in the district particularly in areas that are identified as key growth sectors of mining, tourism, agriculture, construction and manufacturing. Description of the Activity. The department also coordinates all the spatial planning and land management issues in the district. The function of economic planning / development within the municipality is administered as follows and includes: ECONOMIC DEVELOPMENT Formulate, develop and implement economic development policy and LED strategies Facilitate research on economic development and maintain database; Stimulate the local economy by promoting job creation, investment and the development of SMMEs Mobilize investments both nationally and internationally Enhance local economic development through sectoral development focusing especially on agriculture, tourism, manufacturing and mining development and marketing Leverage government and international donor funds to support the LED program Foster partnerships with other stakeholders in support of poverty reduction, job creation projects and infrastructure provision Manage the implementation of LED initiatives in accordance with the IDP Technical support to category B municipalities DEVELOPMENT PLANNING Administration and development of the District Spatial Development Framework (SDF) Develop and maintain GIS System; Assist in the implementation of the IDP Assist category B Municipalities with land use management and development planning Formulation of development Policies, strategies and action plans" 31 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Description of the Activity (cont.) The strategic objectives of this function are to: The strategic objectives of economic development division are: To grow the district economy by 6% per annum To create 6 000 jobs per annum in order to reduce unemployment To reduce poverty by half amongst the rural and urban poor by 2015 To enhance human resources development To enhance the district and six municipalities’ capacity to manage LED The Development Planning Unit’s strategic objective is to guide, coordinate and implement spatial planning policies in the district through: Improved access to spatial information for planning purposes Formulation of development policies, strategies and action plans Creating sustainable human settlements, quality urban and rural environments The key issues for 2005/06 were: Performance reporting Review of the District LED plan Fast racking the compilation of SDF’s by local municipalities Establishment of sector working committees in mining tourism and agriculture Establishment of the Waterberg Development Agency Capacity building and establishment of functional LED unit in local municipality Development of Mining and Cooperatives Strategies 1. Number of all economic development personnel: 4 Professional(Directors/Managers) (3) 1 Non-professional(Clerical/Administrative) 0 Temporary 2 Contract Note: total number to be calculated on full-time equivalent (FTE) basis, total cost to include total salary package 2. Detail and cost of other rural development strategies: The following rural development strategies were initiated by the department: Poverty Reduction Plan Agricultural Development Strategy R 1 415 225 R 500 000 R 150 000 32 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal Function Performance reporting Municipal Function Performance reporting Municipal Function Performance reporting Municipal Function Performance reporting Municipal Function Modimolle Agricultural Training Centre and Establishment of Co-operatives R 1.2 M R 250 000 R 1 900 000 3. Type and number of grants and subsidies received: R 1M Integrated Provincial Support Programme Note: total value of specific planning and development grants actually received during year to be recorded over the five quarters - Apr to Jun last year, Jul to Sep, Oct to Dec, Jan to Mar, Apr to Jun this year. Formulation of Sector Strategies Core sectoral strategies of mining, tourism, cooperatives and agric were successfully completed. Coordination of LED activities in the District and Capacity building cipal Function LED review is under way for proper coordination of LED activities in the district Municipalities were assisted to establish their LED divisions Mining, tourism & agriculture LED working forums were establishment for effective coordination of these sectors The district participated effectively on EU LED programme Assisted communities and individuals to apply for funding from EU LED programme Facilitated the establishment and registration of cooperatives in the district with LIBSA Assisted mines to formulate their social and labour plans The variance has been that not all six municipalities managed to establish fully-fledged LED divisions and that the LED-working forum was not as fully functional as expected. Poverty Alleviation and Job creation; Spatial Planning Coordination in district Poverty related projects were successfully implemented such as registration of coops, agricultural training centre and SMME The variance in this area was that training was not effective. Coordinationof Spatial Planning in the district The target was that all six municipalities must have their spatial framework by end June 2006 Five of the six municipalities now have their spatial frameworks The district failed meet the target, one municipality still do not have the spatial framework Tourism Promotion 33 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Performance reporting Tourism was successfully promoted in the district through events such as wildlife expo, Bela-Bela tourism festival, wilde fees in Thabazimbi as well as Modimolle grape festival The tourism strategy & implementation Plan was also completed in the year under review The district participated in the Tourism Indaba in Durban 34 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key Performance Area Basic Service Delivery and Infrastructure Development Municipal function: Sports and Recreation (Social Services) Reporting Level Detail Overview Coordination and facilitation of Sports Arts and Culture Activities to unleash young people's talents Description of the Activity. To establish a structure that co-ordinates sports activities within the district To ensure the construction and maintenance of sports facilities To coordinate annual sports festivals To ensure that municipalities in cooperation with federations contribute to the development of sports programmes Municipalities and other stakeholders to mobilise funding for coaching programmes The Strategic objectives of the above functions are to : Ensure that 25% of young people’s talents are identified within the next 5 years. Ensure effective co-ordination and management of Sports, Arts and Culture within local municipalities. Municipal function The key highlights for 2005/06 were: Hosting O R Tambo Games in District Hosting of Indigenous Games Co-ordinating meetings related to sports, arts and culture Sports Development nurthe Year, Performance Targets Against Actual Achieved and Plans to Improve ormance Performance reporting Municipal function Performance reporting Hosted O R Tambo Games in District Co-ordinated meetings Arts and culture Hosted Indigenous games Provision of awards to athletes Co-ordinated meetings 35 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal function Education Reporting Level Detail Overview To ensure that all learners have access to education Description of the Activity. To encourage partnerships between the relevant sectoral departments and the municipality in identifying infrastructure needs The Strategic objective of the above functions is to : Ensure that all learners in farm areas have access to education The key highlights for 2005/06 were: Fencing rural school Purchasing of computers to offshoot schools Meetings with Department of Education Municipal Function Education in farming communities Performance Reporting Fencing rural school Purchasing of computers to offshoot schools Meetings 36 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal function: Public Safety Reporting Level Detail Overview To improve the level of safety and security by reducing the incidents of identified crime and ensuring that disaster management plans are in place. Description of the Activity. To ensure that proper co ordination of safety and security campaigns within the district Supporting local municipalities to have capacity to render a disaster management function The Strategic objectives of the above functions are to : 1. Reduce or eradicate incidences of crime in the District by 5% before 31 March 2006 2. To empower local municipalities to render a disaster management function 3. Disaster prevention and preparedness 4. Improvement of disaster management communication network The key highlights for 2005/06 were: Municipal Function Performance Reporting Municipal Function Performance Reporting Establishment of rural and community safety Establishment of disaster centres Establishment of Fire Protection Association Established Join Operation Committees Appointed service provider to develop the communication network plan Safety and security Meetings of rural and community safety held Disaster Management Distributed tents and blankets to disaster victims Appointed Disaster Officer Distribution of 3 fire engines to local municipalities 37 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal Function Reporting Level Overview Description of the Activity. Municipal Function Performance Reporting Environmental Health Detail The main focus is on prevention of spread of communicable diseases, investigation of reported cases, control of outbreaks, monitoring and meat quality and compliance with legislation; promoting integration of environmental management. To provide services in terms of the Health Act, 1997 (No. 63 of 1977) Monitor compliance with Occupational Health and Safety Act to ensure that appropriate preventive and remedial measures are implemented. Waste management Abattoir The Strategic objectives of the above functions are to : 1. To prevent the spread of disease, raise health and hygiene awareness; and protect the natural environment; thereby contributing to the social and environmental stability of the District 2. Management of the Abattoir to ensure that the meat slaughtered is good for human consumption The key issues for 2005/06 were: Establishment of disaster disease outbreak committee Developed Environmental and Waste management plan Audit of landfill sites within district Meetings held with veterinarian services Monitoring of hygiene at abattoir Health and Social Welfare Establishment of an orphanage drop in centre Coordination and completion of devolution of municipal health services from local municipalities and provincial government Appointed Assistant Head of health Municipal Function Waste management Performance Reporting Audited landfill sites Rehabilitated Bela Bela landfill site Developed Integrated waste and environmental plan Management of Abattoir Appointed general workman Reviewed contract of IMQAS for meat examination and grading Municipal Function Management of Abattoir 38 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Key Performance Area Municipal Function Reporting Level Basic Services and Infrastructure Development Water & Sanitation Road & Storm water Electricity Municipal Infrastructure Grant Programme Detail Overview The mission of the Department is to provide technical support in ensuring that the services provided by the Municipality in realizing the strategic focus areas of Technical Services are being done efficiently and effectively. Description of the Activity Technical Services is comprised of the following functional areas: 1. 2. 3. 4. Water and Sanitation Roads and Storm water Electricity MIG Programme The Strategic objectives are as follows: Coordination of water and sanitation development. Ensuring proper management of the district road network Co-ordination of the provision of the electricity services Management, administration and coordination of the MIG Programme The key issues for 2005/06 were: Performance Reporting Coordinate Monthly District Water and Sanitation Forum Re-gravel/pave identified local access roads Coordinate Monthly District Energy Forum Management of the MIG Programme and the MIG Project Management Unit 1. Water and Sanitation DWAF has established Area Planning Forum for the Waterberg District Municipality for the coordination of the planning and development of water and sanitation activities. Waterberg District Municipality is a stakeholder in the forum 39 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Four Area Planning Forums and two Catchments Management Agencies meeting were hosted for the year A total of 16 old water and sanitation projects were managed for the year 2. Roads and Stormwater A total of 13 local access roads were re-gravelled/paved for the year Only about 30% of the work towards the development of the roads management and information system was done 3. Electricity Four District Energy Forums were held for the year A total of 3 old electricity capital projects were managed for the year Municipal Function Performance Reporting Municipal Function Performance Reporting Municipal Function Performance Reporting Municipal Function Performance Reporting Municipal Function Performance Reporting 4. MIG Programme R1.9m was allocated to the Waterberg District Municipality towards the financing of the management of the MIG Programme worth R58.0m The MIG Project Management Unit was established in January 2005 A total of 10 old CMIP projects and 18 new MIG projects were managed for the year Water and sanitation coordination It was established that DWAF was also coordinating the planning and development of water and sanitation services via the Area Planning Forum. Roads management system The road function was devolved to the district as at July 2004. The District engaged with RAL to acquire information and database of the Waterberg District Road Network. Re-gravelling/Paving of roads Due to lack of knowledge and information on the district road network, the District continued to re-gravel/pave local access roads. Development of the Roads Management System is expected to be complete by June 2005. Electricity coordination The major issue in the electricity services is the restructuring of the electricity business which will have a major impact on Local Municipalities. The sub-issues that were identified are the ring-fencing of the electricity business by the Local Municipalities and the handing over of the electricity distribution licence from Eskom to Local Municipalities. MIG Programme The District was able to develop and establish the MIG Programme Management System: the PMU, the MIS Reporting; the District Monthly MIG Forum. The District MIG Programme will however cease to exist as at April 2006. The District has employed two technical assistants (PMU Technicians) towards the strengthening of the capacity to manage the own funded Capital Programme as well. 40 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 3.2 PERFORMANCE HIGHLIGHTS FREE BASIC SERVICES The District does not directly render water, sanitation and electricity services to residents but only performs a coordinating role and providing project management assistance to the six local municipalities. The following information was obtained from the PIMSS database in the district. It should be noted that the purpose for including this information in the Annual Report is to provide a district picture of progress made during the previous financial year in rendering basic services to indigent households. Number of indigent households benefiting from free basic services# Local municipality Total number of households* Water Sanitation Electricity Bela-Bela 12 279 9 500 0 9 500 Lephalale 23 401 7 500 140 2 500 Modimolle 17 536 13 000 4 500 13 000 Mogalakwena 68 010 38 148 2 148 1 107 Mookgophong 6 977 2 800 0 3 100 Thabazimbi 20 280 6 498 0 492 Total 148 483 77 446 6 788 29 699 *Total number of households according to 2001 Census # Information provided by local municipalities Service Delivery Backlogs Access to Services 41 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Service 1996 2001 2005 (117 615 Households) (168 071 Households) (222 569 Households) Basic and above Below basic Basic and above Below basic Basic and above Below basic Water1 86 241 31 374 145 316 22 754 148 546 74 023 Sanitation 104 448 13 167 142 638 25 433 66 153 156 416 Electricity 53 579 64 036 109 752 58 319 118 483 104 086 Refuse Removal 37 612 80 003 54 553 113 517 60 345 162 224 Housing2 83 217 34 400 131 252 36 823 50 810 171 759 Telephones3 85 131 32 484 147 901 20 170 n/a n/a Notes: 1. 2001 figures – Basic and above include pipe water within a village, which is not included in 1996 and 2005. 2. Housing figures only include housing delivered by government. 3. Telephone statistics for 2005 were not available. 42 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 3.3. KEY CHALLENGES The following challenges have been identified impacting on the provision of basic infrastructure and services in the various local municipalities. Electricity Coping with the challenges of the electricity reform process Upgrading electricity supply to meet the demand and development of business operations Ensuring access to free basic electricity in villages and farming communities Register and supply all deserving beneficiaries with free basic coupons Water Finalization of the Section 78 Process Recruitment and retention of technical skills for project planning, implementation and supervision Budget required to eradicate the backlogs Water Resources and water demand Development of Cost Recovery Systems Maintenance and Operations of transferred DWAF Schemes Provision of water to industrial users to unlock economic development Synergy across the three spheres of government in budget allocation, project implementation and monitoring Capacity of emerging service providers Refuse removal (solid waste) Rehabilitation of borrow pits, quarries and dumping of construction waste material. Preserve the district heritage and protection of identified heritage sites. Duration of producing Environmental Impact Assessment study for various projects. Aligning the land use management system with the spatial development framework Ensuring that all municipalities that operate with non permitted land fill sites acquire the necessary permission from the relevant department to operate such. Ensure that all land fill sites are managed according to the required standards Identification of new and rehabilitation of existing dumping sites 43 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Roads Developing a road master plan for Waterberg District Municipality. Funding for implementation of projects identified in the Waterberg District Municipality Integrated Transportation Plan. Maintenance of District roads. Aligning integrated environmental management plan with implementation of Integrated Transportation Plan. Upgrading of roads and other safety improvements. Housing Housing not a competency of the district municipality, therefore do not have the capacity to provide the service Approval of beneficiaries Capacity of Developers / Contractors Sub-contracting by Developers Problems by Developers with acquisition of building material Honoring of agreements / Developers starting on time as per agreements Existence of informal dwellings on building sites Illegal occupation Funding for township establishments Local Economic Development Managers serve as both IDP and LED manager and at times no official to drive LED Social and Economic projects are not separated Lack of project management There is no clear job descriptions in LED units Lack of funding for LED projects Education Provision of electricity to 190 schools, which accounts to 35 % of total number of schools recorded under the departmental records. Provision of water to 161 schools that comprise 30 % of the schools listed under departmental records. Provision of sanitation to 98 schools about 18% of those listed under departmental records as properly registered schools. 44 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Provision of additional classrooms as the average indication is that each classroom accommodates approximately 45 learners on a district scale. Ensuring that gender equity is maintained among educators throughout the district. Investigate the need to build additional institutions of higher learning Ensuring that FET centres and Institutions of Higher Learning that are not on departmental records are properly registered with the department Social Development Ensuring a paradigm shift from handouts to social development Development of an integrated development planning approach among all private and government sectors Recruitment of foster parents for fostering of 800 orphans listed under departmental records. Ensuring that the infrastructure developed in public institutions cater for the disabled. Delivery of service to the disadvantaged in remote rural areas. To ensure that social development projects are strengthened to address poverty pockets in areas where they are established. Bringing both private and public institutions on board in supporting community-based projects with an element of Local Economic Development. Development of Drought relief programme that integrates operational plans of all participating stakeholders in drought prone areas Involvement of all stakeholders in the off-loading of emergency food security to beneficiaries Health To increase access to ARV services district wide. To decrease the vacancy rate of professionals at hospital and PHC level To improve the quality of child care and reduce the infant mortality rate Increase access and utilisation of VCT, care and support services Minimise the impact of HIV/AIDS on the working force with specific reference to public servants. Intensify HIV/AIDS and TB awareness campaigns. Empowering SMME’s in the district through BEE Projects. Safety and Security Poor lightning in certain areas that contribute to the commission of these crimes. Inaccessible roads in rural areas like Bakenberg, Mapela and surrounding areas in Mahwelereng as well as Gilead policing areas. Street kids that roam the streets during the night are also exposed to the danger of falling victims to crime. The escalating number of Illegal operation of shebeens and unlicensed liquor outlets that sell liquor to children less than 18 years of age. 45 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Land Development Accelerating the finalisation of land claims lodged, especially those that are under investigations. Finalising and adopting the spatial development framework. Land redistribution hindering residential and economic development. Addressing the land tenure rights in rural areas and townships. Venturing into private public partnerships on spatial development initiatives. Existence of informal dwellings on building sites Illegal occupation Funding for township establishments 3.4 KEY SUCCESSES The key successes relating to the performance of the District Municipality include the following amongst others: The District won the provincial Vuna awards for the category C municipality and won for the following KPAs: • Basic Service Delivery • Municipal Financial Viability and Management • Good Governance and Public Participation The District also won third place in the national Vuna awards Conversion of accounting policies and reporting to GAMAP/GRAP HIV/AIDS awareness campaigns conducted Completion of district LED plan and district Marketing and Investment Strategy Developed District Disaster Management Plan Land donated for the construction of Disaster Centres in Modimolle and Lephalale Established District Water and Sanitation & Energy Forums Re-gravelled and paved identified local access roads 46 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 4: PROCESS PLANNING 47 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4.THE PLANNING PROCESS AND INTRODUCTION OF INTEGRATED DEVELOPMENT PLANNING Integrated development planning is one of the key tools for local government to cope with its new role and function in terms of the Constitution of The Republic of South Africa, 1996 and other applicable legislation. In contrast to the role planning has played in the past, Integrated Development Planning is now seen as a function of municipal management, as part of an integrated system of planning and delivery. The Integrated Development Planning process is meant to arrive at decisions on issues such as municipal budgets, land management, social and economic development and Institutional transformation in a consultative, systematic and strategic manner. Integrated Development Planning is a process through which municipalities prepare a strategic development plan, for a five-year period. The Integrated Development Plan (IDP) is a product of the integrated development planning process. The IDP is the principal strategic planning instrument that guides and informs all planning, budgeting, management and decision-making in a municipality. It is a tool for bridging the gap between the current reality and the vision of satisfying the needs of the whole community in an equitable and sustainable manner. Integrated development planning will enable municipalities to develop strategic policy capacity to mobilise resources and to target their activities. In practice the IDP is a comprehensive strategic business plan for the municipality over the short and medium term. Under the new Constitution, local government has a new, expanded role to play. In addition to the traditional role of providing services, municipalities must now lead, manage and plan for development and also play an active role in social and human development. In addition to ensuring that all citizens have access to at least a minimum level of basic services, municipalities must now also take a leading role in addressing poverty, and in promoting local economic and social development. They must not only deliver on present demands for services, they must also anticipate future demands and find ways to provide services in an effective,efficient and sustainable manner over the short, medium and long term. The value of integrated development planning for municipalities lies in the formulation of focused plans, based on developmental priorities. It is essential to spend the limited council resources on the key development priorities of the local community. This is the essence of the IDP - how to align the projects,plans, 48 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 budgets and other council resources, as well as the budgets, programmes, etc. of Provincial and National Government with the sustainable development priorities of the community. 4.1 INSTITUTIONAL ARRANGEMENTS, ROLES AND RESPONSIBILITIES The IDP process requires that all role-players are fully aware of their own, as well as other role-players’ responsibilities in the execution of the IDP process. The roles and responsibilities of the various spheres of government and other relevant stakeholders are as follows: The role of the national sphere of government is to provide a legal framework, policy guidelines and principles for sectoral, provincial and local government planning. National government’s involvement in the process was basically restricted to the input from specific departments (e.g. DWAF) rendering services in the provinces and to assist and guide municipalities in the integrated development planning process; The role of the provincial sphere of government is to monitor the IDP process on a provincial level, facilitate horizontal alignment of the IDP’s of district municipalities within the province and to ensure that vertical/sector alignment took place between provincial sector departments and the municipal planning process; The role of the Waterberg District Municipality is firstly to compile a 5 - year IDP as part of an integrated system of planning and delivery, which will serve as an outline for all future development activities within the municipal area. Secondly, the district municipality is also responsible to effect horizontal alignment of the IDP’s of the municipalities, vertical alignment between district and local planning and the facilitation of vertical alignment of IDP’s with other spheres of government and sector departments; and The input and participation of corporate service providers, private sector, NGO’s, representatives of organised stakeholder groups, etc. in the IDP process is important as these stakeholders are involved in providing goods and rendering services in the municipal area and to inform the planning process of issues, problems and constraints experienced, opportunities that exists and areas of potential intervention. The following diagram indicates the organizational structure that was established to ensure the institutionalisation of the IDP process, the effective management of the drafting of the IDP and to ensure proper and sufficient stakeholder participation in decision-making. 49 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DIAGRAM 1: INSTITUTIONAL ARRANGEMENTS FOR THE IDP REVIEW PROCESS COUNCIL EXECUTIVE MAYOR/MAYORAL COMMITTEE MUNICIPAL MANAGER/PIMSS CENTRE STEERING COMMITTEE REP FORUM CO-ORDINATING COMMITTEE TECHNICAL SERVICES CORPORATE SERVICES DISTRICT CLUSTERS FINANCE PLANNING & ECONOMIC DEV. SOCIAL SERVICES PROJECT TASK TEAMS TABLE 4.1: 50 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4.2THE ROLES AND RESPONSIBILITIES OF EACH STAKEHOLDER DURING THE IDP REVIEW PROCESS ACTORS Executive mayor/committee ROLES AND RESPONSIBILITIES Ensures that all relevant political actors are appropriately involved, monitor the planning process, consider, adopt and approve the IDP Participate in the IDP process. Assists the mayor as well as officials in problem solving and establishing policies regarding their specific portfolio committees. Portfolio Councillors Ward Councillors and Committees Municipal Manager Line function Managers IDP manager PIMSS Sector Departments (Province, national) Business sector NGO’s and CBO’s Community members Link the planning process to their constituencies, organise stakeholder consultation and participation through District Level representative structures and through the IDP Rep Forum and ensure that the municipal budget is linked to and based on the IDP. Is responsible for the overall management, co-ordination and monitoring of the planning process, ensuring that all relevant actors are appropriately involved, is responsible for the day-to-day management of the drafting process, ensures that Alignment takes place with provincial and national department’s budgets and alignment of planning activities on provincial and local level. Takes joint responsibility for overall management, co-ordination and monitoring of the planning process. They would identify persons to be in charge of the different roles, activities and responsibilities of the process and specific planning activities, screens the contents of the IDP, considers and comment on inputs from subcommittees, provincial sector departments and specialists,\as well as comment on draft outputs from each phase of the IDP. This position does not exist at district level. The PIMSS Centre is currently fulfilling such role. Offer Professional support and technical guidance to both the district and local municipalities. Co-ordinate Project implementation and IDP meetings. They provide all relevant technical, sector and financial information for analysis to determine priority issues and contribute technical expertise in the identification of projects. They are also responsible for the preparation of Project proposals, the integration of projects and sector programmes. The form part of the IDP representative forum and make contributions to the IDP process at that level. Support the alignment procedures between the municipalities and spheres of government and product related contributions at the IDP representative forum. Submit inputs to the IDP process through ward committees and public consultation processes to the IDP representative forum at Local municipal level. Municipalities will then submit the said inputs in a form of in-depth analysis to the district for consideration during the review process. Each ward in all municipalities within the district will send one delegate to the IDP Representative Forum effective from thisfinancial year. 51 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4.3 PROCESS OVERVIEW: STEPS AND EVENTS ACTIVITY TEMPLATE PREPARATORY PHASE PLANNING ACTIVITY 1/1 Drafting of framework and plans 1/2 Planning process 1/3 intergovernmental consultation 1/4 Public consultation participation 1/5 Executive decision making RESPONSIBLE PERSON Review PIMSS Manager Municipal Manager Discuss and adopt IDP/BUDGET/PMS Review Framework and process plan Municipal Manager Discuss and adopt IDP/BUDGET/PMS Review Framework and process plan Executive Mayor TASK Prepare IDP/BUDGET/PMS Framework and process plan and Discuss and approve IDP/BUDGET/PMS Review Framework and process plan Executive Mayor Discuss and approve IDP/BUDGET/PMS Review Framework and process plan Executive Mayor PARTICIPANTS TIME SCHEDULE Steering Committee 01 -09 Aug 2006 Steering Committee 11 August 2006 Co-ordinating Committee 18 August 2006 IDP Rep Forum 22 August 2006 Municipal Council 24 August 2006 52 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ANALYSIS PHASE PLANNING ACTIVITY RESPONSIBLE TASK PERSON Identification of gaps & PIMSS Manager 2/1 Compilation of existing incorporation of new information. Municipal Manager information Identification & analysis of spatial PIMSS Manager 2/2 Spatial analysis. gaps. Municipal Manager PARTICIPANTS TIME SCHEDULE Steering Committee 01 Sept- 28 Oct 2006 Steering Committee 01 Sept- 28 Oct 2006 2/3 Steering Committee Socio-economic analysis. Identification & analysis of socio- PIMSS Manager economic issues. Municipal Manager 2/4 Community and stakeholderlevel analysis. 2/5 Reconciling existing information. 2/6 Municipal wide analysis. 2/7 Review of Municipal priority issues. 2/8 In-depth analysis of priority issues. 2/9 specific guidelines and programmes. 2/10 Consolidation of analysis results. Analysing inputs from community Municipal Manager & stakeholders. Executive Mayor PIMSS Manager Reconciling activities 1/1 & 1/2 Municipal Manager Identification & analysis of gaps Municipal Manager within municipal wide issues. Executive Mayor Review the municipal priority PIMSS Manager issues. Municipal Manager In-depth analysis of reviewed PIMSS Manager priority issues. Municipal Manager In-depth analysis of reviewed sector PIMSS Manager specific issues. Municipal Manager Compiling summary reports for PIMSS Manager each priority issue. Municipal Manager 01 Sept- 28 Oct 2005 Co-ordinating Committee Steering Committee IDP Rep Forum Steering Committee Steering Committee Steering Committee Co-ordinating Committee 21 October 2006 23-27 October 2006 08 December 2006 27 Oct – 10 Nov 2006 27 Oct – 10 Nov 2006 27 Oct – 10 Nov 2006 13 – 24 Nov 2006 53 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 STRATEGIES PHASE PLANNING ACTIVITY 3/1 3/2 3/3 3/4 3/5 3/6 3/7 Vision Working objectives Localised Strategic guidelines Creating Strategic Alternatives. Financial strategy TASK Reviewing the vision. RESPONSIBLE PERSON PIMSS Manager Municipal Manager PIMSS Manager Reviewing the objectives. Municipal Manager Reviewing Localised Strategic PIMSS Manager Guidelines Municipal Manager Developing strategic alternatives. PIMSS Manager Municipal Manager Refining resource frames & redesigning financial strategies. Chief Financial Officer Organising District Municipality PIMSS Manager level Strategy Workshop Municipal Manager Translating District-wide strategies into Local and District Projects Municipal Manager Executive Mayor Compiling & structuring Municipal Manager information on alternative strategies Executive Mayor Mid year review Linking District strategies with Local Municipal strategy 3/8 Creating conditions for public debates on alternatives 3/9 Analysing alternatives Analysing alternative strategies Making choices on viable strategies. 3/10 Deciding on alternatives PARTICIPANTS Steering Committee Co-ordinating Committee Steering Committee TIME SCHEDULE 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 Steering Committee Co-ordinating Committee Steering Committee 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 04 Dec- 14 Feb 2007 Extended Steering Committee 15-16 February 2007 Co-ordinating Comm. 02 March 2007 IDP Rep Forum 09 March 2007 Municipal Manager Executive Mayor Municipal Manager Executive Mayor IDP Rep Forum 09 March 2007 IDP Rep Forum 09 March 2007 54 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJECT PHASE PLANNING ACTIVITY 4/1 4/2 Project Task Teams TASK Reviewing & redesigning projects RESPONSIBLE PARTICIPANTS PERSON District Cluster Chairpersons District Clusters Respective Managers WDM Involvement of project To ensure that project proposals are partners linked to Sector/Corporate specific District guidelines Chairpersons Respective WDM 4/3 Target group Ensuring that the proposed projects participation in meet the expectations of the District Project Planning. targeted groups. Chairpersons Respective WDM 4/4 Designing Project Reviewing project proposals. District Proposals Chairpersons Respective WDM 4/5 Setting indicators for To illustrate the impact of the District objectives. project on the targeted groups. Chairpersons Respective WDM 4/6 Project To provide a basis for a viable District Output/Target/Locations management tool. Chairpersons Respective WDM 4/7 Major Activities/Timing/ To provide a basis for a viable District Responsible Agencies management tool. Chairpersons Respective WDM TIME SCHEDULE 04 Dec-14 Feb 2007 Cluster Managers District Clusters 04 Dec-14 Feb 2007 Project Task Teams 04 Dec-14 Feb 2007 Project Task Teams 04 Dec-14 Feb 2007 Project Task Teams 04 Dec-14 Feb 2007 Project Task Teams 04 Dec-14 Feb 2007 Project Task Teams 04 Dec-14 Feb 2007 Cluster Managers Cluster Managers Cluster Managers Cluster Managers Cluster Managers 55 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4/8 4/9 4/10 Cost/Budget Estimates To provide a basis for a viable District Cluster /Sources of Finance management tool. Chairpersons Project Task Teams Respective Managers WDM To ensure a link between proposed Establishing Preliminary projects and available resources. Budget allocations Chief financial officer Steering Committee To ensure a link between proposed Confirmation of project projects and available resources. District Cluster designs Chairpersons Steering Committee Respective Managers WDM 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 56 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 INTEGRATION PHASE PLANNING ACTIVITY 5/1 5/2 5/3 5/4 5/5 5/6 5/7 5/8 5/9 TASK Integrating Projects and To ensure a holistic approach to Programmes. develop projects. Screening of draft project Checking project compliance with proposals. priority issues & strategies. (5) Year Financial Plan To create MTEF for planning budget link. (5) Year Capital To inform the municipal budget. Investment Plan Integrated Spatial To review a framework for Development Framework integrated land-use management. Integrated LED Programme To review existing LED Plan. Integrated Poverty To ensure that the IDP is focused Reduction Programme on poverty reduction and gender equity. Integrated Environ- To review existing Environmental mental Programme Plan. Integrated Institutional To ensure institutional Programme transformation & integrated management systems. 5/10 Performance Management System 5/11 Integrated bulk water resource/ Development management strategy RESPONSIBLE PERSON PIMSS Manager Municipal Manager PIMSS Manager PARTICIPANTS Sector Specialists Steering Committee Sector Specialists Steering Committee Steering Committee Chief Financial Officer TIME SCHEDULE 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 04 Dec-14 Feb 2007 Steering Committee Chief Financial Officer Manager: Planning & Economic Development Manager: Planning & Economic Development Manager: Planning & Economic Development 04 Dec-14 Feb 2007 Steering Committee 04 Dec-14 Feb 2007 Steering Committee Interest Groups 04 Dec-14 Feb 2007 Steering Committee 04 Dec-14 Feb 2007 Manager: Social Services Steering Committee Environ. Specialists 04 Dec-14 Feb 2007 Municipal Manager Steering Committee 04 Dec-14 Feb 2007 Manager: Services Steering Committee 04 Dec-14 Feb 2007 Technical Steering Committee 04 Dec-14 Feb 2007 To update the existing system. To develop a strategy would ensure an integrated approach to bulk water supply Manager: Services Corporate 57 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 APPROVAL PHASE PLANNING ACTIVITY TASK 6/1 Providing opportunity Integrating Plans and Programmes for comments from Sector in compliance with Sector Dept. Guidelines. 6/2 District-Level Workshop for horizontal co-ordination. To align the District and LMs IDPs. 6/3 Providing for comments public. 6/4 6/5 RESPONSIBLE PERSON PARTICIPANTS TIME SCHEDULE Municipal Manager Steering Committee 19-22 Feb 2007 Co-ordinating Committee 03 May 2007 IDP Rep Forum 11 May 2007 IDP Rep Forum 11 May 2007 WDM Council 29 March 2007 Co-ordinating Committee 02-06 Apr 2007 Steering Committee 09-27 Apr 2007 WDM Council 24 May 2007 Municipal Manager Executive Mayor opportunity To check compliance of the IDP from the and the public priorities. Municipal Manager To incorporate identified gaps into the IDP. PIMSS Manager To adopt the draft IDP, as a legal binding document. Executive Mayor Incorporating comments. Draft IDP - adoption by Council. 6/6 District summaries of Local IDP’s. Preparing IDP summaries for all PIMSS Manager Locals To receive comments from various 6/7 Invitation of public stakeholders and the public on the comments draft IDP Municipal Manager on media To adopt the final IDP, as a legal 6/8 Final adoption by Council binding document Executive Mayor 58 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The Waterberg District Municipality's approach to Review process was based on a community and issue driven approach. Although the District Municipality is legally obliged to review and approve an Integrated Development Plan and to align all actions, projects, programmes etc. according to the issues in terms of the IDP, the approach followed by the Waterberg District Municipality included the facilitation and capturing of issues identified by the community that relates to the competency of other stakeholders and that should be addressed by these stakeholders. The IDP review process officially commenced in October 2005. The planning process necessitated that various meetings and workshops be held with government departments, organizations, bodies and institutions through the established IDP structures. 59 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4.4 MEETINGS/WORKSHOPS HELD DURING IDP PROCESS Meetings Council meetings No. of Meetings Composition 3 Meetings were attended by: Mayor; Councillors; Managers of various service business units or Departments. PIMSS IDP Steering Committee meetings 3 Meetings were attended by: Executive Mayor; Mayoral Committee members; Municipal Manager; Managers of various service business units PIMSS; and Divisional Managers IDP Representative Forum 3 Meetings were attended by: District IDP Steering Committee members; Government departments: 3 Spheres PIMSS; and Traditional leaders Business community, NGO’ s and CBO’s Ward committee representatives and CDW s Community Development Workers Councillors from both district and local Municipality level Purpose The purpose of the meetings were to: Approve the IDP Review Framework and Process Plan Approve draft IDP reviewed Approve final IDP The purpose of the meetings were to: Manage, co-ordinate and monitor the IDP Process; ensure that all relevant actors were appropriately involved; Identify municipal wide issues and ensure that issues are addressed in the planning process; ensure that horizontal & vertical alignment took place in planning process; screen the contents of the IDP; consider and comment on inputs from sub-committee/s and specialists; discuss and comment on inputs from provincial sector departments and support providers; and comment on draft outputs from each phase of the IDP. The purpose of the meetings were to: Co-ordinate with local municipalities, provincial and national departments; form a structured link between the municipal government and representatives of the public; Provide an organisational mechanism for discussion, Negotiation and decision-making between the stakeholders including ward committees and community development workers on the framework and process plan for review, the situational analysis, strategies and 60 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Meetings No. of Meetings Composition Purpose project phases IDP Strategic Review Workshops 4 Meetings were attended by Executive Mayor; Mayoral Committee members; Senior managers; and other senior staff members; PIMSS Sector Departments Private Sector Local Municipalities OTP, Presidency and CSIR To develop a strategic direction for the institution and develop a new vision for the institution To contextualise and apply the NSDP To forge the IGR framework Act between all govt.spheres To give strategic direction to administration on organisational re-arrangements and planning. 61 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The above-mentioned meetings were held on a regular basis at predetermined dates and giving participants sufficient notice of such meetings. The composition of the meetings were done to suit the local circumstances of the Waterberg District Municipality and to ensure that sufficient representation and participation on district and local level could be achieved. Most of the work was done at the Steering Committee level, while public participation took place during Representative Forum meetings and district imbizos held in local municipalities, where local needs and issues were raised. Reports on progress with the IDP process were given to the Representative Forum for discussion. The District Strategic retreat with local municiplities was primarily responsible for alignment of processes, projects and budgets between the district and local municipalities. 4.5 SELF-ASSESSMENT OF THE PLANNING PROCESS The assessment of the IDP process was done in terms of the following criteria: IDP Review process (methodology) as contained in the IDP Guidelines; Content requirements of the IDP as stipulated in the IDP Guidelines; Public participation; Co-ordination with local municipalities in terms of time frames; Integration of planning processes and budgets with local municipalities; and Integration with national and provincial governments. 62 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 4.6 SELF-ASSESSMENT OF THE IDP REVIEW PLANNING PROCESS CRITERIA 1 2 IDP process (methodology) Content requirements of the IDP 3 Public participation 4 Co-ordination with local municipalities (time frames) 5 Integration with local municipalities 6 Integration with national and provincial governments ASSESSMENT The IDP Guide Pack provides sufficient guidelines that can be followed to complete the IDP. The process is clear and logic. The IDP Guide Pack requires minimum outputs or deliverables, which are not necessarily applicable on all levels of local government, i.e. metro councils, district councils, local municipalities. Provision is made for sufficient public participation although stakeholders need to be educated and supported to interact more in the process. District wide Imbizos were held in each local municipality. The review process has experienced difficulty with regard to co-ordination with local municipalities with regard to time frames. This is due for various reasons, which will not necessarily repeat itself in future. Interventions were and are still sought through engagement processes to deal with this matter Thre has been an improvement on the integration of programmes between the district municipality and local Municipalities. The planning on MTEF basis still require further strengthening Integration with Provincial and National Government was still insufficient. The main stumbling block as identified, is the budgeting process of sector departments as it is unknown to officials nominated to be part of the District IDP and the non involvement of municipalities in the formulation of sector plans and programmes. 63 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 5: DEMOGRAPHIC OVERVIEW 64 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5.1. DEMOGRAPHIC OVERVIEW The Waterberg District Municipality is in the western section of the Limpopo Province sharing the provincial border with Botswana. There are five border control posts with Botswana at Groblersbrug, Stockpoort, Derdepoort, Zanziba and Platjan. Within the province, it shares its borders with Capricorn District Municipality to the north and Sekhukhune District to the east. The south-western boundary of the district abuts the Northwest Province and the south-eastern boundary the Gauteng Province. Entry points (roads) to the district from Sekhukhune are the N11, Gauteng the N1 (national road) and R101, from Northwest the R159 and R133. The analysis overview provided in the Revised Waterberg IDP document serves as a reference framework and should be read in conjunction with the various analysis reports compiled as part of each of the sector plans. A brief overview of the study area, socio-economic analysis, spatial and land-use analysis, infrastructure, social services, economic potential and the environment is provided. For a more detailed fact file, the relevant sector plan analysis reports should be consulted. The Waterberg District Municipality’s area of jurisdiction is made up of six local municipalities, as follows: Bela Bela Local Municipality, comprising the town Bela Bela, Bela Bela Township and urban & rural settlement. Lephalale Local Municipality, comprising the town Lephalale and numerous peri-urban and rural settlements. Modimolle Local Municipality, comprising the town Modimolle and urban/peri-urban settlements. Mogalakwena Local Municipality, comprising the town Mokopane and numerous urban/peri-urban and rural settlements. Mookgophong Local Municipality, comprising the town Mookgopong, Mookgophong Township and Roedtan. Thabazimbi Local Municipality, comprising the town Thabazimbi, Thabazimbi Township and urban settlement. 65 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROVINCIAL PERSPECTIVE: LIMPOPO PROVINCE Vhembe V & Musina Messina Mutale Makhado Thohoyandou Makhado Blouberg V & Thulamela V & Dendron V & Giyani V & V & Soekmekaar Aganang V & V & Waterberg V & Mokopane Modimolle V & Bela-Bela V & Bela-Bela Fetakgomo Tubatse V & Lebowakgomo V & V & Thabazimbi Ba-Phalaborwa Mopani Lepelle-Nkumpi V & Modimolle Thabazimbi Tzaneen V & PolokwaneGreater Tzaneen Capricorn Vaalwater Greater Giyani Modjadjikloof V & Polokwane Lephalale WATERBERG DISTRICT MUNICIPALITY Molemole Mogalakwena Lephalale Greater Letaba Maruleng Hoedspruit V& Sekhukhune Burgersfort Mookgopong Mookgopong Makhudutamaga Marble Hall V & Marble Hall V & V & V & Steelpoort V & V & Phalaborwa Bohlabela Bushbuckridge Ohrigstad V & Mkhuhlu 'A' Groblersdal Groblersdal V & Lephalale Lephalale Mogalakwena V & Waterberg V & Modimolle V & Mokopane V & Vaalwater Thabazimbi V & V & Thabazimbi V & Mookgopong Modimolle V & Bela-Bela Mookgopong V & Bela-Bela V & V & 66 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DEMOGRAPHIC OVERVIEW The district contains 11.6% of the Limpopo Province’s total population that is estimated at approximately 5.2 million with an average population density of 52.5 people per square km. This varies widely across the municipalities, from 147 people per square kilometre in the Mogalakwena Municipal area to six people per square kilometre in Mookgophong Municipal area. Mogalakwena Municipality is home to 48.6% of the district’s people (298 419 people) while just 5% of the population live in Mookgophong Municipality. The majority of population within Waterberg is in the age groups of 0-19yrs contributing 46.6% of the total population, and a gradual decline of people as from the age of 20years to 85years. Furthermore, the male population group constitute a higher number than females in Mookgophong and Thabazimbi. Over 44% of Waterberg’s population is under 19 years old. Coupled with this figure is a high number of elderly residents in the area, as reflected hereunder. This implies that many people in Waterberg are dependent on the income of others. 67 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5.2.1. DEMOGRAPHIC PROFILE – POPULATION & GROWTH MUNICIPALITY BELA BELA LEPHALALE MODIMOLLE MOGALAKWENA MOOKGOPHONG THABAZIMBI WATERBERG OCT 2001 POPULATION OCT 2001 HOUSEHOLDS 52 122 96 074 72 797 298 419 30 746 63 883 614 041 12 279 23 401 17 536 68 010 6 977 20 280 148 483 APRIL 2006 POPULATION APRIL 2006 HOUSEHOLDS CURRENT ANNUAL POP GROWTH RATE % 55 579 102 736 81 964 316 169 37 032 68 106 661 586 13 814 26 256 20 732 75 635 8 821 22 674 167 932 1.91 1.95 7.43 1.16 14.94 1.75 29.14 CURRENT ANNUAL HH GROWTH RATE % 2.52 2.38 7.38 1.17 14.68 1.76 29.89 COMMUNITIES HH DENSITY NO OF WARDS 2 41 3 117 2 5 170 4.02 3.92 3.92 4.18 4.20 3.00 8 12 8 32 4 10 74 Source: STATS SA, 2001 & DWAF, 2006 NB: October 2001 Population: The population according to STATS SA as at October 2001. October 2001 Households: The households according to STATS SA as at October 2001. April 2006 Population: An estimated current population based on Census 2001 population and grown annually with STATS SA population grown formula. April 2006 Households: An estimated current households based on Census 2001 households and grown annually with STATS SA households grown formula. Current Estimated Population Growth %: The estimated population growth based on STATS SA population estimates between 2004 and 2005, calculated from communities levels. Current Estimated Households Growth %: The estimated households growth based on STATS SA households estimates between 2004 and 2005. Communities: The total number of communities per Province according to available DWAF data. This will not necessarily include all urban towns as DWAFs focus was primarily on rural communities. Household Density: The average number of people per household based on STATS SA and Census 2001 results. CHART 1: POPULATION SIZE PER LOCAL MUNICIPALITY Thabazimbi 63883 Mookgophong 30746 Mogalakwena 298419 Modimolle 72797 Lephalale 96074 52122 Bela-Bela 0 50000 100000 150000 200000 250000 300000 350000 68 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5.2.2. EMPLOYMENT STATUS PER LOCAL MUNICIPALITY IN THE WATERBERG DISTRICT MUNICIPALITY AREA The majority of population within Waterberg is in the age groups of 0-19yrs contributing 46.6% of the total population, and a gradual decline of people as from the age of 20years to 85years. Furthermore, the male population group constitute a higher number than females in Mookgophong and Thabazimbi. Over 44% of Waterberg’s population is under 19 years old. Coupled with this figure is a high number of elderly residents in the area, as reflected hereunder. This implies that many people in Waterberg are dependent on the income of others. Economic Active Bela – Bela Lephalale Modimolle Mogalakwena Mookgophong Thabazimbi Sub-total Total Not Economic Active Employed 14 371 28 673 22 799 37 089 11 196 26 249 140 377 Unemployed 6 965 5 274 6 992 33 698 2 647 7 045 62 621 11 077 25 040 16 295 94 272 6 183 12 618 165 485 202 998 SOURCE SSA 2001 CENSUS The Human Development Index (HDI) is a reliable indicator of development. It measures life expectancy; literacy and income and shows a slight increase across all areas in the district. This suggests that while the economic situation in terms of lack of income and unemployment is increasing, there have been some gains in terms of service. Household income levels are low. Almost all of the households within the Waterberg Municipal area (94%) record income levels of R1 – R6 400; and 26% earn between R6 001 and R18 000 a year. This translates into approximately 80% of households having annual incomes below R18 001. 69 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Education levels are generally low. Only 11% of Waterberg’s population have matriculated or have above matriculation qualifications. At least 14% have no formal schooling. A comparison of the levels of education across the municipalities point to the strong links between low household incomes, high unemployment and low human development index. In terms of the economic profile of the Waterberg District, the area combines elements of a sophisticated and globalised industrial economy with an under-developed agricultural sector, where household production levels are reportedly declining and where the majority of the population now depends on state pension and welfare as primary sources of subsistence. The district is consequently characterised by huge discrepancies in wealth and skills. The key sectors in the district (as defined by their contribution to GDP) include agriculture, hunting, forestry & fishing Industry as a dominant employer, with 24% of the employed population within the District, followed by Community, Social & Personal Services Industry with 15% of the employed population. Few people are involved in the electricity, gas and water supply Industry constituting 0, 8% of the employed population. Tourism is also a significant contributor to GDP and employment in the district. Despite the high agricultural production potential agriculture continues to contribute only 3.6% towards the economy of Waterberg District Municipality. Many local municipalities continue to import agricultural products outside their boundaries despite this potential. This is probably explained by low levels of development, especially high levels of poverty and poor infrastructural development, suggesting that potential and emerging farmers have limited access to resources necessary for production. Again, agriculture continues to contribute far less than expected to formal employment opportunities, and gross geographic production. These reflect a need for aggressive intervention in providing resources and infrastructure that will encourage agricultural production and hence increase employment opportunities. 70 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHAPTER 6: ANALYSIS OVERVIEW 71 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ECONOMIC CLUSTER ANALYSIS 72 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.1 ENVIRONMENTAL MANAGEMENT PLANNING 73 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.1.1. ENVIRONMENTAL OVERVIEW Waterberg District Municipality has many sensitive and conservation worthy areas within its region, such as wetlands, river systems, cultural sites, rare and endangered species and of course Waterberg Biosphere. There are also many areas, which require remedial attention, i.e. the eradication of alien vegetation, erosion control and aspects which require special management, such as pollution and land use. This special and varied environment also presents many opportunities for the economic development of the area. Environmental degradation in the form of soil erosion, overgrazing and habitat destruction are key issues affecting the quality of the land, while over exploitation and lack of effective control are key issues. 74 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.1.2: Generic impacts and associated mitigation measures Impact Project phase Mitigation measures Performance specifications Soil Loss of top soil: (the essential substrate for plant growth and hence rehabilitation) Pre-implementation; Implementation; Operation a) Access roads Combat erosion Stockpiled topsoil should not be compacted and should be replaced as the final soil layer. No vehicles may be allowed access onto the stockpiles after they have been placed. c) Stockpiled soil must be protected by erosion- control berms if exposed for a period of greater than 14 days during the wet season. Erosion control d) To prevent topsoil from being spread out or mixed with the other spoil during the construction, soil stockpiles must not take the form of windrows. Storage facilities e) Topsoil stripped from different sites must be stockpiled separately and clearly identified as such. f) Topsoil stockpiles must not be contaminated with oil, diesel, petrol, waste or any other foreign matter, which may inhibit the later growth of vegetation and microorganisms in the soil. g) Soil must not be stockpiled on drainage lines or near watercourses. h) Topsoil obtained from sites with different soil types i) Soil must be exposed for the minimum time possible once cleared of invasive vegetation. The timing of clearing and grubbing should be co-ordinated as much as possible to avoid prolonged exposure of soils to wind and water erosion. j) Stockpiled topsoil must be either vegetated with indigenous grasses or covered with a suitable fabric to prevent erosion and invasion by weeds. k) All cut and fill surfaces need to be stabilised with appropriate material or measures when major civil works are complete. l) Erosion and Donga crossings must be dealt with as river crossings. Appropriate soil erosion and control procedures must be applied to all embankments that area disturbed and destabilised. Chemical contamination Invasion of exotic biota Site establishment b) Erosion; Compaction and crusting Changes in soil properties (e.g. acidification and salinisation) Prior to earthing operations all topsoil (top 300mm as a minimum must be stripped and stockpiled separately from subsoil and rocky material. Soil must be stripped in a phased manner so as to retain vegetation cover for as long as possible. Vegetation clearance Topsoil Slope protection Pollution prevention m) Only limited vehicular access is allowed across rocky outcrops and ridges. n) All equipments must be inspected daily for oil or fuel leaks before it operated. Leakages must be repaired on mobile equipment or containment trays placed 75 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures underneath immobile equipment until such leakage has been repaired. o) Soil contaminated with oil must: be dug up to 30cm below the saturated oil mark; or disposed at a permitted landfill site; or the soil can be a) Adequate sedimentation control measures must be instituted at the any river crossings when excavations or disturbance of drainage lines of wetland may take place. Performance specifications Water Altered hydrology Contamination of water resources Sedimentation Salinisation Eutrophication of rivers or impoundments Groundwater contamination Surface water pollution Barriers to migration of fish, aquatic vertebrates and invertebrates Implementation; Operation b) Adequate sedimentation control measures must be instituted at the any river crossings when excavations or disturbance of riverbeds takes place. c) The batching plant must be positioned away from drainage lines, and measures to ensure that no polluted water enters a natural stream, i.e. more than 20m from the nearest stream/ river channel. d) All runoff from batching areas must be strictly controlled. e) Cement contaminated water must be collected, stored and disposed of at a site approved by Site Engineer. f) Waste concrete and cement sludge must be scraped off the site of batching plant daily and removed to an approved landfill site. g) Concrete shall not be mixed directly on the ground. Plastic liners or mixing trays are to be used. h) All fuel, chemical, oil, etc spills must be confined to areas where the drainage of water can be controlled. Use appropriate structures and methods to confine spillages such as the construction of berms and pans, or through the application of surface treatments that neutralise the toxic effects prior i) Vehicle traffic across wetland areas must be avoided. j) No dumping of foreign material in streams, rivers and/or wetland areas is allowed. k) Oil absorbent fibres must be used to contain oil split in water. l) A wetland area and/or river must not be drained, filled or altered in any way including alteration of a bed and/or, banks, without prior consent from DWAF and the relevant DEAT office. The necessary licenses must be obtained fro DWAF in terms Section 21 and 22 of the National Water Act, (Act 36 of 1998). m) No fires or open flames are allowed in the vicinity of the wetland, especially during Site establishment Vegetation clearance Erosion control Water quality monitoring Offices & other structures Storage facilities Pollution prevention 76 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures Performance specifications the dry season. n) No swimming, washing (including vehicles and equipment), fishing or related activity is permitted in a wetland or a river without written permission from Environmental officer. o) The contractor must install and maintain mobile toilets at work sites. p) Maintain soil erosion structures such as stone pitching, gabions, etc to enable effectiveness. q) The contractor must provide adequate and approved facilities for the storage and recycling of used oil and contaminated hydrocarbons. Such facilities must be designed and situated with the intention of preventing pollution of the surrounding area and environment. r) All vehicles must be serviced in the designated area within the contractor camp. s) All chemical spills must be contained and cleaned up by the supplier or professional pollution control personnel. a) All rare flora and seeds must be rescued and removed from the site. Site establishment b) Protected plants must not be cut or damaged in any way. Access roads c) The felling and/or cutting of trees and clearing of bush must be minimised. Vegetation clearance d) Any incident of unauthorised removal of plant material, as well as accidental damage to priority plants, must be documented. Planting e) Transplanting of indigenous plants must be encouraged at all times. Trees and shrubs must be planted so that their stems or trunks are at the same depth as in the original location. Destumping Flora Loss of individuals of rare or endangered species Damage to the integrity of the ecosystem functioning Heavier utilisation of medicinal and/or protected plants Implementation Invasion of alien vegetation f) Transplanted plants must be watered once a week for 5 weeks and therefore once every 2 weeks. g) If any protected tree, identified in the site specific study, is felled, cut, pruned and/or, in the opinion of the environmental officer, is unduly damaged by the contractor, the contractor will pay a penalty (amount stipulated by DEAT) per tree h) Trees selected for preservation in the site-specific study within or adjacent to the works areas must be fenced around their drip line. The fence must be clearly marked with danger tape. No open fires may be lit within this fenced area. Fencing & gates Landscape rehabilitation 77 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures Performance specifications Fauna Loss of individuals of rare or endangered species Implementation; Operation Disturbance of fauna (e.g. disrupted breeding of fish in dammed areas, and disturbed bird nesting areas) a) No species of animal may be poached, snared, hunted, captured or wilfully damaged or destroyed. b) Fishing is only allowed with the written consent of the landowner and only when anglers are in possession of a Provincial Fishing License. c) Snakes and other reptiles that may be encountered on the construction site must not be killed unless the animal endangers the life of the employee. d) Anthills that occur must not be disturbed unless it is unavoidable for construction purposes. e) Any incidents of poaching wilfully disturbance or damage to wild animals, as well as accidental damage to or death of wild animals must be recorded by the CR and made available to the EA on a weekly basis. f) Nesting sites of birds must not be disturbed. g) The contractor’s representatives and environmental officer must ensure compliance with the relevant Nature Conservation Ordinances. h) The contractor’s representative must ensure that domestic and native animals belonging to the Local Community are kept away from unprotected works. i) All animals injured on account of construction activities must be taken to the local SPCA. Dead animals must be disposed at a permitted landfill site. j) No pesticides must be used unless approved by the environmental officer, and may only be applied by an approved specialist. k) If water is dammed, an ichthyologist must be consulted, during the site-specific study, to establish the impact on breeding patterns of the affected fish species. The environmental officer must ensure compliance with the findings of the investigation. l) Particular care must be taken to avoid nesting, Site establishment Protection of fauna m) No breeding and roaming sites of animals in or adjacent to wetlands areas. Dust Odours, exhaust fumes; waste material; smoke Implementation, Operation a) Speed limits must be enforced in all areas, including public roads and private property to limit the levels of dust pollution. 78 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase b) Mitigation measures Dust must be suppressed on access roads and construction sites during dry periods by the regular applications of water or a biodegradable soil stabilisation agent. Water used for this purpose must be used in quantities that will not result in the generation of run-off. c) Suitable screening and containment measures must be in place prevent wind blown contamination. d) The site-specific investigation must quantify the impact of dust on nearby wetlands, rivers and dams in terms of sedimentation. All mitigation measures identified during the site specific study must be implemented. e) The environmental officer must notify all people living within 50m of the construction site of the proposed activities. f) In the event of serious levels of dust pollution, the implementation of constant dust monitoring by qualified consultants must be undertaken. g) Waste must be allowed to stand on site to decay, resulting in malodours and attracting vermin. Waste must be disposed of at a municipal transfer station, skip or on a permitted landfill site. h) The contractors must stick to normal working hours between 07h00 and 17h00 Monday to Friday. i) The contractors must inform all adjacent landowners of any after-hour construction activities and any other activity that could cause nuisance e.g. the application of chemicals to the work surface j) The environmental officer or contractors’ representative must ensure that all vehicles comply with the SABS 0181 standards. k) Vehicles used on, or entering, the site must be serviced regularly to ensure that they do not emit smoke or fumes. a) Noise control measures must be implemented. All noise level must be controlled at the source. If the noise level at the boundaries of the site exceeds 7Db above ambient levels, the local health authorities must be informed. Performance specifications Noise Noise levels Implementation b) All employees must be given the necessary ear protection gear. c) Affected parties must be informed of the excessive noise factors. d) Pumps must be housed in a brick building to help reduce any noises when the Noise control Blasting 79 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures Performance specifications pump is in operation. e) Affected livestock farmers must be informed of excessive noisy activities a month in advance. This will enable them to take appropriate steps to prevent disturbance and possible injury to livestock e.g. moving the livestock to distant camps. f) The relevant by-laws and regulations must be adhered to. These laws include: Environmental Conservation Act, 73 of 1989, Occupational Health and Safety Act, 85 of 1983 and Provincial and local by-laws. These laws regulate noise control. g) Soft explosives and/or noise mufflers must be used during blasting to minimise the impact on humans and animals. h) No loud music is allowed on site and in construction camps. a) Damage to the natural environment must be minimised. Access roads b) Trees and tall woody shrubs must be protected from damage to provide a natural visual shield. Excavated material must not be placed on such plants and movement across them must not be allowed. Combat erosion Aesthetics Reduced sense of place and tourism potential of the area; Implementation, Operations Reduced visual integrity Vegetation clearance Slope protection c) The clearing of sites must be kept to a minimum and surrounding vegetation must be left intact as a natural shield. d) At construction sites in densely vegetated areas, the vegetation must be cut at angles of 45 degrees from the bottom to minimise any visual impact. Aesthetics e) Marking for surveying and other purposes must only be done with pegs and beacons. Painting and marking of natural features must not be allowed. Blasting f) All waste concrete/cement shall be removed together with contaminated soil after the completion of the project. g) Where existing access routes and borrow pits have been overgrown with vegetation such surfaces must not be graded. h) Borrow pits must be shaped to have undulating slopes and surfaces such that they blend into the natural landscape as much as possible. i) Blasted areas and cut and fill slopes must be as rough as possible such that the natural surroundings are emulated as far as possible and that the jagged ledges facilitate the accumulation of soil and the subsequent establishment of vegetation. j) Where possible, concrete surfaces on embankments and storm water gullies must Shaping and trimming Offices & other structures Landscape rehabilitation 80 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures be undulated to minimise surface reflection. k) Excavated material must be flattened (not compacted) or removed from site. No heaps of soil material must be left on site once the Contractor has moved to a new construction site. l) Littering on site and the surrounding areas is prohibited. Clearly marked litterbins must be provided on site. The contractor’s representative must monitor the presence of litter on the work sites as well the construction campsite. All bins must be cleaned of litter on a daily basis. Performance specifications m) Excess concrete, building rubble or other material must be disposed of in areas designated specifically for this purpose and not indiscriminately over the construction site. n) All plastic material must be removed from area where livestock could swallow it. o) Contaminated soil must be treated and disposed at a permitted waste disposal site, or be removed and the area rehabilitated immediately. a) Work in areas where artefacts are found must cease immediately. The Environmental Officer must be notified immediately and Global Positions System reading must be taken. b) The excavation must be examined by an archaeologist as soon as possible. The EA will advise the Contractor of necessary actions to be taken after receiving advice from the archaeologist. All necessary actions to ensure that delays are minimised must be taken. c) Under no circumstances must the contractor, his employees, his sub-contractor’s employee remove, remove, destroy or interfere with archaeological artefacts. Any person who causes intentional damage to archaeological or historical sites or artefacts could be penalised or legally prosecuted in terms of the National Heritage Resources Act (Act 25 of 1999). d) All known and identified archaeological and historical sites must be left untouched. No stones or rocks must be removed from such sites. e) The contractor’s representative must ensure that employees do not gain access to any archaeological areas (whether fenced or unfenced), expect when authorised to do so by the environmental officer. Disturbance of archaeological areas Implementation 81 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures Performance specifications Relocation of homesteads or community due to project Planning, Implementation a) Owners of Land to be expropriated must receive compensation in terms of Expropriation Act, Act 63 of 1975; Site establishment b) An extensive public participation must be undertaken allowing a decision making process that is based on rights and risks culminating in negotiation to benefit sharing, resettlement and compensation; c) Project must be planned in consultation with the local community leaders. d) Resettlement action plan and development programmes for the displaced must be planned in advance. This must be done in accordance with the S&ES standards Resettlement Action Plan; e) If required, provision of temporary accommodation must be planned in advance. f) Ongoing liaison with community leaders/ representatives must be maintained in order to tract any problems with the relocations. p) Affected people must be empowered to participate effectively in the process. Direct or indirect loss of essential resources Implementation, Operation a) The amount of essential resources lost must be minimised through alternative project design b) Damaged to crops or other food resources must be compensated for. a) Any graves situated in the construction site or area of inundation in case of dams must be dealt with according to the Exhumation Laws of the Provincial Government and with the bye-laws of the Local Municipality Authority. b) If a graveyard is discovered, the Environmental Officer (EO) must be contacted immediately. The relatives of the deceased must be contacted immediately. The local chief, SAHRA and local Authority must also be informed of the situation. c) The relatives must be informed should a grave need to be moved. The exhumation of bodies must be executed in the local traditional manner and affected families allowed sufficient time to perform any traditional rituals. q) All finds of human remains must be reported to the nearest police station to Site establishment Disturbance of graves Planning, Implementation Site establishment 82 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Impact Project phase Mitigation measures ascertain if there was any crime involved. Performance specifications Disruption of services Implementation a) Where service disruption is inevitable, the contractor must advise the Project Manager at least 7 days in advance, allowing enough time to inform affected parties. b) A complaints register must be maintained on site and must include contact details for complaints by the public in accordance with details provided by the Engineer. c) Updated information boards must be maintained on site and must include contact details for complaints by the public in accordance with details provided by Engineer. a) The project must be planned in consultation with local authorities and aligned with local plans such as IDPs. b) Labour intensive method must be used where feasible, cost effective and not time constraining. c) Local labour must be employed as far as possible. d) Training of the unskilled labour must be undertaken. e) Local suppliers must be used, as far as possible. Site establishment Employment prospects Planning, Implementation, Operation Site establishment 83 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.1.3 WASTE DISPOSAL SITES (UNLICENSED V/S LICENSED) LOCAL MUNICIPALITY NUMBER OF LAND FILL SITES PERMITTED SITES Bela-Bela ONE ONE Mogalakwena TWO ONE Lephalale TWO ONE Modimolle TWO TWO Mookgophong ONE TWO Thabazimbi FOUR Three TOTAL TWELVE(12) TEN(10) CHALLENGES Ensuring that all municipalities that operate with non permitted land fill sites acquire the necessary permission from the relevant department to operate such. Ensure that all land fill sites are managed according to the required standards Identification of new and rehabilitation of existing dumping sites 84 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.2 SPATIAL DEVELOPMENT PLANNING 85 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.2.1 SPATIAL AND LAND USE OVERVIEW Waterberg District Municipality covers an area of approximately 4 951 882ha. The municipal area consists mainly of commercial farms, game farming, etc. and only approximately 0,43% of the total area is used for settlement purposes (i.e. towns and villages). Approximately 69% of all the settlements (i.e. towns and villages) in the Waterberg District Municipality area are located within Mogalakwena Local Municipality. Approximately 68% of all the larger settlements with 5 000 people and more are also located within this local municipality. The problem is, however, that both Mogalakwena and Lephalale Local Municipalities have a large number of small villages, being villages with less than 1 000 people. These low population densities have serious implications to improve the levels of service provision to communities. The cost associated with respect to the provision of service infrastructure is very high. This problem within the Waterberg District Municipality is further exacerbated by the fact that at least 50% of the population are located within Mogalakwena Local Municipality, meaning that the majority of the population are located in relative small settlements, which are scattered over a large area. An overall appraisal of the Waterberg District indicates distinctive differences in the spatial patterns of development (i.e settlement patterns) between the six local municipalities. In general, it is evident that the urban areas (Mokopane, Mookgophong, Modimolle, Lephalale, Thabazimbi and Bela Bela) dominate the district urban settlement pattern. Apart from this dominant urban centres, the district is characterised by a number of smaller towns (some of which function as sub-regional service centres), so-called communal land areas where dispersed rural settlements are the dominant pattern, and areas where extensive commercial agricultural land holdings are the norm. However, within the generalised spatial landscape of these areas one finds diverse and complex urban and rural situations. As noted above, the Waterberg District has a distinctive settlement pattern that encompasses a range of settlement types from major urban centre to smaller regional and sub-regional service centres; and from dispersed rural settlements to isolated homesteads. The settlement hierarchy developed for the Limpopo (currently under review) in the Limpopo Provincial Spatial Rationale assists in the categorisation of the hierarchy of towns and settlements prevailing in the Waterberg district. The Provincial Spatial Rationale motivates the categorisation of settlement in the province. Within this framework, five levels of settlement are identified in the Provincial Spatial Rationale, which correlate broadly to a strategic framework for investment in settlement. 86 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 With regard to the above strategic framework for investment in levels of settlement, a number of key implications for the management of settlement development are derived. A settlement hierarchy is usually based on the classification of individual settlements2 (e.g. towns and villages). This would mean that the approximately 2 450 towns and villages in the Limpopo Province would have been individually classified in terms of a proposed hierarchy. Polokwane (Pietersburg) would have been the highest order settlement with second order settlements such as Mokopane (Potgietersrus), Thohoyandou, Tzaneen, Makhado (Louis Trichardt), etc. Third order settlements would have included places such as Giyani, Lebowakgomo, possibly Jane Furse, etc. The settlement hierarchy as contained in the Limpopo Province Spatial Rationale (Review) 2002 is as follows: First Order Settlements (Growth Points) [GP] Growth points are further divided into three categories, viz.: Provincial Growth Point [PGP]; District Growth Point [DGP]; and Municipal Growth Point [MGP]. Second Order Settlements (Population Concentration Points) [PCP]. Third Order Settlements (Local Service Points) [LSP]. Fourth Order Settlements (Village Service Areas) [VSA]. Fifth Order Settlements (Remaining Small Settlements) [SS]. Settlement clusters therefore indicate priority development areas/nodes in which primarily first order settlements (three types of growth points) and second order settlements (population concentration points) are identified. Growth points are therefore the highest order in the settlement hierarchy, with Population Concentration Points being the second order in the settlement hierarchy. 2 There are six towns within the Waterberg District that are seen from a provincial perspective to be higher order urban areas where the highest levels of investment (First Order Settlements) could be targeted to achieve key development goals. These are identified as Mokopane For the purposes of this classification and the spatial rationale, settlement is defined to include all types of settlements (e.g. proclaimed towns and rural villages). 87 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 (Provincial Growth Point), Mookgophong (Provincial Growth Point), Modimolle (Provincial Growth Point) Bela-Bela (Provincial Growth Point), Thabazimbi (Provincial Growth Point) and Lephalale (Provincial Growth Point); In addition, six townships or smaller towns in the district are identified in the Provincial Spatial Rationale for so-called Municipal Growth Points; that is investment to boost capacities of existing infrastructure or to extend institutional capacity for developmental purposes. These are identified as Pienaarsrivier, Vaalwater, Rebone, Bakenberg, Roedtan and Northam; In the strategic terms adopted by the Provincial Spatial Rationale, the remaining settlements within the Waterberg District should be seen as areas that, in the first instance, should be regarded as settlements that need to achieve basic levels of services. However, it is noted that the Limpopo Provincial Spatial Rationale should not be read as a deterministic document and merely aims to set normative guidelines for spatial development and related investments. It seems reasonable to assume that where individual instances (or settlements) are identified that have clear growth potential, these could be classified as Municipal Growth Points areas where investment could be targeted at higher levels than basic service in order to achieve desirable developmental outcomes. 6.2.2 LAND AND HOUSING & LAND REFORM 6.2.2.1 Land Reform Waterberg District Municipality must develop a “Land Reform and Settlement Plan” (LRSP) as a sector plan in its Integrated Development Plan, which must be prepared with specific reference to the key land issues relating to land reform and settlement development in the District. Land reform issues within Waterberg District Municipal area encompass a complex array of challenges located within the sphere of land access, land tenure, land restitution (Land claims) and land administration. The Land Reform Programme for Waterberg District Municipality, especially the LRSP, is key to unlocking such challenges. These will differ from one local municipal area to another. Therefore the key challenge for the district in the land reform process is to deal effectively with the injustices of land dispossession, equitable distribution of ownership, reduction of poverty and economic growth, tenure security as well as a system of land management which will support sustainable land use patterns. This is in line with the National Policy on Land Reform, 1997. These will be dealt with in terms of the required land related legislation. It is clear that land reform is seen as a composite suite of issues and interlocking components, the precise make up of which will differ from one municipality to another. Some of these components include, land identification, land acquisition, in-site upgrade and tenure upgrade, land planning for residential and productive uses, land-legal issues (e.g. land rights audits, title adjustments, land survey, registration of ownership etc.) post implementation livelihoods support, post implementation land use management, and infrastructure / asset maintenance and operational issues. 88 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 New developments involving four pieces of legislation will assist in the development of LRSP, which impact on issues of tenure reform, land administration and the capacity of various spheres of government to carry out planning and management, and implementation of land reform All of the laws interlink either directly or indirectly to the Municipal Structures Act and are noted as follows: • The promulgation of the Communal Land Rights Act 11 of 2004 (ClaRA). The Act is cross-linked to the Traditional Leadership and Governance Framework Amendment Act, 41 of 2003 (TLGF). • The successful lodgement of restitution claims to land rights lost as a result of betterment in terms of Restitution Act, 22 of 1994, • The Intergovernmental Relations Framework Act, 2005, 89 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SETTLED LAND CLAIMS IN THE WATERBERG DISTRICT MUNICIPAL AREA PER LOCAL MUNICIPALITY MOGALAKWENA LOCAL MUNICIPALITY PROJECT URBAN/RURA L CLAIMS FORMS LODGED HOUSEHOLD S MALE HEADED HOUSEHOLDS FEMALE HEADED HOUSEHOLD S BENEFECIARI ES PROPERTIES RESTORED HECTARES TOTAL AWARD (R) SETTLEMEN T DATE 1.Mokerong Urban 183 183 N/A N/A 915 None N\A 3660000.00 28/07/2000 2. Sandril/Seedat 3. Hafsa Cachalia 4. Mabyaneng Community Uraban Urban Rural 2 6 1 2 6 401 N/A N/A N/A N/A 10 30 700 N/A N\A 3706.2310 1780440.00 01/07/2004 5.Koka Matlou Community 6.Lebelo Community 7. Legata Community 8. Mabula Mosima 9. Seema Community TOTAL = 9 Rural 1 250 N/A N/A 921 2955.0717 5225000.00 01/07/2004 Rural 1 479 N/A N/A 984 None None Vier en Twintig 701 LR Bellevue 700 LR Sterkwater 299 KR Blinkwater 244 KR 3600 8919760.00 01/07/2004 Rural 1 45 N/A N/A 154 Rural Rural 1 1 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A RURAL = 6 URBAN = 3 197 1366 1. Rooipan Comm. Rural 9 160 N/A N/A 700 2. De Hoop Community 3. Letlhakaneng Community 4. Ga-Tjale Community 5. De Hoop Families Rural 1 117 N/A N/A 349 2 200 480.00 05/08/2004 Rural 1 95 N/A N/A 327 642399 Rural 1 99 N/A N/A 376 12386866 Rural 18 200 349 4197.0926 1671 Geluk 588 LQ Emaus 725 3714 N/A N/A 11932.302 MOOKGOPHONG LOCAL MUNICIPALITY 1484.4658 De Hoop 638 KR 678.2176 90 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TOTAL = 5 RURAL = 5 URBAN = 0 30 671 2101 13034946.56 1.Pienersrivier Community(More tele) Rural 2 101 68 43 369 Ptn 1 & 13 Vaalboschbult 66 JR 1966.0998 5108440.00 09/03/2004 2. Koka Matlou Urban 1 N/A N/A N/A N/A Skrikloof N/A N/A N/A TOTAL = 2 RURAL = 1 URBAN = 1 3 101 68 43 369 1966.0998 5108440.00 1.Modimolle Community Rural 1 672 12491 52158680.00 TOTAL = 1 RURAL = 1 URBAN = 0 1 672 12491 5215868.00 1.Ba-Phalane Ba Mantsere Community Rural 1 500 N/A N/A 3000 Schilpadnest 385 KQ 1884.266 53533250.00 2. Morongwa Community Rural 1 200 N/A N/A 350 R/E, PTN 4 &5 of Nooitverwacht 635 LQ Sterkfontein 677 LQ 3752.8883 1 088 000.00 TOTAL = 1 RURAL = 2 URBAN = 0 RURAL = 12 URBAN = 3 2 700 3350 5637.1543 54621250.0 230 3510 13578 BELA BELA LOCAL MUNICIPALITY MODIMOLLE LOCAL MUNICIPALITY N/A N/A 4044 Middelfontein 564 KR Nonpoort 722 KR Naauwpoort 579 KR Bukane 662 KR Tierkloof 576 KR Groenfontein 383 KR Zandfontein 566 KR 4044 01/07/2004 LEPHALALE LOCAL MUNICIPLITY TOTAL = 15 06/06/2003 13066973.12 91 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SOURCE: LAND CLAIM COMISSION, 2006 92 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.2.2.2. Land and Housing The objectives of this sector are to ensure accessibility to land through the Land Reform Programme, as per the National Land Policy, provision of adequate and sustainable housing in line with the provision of both the national and provincial policy and legislative prescripts, as well as ensuring organised method of settlement planning and surveys through acceptable development planning and survey legislative prescripts. 6.2.2.3. Land Tenure In South Africa the primary real right in land is that of outright ownership for which a Full Title Deed is registered. It is very similar to the English concept of "freehold title" whereby the land and the buildings on the land constitute one property. Most land in South Africa including farms, small holdings, residential township erven, commercial properties, etc. are privately held by outright ownership and therefore registered in Full Title. The piece of land is surveyed by a land surveyor and its borders will be physically pegged or beaconed. The property’s placement, size and borders are recorded in a Surveyor General diagram that forms part of the registered Title Deed of the property. An owner will have exclusive use of the entire piece of land, but the use of the land (business, residential, etc.) and the density or number of buildings (even on farms and small holdings) are governed by the applicable land use rights. An owner may furthermore sub-divide or consolidate his land, subject to the relevant town planning scheme, legislation and/or Article 21 Company rules (in the case of a private development). Land tenure reform is being addressed through a review of present land policy, administration and legislation to improve the tenure security of all South Africans and to accommodate diverse forms of land tenure, including communal tenure. Residents of the former so-called townships such as Phagameng, Bela-bela, Regorogile, Mookgophong, Thusang and Marapong obtained full property ownership rights over the past approximately 9 years through the Extended Benefit Scheme implemented by government since 1994. Land tenure in the rural areas of Mogalakwena and Lephalale, however, still need to be addressed. Land is held in trust for tribal authorities with communal ownership as the most likely option. Tenure rights in townships such as Mahwelereng (so-called R293 towns) must also be addressed to ensure upgrading of the existing rights. Land restitution (land claims) and land redistribution of which the potential impact is yet unknown could alter the spatial pattern and land needed for various macro land-uses (e.g. settlement development, agricultural development, mining, conservation areas, etc.) enormously. On the other side many people would obtain access to land that could result in improved living standards and quality of life. It could unfortunately also result in large-scale sterilisation of economically productive land (e.g. high potential agricultural land, mining of certain minerals, nature conservation areas, etc.) if not managed and planned properly within the context of a spatial development framework that considers all these factors. 93 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3 LOCAL ECONOMIC DEVELOPMENT PLANNING 94 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.1 ECONOMIC OVERVIEW The magnificence of the Waterberg District Municipality is self-expressed in its cultural diversity, history and natural environment, and is endowed with a range of habitats, tourist attractions and wildlife. Its economic profile is characterised by its six local municipalities and it revolves around agriculture, commerce, manufacturing, mining and quarries, residential development, smallholdings, water-bodies, etc. Despite high levels of unemployment, Waterberg District Municipality is among the highest contributors to the provincial economy and has a relatively good infrastructure. However, many people and households in Waterberg District Municipality earn a living from the informal sector, spaza shops, hawking, and street vending. Many households would plan their informal merchandising opportunities around specific events such as old-age pension pay days, holiday seasons, Christmas and new period as travellers and tourist abound in the region. Economic indicators state that the Waterberg District Municipality has the largest economy compared to other District Municipalities in Limpopo. The Waterberg District Municipality has the largest district economy of all five district municipalities in the Limpopo Province. It contributes 26, 79% of the total production in the Limpopo Province in terms of GGP. The mining sector is by far the largest contributor to the district Gross Geographic Product (GGP) with 49.03% of the total production of the Limpopo Province being from the Waterberg District Municipality area; The second highest contributor is Finance sector with Waterberg District Municipality contributing 11.44% of the total provincial production; and Agriculture and forestry with 3.17% of the total GGP of the Limpopo Province. Construction is the lowest contributor to the district GGP with 1.25% while manufacturing contributes 3.72%. The Waterberg District Municipality’s area of jurisdiction has a rich history and heritage that consist of various layers – pre-colonial, colonial and post colonial. The available heritage resources in the district have socio-cultural, spiritual and non-spiritual, historical and political value and meaning that have intangible significance for different people at various levels. There is uncoordinated socio-economic and cultural development in the district. As such, a holistic approach, including systematic cultural mapping, heritage impact assessment and environmental impact assessment should be central in any development that takes place. This includes social development, urban planning and renewal, rezoning, open space development, mining, road construction, commercial and residential development and economic development. This approach will enable balanced development that takes into account a range of economic, social, cultural, historical and environmental aspects. Because of uncoordinated development, and non-adherence to heritage management and existing legal instruments there 95 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 are a number of areas in the district where human remains have been unearthed through development. Sustainable development that takes in cognizance the abovementioned issues should be of paramount importance in the district. Heritage forms part of socio-economic and cultural development. It contributes significantly to the GDP through tourism, particularly cultural tourism. The development, marketing and packaging of heritage tourism routes will accelerate the contribution of tourism (heritage tourism) in the district. Heritage, marketed through the medium of the film industry has a potential to contribute to the GDP and local economic development of the district. Promotion of the district as a film destination will enhance the socio-economic benefits. Aagriculture (31.93%), mining (48.32%) and electricity (36.04%) play a major role in the economy (i.t.o. GGD), providing 26.93%, 16.17% and 0.75% respectively of formal employment. FORMAL EMPLOYMENT FOR WATERBERG AND LIMPOPO Sector Waterberg District Limpopo Province Agriculture 26.98 18.52 Mining 16.17 7.42 Manufacturing 7.43 7.47 Electricity 0.75 0.83 Construction 4.09 4.47 Wholesale 11.04 14.35 Transport 1.80 2.51 Finance 7.61 10.49 Community Services 13.49 12.84 Government Services 10.64 21.10 Total 100 100 SOURCE: WDM LED STRATEGY, 2007 96 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Unemployment has grown within Waterberg. Although the lowest levels of unemployment are recorded in Mookgophong, the 2001 unemployment estimates suggests that 31% of the economically active population is unemployed. The unemployment levels in Mogalakwena, Thabazimbi, Bela Bela and Modimolle are most desperate although Lephalale reflects 2.5%. Contextualizing and applying the NSDP in assessing the economy of WDM 6.3.2. Economic Potential Economic growth is most prevalent in the Lephalale, Mogalakwena and Bela- Bela areas with significant potential for expansion in the mining, agricultural and tourism sectors. The District’s proximity to Gauteng also ensures easy access and linkages to expertise, industries, markets and international opportunities. This contributes to both the comparative and competitive advantages of the Province. 6.3.2.1 Spatial Location of Needs and Potential The District has a relatively high poverty rate, with poverty concentrated in the Lephalale, Mogalakwena and Thabazimbi municipal areas. This situation is supported by the available data that indicate that the Lephalale and Mogalakwena have poverty rates of 60.6% respectively, with Thabazimbi recording a poverty rate of 52%. This is followed by Modimolle at 48% and Mookgophong at 42.2%. High poverty rates are compounded by the unique challenges of service delivery in the area. Service delivery needs within the District are diverse and mainly linked to historical spatial distributions, limited service provision and market accessibility. While the District has significant market expansion opportunities in the agriculture, mining and tourism sectors, the absorption capacity of its economy appears to be hampered by a number of barriers to entry and other structural characteristics, which reduces its ability to alleviate unemployment in the area. Faced with the challenge to address the relative high levels of poverty, the District has taken the approach to leverage its natural and mineral resources to unlock the economic potential in the area. Significant economic opportunities in the mining, agricultural and tourism sectors exist throughout its jurisdiction and therefore targeted strategies to ensure direct and indirect spin-offs for local communities is seen as a key component of the development trajectory for the district. 97 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.2.2 KEY SECTOR SPECIFIC ISSUES Mining, Agriculture and Tourism are seen as key pillars of development in the Waterberg. 6.3.2.2 (a) Mining The extensive and rich mineral resources are located in the North-Eastern and Western parts of the District. At present mining is the largest and predominant contributor to the GDP of the Province at 57.5% with a recorded annual growth rate of 13.9%. Extensive current and planned mining activities are mainly located in the Lephalale area which has the third biggest coal reserves in country, providing the District with a distinct competitive advantage which could strategically position the area as a continental powerhouse of coal fueled electricity production. The coal fields at Lephalale also currently fuels a number of Eskom’s power stations. Other mining activities include iron ore mining in the Thabazimbi area, and extensive platinum reserves in the Mokopane and Northham areas, which has been ear-marked for future exploration. The success of mining development hinges on a number of key factors: effective transport network; water supply; service management; electricity provision; and skilled labour supply. Besides the mineral extraction process, the emergence of new mining communities impacts significantly on housing development, retail and service supply demands. Some concerns have been raised about processes and procedures involved in prospecting in local areas as well as reallocation of communities due to mining rights and activities. Intergovernmental and inter-sectoral planning across private and public sectors to ensure that appropriate planning therefore should precede unlocking potential and conflict mitigation can take place. 98 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.2.2 (b) Agriculture As a key contributor to the Provincial GGP at 28.8%, agricultural and forestry development in Waterberg is seen as another key catalyst for significant economic development. Being predominantly rural, most of the District is suited for livestock production but also with some major cropping taking place in cotton, sunflower, tobacco, and soya bean production. The District is supporting agricultural growth by developing a policy for the subdivision of agricultural land in collaboration with the land claims commission and is negotiating the acquisition of state land for agricultural production. In the two priority areas of Lephalale and Mogalakwene, where both a high levels of need and potential are evident, the following areas of potential were identified: Lephalale Lephalale is seen as an area with high agricultural potential. Accordingly a number of labour intensive development initiatives, have been identified as having the potential of for ensuring wide-spread economic spin-offs for local communities. However, expediting land claims and land restitution processes as well as ensuring access to water for agriculture development is seen as a top priority to unlock the agricultural potential in the area. In partnership with province, LRAD and community, some noteworthy projects include: debushing (Shongwane); commercialisation in DNayala; marula in Maraphong; commonage initiative in Refilwe; and seed nursery in Madibaneng. Furthermore, the area boasts substantial production capacity for table grapes. The grapes produced in the area have a two-week lead-time over other grape production areas in South Africa and globally, providing it with a substantial competitive and comparative advantage. The cultivating of table grapes has already yielded significant profits for local commercial farmers over the past year. The intention is to capitalize on the District’s proximity to Botswana which is regarded as a substantial market opportunity. The challenge however is how to expand these activities to include emerging small scale farmers. 99 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Mogalakwena Unlike Lephalale, Mogalakwena has a smaller agricultural sector. Its potential centers mainly on the production of crops and meat for regional consumption. Extensive growth in the mining sector is seen as an ideal outlet for local production and together with the District, local entrepreneurs, experts and affected community champions are exploring ways of targeting specific buyers in the area. The District has done significant assessments on expanding the existing abattoir to meet local and regional demand for white meat as well as extending chicken farming initiatives. Successful management and execution in this could yield positive results for local employment and production. Other similar initiatives include: the Mokamole Agricultural farm; extension of beneficiation initiatives and primary food production along river courses; potential white meat cluster; citrus farming opportunity; and Doring-draai fishing initiatives. 6.3.2.2 ( c) Tourism The District’s rich biosphere which is home to the Makapan’s Valley World Heritage Site, Nature reserves and which boasts an abundance of fauna and flora, hot-springs and more than 400 bird species is seen as a key catalyst for development in the tourism sector. This cuts across the Bela Bela, Modimolle and Lephalale areas. The District notes that its tourism competitive edge is its proximity to Gauteng, its rich biosphere, malaria free areas and its hunting capital status. The Bela Bela and Thabazimbi area already boasts an extensive and well known tourism network with key attractions being hunting, game parks, bird and wild life. Funding permitting, priority projects include; A conference centre facility at the World Heritage Site Entabeni initiative with the Doordraai project. This project, which will be home to the Big Five, a golf estate and other, is owned by government and is in the process of being developed. License permitting, water will be taken from the Flag- Boshielo dam. 100 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Waterberg District’s location to Gauteng Province has made it a key-visiting site for visitors to the 2010 World Cup. Extensive work is already underway to ensure that all businesses are equipped to take advantage of this opportunity. Some ideas touted at this stage include: the establishment of fan parks for viewing 2010 matches; grading of accommodation; provision of packages for visitors to area; and entertainment and local based activities. Success of this initiative is dependant on: a sound and realistic 2010 strategy for the District; appropriately graded accommodation; reliable and stable water supply; effective transport system; effective communication system; steady supply of big screens for viewing; effective electricity supply; effective signage; and establishment of a world class airport. This would require that the District develops a world class, effective and efficient logistics team to lead its strategy and give manage related interventions. 101 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.3. IDENTIFYING NEEDS IN AN AREA Whilst significant economic opportunities exist in the focus areas, the following key development challenges have been identified, which hamper and affect the pace at which the District will advance: Water supply to residents in remote areas is a huge problem; Water supply for economic development is inadequate; Sanitation facilities and the extent of current backlogs does not meet growing demand and current resources are insufficient to meet this challenge; Settlement planning and development that links outer-lying remote villages with service sites is not in place; Roads and Transport linkages for both economic and commuter usage is inadequate and not suited to meet the needs of economic expansion opportunities in the area; Skills, Literacy levels and readiness of local population to take advantage of economic opportunities is inadequate; High demand for services especially in the outer Lephalale areas and most of Mogalawena is not met because of the current capacity challenges within the municipality. This in turn results in lower rates of service provision; Land release and development for agricultural purposes are not matched with appropriate strategies to capitalize on these opportunities; Economic benefits from mining, agriculture, tourism are in the hands of a limited few and does not necessarily alleviate poverty Extensive private ownership of land, especially foreign owned land in Lephalale areas and the challenge of connecting communities and development initiatives with water source points sometimes located on this land, poses a challenge; 102 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Implications of village relocation as a result of mining activity on local people who will be reallocated and municipalities who have to provide services are not readily negotiated. Decision needed on how what where, who involved in this process. Communication across spheres of government especially with regard planned activity is inadequate. Current pattern of no due regard for governance role of local municipalities leads to unnecessary conflict and resource wastage. 6.3.4 UNLOCKING POTENTIAL AND MEETING REQUIRED NEEDS OF KEY DEVELOPMENT AREAS IN DISTRICT It was agreed that the most pertinent challenge in the Waterberg District area was the provision and availability of water. Water was a crucial catalyst for unlocking economic potential in the agriculture, tourism and mining sectors and lack of water sources and supply had damaging consequences on growth and development in the area. While significant investment by all spheres of government was already ploughed into water initiatives across the District, experts argue that current rates of planning around supply and provision was highly inadequate and shifts were needed to ensure more sustainable planning over the medium to long term. Furthermore, analysis of the spatial economy also reflected very high clusters of poor in Waterberg. This meant that there was a serious disjuncture between where people were located and where economic activity was taking place. This was exacerbated by the high demand for specialized skills in key sectors and the low skills base prevalent in poorer communities. Additionally, while the District’s proximity to Botswana was its comparative advantage, the potential economic spin-offs were hampered by severe infrastructure challenges in the connecting localities. The following have been identified as the key critical blockages to realizing economic potential in the Mogalakwena and Lephaphale areas in the District: 6.3.4.1 Water The shortage of water supply for human consumption and economic production is inadequate. Linked to this is the appropriate management of water supply and the technical competency to address water source, water management and water planning requirements. 103 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.4.2 Roads and transport The extension, maintenance and management of the R33 and the N11, is critical. In this regard, these roads are crucial for linking resource extraction, production and commuters with key economic centers. In addition the upgrading and reorientation of railway stock to improve connectivity with economic centers and service points was also seen as critical. Investment in roads infrastructure in the localities connecting Botswana and South Africa was also seen as a critical blockage requiring urgent attention. 6.3.4.3 Agriculture There is a substantial need for land released for agricultural purposes and the development, to poor communities within the relevant area. In conjunction with the release of the relevant land, local capacity should be enhanced to ensure the sustainable utilization of these resources. 6.3.4.4 Communication The execution of an effective communication strategy across government is required to give effect to key development decisions taken across all spheres of government. Of specific importance, is the issue of communication that relates to the negotiations between mining houses, and the Department of Minerals and Energy, and the Limpopo Investment Agency. The downstream implications from both a policy and implementation process should be articulated and communicated appropriately. 6.3.4.5 Settlements The rural nature of the district and the historical legacies of settlement distribution make service planning and provision a substantial challenge. This is especially true in the case of the Mogalakwena and Lephalale areas. However the plight of the community in the biosphere area in Modimolle was also highlighted, since lack of service provision especially sanitation services, could seriously jeopardize environmental and tourism development down the line. 104 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.3.5 INTERGOVERNMENTAL ACTIONS The following table high-lights the key intergovernmental challenges needed to unlock economic and development potential in the District. It should be noted that in the event that actors are unable to resolve challenges, where appropriate, the presidency could be called upon to intervene as part of the current pilot process. SECTOR WATER ISSUE Water needs and supply management requirements across the District must be quantified. ACTION Agreement is needed on standardized source of statistics for the quantification of water needs and the related planning and implementation interventions. ROLE PLAYERS District Municipality Agreement is needed on alternative sources of water supply given different economic and spatial contexts. This would require intergovernmental cooperation in conducting a detailed analysis across the District. DWAF’s (Water Services, Water Resources and Forestry Divisions.) All Local Municipalities; The results of the analysis will then be used to form the basis for an inter-governmental agreement on an integrated strategy, implementation and resourcing plan. High costs of pipeline installation in the Mogalakwena area result in serious delays in water resourcing and management strategies. Specific emphasis should be given to the challenges around the FlagBoshielo Dam Agreement must be reached with National Treasury regarding potential sources of financing of the Mogalakwena pipeline installation. OTP, DWAF, NT, WDM, LM, DME The District Municipality must be included in deliberations of the Premier’s Office, DWAF, DME, as part of the existing Committee. 105 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The Mokolo Dam wall could be raised by 15 meters to increase the catchment’s capacity. A decision is needed on the extension of the Dam in the Lephalale areas. LM are not readily equipped to deal with high level investment and resourcing needs of huge bulk infrastructure investment. SANITATION At the same time they have to be accountable for financing and maintenance of such investments in the medium- to long term Water supply in the District Municipality is a challenge therefore alternatives to waterborne sewage need to considered and agreed to. Role players are not using standardize baseline statistics As a result, villages in Mogalakwena and Lephalale areas which did not feature in StatsSA data are not accounted for in service provision prioritization processes. The current overload of sanitation infrastructure has negatively impacted new developments. This is exacerbated by limited water supply. REFUSE REMOVAL Land fill sites are not managed in accordance with regulations. In Lephalale water management problem is exacerbated by the absence of waste management strategies. Inter-governmental agreement is needed to conduct a hydrological feasibility study regarding the extension of dam wall by 15 meters. In the event that the wall will be raised, an additional multi-lateral agreement is needed with Botswana, Zimbabwe and Mozambique Inter-governmental agreement is reached on the provision or secondment of ‘transactional advisors’ to advise District and Local Municipalities on the most appropriate funding and investment models regarding mega- investment projects. Based on technical inputs by DWAF, CSIR and other research institutions agreement must be reached on the most appropriate technical solution. General agreement was reached in the meeting that DWAF and IDP stats be used as baseline data. This agreement needs to be formalized in the District. DWAF in partnership with DM, LM to commission hydrological study. OTP to commission meeting with DWAF, DFA, DM to meet regarding multi-lateral agreements and related protocols. DM, LM, NT DWAF to take lead on alternative WBS in collaboration with DM DWAF, LM and DM Agreement must be reached on the need to expand infrastructure to address the radical urban expansion taking place across the District but especially in the Modimolle and Bela Bela areas. DM, LM, DWAF to discuss alternatives. Agreement must be reached on identifying and adopting alternative strategies and methodologies for refuse removal and refuse disposal in rural areas. District to explore talks with CSIR, DEAT on biomass conversion. DM, DEAT, DWAF, LM, Eskom, CSIR 106 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Problems with biomass conversion and licensing and cost of conversation render it difficult for municipalities to deal with this challenge on its own. Initiatives of the ESKOM development foundation looking at conversion and management needs to be explored Dumping sites are not managed properly. By products from industry and mines and how this is managed need to be monitored. MINING District and Local Municipalities are not included in provincial and national deliberations with mining and investment companies that impact on local areas. An agreement needs to be signed with DME, Provincial government and LM/ DM on protocols with regard to investment in local areas. This should include information on: DME, District, OTP, mining companies Prospecting Community reallocation and settlement strategies Service requirements and strategies Local municipalities do not contribute towards agreements on Social and Labour Plans with the Mines. Local and District Municipalities be included in the approval mechanisms from DME regarding Social and Labour Plans submitted by the mines. DM, LM, DME, mines Transport blockages hindering pace at which mining development can take place in both Lephalale and Mogalakwena areas Inter-governmental agreement be reached under the leadership of the Premier’s Office to on addressing access issues pertaining to road infrastructure in the District. As part of this agreement should be the review of financial models. National department of transport, SAMRA, Provincial Department of transport, Lephalale, Waterberg District and Local Municipalities In Mogalakwena ownership of land and mineral rights are unclear. Agreement needs to be obtained on the status of mineral rights and communicated to all relevant role players. Premiers Office,DME, DLA, LM, DM 107 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ROADS AND TRANSPORT Studies commissioned by Spoornet on whether to transport coal from Lephalale to Richards Bay needs to be completed. A decision is needed on most appropriate strategy for coal transportation. This needs to be communicated with Local and District municipalities. Specific roads priority actions includes: R33 and N11 unlock mining potential with Botswana and Polokwane. Specific roads implementation plan needs follow up. NT, TIL, SANRA deciding R33 road. Includes distance between Modimolle and Lephalale. Funding model agreed on and being explored needs finalization. Project underway with Dept roads and transport with all municipalities on the development of an appropriate roads and transport plan. DM and dept of roads and Transport to communicate progress. Decision needed on R33 road from Lephalale to Modimolle. High level intervention needed. R33 road between Modimolle and Lephalale needs upgrade. Road between Modimolle and Mabatlane needs upgrade. Rail between Brits and Lephalale also needs upgrading. Condition of rail to carry the heavy load (more than 30 tons) is not clear. R33 road between Modimolle to Lephalale study was concluded. Financing cannot be done by Province. This requires National treasury to give permission for province to take up loan. DM, Mines, DT, DME OTP, DM and Department of Roads and transport to follow up on challenges 108 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 South African National Roads Agency to upgrade R33. Agreement needed to make it a priority. Need guarantee that the upgrade will take place in the near future. R33: decision needed by Province to ensure clear guideline from National Treasury. National Treasury and SANRA to agree on guarantee for future loan DM should secure funding for gravel roads en-route to Botswana. National Treasury, SANRA and District Municipality, Provincial Department of Transport. NT to give direction on best models for roads extension. TIL to coordinate and report on findings to all affected stakeholders. Decisions needed on the following other roads: Roads in biosphere- engaging EU to fund project to upgrade road. Information sharing needed with locals municipalities. Alma to Marakele and Thabazimbi to Mabatlane. Road from Mogalakwena to Marken a problem. Current EPWP is not optimal for rapid delivery of services and quality requirements of Mogalakwena Local Municipality Agreement on additional funds needed from National Treasury to construct road using labour-based methods and technologies. Provincial dept of public works; RAL; DM and LM. EPWP is perceived as failing, due to perceptions that the labour force is being exploited. The need is for an agreement that would ensure that the remaining components of the project be completed as a matter of urgency. AGRICULTURE Water supply for agricultural development is a significant challenge. There is a challenge around access to viable agricultural opportunities, financing for agricultural development, capacity and resourcing for small scale farming initiatives and the finalization of land acquisition and transfers. Access to profitable agricultural ventures that are Assessment and agreement is needed regarding the water supply and water management strategies over the medium- to long-term. DM and Department of Agriculture to reach agreement on priority areas. Agreement and information is needed at District level on financing intermediaries for agriculture sector. DWAF, WDM and Lephalale to follow up on water provision alternatives and possible DM, Department of Agriculture, Dept of Roads and transport Agreement is needed on how to address the current shift from 109 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 sustainable remains a problem without access to proper financing, agricultural production to game farming, and its impact on local labour supply. Transformation of agricultural farms to more profitable game farming initiatives across the Waterberg presents a labour, service provision and skills challenge for the District. Agreement on strategies required to address the peri-urban growing trend is required. Regional marketing and specialization of chicken farming initiatives have significant spin-offs for local entrepreneurs Agreement needs to be reached with the mines to ensure poultry interventions link into the potential market presented by the mines. Agreement must be reached on the level of support to be given to the African Rural Development Corporation, NGO which is linking local agricultural production with national and international markets. Agreement on water supply as it pertains to these issues is required. LAND INDUSTRIAL DEVELOPMENT ZONES MONITORING OF DEVELOPMENT Information gaps exist on progress with land reform initiatives Agreement on how successful grape farming initiatives can be replicated by emerging farmers and communities to ensure spread of the benefits of these viable investment opportunities. Research to be commissioned and agreement be reached on land restitution progress and impact of change in land use given high rate of conversion of agricultural farms into game and hunting farms. DM Administrative delays with land release is hindering agricultural and economic development High level assistance is needed with unlocking blockages with land release especially land owned by DLA and Eskom. DM, DLA, OTP Presidency Unlock and link Industrial development zones in Province and district with relevant opportunities. Villages need to be connected to economic opportunities. This includes Marken to Mokopane, Marken to Polokwane, N11, establishing linkages between the Maputo corridor and Lephalale. DM, LM and DRT, LIP to follow up Decisions and commitments made by mining companies, Eskom, DWAF and other sector departments are not adequately monitored at district level. Agreement must be reached on the upgrading of the road connection as it relates to the transportation of coal to the smelter in Polokwane. Agreement needs to be reached by the District Municipality with stakeholders on how it will review, managed and monitor commitments of agencies and related government departments. DM in collaboration with province and affected sector department 110 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 INFRASTRUCTURE 111 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CLUSTER ANALYSIS WATER SERVICES OVERVIEW 112 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.4. WATER SERVICES The Waterberg District Municipality is not Water Service Authority. The Water Service Authority (WSA) function is the responsibility of the local municipalities of Mogalakwena, Bela Bela, Thabazimbi, Lephalale, Mookgophong and Modimolle. The Waterberg District Municipality WSA population (sum of WSA Population of local municipalities) has been estimated to be 614041 people, based on data from Statistics South Africa. 6.4.1. Level of services The 2005/2006 WSDP study highlights that as of March 2005, the following percentages of people had access to RDP water services: • Water - RDP standard or above 42% (25 litres per person per day within 200m walking distance) • Sanitation - RDP standard or above: 23% (waterborne sewerage or VIP toilet) As of April 2006, the Waterberg District Municipality had improved water services to the extent of: • Water - RDP standard or above 90% (25 litres per person per day within 200m walking distance) 113 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 • Sanitation - RDP standard or above 49% (waterborne sewerage or VIP toilet) WATER BACKLOG NO Infrastructure population NO Infrastructure Household Oct 2001 April 2006 Backlog % Oct 2001 55 820 33 353 8 13 498 Estimated cost to eradicate = 186 006 545.00 Population (Access below RDP Oct 2001 April 2006 Backlog % 350 326 314 908 10 Estimated cost to eradicate = 385 594 500 Source: DWAF, 2006 April 2006 8 272 Backlog % 9 Population (Access below RDP) Households RDP) Oct 2001 147 007 Oct 2001 37 412 April 2006 99 036 Backlog % 9 (Access April 2006 25 618 below Backlog % 10 SANITATION BACKLOG Households (Access below RDP) Oct 2001 88 097 April 2006 79 015 Backlog % 10 Providing a higher level of service to the resident within Waterberg District Municipality is a challenge especially within peri-urban areas due to the backlogs still to be eradicated and the increase in the water demand these higher level of services will result in. Residents want to move from access to communal stand tap water supply to individual erf connection and from a VIP to water borne sewage system. The same challenge applies where communities want to extend the water supply infrastructure into their area by connecting into nearby reticulation. 6.4.2. Raw Water Situation The urban areas of the Waterberg District Municipality Water Service Authority (of six local municipalities) function are generally in need of upgrading in terms of capacity of bulk infrastructure and access to raw water supply. This need is growing rapidly as the continued process of urbanization continues and pressure is placed on local municipalities to provide housing and basic services. Water Resources • • Mokolo Dam Doorndraai Dam 23 x 106 m3/a 8.6 x 106 m3/a 114 • • • • • WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Glen Alpine Dam 5.6 x 106 m3/a Donkerpoort Dam 0.6 x 106 m3/a Transfer in – Thabazimbi from Vaalkop Dam 22 x106 m3/a – Bela-Bela from Roodeplaat Dam 3 x106 m3/a – Modimolle from Roodeplaat Dam 3 x106 m3/a Ground water Use – Well developed fields in the Mookgopong (0.99 x 106 m3/a Use) and Mogolakwena (1.6 x 106 m3/a Use) – Extensive use of ground water in the District’s rural and farming areas, and most of them have no detail of quantities used Return flows – Bela-Bela about 2.5 x 106 m3/a used for irrigation - Most areas treatment cost to portable standard not viable Existing Bulk Water Supply • • • • • • Thabazimbi – Domestic 0.6 million m3/a – Mining and Industrial 18 million m3/a Lephalale – Domestic 1 million m3/a – Mining & Industrial 4 million m3/a – Power Generation 7 million m3/a Bela-Bela – Domestic 3 million m3/a Modimolle – Domestic 3 million m3/a Mookgopong – Domestic 1.2 million m3/a Mokgalakwena – Domestic 4 million m3/a 115 – • • • • • WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Mining & industrial 6 million m3/a Possible and Probable alternatives of water supply Raising of the Mokolo Dam Transfer from the Crocodile (West)/Marico ORWRDP: Raising of Flag Boshielo Dam and construction of De Hoop Dam to augment water supply to Mokopane Ground water use Water Trading with the irrigators Water Situation 2000 L. Crocodile Surface water 7 Return flows 23 Transfer in 112 Total 171 Requirements 171 Balance 0 Matlabas/Mokolo 35 4 0 46 63 -17 Lephalala 38 0 0 42 42 0 Mokgalakwena 50 7 3 75 79 -4 334 355 -21 Total in Waterberg Municipality 116 Water Situation 2025 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Local Yield Transfer in Local Requirement Transfer out Balance Potential for Development L. Crocodile 59 113 173 0 -1 0 Matlabas/Mokolo 46 0 63 0 -17 0 Lephalala 42 0 43 0 -1 0 Mokgalakwena 73 3 101 0 -25 7 Total in Waterberg Municipality 220 116 380 0 -44 7 Existing Bulk Water Supply • • • • Thabazimbi – Domestic 0.6 million m3/a – Mining and Industrial 18 million m3/a Lephalale – Domestic 1 million m3/a – Mining & Industrial 4 million m3/a – Power Generation 7 million m3/a Bela-Bela – Domestic 3 million m3/a Modimolle – Domestic 3 million m3/a 117 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 • • • • • • • Mookgopong – Domestic Mokgalakwena – Domestic – Mining & industrial 1.2 million m3/a 4 million m3/a 6 million m3/a Possible and Probable alternatives of water supply Raising of the Mokolo Dam Transfer from the Crocodile (West)/Marico ORWRDP: Raising of Flag Boshielo Dam and construction of De Hoop Dam to augment water supply to Mokopane Ground water use Water Trading with the irrigators Raising of Mokolo dam Full Supply Level (m) • Description Capacity (x 10 6m3) Historic Firm Yield (x 10 6m3/a) 921 Current 146 27.1 927 New 303.88 48.2 Transfer from Crocodile west/Marico 45 million m3/a 118 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.4.3. DROUGHT RELIEF 6.4.3.1 TECHNICAL INVESTIGATION 6.4.3.1.1 Motivation The motivation for each selected piece of work required was tested against the above drought relief principles. The fact that this funding was provided is sufficient proof that the money is required in the area. We need to ensure that it is spent for the purpose of alleviating domestic water supply problems induced by drought. (a) Lephalale Municipal Area Rainfall in Lephalale area has been erratic over the past years. Except for a period of above average rainfall over January – March 2003, the rainfall has been far below average. During the previous drought relief programme Lephalale’s efforts was for developing additional water sources concentrating on villages where supply was insufficient and risk of failure high, but also ensuring that at least one additional source 119 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 was developed for all villages dependant on a single source. An indication of the rate of success is the fact that more than 50% of holes were successful, in an area notorious for the low strike rate. In the Shongoane area the almost total absence of ground water makes it difficult to implement a conjunctive water use policy as is used in other villages near the river. The biggest problem at this stage, after a rainfall season with less than 60% of expected rainfall, are the villages in Shongoane which are depending mainly on water from the Lephalala river, namely Setateng. This is the largest village in Lephalale and obtains all its water from the Lephalala river. Flow in this river dried up in early June 2005, compared to typical patterns of surface flow continuing until September/October. It is evident that the water available will not be sufficient to last until the river starts flowing again, even though pump rates have already been reduced, except if it rains during winter which is highly improbable. It is proposed that additional river well points be developed, equipped and linked to existing supply systems in both Setateng and Matladi, which depends on water from the river for 80% of its supply. This will result in use and access to water sources other than those presently utilised. For Mothlasedi and Ga Monyeki the same option is proposed. At the same time it is proposed that water supplies be developed for Phahladira. This village which lies adjacent to Matladi but inside the Mogalakwena municipal area and has no water supply at all presently people are using water directly from the river when available, or buy or take water from nearby villages at great cost and hardship. For a longer term and more permanent solution, it is proposed that a weir be constructed which will increase the water storage capacity and availability, and reduce the risks of water in the river bed being totally depleted. The construction on the weir need to be preceded by a thorough feasibility study, technical report and EIA, and is regarded as a request for future funding. Allowing an amount of R 220 000 for the investigation and reports under the present funding would however be sufficient to kickstart this initiative. (b) Mogalakwena Municipal Area The Mogalakwena rural communities are situated north of Mokopane. This falls in the summer rainfall area and has a low annual average rainfall. The recent below average rainfall did create water supply problems and especially to the communities obtaining water from boreholes or well fields alongside the Mogalakwena River. 120 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Many of the sand point abstraction pits in the Mogalakwena area are now not a reliable source and an alternative means of abstracting this sand/alluvium encased water should be embarked upon. This drought relief project would therefore concentrate on constructing new abstraction boreholes just adjacent to the Mogalakwena River to alleviate this problem. Stolen or broken pumps would also listed as part of this project. Instead of securing (drilling) additional boreholes, more people can be helped by replacing and repairing these pumps. The carting of water in the Mogalakwena area is daily occurrence. DWAF has supplied two water tankers as far back as 1988. The one tanker is stationed at Mokopane and supplies water to the Mapela, Bakenberg and Mokopane areas. The other tanker is stationed at Salem Satellite office and supplies water to Nkidikitlana and Salem Desert area. Currently DWAF provides the drivers and the running costs for the vehicles. These two vehicles are breaking down more regularly now and really need to be replaced. DWAF officials have confirmed that these vehicles operate everyday as well as on week-ends. (c) Mookgophong Municipal Area Mookgophong town obtains about 0.75 million m³/year from the Nyl Wellfield and about 0.42 million m³/year from the dam nearby. Ultimately additional bulk water would be obtained from the Magalies Water Board pipeline which presently stops at Modimolle. This augmentation is still far from a reality. The yield from the 10 equipped boreholes in the Wellfield has started to diminish due to the dry period production on the boreholes had to be cut back. There are unequipped boreholes available for expansion of this wellfield. The proposal is to equip two boreholes and construct the necessary pipeline (about 2km) to the collection tank from where it is pumped to Mookgophong Town. An interim solution to pump into the adjacent borehole pipeline to the collection tank can be considered if there are not sufficient funds to do all the work at once. These boreholes typically yield up to 10ℓ/s each. (d) Thabazimbi Municipal Area 121 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The Rooiberg housing area has an acute problem. The current 260 houses and newly completed 264 RDP housing units development have no water supply at present. The yield in the eight (8) available boreholes have diminished to such an extent that the Thabazimbi Municipality is carting water every day from Leeupoort. The past two weeks has resulted in the 6000kℓ truck making 3 deliveries per day to the stricken area. The following two boreholes are available to equip and can give immediate relief: 1 x Borehole on private land but of which approval has been obtained. The borehole is already equipped and can deliver 5.5 ℓ/s. A pipeline of 520m is needed for this. 1 x Borehole about 500m from the reservoir can be equipped to yield 2.8ℓ/s. The requirement is for the borehole pump and pipeline to be constructed. Thabazimbi Municipality would install the electrical cable (500m) and transformer if the project can supply it. (e) Belabela Municipal Area Belabela Town obtains water from their own boreholes as well as augmentation of surface water via the Magalies Water Board pipe line. The dry period has influenced the water table and the groundwater availability. The request from Belabela Municipality was to reinstate a borehole which was lost due to a blockage. Instead of searching for suitable drilling positions, a new borehole can be drilled just next to the blocked borehole in Roodepoort street in Belabela town. (f) Modimolle Municipal Area The water supply to two remote settlements has been affected very seriously. They are: Mabatlane (previous name Vaalwater) Mabaleng (previous name Alma) 122 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 At Mabatlane the existing eight equipped boreholes are not sufficient to supply water to the area. Further augmentation is only possible by means of further groundwater exploration. The Mabaleng water also requires further boreholes. The need to do a proper geohydrological study to the above areas is critical. The groundwater has not been quantified properly yet and an exploration study is suggested to identify or target the major water bearing structures in the vicinity. This information would help in the strategic planning of bulk water to these areas. 123 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ELECTRICITY SUPPLY OVERVIEW 6.5. ELECTRICITY PROVISION OVERVIEW The provision of sufficient electricity supplies is vital for the general development and prosperity of the Waterberg region. The Waterberg District Municipality does not generate or distribute any electricity itself but has an interest to ensure that the provision of electricity is closely aligned to the developmental needs of the area as a whole. Waterberg District Municipality therefore sees its role as facilitating proper interaction of all roleplayers in the Integrated Development Planning Process [IDP] and the providers of bulk and reticulation services, like Eskom in the electrification field. The fact that the majority of rural households still live in a dispersed settlement format makes the provision of electricity more difficult for service providers such as Eskom. The Waterberg Electricity Development Plan should be developed to depict the extent of electrification development in the district. 2006/07 IDP Review depicts that rural electricity backlogs in Waterberg as at end 2005 stands at 9 070 households. Electrification programme (as per ESKOM) and individual municipalities 2001/02 Munic Budget Budget 2002/03 Households Connected 2003/04 budget Households 2004/05 budget households Budget 2005/06 Households Connected 2006/07 Budget Target Conn. Budget Target connections 124 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Mogalakwena 2,3m 10,4m 3372 Lephalale R7,1m 2304 R9,4m 3031 22,95m 5909 5,645m 1525 R8,1m 1723 R1 429 837 2190 0 0 4 066 000 1 926 2 039 000 966 R2, 066m 3374 Modimolle R128 000 R800 000 500 R2.4 million 750 R2.9 million 1000 R3.9 million 1260 R2.7 million 1003 R2, 760, 000 699 Mookgophong R811450 R730 200 Upgrade R400 000 50 R1 597 500 202 3 970 000 500 R745 000 94 R620 000 78 Bela-Bela R5,41m R229019 71 R275 900 89 134 0 0 R1,05m 262 R1, 002m 340 Thabazimbi R64 000 R67 000 190 R71 000 286 R144 000 576 R207 000 829 R254 000 1015 R2, 688, 000 808 R11, 676, 737 5 669 R14, 423, 514 4 943 R35, 093, 000 10, 424 R12, 433, 000 4, 865 R17, 236, 000 7 022 Totals R382 014 FREE BASIC ELECTRICITY Households receiving free basic electricity by municipality; LOCAL MUNICIPALITY Households BUDGET ALLOCATION (2004/05) TOTAL EXPENDITURE (2004/05) 2005/06 Indigent TOTAL HOUSEHOLDS RECEIVING FREE BASIC ELECTRICITY Total Expenditure, 2005/2006 2006/07 Budget allocation Mogalakwena 4553 1 107 R3 100 000 R37 586 142 R3, 000, 000 R1, 032, 784 R1, 210, 524 Lephalale 15 000 4 077 R1 050 00 R0 112 R65, 035 R63, 718 R66, 333 Modimolle 3 045 14 695 R3 645 000 R3 570 885 R2, 852, 000 R2, 852, 000 R3, 175, 700 Mookgophong 1 898 1 898 R4 565 972 R2 369 718 R1, 500, 000 R1, 439, 000 R1.5m Bela-Bela 8 683 8 683 R812 200 R 989 862 R964 830,000 R1 086 000,00 R776, 700 Thabazimbi 4 770 10521 R4 500 000 R1 070 000 R7, 475, 855 R2, 523, 494 R3, 913, 965 Budget allocation 125 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TOTAL 24 545 40 981 R17 673 172 R45 586 607 R979, 722, 890 R8, 996, 996 R10, 643, 222 EDI RESTRUCTURING AND RINGFENCING PROCESS MUNICIPALITY STATUS 1. Mogalakwena 2. Thabazimbi 3. Mookgophong 4. Lephalale 5. Bela-Bela 6. Modimolle Busy with ring fencing process Not yet started Not yet started Not yet started Not yet started Not yet started 126 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Distribution Network Geographically: Limpopo 127 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Transmission Network Overview Action Plan In 2008/9 build a 400kV line from Witkop to Tabor Substation Supply Risks Network flexibility & capacity during abnormal conditions on the Witkop, Tabor & Spencer networks Action Plan In 2008/9 build a new 275kV line between Tabor & Spencer Substations Action Plan In 2007/8 Install a second 250MVA, 275/132kV transformer in Spencer Substation Action Plan In 2010 a third transformer is planned to be installed in Witkop Substation 128 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Network Overview (Vaalwater) Action Plan Construct Dorset switching station, 2008 Supply Risks Insufficient capacity to supply growing tobacco farming and eco-tourism Supply Risks Very long feeder line and poor reaction time. Action Plan Construct Bulgerivier substation in 2008 129 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Network Overview (Bela Bela) Supply Risks Insufficient capacity at Zwartkloof Action Plan Install 2nd transformer at Zwartkloof Supply Risks Warmbron substation out of capacity. Action Plan Upgrade substation to 2 x 20MVA in 2007/8. 130 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHALLENGES Coping with the challenges of the electricity reform process Upgrading electricity supply to meet the demand and development of business operations. Ensuring access to free basic electricity in villages and farming communities Propagate, register and supply all deserving beneficiaries Low number of token collection Limited number of vending stations. Lack of finance for ring fencing process 131 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ROADS INFRASTRUCTURE OVERVIEW 132 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.6 ROADS MANAGEMENT The Waterberg District Municipality has an interest to serve all the people residing in its area of jurisdiction. To this end, a well established road network and the proper maintenance thereof, is absolutely vital to the economy of the region as a whole and to ensure accessibility to all and proper linkages between urban and rural environments. The Waterberg District Municipality would therefore endeavour to promote good co-operation between national, provincial and local road authorities at all times. The road network is the “heart” of the transport network in the Waterberg District Municipality, considering the long distances between production locations and markets. Transport and development go hand-in-hand, especially where public transport is concerned. Roads are classed according to the function they have to perform. The main differences between the various classes of roads relate to the extent to which they cater for traffic movement or for access. Freeways and toll roads are the responsibility of the National Roads Agency, while arterial, collector and local roads are the responsibility of the Limpopo Roads Agency. The municipalities are responsible for the road networks within their respective municipal boundaries. This section describes the road hierarchy in the Waterberg District Municipality, in terms of National Roads, Provincial Roads, and District Roads, and their significance with respect to access and mobility for Public Transport, Freight, and Tourism. Traditionally roads projects were prioritised according to traffic volumes and pavement conditions. The new criteria for prioritisation of road projects include traffic volumes, pavement conditions, public transport, passenger volumes, tourism, and freight. 6.6.1 National Roads The National Roads Agency is the custodian for the National Road Network. Currently the N11 is the only National Road declared in the jurisdiction of the Waterberg District Municipality. However, several roads are to be handed over from the Road Agency Limpopo to the National Roads Agency (NRA). 133 6.6.2 Provincial Roads WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The Provincial road network is currently the responsibility of the Roads Agency Limpopo (RAL) and the Department of Roads and Transport. The RAL utilise the Road Management System (RMS) as a tool for assisting with road network management. There are several Provincial Roads in the WDM. According to the PLTF, the current RAL strategies are identified according to the Provincial Growth and Development Strategy (PGDS). The PGDS of the Limpopo Province is primarily focussed on the development needs and in particular the development corridors and economic development centres that have been identified and that are of economic importance to the province. The assessment of roads, traffic counts and inspections of bridges are conducted and fed into the system. The RMS then reflects the road network conditions and predicts deterioration patterns. The system assists in prioritising road maintenance and rehabilitation projects. In addition to the above roads, the local access roads are gravel and predominantly utilised by buses and taxis. The condition of these roads is below standard. They require upgrading and improved storm water management. The RAL has completed process of demarcating roads for the WDM. There is a map with the demarcated routes, but the route description is not yet complete, and the formal transfer of authority is enacted. As a result, there is no Roads Master Plan for the WDM yet. It must be borne in mind that all of these roads were previously maintained by the Province and not by Waterberg District Municipality. 6.6.3 Proclaimed Waterberg District Roads The Roads Agency Limpopo is the custodian of all Provincial Roads in the Limpopo Province. The Department of Roads and Transport also carries out maintenance. The Local Municipality identifies road maintenance and upgrade projects at random in consultation with the communities and Ward Councillors. 134 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROCLAIMED WATERBERG DISTRICT ROADS 135 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 WATERBERG DISTRICT Conditions of District Roads ITEM ROAD DESCRIPTION No. NO LENGTH MUNICIPALITY CONDITION IN KM 1 D180 Bela Bela - Alma 31 Bela Bela & Modimolle 2 D190 Mookgopong - Marken 3 D1897 Radium - Syferskuil 4 D1679 Mabatlane - Bakkerspas 41 MODIMOLLE 5 D936 Bela Bela - Settlers - Marble hall 28 Bela Bela & Modimolle 6 D1590 Northam to Swartklip mine 25 Thabazimbi Modimolle 7 Bela Bela Gravel road should be upgraded to tar. Many heavy vehicles on road. Material not suitable for gravel road. Large new developments along road Culvert collapsed during 2006 and should be upgraded & replaced. Many taxis and traffic on the road. Needs to be tarred No gravel on road. Drainage system needs to be upgraded. Mountainous area. High tourism area Road carries high traffic volume and very undulated Road is very rockey 136 8 D3537 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Marulaneng- Segole 37.61 MOGALAKWENA Regravelling whole road, collapsed bridge at km 08 Limburg - Bakenberg 17.2 MOGALAKWENA Regravelling 4 km 9 D4426 P20/1 - Kromdraai 20 Thabazimbi 10 D113 N West - Botswana 30 Thabazimbi 11 D134/2 Mookgophong - Roedtan 43 Mookgopong 12 D3534 Ditlotswane - Rooiwal 13 D1944 Rust de Winter - Small holdings 14 D600 Mookgopong - Constantia 15 D3507 Mapela- Bakenberg 16 D522 Donkerkloof - Bela Bela 35 MODIMOLLE 17 D2649 Lephalale - Witkop 46 Lephalale 18 D1394 P1/4 - De Nyl Zyn Oog 19 D3550 Masipa- Flakfontein 20 D3513 D192- GaMosidi 7 D3505 15.57 MOGALAKWENA Bela Bela 10 Mookgopong 13.31 MOGALAKWENA 5 MODIMOLLE 12.5 MOKGALAKWENA 2.5 MOKGALAKWENA Trafic is high on road and can not be maintained as a gravel road. Access road from N. West to Botswana Derdepoort border post. Needs to be tarred Road is very undulated Regravelling 15.57 km (clay material) Bridge needs to be replaced High daily traffic on road. Maintenance cost is very high. Needs to be tarred Regravelling 5km (clay material) High daily traffic on road. Maintenance cost is very high. Needs to be tarred 30km of the road can only be used by 4X4 vehicles. Upgraded as gravel road Road is closed for all traffic since 2006. Should be reconstructed. Heavy blading, drainage structures Regravelling 2.5 km 137 21 D1958 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Sandplaas - Mapela 31 MOKGALAKWENA Regravelling from km 0- 20.1 22 D2664 Spoedwell - N11 20.46 MOOKGOPONG Wash aways for 7km 23 D947 Kalkfontein - D943 13.81 MOOKGOPONG Regravelling, pondings 24 D598 Groenvallei - Koelemansrus 45.54 MOOKGOPONG Exposed and broken culverts 25 D626 Pienaarsriver - Rust de Winter 10 Bela Bela Dangerous edge breaks & potholes 26 D165/1 P1/5 - Hessie se Water 15 MODIMOLLE Road is very rockey 27 D986 Doornfontein - N11 28 D1753 N11 - Cades 29 D2658 N11 - Doelen 11.37 Mookgopong-Mogalakwena Exposed and broken culverts 30 D1930 P134/2 - Oranjefontein 18.71 MOOKGOPONG Exposed and broken culverts 31 D1001 Immerpan-Ga-Mashabela 32 D104 N11 - Voorspoed 33 D717 23.96 MOOKGOPONG Exposed and broken culverts 10 MOOKGOPONG Exposed and broken culverts 8.47 MOOKGOPONG Clay material 15.92 MOOKGOPONG Clay material P134/2 - Rotterdam 7.83 MOOKGOPONG Clay material 34 D692 Roedtan - Grassvallei 27.06 MOOKGOPONG Very rocky 35 D1430 Danspan - Blinkwater 23.68 MOOKGOPONG Pondings and furrows 36 D1347 Marnitz - P19/1 50.05 Mogalakwena Broken and Exposed Culverts 37 D1825 P19/2 - D580 8.65 Mogalakwena Broken and Exposed Culverts 138 38 D1711 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Steilloop - Marken 30.9 Mogalakwena Broken and Exposed Culverts 39 D3111 D1367- D3109 10.24 Lephalale 40 D3114 D3117 - D3102 20 Lephalale 41 D3102 D3110 - D3114 18.2 Lephalale 42 D3579 SODOMA - N11 43 D2211 MOEREDYKSTR - D580 44 D580 OVERYSEL - P91/2 45 D3269 MOKORONG - Ga Mothapo 28.58 Mogalakwena Road collapsed due to to wash awys t4raffic uses only one portion Rocky - Blasting 46 D5006 SEIRAPPIES - N11 13.32 Mogalakwena Installation of draining structures 47 D3576 REBONE - Monte Christo 14.36 Mogalakwena 48 D2644 SKRIKFONTEIN - Magagamatala 16.85 Mogalakwena Regravelling -forrows on the road reserve Rocks - Blasting 49 D1836 P19/2 - BERG 50 D693 19.85 Mogalakwena 7 Mogalakwena 20 Mogalakwena Rocks and Sand Regravelling - Road below surface ground level Regravelling - Road below surface ground level Extremely sandy Wing wall washed away 32 Lephalale Regravelling Slippery P84/1 D171 21.54 Lephalale Regravelling Slippery 51 D171 D693 -D2650 11.78 Lephalale Regravelling Slippery 52 D174 D889- D887 27.73 Lephalale Regravelling 600mm pipes 53 D2286 D175- P16/2 33.48 Lephalale Regravelling 600 mm pipes 139 54 D1925 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 D2649-D2701 45.22 Lephalale Regravelling 55 D1556 Tolwe- Platjan 67 Lephalale 56 D1179 Tolwe -Maassdroom 34 Lephalale 57 D873 Maaasdroom-platjan 61 Lephalale 58 D217 Tugela -Vivo 59 D1306 Tolwe- Swartwater 60 D876 30.6 Lephalale Too rocky, below surface ground level Regravelling below surface ground level Regravelling, rocky, 600mm culverts Rocky, Regravelling 25.06 Lephalale Reshape Baltimore-Swartwater 50 Lephalale Reshape 61 D1522 Swartwater - Groblersbrug 27 Lephalale Reshape 62 D1501 N11 - Ga Mashahane 15 Mogalakwena Very rocky and very Sandy 63 D1231 Percy five - Mokopane 14.37 Mogalakwena 64 D3522 Mapela - D3505 21.14 Mogalakwena 65 D1965 Mampoer - Melkrivier 66 D932 Koelemansrust - Bokpoort 14.71 Mogalakwena Slippery during rainy season 67 D192 Sterkrivier - P19/2 17.73 Mogalakwena 67 D710 Saaiplaas - Sterkrivier 21.3 Mogalakwena Very rocky, slippery during rainy season Installation of drainage structures 69 D3502 Mapela - Tshamahansi 9.47 Mogalakwena Clay material towards the end 35 Mogalakwena Clay material on surface and exposed rocks Extremely rocky, and below surface ground level KM28 to end is very rocky 140 70 D3529 71 D3525 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Mapela - Molekana 3.7 Mogalakwena Road below the surface ground level Regravelling Mapela - N11 4.15 Mogalakwena Too sandy 141 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TRANSPORT PLANNING 142 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.7. INTEGRATED TRANSPORT PLANNING The National Land Transport Transition Act, 22 of 2000 assigns planning responsibility for land transport to municipalities in conjunction with other spheres of government. The Waterberg District Municipality adopted its first Integrated Transport Plan (ITP) in 2004. A comprehensive review is currently conducted. The ITP presents low levels of accessibility for communities in both rural and urban areas to acceptable road-based public transport services in the district. This is related primarily to the condition of roads as well as the fragmented manner in which public transport services between urban and rural areas are provided. In terms of the powers and functions devolved by the Local Government Municipal Structures Act, 117 of 1998 the Waterberg District Municipality became responsible for the municipal public transport as from 1 July 2005. This is a shared function with local municipalities in terms of services and infrastructure provision. It is recognised in the ITP that more than 60% of residents in the district do not have access to public transport services and or facilities within a 2km walking distance from their households. It is mainly the rural poor that are highly affected by the need for a better and more regular public transport service. The condition of roads has led to the use of illegal and highly fatal load delivery vehicles, whilst the urban communities enjoy the better services on paved and gravel roads which are usually maintained. Currently the day-to-day transport for scholars and workers pose a serious challenge. The ITP focuses on the road-based public transport infrastructure challenges and identifies the need for a Public Transport Plan. The role of stakeholders and the effective utilisation of the Current Public Transport Record (CPTR) in the planning and development of transport services and infrastructure within the district remain central to the successful interventions by government in pursuing the transformation of the entire public transport sector. The CPTR has also been updated in order to fulfill the strategic and operational requirements. It is one of the district objectives to establish accountable, reliable and organised institutions to manage the post transformation processes towards an integrated, effective, safe and efficient movement of people and goods in the district. 6.7.1 OVERVIEW OF PUBLIC TRANSPORT It has been identified in the Current Public Transport Record (CPTR, 2005) that public transport in the Waterberg district is dominated by taxis (140 taxi routes), with more than 90% of passengers transported by means of taxis, while buses serve only a small sector of the population (less than 10% of the daily local public transport users – 9 bus terminals). Passenger rail services are non-existent, existing rail lines are currently used mainly for freight transport and therefore infrastructure for passengers at stations is limited and in most cases non-existent. The Waterberg District Municipality ITP and CPTR 2005, reveals a number of key public transport issues within the district as listed below: 143 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.7.1 (a) Poor road Infrastructure The Waterberg District, because of its rural nature and settlement patterns, is characterised by general lack of good road infrastructure, which essentially forms the backbone of any good public transport system. Access to social services and general mobility (to employment and economic opportunities) is restricted due to poor transport infrastructure and lack of suitable public transport services, particularly in remote rural areas. In many instances, missing road links prevent access to rural areas. The poor road infrastructure results in mini-bus taxi operators restricting their services to paved roads, whilst bakkies and sedans operate most of the local routes on these gravel roads. 6.7.1 (b) Lack of Public Transport Facilities Although the Waterberg District Municipality has over the past years embarked upon a process of upgrading public transport facilities (e.g. MultiModal Node in Mogalakwena), many taxi ranks are still operated informally on-street or from vacant off-street areas. Many facilities lack basic infrastructure such as toilets, shelters, paving or informal trading facilities. 6.7.1 (c) Lack of Leaner Transport The current bus subsidies budget makes little provision for learner transport. Despite the fact that more than 47% of the population within the Waterberg District Municipality is 19 years or younger, no formal learner transport system is in place either within the urban or rural areas. 6.7.1(d) Lack of formalization of the taxi industry Most permits issued prior to 2001 were radius permits, allowing the permit holder to operate on any route within a specific radius of the origin. This results in duplication of services and contributes to violence on routes shared between taxi associations. Guidance with regards to the formalisation of the taxi industry through the proposed Permit Conversion Process and Taxi Recapitalisation Process is imperative within the public transport industry. 6.7.1(e) Cost of Public Transport Services Given the low levels of household income within the Waterberg region, it is vital to keep fares to a minimum. However, only a few bus routes are subsidised, hence the bulk of the population within the region is paying a premium for making use of public transport. 144 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.7.2 Service Coverage Public transport coverage is relatively good, despite the poor condition of roads and public transport infrastructure. However, many of the schools, clinics and other recreational areas in the rural areas of the district still remain in accessible and public transport services are not provided for these facilities. Passengers, although being dependent upon public transport as their only means of mobility in rural areas, generally have a negative perception of the public transport industry, mainly due to the problems listed above. 145 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DISASTER MANAGEMENT PLANNING 146 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.8. DISASTER MANAGEMENT PLAN Disaster Management arrangements are designed to: Deal with all hazards. While most attention is given to the obvious emergencies such as fire and transport accidents, a wide range of hazards could be dealt with using disaster management arrangements and resources. This might include emergencies for which there is little or no experience in the Limpopo Province, such as earthquakes or environmental emergencies. Be integrated. (Involve all people and relevant agencies). The management of emergencies is a shared responsibility involving many people and organizations in the community. It is not something done by one sector of the community to or for the rest of society, although some organizations have specialist roles of this kind, viz; o Private sector organizations are often involved when their services and resources are needed for prevention, response or recovery activities, or where emergencies affect their buildings, equipment, personnel, suppliers or customers. o Individual members of the community are also responsible for taking preventative, protective and restorative actions in their own and community’s best interests. o Government departments and Voluntary Organizations are also playing a major role in disaster management. Be comprehensive. (Cover prevention, response and recovery). Prevention response and recovery are all important aspects of disaster management, and each should be explicitly addressed in the arrangements. 6.8.1 Approach It is imperative that comprehensive contingency plans be drawn up. For this the commitment of all likely role players has to be ensured. There are two legs for such contingency planning, namely; Humanitarian aid co-ordinated by Disaster Management; and The Safety and Security leg (SANDF and SAPS). The humanitarian aid concentrates on the physical, social and mental well being of te individual. Disaster Management on this plain of operation strives to protect human life and to ensure the dignity of the individual. 147 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The following possible disasters were identified: Refugees; Epidemics; Explosions; Extreme weather e.g. strong winds, droughts, floods, etc; Hazardous material; Aircraft crashes; Fire, (veldt fire); Transport; Power; and Nuclear waste. Consideration will be given to the five most likely occurrences of the above in the next twenty months. No contingency guidelines were considered for the following as it lies within the mandate of the SANDF and SAPS: Riots; Terrorism, hijacks, hostage and bombs; and Faction fights. Disaster management and other departments will act in an supportive role in the event that any of the above mentioned three scenarios might occur. 6.8.2 Aim of the Contingency Plan The aim of the contingency planning is to be able to handle a disaster situation ensuring essential needs satisfaction regarding security (social and mental), shelter, education, water, food, health, psychological services and sanitation. 148 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 From the above it is clear that there is a holistic management approach and that the interactive relationship between all those involved is of paramount importance. The idea that any line function is more important than another is therefore disregarded. Team play will be the basic approach without interference in any line function. To achieve this Disaster Management will play the co-ordinating role. 6.8.3 Interdepartmental Joint Planning Factors There are specific factors that need to be taken into account by all involved Departments. These factors will have a definite influence on any planning and therefore it needs to be addressed when planning for the execution of any or probable tasks, viz: Specially trained personnel (e.g. consultants, engineers, medical practitioners, etc.) Finances – internal budgetary constraints need to be addressed as well as the consideration of external, private, national and international contributions. The remuneration of personnel with regard to overtime and other special allowances also need to be taken into account. Corporate communication plan. Departmental corporate communication specialists need to liaise to set up a predetermined media liaison plan. The influence of traditional leaders. The problems that might arise due to an ethnic diversity. The need for inter departmental liaison e.g. mutual aid agreements Exposure of personnel to adverse working conditions Post trauma stress disorder counseling for personnel Joint training and exercises The execution of the tasks for disaster management prevention, response and rehabilitation by; o Relevant Provincial Departments o District Municipalities; and o Local Municipalities. 6.8.4 Findings After careful evaluation of the ten listed disaster scenarios it became quite clear that the following five disaster scenarios have an above average chance to manifest during the next twenty months, namely: Influx of Refugees; 149 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Epidemic(s) Extreme weather incident(s) i.e. floods, strong winds, droughts, etc.; Hazardous materials incident(s); and Fire The manifestation of the above five will significantly increase the chances of the other five of occurring. It also became clear that the most dangerous situation would be if any two or more of the above five would manifest simultaneously at any one point in time. 6.8.5 Incidents of noting during 2006 – 2007 1 house destroyed in a runaway veld fire on 18 January 2007 in Morwe Village – a child of eight years old was seriously burnt. 14 families had the roofs of their homes damaged by a storm in Mapela on 06 May 2006. 6.8.6 Conclusion From the above it is clear that a concerted and co-ordinated effort by all municipalities and departments is the key to success in the handling of a protracted emergency or disaster situation. A Comprehensive Disaster Management Plan will be developed within a period of 1 (one) year outlining the processes, procedures and mechanism for addressing individual/specific disaster situations. 150 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 FIRE FIGHTING SERVICES 151 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.9. FIRE SERVICES Legislative Requirements Municipal Structures Act 117 of 1998. Fire Brigade Services Act 99 of 1987 SABS Building Regulation 0400 1999 Since improvement of fire service delivery to vulnerable communities is an ongoing objective of the Waterberg District Municipality, the IDP review process ensures that, through the provision of effective fire services, fire risks and losses are being reduced. Community Vulnerabilities Urban communities are faced with fire risks, which include formal and informal buildings as well as hazardous material type fires. Poor building materials and poverty exposes the informal structure dwellers to high fire risk. Rural: The nature of heat sources to sustain livelihood by rural communities places people at risk. The examples of these risks are veld fires, thatched roofs, cooking fires and lightning. Waterberg District Municipality is not directly rendering fire-fighting services; but provisions are made annually for the operational and capital budgets to enable the local municipalities to render the services on behalf of the District through the signed Service Delivery Agreements. The fire fighting services became the District function from the 01st July 2003. 152 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 BACKGROUND Waterberg District Municipality is not directly rendering fire fighting services; but provisions are made annually for the operational and capital budgets to enable the local municipalities to render the services on behalf of the District through the signed Service Delivery Agreements. The fire fighting services became the District function from the 01st July 2003. The operational budgets for 2006/07 were approved by Council as follows: 1. Mogalakwena Municipality =R1 774 100 2. Lephalale Municipality =R1 243 970 3. Thabazimbi Municipality =R 162 960 4. Bela-Bela Municipality =R 575 170 5. Modimolle Municipality =R 384 465 6. Mookgopong Municipality =R 454 145 MOGALAKWENA MUNICIPALITY The fire fighting services in Mogalakwena is rendered by 14 personnel (traffic/fire officers), please note that currently there is no permanent dedicated fireman and the station is operating for twenty four (24) hours seven (7) days a week. These identified traffic officials are multi-skilled up to predetermined level of proficiency. This well equipped fire station was constructed previously by the local municipality and is in possession of fire equipment and/or vehicles at their use. i.e. Heavy load water tanker, Old John Bean, Outdated Pathfinder, Rapid Intervention Vehicle (Dyna), Unimoq water tanker, Bakkie with fire trailer. Serious consideration needs to be put in place for the replacement of other old fire vehicles. It should also be noted that some fire fighting equipment are outdated. The first turnout fire engine for all building fires has been commissioned firstly in 1972 (John Bean). Some times ago an old air-crash tender (pathfinder) was purchased for its ability to carry large quantities of water; this was all that they could get due to budgetary constraints. This however was not a good idea as maintenance of this fire vehicle is totally impractical. Mogalakwena was allocated with 37 disaster tents and 15 blankets during 2006/07 financial year. 153 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LEPHALALE MUNICIPALITY Fire fighting service is currently rendered by Kumba Resources on behalf of Lephalale local municipality and they are only responsible for 40km’s radius. As a result vulnerable/exposed (poor) rural communities are without the services. The District has initiated the construction of Lephalale local Disaster Centre and the progress on site is at 65%. The District has terminated the contract due to the fact that the Contractor was experiencing some cash flow problems, defaulting etc. The District had commissioned a heavy load water tanker, vehicle and fire trailer for the new centre. Operational budget provisions are also made for the purposes of personnel recruitment and currently the municipality does not have dedicated personnel for rendering this function. Lephalale was allocated with 30 disaster tents and 14 blankets during 2006/07 financial year. MOOKGOPHONG MUNICIPALITY There is also no permanently appointed fire fighting personnel in Mookgophong. Three quarter of the fire station is permanently occupied by the Waterberg Emergency Medical Services and Mookgopong Cancer Association. The fire fighting equipment are outdated and needs to be replaced. They apparently follow the same modus operandi as Mokopane and the other towns by utilizing traffic personnel to render services on a standby basis. The District had upgraded the entire building for the purposes of ensuring the smooth operations. Mookgopong was allocated with 15 disaster tents and 10 blankets during 2006/07 financial year. MODIMOLLE MUNICIPALITY A beautiful complex is in the process of being completed (99%) for emergency services. The location for this site was also very well chosen. When completed it should be very well functional with almost all the role players in the emergency environment under one roof. This should be if the personnel, fire vehicles and other fire equipment can be correctly addressed and should this facility be managed correctly it could become a fine example for emergency services in the Limpopo Province. 154 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Once again there are no skilled and trained personnel employed and also the traffic personnel are required to perform basic fire services on a standby basis. The fire vehicles and equipment are outdated needs replacement and the District currently commissioned a heavy load water tanker, vehicle and a fire trailer. Modimolle was allocated with 22 disaster tents and 12 blankets during 2006/07 financial year. BELA- BELA MUNICIPALITY The situation at Bela-Bela is more or less the same as that of its neighbouring town, Modimolle. Also traffic officials are rendering the service on a standby basis. The fire vehicles and equipment are outdated needs replacement and the District currently commissioned a heavy load water tanker and a fire hand drawn trailer. The District had upgraded the entire building for the purposes of ensuring the smooth operations. Bela-Bela was allocated with 20 disaster tents and 12 blankets during 2006/07 financial year. THABAZIMBI MUNICIPALITY The fire vehicles and equipment are outdated needs replacement and the District currently procured for the Rapid Intervention Vehicle. Budget provision is made in favour of upgrading the station during 2007/08 financial year. The traffic personnel are required to perform basic fire fighting services on a standby basis. Thabazimbi was allocated with 20 disaster tents and 12 blankets during 2006/07 financial year. CONCLUSION The said local municipalities above are submitting their monthly operational claims to be paid by the District Municipality. The operational budget for 2007/08 made provision for the recruitment of additional fire fighting personnel 155 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SOCIAL CLUSTER ANALYSIS 156 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SPECIAL PROGRAMMES 157 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.10 SPECIAL PROGRAMMES In recognition of the need to integrate marginalised communities, Special Programme Unit for the facilitation of the integration and mainstreaming process must be introduced in Waterberg.. Much work was done on an adhoc basis by the local municipalities in this regard but was more focused on campaigns rather than economic development programmes. As Statistics South Africa confirms, young people constitute the majority of the population of the Waterberg District, (StatsSA 2001). Women account for 52% of the district’s population (StatsSA 2001). In spite of the above reality, young people and women have not been the key beneficiaries in the economic mainstream of the district. A District Youth Plan and its implementation plan must be developed. Whilst there are organisations representing disabled people, the reality that faces the district is that disabled people are not integrated into the district municipality’s implementation plan. This has led to low economic development opportunities for disabled people. A survey must be conducted by Waterberg to develop the Disability Plan. The Waterberg District needs to facilitate this process through the implementation of the Disability Plan for the purposes of moving faster in resolving problems faced by disabled people. Children in the district also bear the brunt of disorganisation. The Waterberg District should embark in the process of establishing a junior council which will be the pace setter for the development of the children’s development framework that will promote the participation and consultation of children. As a sector plan, the Special Programmes Strategy sets the framework for the integration and mainstreaming of all the designated groups. Funding needs to be availed for the implementation of the strategy through the integration of programmes and projects of all clusters and sector plans of the Waterberg District. 158 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SAFETY AND SECURITY OVERVIEW 159 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.11 OVERVIEW OF CRIME Crime prevention was identified as one of the district – wide priorities. Presently two out of four Municipalities in the district has identified crime as a priority in their IDP. The other Municipalities are silent on crime prevention despite the fact that Waterberg is a tourist area. Out of 21 prioritised Police Station in Limpopo, Waterberg District Municipality has three, namely: Mahwelereng; Mokopane; and Bela-Bela. These Police Stations contribute to high crime rate in the Province. Mahwelereng Police Station contributes a high number of contact crimes in the whole country. There are twenty-seven (27 Police Stations in the district Municipality.unfortunately some of these Police Stations are not in line with municipal boundaries, for example: Police Stations in Capricorn fall within Waterberg District Municipality and some Police Stations in Sekhukhune falls within Waterberg District Municipality. Crime Prevention goes beyond the provision of Police Stations and Police Services. It implies that the broader community in collaboration with all spheres of government has to be partners in crime prevention. 6.11.1. Most Prevalent Crimes in Waterberg Stock theft Robbery with weapon other than firearm Theft of motor vehicle Indecent assault Attempted murder Burglary Robbery aggravating Source: SAPS, District, 2006 160 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.11.2. Identified possible causes of crime • Unemployment • Poverty • Inadequate or inaccessible policing • Alcohol and drug abuse • Lack of sporting and recreational facilities, lack of skills, and low self-esteem • Moral degeneration and break-down of family structures, rapid and uncontrolled urbanisation The information as on the chart below span over two (2) Quarters namely the Second Quarter (July – September 2006) and the Third Quarter (October – December 2006). 161 PERFORMANCE CHART WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Quarter 2 – 2006/2007 (July, August & SeptembeTheft (Other)r 2006) Decreasing/Equal Priority Crimes Crimes % Down Crimes Attempted Murder Attempted Theft of Motor Vehicle and Motorcycle Burglary (Excluding Residential Premises) Theft Off/from Motor Vehicle Common Robbery Assault common Assault Gbh Fraud Theft (Other) Murder Attempted Robbery: Aggravated: with Fire-arm Attempted Theft (Other) Crimes -40.48 -30 -22.45 -10.11 -9.9 -8.97 -5.57 -4.17 -0.94 0 0 0 Theft of All Stock Robbery with Weapon Other Than Firearm Theft of Motor Vehicle and Motor Cycle Indecent Assault Burglary (Houses) Robbery Aggravating Arson Malicious Damage to Property Shoplifting Rape Quarter 3 - 2006/2007 (October, November & December 2006) Decreasing/Equal Priority Crimes % Down Crimes Attempted Murder Arson Attempted Burglaries (Business) Attempted Theft of Motor Vehivle and Motor Cycle Murder Shoplifting Theft of All Stock Rape Theft Off/from/Off Motorcycle Common Robbery Attempted Robbery: Aggravated: with Fire-arm Attempted Theft From/off Motor Vehicle Source: SAPS, District, 2006 -50 -34.78 -33.33 -25 -23.91 -17.95 -10.17 -7.36 -2.38 -0.58 0 0 Indecent Assault Attempted Murder Burglary (Excluding Residential Premises) Robbery Aggravating Burglary (Houses) Fraud Theft of Motor Vehicle and Motor Cycle Assault Gbh Robbery with Weapon Other Than Firearm Malicious Damage to Property Theft (Other) Assault (Common) % Up 63.64 61.11 41.82 35.71 22.31 20.59 16 12.1 11.36 9.4 % Up 40 34.48 27.66 25.81 12.17 7.5 5.63 5.03 4.65 3.5 2.15 2.06 162 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHALLENGES: Illegal operation of unlicensed shebeens and taverns Monitoring of proper utilsation of licenses and permits issued to liquor sellers Access to certain crime scenes due to bad conditions of roads Lack Street lighting in most streets in rural and urban/informal settlements Ineffective operation of Community Policing Forums Crime awareness and substance abuse Domestic violence,( women and child abuse) Stock theft Robbery Burglary Untimely response by SAPS to crime scenes Access to police service in rural areas 163 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 HEALTH SERVICES OVERVIEW 164 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.12. HEALTH Co-ordination of health services should take place at district level where different health rendering authorities should formulate a plan called the District Health Plan which should be linked to the district municipality’s Integrated Development Plan. The plan sets out the goals and strategies that will enable the health district to best meet the health needs of its population and includes details of the funding allocated for implementation. 6.12.1.1 Health Priorities PROVINCIAL, DISTRICT AND LOCAL MUNICIPALITIES SPECIFIC COMMUNICABLE AND NON-COMMUNICABLE PRIORITIES Provincial District Bela-Bela Lephalale Modimolle Mogalakwena Mookgophong Thabazimbi HIV/AIDS Tuberculosis Pneumonia Malaria Cancer Food poisoning HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal Meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension HIV/AIDS Tuberculosis Agricultural Poisoning Meningo – coocal meningitis STI Hypertension Source: Dept of Health, 2007 NB: Tuberculosis – HIV/AIDS link is the major cause of death Tuberculosis is the major notifiable condition in the Waterberg District 165 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROVINCIAL, DISTRICT AND LOCAL MUNICIPALITIES PHC PRIORITIES Provincial HAST Communicable & communicable diseases Maternal Care Malaria Life style diseases (Chronic Diseases) MVA/ Assaults non District HAST Hypertension Bela Bela HAST Hypertension HAST Hypertension HAST Hypertension HAST Hypertension HAST Hypertension HAST Hypertension Diabetes MVA/ Assaults Chemical poisoning Diabetes MVA Chemical poisoning Diabetes MVA Assaults Diabetes MVA Chemical poisoning Diabetes MVA Assaults Diabetes MVA Assaults Diabetes MVA Assaults Mental Illness & substances abuse Mental Illness Mental Illness & substances abuse Mental Illness Mental Illness & substances abuse Mental Illness Mental Illness substances abuse Mental Illness & substances abuse Mental Illness Mental Illness & substances abuse Mental Illness Mental Illness & substances abuse Mental Illness Lephalale Modimolle Mogalakwena & Mookgopong Thabazimbi Data Source: Provincial Annual Performance Plan , Provincial and District Annual Report Narrative on the District Health Priorities: Informal settlements at Bela Bela, Modimolle, Thabazimbi, Lephalale and Mookgopong influence health conditions e.g HAST Chronic conditions e.g. hypertension and diabetes in all municipalities Chemical poisoning prevalence high at Modimolle and Thabazimbi 166 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 2005\06 2006/07 Target CD4 Testing Rate 1 1 976 - 36.8 40.0 1 1 1 1 1 499 69.23 - 93.98 100 2006/07 Target 2005\06 No. of people assessed 2004/05 Ellisras 1 1 George 1 1 Masebe Mokopane 1 1 Thabazimbi 1 1 Amandebult 1 1 Warmbaths 1 1 Witpoort 1 1 Source: Dept of Health, 2007 Number of accredited sites that are functional 2006/07 Target 2006/07 Target Number of accredited sites 2005\06 Hospitals Accredited Sites For The Comprehensive Plan For Hiv And Aids Care, Management And Treatment (Arv Program) – Trends and Targets 2005\06 6.12.1.2. - NB: There are eight hospitals and only seven are accredited. Some hospitals have structural problems. 167 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.12.1.3 Number of Public Health Sector Facilities By Type And Authority (Pdoh & Lg) Visiting Points Local municipality Bela Bela 2005/06 2006/07 2007/08 Lephalale: 2005/06 2006/07 2007/08 Modimolle 2005/06 2006/07 2007/08 PDoH LG Mobiles PDoH 123 123 133 3 2 3 60 80 85 5 6 6 417 417 422 6 5 6 Satellite Clinics LG PDoH 1 LG Fixed Clinics PDoH LG CHCs PDoH District Hospitals LG Number Any other Hospital providing level I Care Number # of Beds # of Beds3 2 3 4 2 - 4 6 6 2 2 2 2 124 124 124 1 3 3 2 1 1 1 122 122 122 1 1 1 133 133 133 ( 1) 20 Spesialised Mogalakwena 2005/06 2006/07 2007/08 Mookgopong 2005/06 2006/07 2007/08 Thabazimbi 2005/06 2006/07 2007/08 DISTRICT 3 312 312 322 10 12 14 23 24 26 1 145 146 150 2 2 3 0 3 3 3 144 144 154 4 5 6 3 8 8 3 2 2 2 1 1 223 223 223 1 1 1 254 254 254 0 0 0 1 1 1 55 55 55 Number of Beds refers to usable or functional or active beds per hospital 168 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TOTAL 2005/06 2006/07 2007/08 1201 1221 1266 30 32 38 0 0 0 1 0 0 0 0 0 33 47 50 13 0 0 1 1 1 6 6 6 657 657 657 2 2+1 2+1 387 387 387 6.12.1.4. District Primary Health Care and Hospital Services Per Population Local municipality Total Population4 Estimated Population per Facility Type and District Hospital Bed5 Non-Fixed Facilities 3285 Fixed Clinics 36875 CHC Bela Bela 55506 Lephalale Modimolle Mogalakwena 102822 89908 313305 15814 22016 37387 73196 45513 237007 Mookgopong Thabazimbi Provincial Hosp Total DISTRICT TOTAL 42922 67921 5693 19776 n/a 2635 44382 16337- 672383 103971 439608 16337 District Hospital 16120 15544 19195 District Hospital Beds 133 124 122 George Masebe 260, Voortrekker 91, Mokopane -254 10068 55 387 60927 652 District Hosp Source of Data: DHIS, Prov and District Annual Report Narrative: Population in farming areas moved. Seasonal workers used in some farming areas 4 Population should be those of the resident people within the local municipality and district. Cross reference to the DHIS is crucial and deviations to the data captured on the provincial database will need to be clearly explained. Any major cross boundary flow of patients should be explained in text. 5 Estimated population per facility type. You may calculate per facility per local municipality if considered more relevant. Fro the District Average row, calculate average across local municipality. 169 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CHALLENGES: The devolution of municipal health services Access to ARV services district wide Vacancy rates of professionals at hospitals Access, utilization of VCT, care and support services Improvement of conditions in rural hospitals and clinics Impact of HIV/AIDS on the working force w.r.t public servants NGO involvement in departmental programmes Compliance with the legislation pertaining to healthy meat production by the abattoir 170 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 OVERVIEW OF EDUCATION SERVICES 171 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.13. Education MUNICIPALITY TYPE OF SCHOOL SEC SPECIAL PRIMARY BELA-BELA LEPHALALE MODIMOLLE MOGALAKWENA 3 28 7 104 1 0 1 0 20 77 56 167 COMBIN ED 6 8 14 13 MOOKGOPHONG THABAZIMBI 3 5 0 0 16 41 150 2 225 TOTAL LEARNERS FET TOTAL EDUCATORS FEMALE MALE FEMALE LEARNERS PER EDUCATOR RATIO ACCEPTABLE RATIO: 1:35 – SECONDARY 1: 40 – PRIMARY SCHOOLS WITH NO. OF CLASSRO OMS ELECT MALE WAT SAN 0 1 0 1 30 114 78 285 5 680 18 912 8 604 54 135 5 754 15 830 8 309 54 867 191 726 337 1 919 127 558 193 1 461 36.0 27.1 27.0 32.2 485 1 086 582 173 25 83 53 205 27 72 34 159 29 97 74 234 5 2 0 0 24 48 2 853 4 092 2 587 4 394 127 195 68 91 28.0 30.0 2418 303 11 27 15 36 22 41 48 2 579 94 276 91 741 3 495 2 498 31.0 5 047 404 343 497 Source: Department of Education, 2007 There are a total number of 30 schools in Bela-Bela municipal area. From the said total number of schools 25 have electricity whilst 27 have access to clean water. One (01) school require sanitation, 03 still require to be provided with water services whereas 05 need to be electrified. The learner teacher ratio was recorded at 36.0 (which means on average each teacher handles 36 learners per class). In Lephalale municipal area 83 schools have access to electricity whereas 72 have access to water. Out of 114 schools, only 97 have access to sanitation, which mean that there is a backlog of 17 schools that need sanitation, 31 require electricity and 42 needing water provision. The learner per educator ratio accounts for 27.1 learners per educator on average. There are more female learners attending school than male learners. The number of female educators is higher than that of male educators. Modimolle has 53 schools that are electrified and 34 that have access to water supply. With 78 schools, 74 have sanitation facilities. The status regarding schools with basic services indicates a need to still supply 25 schools with electricity, 44 with water supply and 4 with sanitation services. There is a high number of female learners as compared to male learners. The indications are further that there are more female educators than their male counterparts. Learner-teacher ratio is at 27.0 learners per class. 172 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 There are schools in the 285 Mogalakwena municipal area. A total number of 159 schools have access to water supply. Only 205 schools have access to electricity. From the total number of schools, 234 schools are recorded to be having sanitation facilities. There is a further need to provide 80 schools with electricity, 126 require water supply whereas 51 still need to be provided with sanitation facilities. There are more male learners than females. The female educators outnumber their male counterparts. The learner-teacher ratio is at 32.2 per class. Mookgophong has a total number of 24 schools. Fifteen (15) schools have water supply and 11 having access to electricity. With 23 schools, 22 have sanitation facilities. There is still a need to provide 13 schools with electricity, 09 with water supply and 02 with sanitation facilities. The female learner s outnumbers male learners. There are more female educators than males. The learner per educator ratio is at 28.0 per class. Thabazimbi has 48 schools in total. From the total number 41 have access to sanitation and 36 having access to water supply. Only 27 schools have access to electricity. The implication is that 21 schools still require electricity, 12 with water and 07 with sanitation services. The male learners dominate the females. The teaching profession in this municipal area is female dominated. The learner per educator ratio was recorded at an average of 30.0 learners per class. 173 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 MATRIC RESULTS 2005 – 2006 NAME OF SCHOOL BELA BELA LOCAL MUNICIPALITY 2005 (%) 2006 (%) BELA-BELA MAOPE WARMBAD 32.2 30.4 100 29.38 38.88 98.68 MODIMOLLE LOCAL MUNICIPALITY LESEDING MEETSETSHEHLA MOSHIA MOHLAKAMOTALA NYLSTROOM PHAGAMENG SETTLERS 52.6 100 61.9 98.2 98.9 44.3 100 76.47 98.78 72.22 100 100 50.48 98.68 MOOKGOPHONG LOCAL MUNICIPALITY HANS STRIJDOM MAKHUTJISHA ROEDTAN 97.4 50.6 54.5 95.59 46.23 78.57 THABAZIMBI LOCAL MUNICIPALITY GROENVLIE FRIKKIE MEYER MABOGOPEDI NALETSANA NORTHAM COMP 100 99.2 68.9 66.6 88.88 100 23.23 0 68.57 LEPHALALE LOCAL MUNICIPALITY BAITSWE BATLHALERWA 100 68 100 55.74 NAME OF SCHOOL 2005 (%) 2006 (%) DIAMONA DIMPE DINOKO ELLISRAS 100 90.9 81.1 99.1 80.95 96.0 76 98.31 174 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KODUPO LETUPU MAJADIBODU MALEBO MANANYE MATHULASERA MATSHWARA MATSIABABA MAZWE MMAY MOKONONKWENOKO MORAKOLO MOTLHATJWA MPEDI MPHARI PHEGELELO RABODITSE RADINONG RASERITE SEOKETSENG SEPHUTI SETHULA THABANG TSHIRELETSO 100 100 81.7 69.6 89.1 100 87.7 79.2 82.4 68.9 76.8 100 96 54.8 57.7 82.5 78.6 62.1 82.8 77.3 42.5 81.3 100 78.9 90.91 100 52.35 51.61 69.73 63.16 64.18 28.57 24.29 60.87 86.21 96.67 90.32 84.62 38.46 76.0 92.31 50 53.85 84.62 50 88.88 100 96.15 MOGALAKWENA LOCAL MUNICIPALITY BAKENBERG BATHOKWA 58.5 54.3 36.12 34.0 NAME OF SCHOOL 2005 (%) 2006 (%) CHARLES MARAKALALA DENIS MATLHABA II GEORGE LANGA GEORGE MASIBE JM GWANGWA JOHN MANGANYE KGAUBOTLALE KGAKGATHU KGOKARI KGOLODI 42.4 48.9 26.1 80 85.7 59.1 26.3 53.57 62.7 59.63 31.92 39.79 34.23 66.67 30.76 66.67 57.14 42.85 60.37 30.14 175 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KOLOBE RAMOSOBANA LAMOLA LEMETJA LAPHADIMISHA MAFASA MALEMOCHA MASHAMAITE MASHOBELA MASHUBASHUBA MATATANE MATHULAMISHA MATOPA MATSOGELLA MMAMOPI MOKGALAKA-MOLEMOLE MOOKAMEDI MPADI MAWELE NAKONKWETLOU NKORU NKUBE NTHUBA PALEDI 81.6 55.88 96.77 41.6 64.29 23.6 76.24 76 90.48 46.7 70 74.7 57.9 90.91 100 73,9 85.71 48 100 83.7 37.3 56.74 78.38 27.27 61.53 43.75 30.43 68.57 49.42 60.0 70.96 57.89 55.0 83.33 38.36 45.68 100 0 57.14 20 61.29 70.27 51.11 86.21 46.59 32.43 NAME OF SCHOOL 2005 (%) 2006 (%) PHAHLA PHAHLA PIRWANA PT MATLALA RAKUKUBANE RAMOLLWANA RALELEDU SEGOBOKO SENWANE SERAME SESHOATLHA SESHOKA SEWELABATHO SIYAKHALENI TLOU MATLALA MPHOKENG 40 77.27 54.54 36.2 84.1 74.29 72 61.5 80.5 45.2 58.4 60 61 75.34 76.47 60 67.65 49.15 39.68 72.73 75 28.57 31.25 8.56 31.15 25.71 32 33.33 75 42.86 176 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 MOTJERE KUDUSHE NKOBO TSHEBEDI AB MAKAPAN AC SPORT EXC BEN HLONGANA DG TSEBE EBENEZER EDL RAMPOLA FRED LEDWABA HIGH GOBELA GOJELA HEBRON MODEL SCHOOL JOHN PETRO KGABA KGATHI YA MOSHATE LANGALIBALELE 77.46 77.42 72.97 95 66.3 2.2 65.9 85.7 88.8 67.25 68.1 61.5 42.2 92.3 38.6 41.1 51.2 16.98 70.11 53.13 26 81.25 35.83 10 35 69.23 85.71 80.43 54.55 34.78 68.70 92.98 19.41 32.47 43.12 40 NAME OF SCHOOL 2005 (%) 2006 (%) LEKWA LELESO LETAMONG MADIKWE MAKGENENE MALEYA MAPANOLLA MASS MOJA MASERUNYANE MASODI MATANTA MATSIBE MC LANGA MADIKANA MMANTUTULE MMATEDU MMOLAWA MOKOTLI-NTLAKANA MPIRWABIRWA MPUNYE 47.2 75.0 2.2 24.1 81.8 74.1 29.1 57.6 43.8 57.6 63.6 31 48.2 85.5 68.8 79 47.5 83.4 51.6 32.9 45 34.48 52.17 25.69 36.11 65.62 54.29 31.03 51.25 56.25 45.0 42.19 63.16 82.80 55.83 66.18 82.57 78.91 48.15 30.26 177 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 NKAKABIDI NTATA NORTH CREST PIET POTGIETER RAMOGABUDI SAINT THOMAS SEKOBA SERITARITA SOMAVUGHA STERKRIVIER TETEMA TJITJILA WATERBERG 88.8 55 27.02 100 100 38.46 74.2 47.6 55.6 73.6 65 55.2 97.4 71.25 33.68 62.86 97.52 93.15 42.86 14.71 65.45 33.66 15.38 61.63 41.18 97.14 NAME OF SCHOOL 2005 (%) 2006 (%) WEENEN 85.7 79.31 TOTAL WATERBERG DISTRICT MUNICIPALITY 63.11% 55.5 % Source: Dept. of Education, 2007 CHALLENGES: Provision of water, sanitation and electricity to needy schools Provision of additional classrooms Addressing gender imbalances among educators district wide. Curricula of FET’s to be demand orientated (e.g economic development) Partnership between locals, private sector and FET’s on skills development 178 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SOCIAL DEVELOPMENT OVERVIEW 179 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.14. Social Development 6.14.1. Information On Beneficiaries In Receipt Of Social Grants Within The Waterberg District Municipal Area LOCAL MUNICIPALITY MOGALAKWENA BELA BELA MODIMOLLE LEPHALALE MOOKGOPHONG THABAZIMBI OLD AGE 23955 1845 2315 4317 871 1825 35128 DIS 7200 956 1283 2167 340 1048 12994 WAR VETERAN COMB GRAND IN AID 20 1 3 8 1 4 37 7 2 2 7 1 3 22 146 19 13 36 3 6 223 FOSTER CARE BENEFICIARIES 1270 287 324 377 71 161 2490 FOSTER CARE CHILDREN CARE DEPENDENCY BENEFICIARIES CARE DEPENDENCY CHILDREN CHILD SUPPORT BENEFICIARIES 1966 455 534 592 104 250 3901 433 43 74 113 23 57 743 447 45 79 120 24 61 776 39842 4038 7650 10509 2655 4927 69621 CHILD SUPPORT CHILDREN 71312 7081 14049 19267 4704 8403 124816 TOTAL BEN 72873 7191 11664 17534 3965 8031 121258 CHILDREN 73725 7581 14662 19979 4832 8714 129493 TOTAL Source: Department of Social Development, 2007 NB: Combination refers to people who are getting Old Age Grant and Child Support Grant. Grand in Aid refers to Old Age people who are at home not housed in an old aged institution. Care dependency Grant refers to people with disability from 18 years old. Old Age - Mogalakwena Local Municipality (23 955) has the highest number of people receiving Old Aged pension, followed by Lephalale Local Municipality (4 317) and Modimolle Local Municipality (2315) and Mookgophong Local Municipality is the least with a total number of (871). BelaBela Local Municipality has (1845) pensioners while Thabazimbi Local Municipality has (1 825) people receiving old aged pension. The total number of people receiving Old Aged pension in Waterberg District Municipality is (35128). Disability - Table 5.1 outline the number of people with disability per local municipality within the District. It is evident from the table that (12994) people receive disability grants in the district. War Veterans - There are (37) people-receiving aid as War Veteran in the whole district. Number of 180 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 people receiving Grand in Aid is (223). For Forster Care Grant Beneficiary there are (2490) people in number and Forster Care Grant Children is (3901). Child Dependency Grant Beneficiary there are (743) and Child Dependency Grant Children are (776). For Child support Grant Beneficiary they are (69621) in number and Child Support Grant Children are (124816).Total number of beneficiary is (121258) and total number of children is (129493). The conclusion that could be derived from the above table is that a total number of 124816 (2006 was 117 382) receive social grants and can thus be declared economically inactive. The said number account for a total population of (20.3%) (2006 was 19.1%) district wide. 6.14.2. Emergency Food Security Programme MUNICIPALITY THABAZIMBI SUB-TOTAL BELABELA SUB-TOTAL DISTRIBUTION POINT 190 52 242 DISTRIBUTION CENTRES REGOLOGILE NORTHAM NUMBER OF BENEFICIARIES 190 52 242 195 73 268 BELABELA COM HALL PIENARSRIVER 195 73 268 180 27 PHAGAMENG COM HALL ALMA MOSHIA HIGH VAALWATER LESEDING COM HALL 180 27 MOKGOOPONG COM HALL THUSANG(ROETAN) COM HALL 226 59 285 MODIMOLLE SUB-TOTAL 112 319 MOKGOOPONG SUB-TOTAL 226 59 285 112 319 181 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ABBASPOORT SHONGWANE SELEKA WITPOORT 95 108 135 60 398 MAHWELRENG WELFARE 152 MOGALAKWENA 1 SUB-TOTAL MAPELA 69 221 MOGALAKWENA 2 BAKENBERG MAKOBE TRIBAL HALL TAUEATSWALA TRIBAL HALL 70 101 96 267 LEPHALALE SUB-TOTAL 95 108 135 60 398 SUB-TOTAL TOTAL 2000 2000 Source: Dept of Social Development, 2007 Note: The food parcels contain the following: 1X 5kg dried beans,1X 5kg Sugar,1X 2,5kg Samp,1X1kg Full Milk Powder,1X1kg Soya mince 1X1kg Iodised salt, 1X 800g Soup, 1X810g Peanut butter, 1X2 litres sunflower oil,100x1, 5kg tea bags, 2X 500g Washing powder, 4X125g bath soap & 2X25kg maizemeal. 182 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.14.3. Integrated Social Development Services to replace emergency food security program. ALLOCATION OF FOOD PARCELS MUNICIPALITY Bela –Bela Lephalale Modimolle Mogalakwena Mookgophong Thabazimbi TOTAL POVERTY LEVEL 40.9% 60.6% 48.3% 60.6% 42.2% 52.3% ALLOCATION 268 398 319 488 285 242 2000 Source: Dept of Social Development, 2007 CHALLENGES: Recruitment of foster parents for fostering of orphans Sustainability of social development projects Involvement of all relevant stakeholders in the off-loading of beneficiaries Service delivery to the disadvantaged in rural areas Staff turn over 183 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 GOVERNANCE AND ADMINISTRATION CLUSTER ANALYSIS 184 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 HUMAN RESOURCES AND ORGANISATIONAL MANAGEMENT 185 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 16.5 MANAGEMENT ORGINASATIONAL STRUCTURE Municipal Manager Manager: Corporate Services Manager: Social Services Manager: Technical Services Manager: Planning & Economic Development Chief Financial Officer Office of Executive Mayor Assistant Manager: Legal Services Assistant Manager: Social Services Assistant Manager: Roads and Stormwater Assistant Manager: LED Assistant Manager: Expenditure Assistant Manager: Community Participation Assistant Manager: Capital Program Assistant Manager: Development Planning Assistant Manager: Income Executive Assistant Assistant Manager: Human Resources 186 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1 SWOT ANALYSIS OF VARIOUS MUNICIPAL FUNCTIONS PER DEPARTMENT 6.15.1.1. NAME OF DEPARTMENT: INFRASTRUCTURE DEVELOPMENT PRIORITY ISSUES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. WATER , SANITATION AND DROUGHT RELIEF 2. ROADS AND STORMWATER 3. ELECTRICITY CO-ORDINATION SWOT ANALYSIS NATIONAL KPA MUNICIPAL FUNCTION STRENGTHS WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION 187 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 BASIC SERVICE AND INFRASTRU CTURE DEVELOPM ENT Water & Skills, sanitation expertise, operational budget and transport resources are available for co-ordination purposes. HR capacity to respond to invitation for co-ordination is limited by number of staff. Support from National and Provincial Government in coordinating water and sanitation activities. Waterberg DM has a district eye-view of opportunities and potentials, to avoid local vested interests. Central provision of problem solving models Insufficient Skills and expertise at LMs regarding water and sanitation development. There is not enough water and financial resources to meet the demand at LMs. Non-attendance of meetings by LMs Separate functions on water and sanitation activities at LM levels as opposed to the District level. The District need to separate the water and sanitation coordination activities. The WSA status residing at the LM levels is negative towards the potential of the District to take advantage of District-wide opportunities and potentials. HR component need to be increased (create separate posts for water and sanitation co-ordinators) (two junior officials) Non-attendance leads to poorly informed decisions around programs implementation Identify the possibilities for sharing the WSA function with the LMs. (one senior official) Identification and understanding of reasons for poor attendance, and engagement with senior management at LM level to delegate officials. 188 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Drought relief Skills, expertise, operational budget and transport resources are available for planning purposes. HR capacity to do the planning is limited by number of staff. Joint funding from the WDM and the Province facilitates the planning process. No proper systems and management of drought relief programme There is no dedicated person for drought relief activity Create a post of drought relief Officer (one senior official) 189 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Roads and Draft report stormwater on the institutional arrangements and roads condition regarding District road authority function is available. Absence of skills, expertise, operational budget and transport resources for the roads authority function. Availability of information resources at RAL. Limited skills, expertise, operational budget and transport resources are available for roads and stormwater planning and development. Inability to spend potentially higher capital budget on maintenance (regravelling) of roads. Ability to comply and respond to Government objectives and strategies (e.g. EPWP, ASGISA). Road condition information is outdated. Effective planning is hampered by outdated information. Possibility for MIG Funding for construction of roads. Inability to discharge the road authority function. Unlocking of access to LED opportunities. Inaccessibility of economic opportunities and social services. Backlog of roads and stormwater services. Lack of organizational structure, funding, and execution capacity. Grow (HR) the project management capacity of the WDM. (one senior and one junior officials) Conduct a road condition survey on a five year cycle. Increase funding sources and amounts. Establish a section 78 process. Develop and implement the organizational structure that will ensure the effective discharge of the road authority function. (one senior official) 190 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Electricity Skills, expertise, operational budget and transport resources are available for co-ordination purposes. HR capacity to respond to invitation for co-ordination is limited by number of staff. Support from National and Provincial Government in coordinating electricity activities Establishment of REDS. Non-attendance of meetings by some LMs. Non attendance of Local Energy Forum by the WDM. Non-attendance leads to poorly informed decisions around programs implementation. No opportunity to attend to Local Specific issues about LMs Identification and understanding of reasons for poor attendance, and engagement with senior management at LM level to delegate officials. The District needs an electricity coordinator. (one junior official) 191 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Technical Support to other Department s Availability of Technical Support and Advice. HR capacity to provide advice is limited by number of staff. Procedures and solutions are streamlined and standardized. Crisis management in Technical Services due to ad hoc request for support. Non-standard procedures and solutions lead to duplication of efforts and wasteful expenditure. Other departments request support in an ad hoc manner without appropriate planning. Support from Technical Services should clearly be indicated in the project Sitting with different plans/designs. solutions to the similar problem. Development and implementation of technical procedures and solutions should be standardized by Technical Services. 192 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 MIG and EPWP Skills, expertise, operational budget and transport resources are available for co-ordination purposes. HR capacity to respond to invitation for co-ordination is limited by number of staff. Support from National and Provincial Government in coordinating MIG activities Non-attendance of meetings by some LMs. Possibility for MIG Funding for construction of roads. Inability to address the roads and stormwater backlog of services. Non attendance of Local MIG Forum by the WDM. Non-attendance leads to poorly informed decisions around programs implementation. No opportunity to attend to Local Specific issues about LMs Poor MIG expenditure due to lack of HR. Identification and understanding of reasons for poor attendance, and engagement with senior management at LM level to delegate officials. MIG Funding to be used to secure the services of the PMU. 193 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 INF R A S T R U C T UR E D E V E L O P ME NT P 78 MA NA G E R P 79 S E C R E T A R Y PL 7 P 80 A S S IS T A NT MA NA G E R R OADS PL 3 P 83 T E C H NIC IA N MA INT E NA NC E R O A D S PL 6 P 81 A S S IS T A NT MA NA G E R C A P IT A L P R O G R A MS PL 3 P 85 T E C H NIC IA N C A P IT A L P R O G R A MS PL 6 P 86 A D MIN A S S IS T A NT PL 9 194 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1.2 NAME OF DEPARTMENT: SOCIAL SERVICES PRIORITY ISSUES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. 2. 3. 4. 5. 6. MUNICIPAL HEALTH SERVICES ENVIRONMENTAL MANAGEMENT SERVICES DISASTER MANAGEMENT AND FIREFIGHTING SPORTS, ARTS AND CULTURE CO-ORDINATION EDUCATION CO-ORDINATION SAFETY AND SECURITY CO-ORDINATION SWOT ANALYSIS 195 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 NATIONAL KPA MUNICIPAL FUNCTION STRENGTHS WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION BASIC SERVICE MUNICIPAL HEALTH SERVICES Ass.Heads are appointed and Environmental Health Officials are devolved to the District Delay in the finalization of devolution process Installation of compatible Municipal Health IT System. Shortage of Municipal Health Officials. Insufficient funding Increased funding for Municipal Health. Lack of internal cooperation Law enforcement against offenders BASIC SERVICES AND INFRASTRUCTURE DEVELOPMENT Lack of by – laws Proper Management and control. Initiated the process of standardized by – laws. Memorandum of understanding has been signed between the Province and the District for rendering the services Landfill sites funds are available Some Local Municipalities have not signed memorandum of agreement. No memo of agreement between the District and Locals with regard to management and control of landfill sites The two officials are unable to maximize the service Two officials appointed to handle MHS function Well coordinated service Monitoring, coordination and support on implementation IWMP by local Municipalities Adherence to prescribed requirements of DWAF Environmental summit Reduction in communicable and non communicable diseases Increased mortality and morbidity rate Delay of signing the memorandum of agreement that lead to the hampering of a well coordinated service Closure of landfill sites by DWAF to non complying local municipalities Increase in mortality and morbidity rate Recruitment of personnel. Finalization of by - laws Finalization of Memo of transfer agreement No memo of agreement between the District and Locals with regard to management and control of landfill sites MHS devolved function creating an administrative burden. Follow-up those Locals Municipalities that have not Signed. Engaging Local Municipalities to sign memorandum of agreement. Implementation of DWAF requirements. Strengthening of the administration of MHS function 196 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ENVIRONMENTAL MANAGEMENT Deployment of DEAT Official to the District. Environmental Management Plan initiated Lack of support staff. Internal delays of Environmental Management Plan To improve Environmental conditions across the District. Adherence to Environmental Legislation. Lack of funds. Lack of personnel Personnel recruitment Poor management of Environmental Activities Inability to implement a plan due to internal delays Approval of the plan by Council Establishment of Environmental Management Unit. Re-submission of Environmental Management Plan before council Improved Environmental conditions Environmental Degradation Heritage issues are addressed by both Social and Planning Department Uncertainty with regard to location of this function. Coordination, monitoring and support of heritage sites. Heritage issues will not be addressed optimally by District No clear coordinating function Proposal that heritage be located to Social Services Air quality management plan has been initiated Insufficient fund Adherence to Environmental Legislation Absence of additional funds. Unavailability of sufficient fund Reallocation for additional funding Waste management plan has been initiated Internal delays of Waste Management Plan . Adherence to Environmental Legislation. Inability to implement a plan due to internal delays Approval of the plan by Council Re-submission of Waste Management Plan before council Improved Environmental conditions 197 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 FIRE FIGHTING SERVICES Purchased mobile heavy load fire fighting tankers, vehicles and skid units. Lack of human capital or personnel. Provision of comprehensive fire fighting services. Veldt fires. Personnel recruitment. Domestic Fire. Inadequate and insufficient equipments Funds. Outdated fire equipment. Securing of sufficient funds to acquire additional fire fighting equipments Personnel recruitment. Lack of personnel Service Delivery Agreements entered into between the District and Local municipalities. Allocated operational and capital budgets for rendering the services. Initiate the process of fire-fighting by-laws. Irregular submission of fire monthly claims and internal audit for fire fighting services Rendering of the fire fighting services efficiently and effectively. Direction boards to incidents Inaccessible areas/settlements Inconsistencies on the submission of monthly fire fighting claims by all local municipalities. Regular or bimonthly meetings with the locals. Lack of standardized tariff policy for fire call – outs purposes Uniformity in terms of rendering call –out charges by local municipalities Audit queries To have a uniform fire fighting tariff policy for all callouts charges. Internal delays by implementing Department. Adherence to applicable legislation. Non performance towards service delivery by Local Municipalities. Non –compliance with fire fighting legislations Development of District standardized tariff policy for fire fighting call- out charges. Finalization of bylaws Municipalities have inconsistencies in rendering the fire fighting services Inability to implement a by-law due to internal delays 198 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TO COORDINATE AND SUPPORT TO STRUCTURES DEALING WITH EDUCATION Provision of support services to structures dealing with education. Lack of working relationship between the Department and the District Municipality. Upliftment of standard of education. Insufficient funding. Alignment of project between Department Education and District Municipality Social Cluster meeting to be strengthened. Intervention by Political office. 199 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 TO COORDINATE SPORTS, ARTS AND CULTURE Hosting of District O.R Tambo and Indigenous Games regionally and Provincially Lack of promotion on individual Sporting codes. To unleash the potential of young talents in the District Lack of interest by youth. Attracting enough young talents. Insufficient funding. Lack of a sports, arts and culture officer within the social services department. Research to be made within the Province about the location of sports, arts and culture subdivision. Personnel recruitment. Inter Departmental disagreements with regards to the location of the function. TO COORDINATE AND SUPPORT TO STRUCTURES DEALING WITH SAFETY AND SECURITY Established District Sports Council Poor attendance of meetings by locals . Establishment of sports assembly. No official dealing with sports activities. Coordination of relevant stakeholders Personnel recruitment Strategic location for coordination and support. Lack of coordination and support plans initiatives. Development of crime prevention strategy. Lack of cooperation with regard to the sharing of information Coordination and support initiatives. Regular meeting with all structures dealing with Safety and Security. Lack of crime prevention strategies. Attendance of SAPS rural safety committee meetings. Uncoordinated awareness programmes with the District No coordinated effort by the Province. Interact with the sister Department and local municipalities to develop the crime prevention strategy. 200 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CURRENT STAFF COMPLEMENT DEPARTMENT TOTAL DEPLOYED OFFICIALS NUMBER OF STAFF DESIGNATION STATUS MANAGER:SOCIAL SERVICES OCCUPIED ASSISTANT MANAGER:SOCIAL SERVICES OCCUPIED ASSISTANT HEAD HEALTH SERVICES X 2 OCCUPIED DISASTER MANAGEMENT OFFICER OCCUPIED MUNICIPAL HEALTH OFFICIALS 22 0CCUPIED 07 VACANT 33 26 07 33 33 ASS. DIRECTOR 01 01 COMM.ENVIRONMENTAL WORKER 201 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 S O C IA L S E R V IC E S P 58 MA N A G E R P 59 S E C R E T A R Y PL 7 P 60 A S S IS T A NT MA NA G E R S O C IA L D E V E L O P ME NT PL 3 P 66 A S S IS T A NT MA NA G E R MU NIC IP A L H E A L T H S E R V IC E S PL 3 P 62 D IV IS IO N A L MA NA G E R PL 5 P 61 C H IE F F IR E O F F IC E R PL 6 P 64 D IS A S T E R MA NA G E ME NT O F F IC E R PL 6 P 65 E NV IR O N ME NT A L H E A L T H P R A C T IO NE R PL 6 P 65D IV IS IO N A L MA NA G E R P L 5 P 42 E NV IR O NME NT A L HE AL T H P R A C T IT IO NE R PL 6 202 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1..3 NAME OF DEPARTMENT: FINANCIAL SERVICES PRIORITIES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. INSTITUTUIONAL DEVELOPMENT SWOT ANALYSIS KPA MUNICIPAL STRENGTH FUNCTON FINANCIAL Revenue VIABILITY AND Management MANAGEMENT Main source of income is grants Strong investment portfolio Low turnover of personnel WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION Dependent on govt for grants Donor funding Uncertainty of govt grants Insufficient revenue Investigate alternate sources of revenue RSC Levies eliminated – levy payers not paying Appoint Tracing Agents Revenue to replace RSC Levies may not be a district responsibility Institute legal action Summons must be issued by 30 June 2008 Loss of income Additional funds available for projects Fluctuation of interest rates Placement of personnel Loss of personnel due to elimination of RSC Levies 203 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Expenditure Management Efficient expenditure management Low turnover of personnel Financial Reporting Budget Compilation and Control Ability to report timeously in compliance with MFMA Poor implementation of projects by other departments SCM unit not fully operational Inability of financial system to report in the required format Officials inability GAMAP/GRAP to compile AFS conversion in new format completed Ability to Inability of compile and financial system approve budget to monitor budget Placement of personnel due to elimination of levies Grants may be reduced due to poor implementation of projects Unfunded mandates(Municipal Health Service) Job evaluations may result in increase in personnel costs Non compliance of MFMA Poor service delivery High personnel costs Effective implementation of PMS Submission to National Treasury for additional grants Finalise and approve organogram Amend/upgrade system Training officials Non compliance of MFMA Amend/upgrade system Regular report to managers CURRRENT STATUS 204 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DEPARTMENT NUMBER OF STAFF DESIGNATION 1.CHIEF FINANCIAL OFFICER 2.ASSISTANT MANAGER:EXPENDITURE 3.ASSISTANT MANAGER: INCOME 4.ASSIST ACCOUNTANT x2 5.CLERK GRADE 1 x4 6.CLERICAL ASSISTANTS x2 7.ADMINISTRATIVE ASSISTANT 8.DEPUTY CFO 9.ACCOUNTANT SCM UNIT (4 POSTS) BUDGET AND REPORTING OFFICER FINANCIAL INTERNS x 2 TOTAL CURRENT STATUS OCCUPIED OCCUPIED OCCUPIED OCCUPIED (1) OCCUPIED OCCUPIED OCCUPIED ELIMINATE ELIMINATE PROPOSED PROPOSED 2 OCCUPIED (CONTRACT) 14 + 2 205 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 F IN A N C IA L S E R V IC E S (2) P1 C H IE F F IN A NC IA L O F F IC E R P 2 S E C R E T AR Y PL 7 P 3 A S S IS T A NT MA N A G E R B UD G E T & E X P E ND IT UR E PL 3 P 4 A S S IS T A NT MA N A G E R S UP P L Y C H A IN MA NA G E ME NT & R E P O R T ING PL 3 P 12 S C M O F F IC E R PL 6 P 6 S A L A R Y O F F IC E R PL 6 P 8 S E N IO R C R E D IT O R S PL 8 P 13 C L E R IC A L A S S IS T A NT P L 10 P 10 S E NIO R S C M CLERK PL 8 P 11 S E NIO R S C M CLERK PL 8 P 13 C A S H IE R /C L ERK P L 10 206 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1.4 NAME OF DEPARTMENT: PLANNING AND ECONOMIC DEVELOPMENT PRIORITIES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. ECONOMIC DEVELOPMENT SWOT ANALYSIS 207 KPA MUNICIPAL STRENGTH WEAKNESSE OPPORTUNITIE THREATS WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 FUNCTION S S S LOCAL ECONOMIC DEVELOPMENT Development Legislative Planning Framework. (Management of Spatial Development Framework & Land Use) Limited /Insufficient technical capacity Budget Dedicated Unit Legislative Framework Lack of by-laws to enforce SDF. Availability of financial resources. Lack of cooperation from local municipalities. Easy to provide services. Land ownership patterns OVERALL CHALLENG ES Lack of bylaws to enforce implementatio n. PROPOSED INTERVEN TION Assist municipalities to draft bylaws. Limited capacity in human, technical and financial expertise. The establishment of the Development Agency. Identify investment opportunities Maximize effectiveness of land –use. Economic Legislative development requirements. (Promotion & Facilitation of LED) Dedicated Unit at District level . Political buy- in. Availability of sectoral strategies. Lack of community involvement. Lack of common understanding of LED. Lack of human capacity and technical expertise in local municipalities. Stimulate economic growth and development. Sector strategies encourage new business expansion and job creation. It is a tool that provides leadership to sectoral development. Promotes economic growth and development. Dependency syndrome arising out of poverty alleviation projects. Dependant on other services to thrive. Lack of political buy- in. 208 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Management Abattoir of the Ownership by the municipality. Human resource capacity. Regulation and co- The integrated ordination of public transport plan is transport matters in place. Operating at 50% capacity. Job creation. Not profitable. The abattoir supports Working conditions local business. of employees. Contributes to LED and PDGS. Lack of human, technical and financial capacity. Lack of role clarification. Business opportunities for SMMEs. Improved public transport system. Trading limitations. Unavailability of land for transport facilities. Negative impact on public transport service. Management model of the abattoir. Establishment of Development Agency. New mandates with no requisite capacity to execute. Build new capacity in human resource, technical and financial. Regulations and management model. Prone to violence. 209 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CURRENT STAFF COMPLEMENT DEPARTMENT TOTAL OVERALL TOTAL NUMBER OF STAFF DESIGNATION STATUS MANAGER:: PLANNING AND ECONOMIC DEVELOPMENT ASSISTANT MANAGER:DEVELOPMENT PLANNING ASSISTANT MANAGER:ECONOMIC DEVELOPMENT LED CO-ORDINATOR ADMIN & HYGIENE OFFICER MARKETING & TOURISM OFFICER GENERAL WORKSMAN SLAUGHTERERS OCCUPIED VACANT OCCUPIED OCCCUPIED OCCUPIED VACANT OCCUPIED OCCUPIED X 8 13 02 15 210 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 P L A NNIN G & E C O N O MIC D E V E L O P ME NT P 38 MA N A G E R P 39 S E C R E T A R Y PL 7 P 40 A S S IS T A NT MA NA G E R D E V E L O P ME NT P L A NN ING PL 3 P 42 ID P O F F IC E R PL 6 P 41 A S S IS T A NT MA NA G E R E C O NO MIC D E V E L O P ME NT PL 3 P 42 ID P O F F IC E R PL 6 P 46 A S S IS T A NT ID P O F F IC E R PL 8 P 43 MA R K E T ING & T O U R IS M O F F IC E R PL 6 P 44 A G R IC U L T U R A L O F F IC E R PL 6 P 45 T R A NS P O R T MA NA G E ME NT O F F IC E R PL 6 P 47S E NIO R A D MIN CLERK PL 8 P 49 G E NE R A L WO R K S MA N PL 9 P 48 A D MIN A S S IS T A NT PL 9 P 57 S L A UG H T E R E R S P L 13 211 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1.5 NAME OF DEPARTMENT: CORPORATE SUPPPORT SERVICES PRIORITIES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. INSTITUTIONAL DEVELOPMENT KPA MUNICIPAL FUNCTION STRENGTHS WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION TRANSFORMATI ON AND ORGANISATIONA L DEVELOPMENT LEGAL SERVICES Sufficient budget provided for the legal services Maintenance of records of contracts and the management of agreements Assigning the duties of administering legal matters to the administration unit Ability to source legal competency in the administration unit To appoint a resource that is sufficiently competent to deal the administration of legal matters HUMAN RESOURCES MANAGENT Availability of approved posts Delay in obtaining approval to fill key vacant positions Clear recruitment/ Staff \provisioning policy Failure to comply with the policy Transfer of legal matters to the Administration unit and appointment of a senior official (Assistant Manager) to be responsible for both administration and legal matters Speedy approval of the delegations policy framework Manageable staff component Staff incentives not attractive Recruitment of local people High staff turnover Retain staff (especially key personnel) Develop a policy for retention of key personnel Effective personnel administration Non-integration of the HRM system with other systems Development of the MSP to integrate all IT systems Dissatisfied personnel and low morale Maintain Effective personnel administration Integration of the HRM and PayDay systems to the other It systems in the municipality Service delivery is negatively affected 212 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ADMINISTRAT IVE AND AUXILLARY SERVICES Personnel appraisals not done in terms of requirements PMS framework has been adopted Fairly new building Insufficient funding for building maintenance Provision of office space Approved posts on the organogram Shortage of staff Job opportunities for people from the district Draft Fleet Management Policy developed Delay in the approval of the policy Consideration of policies at the ensuing Strategic Planning Workshop Deserving officials not reward and underperfomance not being dealt with Physical and health risks to staff and people visiting the municipality Staff doing duties that are not in their job descriptions Abuse of municipal vehicles Coordinate and facilitate PMS evaluations/ appraisals (annually) Strategic information of PMS are assessed and evaluated by HR, and steps taken Ensure safe and comfortable buildings Seek sufficient funding (internally or externally) Basic duties are not attended to in time Fill Corporate Services Vacancies Lack of standard procedure for managing the municipal fleet Submission of the draft policy for approval 213 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CURRENT STAFF COMPOSITION DEPARTMENT CORPORATE SERVICES NUMBER OF STAFF DESIGNATION STATUS MANAGER:CORPORATE SERVICES ASSISTANT MANAGER: LEGAL SERVICES ASSISTANT MANAGER: HUMAN RESOURCES SENIOR ADMINISTRATIVE OFFICER RESEARCH & INFORMATION OFFICER HUMAN RESOURCE DEVELOPMENT OFFICER SENIOR RECORDS OFFICER ADMINISTRATIVE OFFICER/ SECRETARY DRIVER/MESSENGER/MAINTENANCE OFFICER ADMINISTRATIVE ASSISTANT:HR DOCUMENT PROCESSING CLERK RECEPTIONIST/TYPIST TELEPHONIST CLEANERS X 6 PREMISES CLEANER 20 TOTAL 20 OCCUPIED VACANT VACANT OCCUPIED VACANT OCCUPIED OCCUPIED OCCUPIED VACANT OCCUPIED OCCUPIED OCCUPIED 4 OCCUPIED VACANT 2 VACANT 12 VACANT 08 20 214 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 C O R P O R A T E S E R V IC E S P 19 MA N A G E R P 20 S E C R E T A R Y PL 7 P 21 A S S IS T A NT MA NA G E R H UMA N R E S O UR C E PL 3 P 23 H R D O F F IC E R PL 6 P 24 H R O F F IC E R PL 6 P 27 P MS O F F IC E R PL 6 P 22 A S S IS T A NT MA NA G E R L E G A L & A D MIN IS T R A T IO N P L 3 P 25 IC T O F F IC E R PL 6 P 26 S E NIO R A D MIN O F F IC E R PL 5 P 28 S E NIO R R E C OR DS CLERK PL 8 P 32 A S S IS T A NT A D MIN H R PL 9 P 29 R E C O R D S CLERK PL 9 P 30 R E C E P T IO N IS T / T E L E P H O NIS T PL 9 P 31 MA INT E NA NC E O F F IC E R /D R IV E R PL 9 P 37 C L E A NE R S P L 15 215 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1.6NAME OF DEPARTMENT: OFFICE OF THE EXECUTIVE MAYOR PRIORITIES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. PUBLIC PARTICIPATION AND COMMUNICATION 2. SPORTS, ARTS AND CULTURE CO-ORDINATION 3. EDUCATION CO-ORDINATION KPA MUNICIPAL FUNCTION STRENGTHS WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION 216 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 GOOD Provide Political Retention of Councilors from the previous GOVERNANCE Leadership Council AND PUBLIC PARTICIPATION Lack of capacity by other cllrs. Effective running of council compromised service delivery Councilors need to be capacitated Executive Mayor served at provincial legislature for more than six years Unplanned activities The Executive Mayor has exposure with the political environment as she served in the Provincial Legislature Ineffective coordination of special projects Some Mayoral Committee Members were Mayors of Local Municipalities during the previous Council Establishment of structures which are not functional Some Councilors are familiar with the political environment as they have served in the previous Council Overspending caused by unplanned activities [Provincial & National Departments] Non functional of structures causes non compliance to legislative requirements Administrative support to the political leadership is inadequate Aligning functions with the organizational structure Vacant positions such as Executive Assistant , Special projects etc have effect on the functions of this office Non compliance/adherence to schedule of council meetings or activities caused by interruptions by Provincial Departments Coordination of activities be aligned with the calendar of other departments at the level of IGR (to be addressed at the level of IGR Fora) Establishment of Inter Governmental Relations Fora within the district Consolidation of capacities within members of the Mayoral Committee Capacity Building of Councillors (ie Skills Audit to be conducted) 217 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Community Participation Database of stakeholders has been deveolped No Mayoral Imbizos Effective stakeholder engagement Community outreach programmes such as Domestic Workers & Farmworkers conducted No budget for capacity building of ward committees Lack of coordination for the Community development Workers [CDW] Effective participation by ward committees Communities not aware of Local Municipalities and District Municipality`s functions Civil unrest caused by lack of knowledge Inadequate budget allocation for all Community Participation programmes Budget Forum be established to influence the allocation of budget informed by activities Ineffective stakeholder engagement Develop clear programmes for Community Participation Unknown political leadership by communities Ward Committees not fully functional /ineffective Ineffective participation by ward committees on the district planning Develop monitoring and evaluation of Community Based Organizations & ward committees Develop a policy to assist Community Based Organizations The Local Municipalities to provide out of pocket expense for the Ward Committees Provide budget for the Capacity building programme of ward committees 218 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Coordination Council Committees of Council and Mayoral Committee meet as required by legislation The meetings always quorate Rules of Order adhered to by councilors Promote intergovernmental relations Structures have been launched (i.e. District Speakers Forum, District Mayors Forum, District Traditional Leaders Forum etc) Managers preparing items for Council agenda without prior approval of the relevant Portfolio Committee, that results in the portfolio Councillors disowning an item. Learning on how meetings are conducted Legislative compliance Promotion of broad participation by Councillors Poor participation in the council by Councillors caused by late delivery of agendas Coordination of Portfolio Committees done by different departments Agenda items be submitted within the stipulated time frame Fragmented approach on coordination of committees Late submission of items delays compilation of agendas and delivery Ineffective functioning of the District IGR forum Coordination of all Portfolio Committees be located in the Office of the Speaker.( i.e. two Committee Officers be appointed) All agenda items be discussed by Portfolio Committees before submission to the Mayoral Committee. Learning network Lack of dissemination of information Structures do not meet as expected Advocacy of IGR Act [compliance] Streamlined activities Collapsed forums due to non compliance Legislation [IGR Act] had effects on this as it was a bill then, presently as an Act has changed composition of members Resuscitate other forums established 219 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Strategic Partnership Exchange of programmes/Knowledge Sharing/Networking [DLN & Kgatleng] Insufficient budget allocation defeats implementation of these programmes Enhances capacities of entities Implementation of programmes defeated Learning opportunities Level of understanding of partners may be different due to different functions by entities Joint Projects Special Projects Structures have been established [ Youth, Sports & AIDS Councils] Political support or backing Budget allocation dedicated to the programe Interdepartmental conflict regarding the location of the function i.e. Sports, Arts & Culture. Provide an identity for the Office of the Executive Mayor Provide oversight role on the executive authority and administration Members of the Mayoral Committee act consistently in relation with the portfolios they head, and that they adhere to policies of Council To review strategies of partnership with Kgatleng District Council It brings the municipality closer to the people Direct link with vulnerable grou Discourse between line function and political office bearers, which results in disharmony Location of these function and budget Not functional Service delivery undermined ps Tension between political and administration hampers objective oversight Effective implementation of council resolutions Paralysis of the structure No monitoring tool to track the implementation of resolutions Service delivery undermined Internal advocacy of these programmes to roll out Projects and budget be properly located in the Office of the Executive Mayor T o resuscitate various Councils through meetings and summits Development of clear plans for anchor projects Roles be clarified Periodic review of council resolutions Misunderstanding of roles 220 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CURRENT STAFF COMPLEMENT DEPARTMENT TOTAL NUMBER OF STAFF DESIGNATION MANAGER: OFFICE OF EXECUTIVE MAYOR ASSITANT MANAGER: COMMUNITY PARTICIPATION EXECUTIVE ASSISTANT COMMITTEES AND COUNCIL CO-ORDINATION OFFICER COMMUNICATIONS OFFICER SPECIAL PROJECTS CO-ORDINATOR SECRETARY TO SPEAKER SECRETARY TO EXECUTIVE MAYOR EXECUTIVE MAYOR’S DRIVER ADMINISTRATIVE ASSISTANT 10 10 STATUS OCCUPIED OCCUPIED OCCUPIED OCCUPIED OCCUPIED VACANT OCCUPIED OCCUPIED OCCUPIED OCCUPIED 09 01 10 221 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 O F F IC E O F T H E E X E C U T IV E MA Y O R P 67 MA N A G E R P 72 S E C R E T A R Y PL 7 P 69 A S S IS T A NT MA NA G E R C O MMUN IT Y P A R T IC IP A T IO N PL 3 P 68 E X E C UT IV E A S S IS T A NT PL 3 P 70 C O MMUN IC A T IO N O F F IC E R PL 6 P 65 S P O R T S O F F IC E R PL 6 P 72 S E C R E T A R Y T O T H E MA Y O R PL 6 P 74 S E C R E T A R Y T O T HE S P E A K E R /C H IE F WH IP PL 7 P 73 S P E C IA L PR OJ E C T S C O O R D IN A T O R PL 6 P 71 C O UNC IL & C O MMIT T E E S O F F IC E R PL 6 P 75 A D MIN & S E C R E T A R IA L A S S IS T A NT PL 9 P 76 MA Y O R ’S D R IV E R PL 9 222 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.1.7 NAME OF DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER PRIORITIES DELEGATED TO THIS DEPARTMENT FOR IMPLEMENTATION 1. THIS OFFICE ADMINISTER THE IMPLEMENTATION OF TARGETS SETS ON ALL THE 14 PRIORITY ISSUES SWOT ANALYSIS NATIONAL KPA BASIC SERVICE AND INFRASTRUCTURE DEVELOPMENT MUNICIPAL FUNCTION STRENGTHS WEAKNESSES OPPORTUNITIES THREATS OVERALL CHALLENGES PROPOSED INTERVENTION Provide districtwide planning and co-ordination Lack of sufficient capacity in Technical Services Department. (staffing) Inability to comply with the MPPF and the systems act to review our PMS annually TRANSFORMATION Organizational All locals adopted AND performance Performance ORGANISATIONAL management Management DEVELOPMENT Systems PMS currently under review by corporate services SDBIP’ s approved and performance Improvement of the district infrastructure Loss of investment opportunities. Communities dissatisfaction Meager equitable share and unfunded mandates. Seek alternative sources of funding. Adequate staffing of the Technical Services Department Electronic generation of progress reports Failure to reward performance Funding and review of the PMS in municipalities Acquire an electronic system that will assist in generating quarterly performance assessments Uninformed decisions on performance related aspects Inaccuracy of reports Loss of confidence by community in service delivery Effective implementation of approved programmes/projects Setting Improved Service unrealistic targets delivery and KPI’s P oor expenditure patterns Establish and strengthen the performance management unit Conduct intensive project management training workshops with senior management and 223 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 contracts being aligned with new regulations programmes of t he municipality Conducting quarterly assessments on individual managers including MM Involvement of middle and lower management on implementation of PMS Organisational project management Projects are aligned to strategies. Projects do not have clear targets and baseline indicators. Projects are designed such that are easy to monitor and evaluate. Cash flow projections are not fully realistic Ensure effective Fully fledged Management management team and is in place administration of the institution Management not functioning as a collective. Failure to submit reports timeously Expedite decision making and improve service delivery respective local municipalities. High staff turn over Cascading the PMS to other/lower levels in the institution. Measuring impact of inputs on project delivery. Projects not completed within scheduled time frame. Out flow of key expertise at senior and middle management level Implementation of rolled over and current financial year projects. Low staff continuity Signing of performance agreements with lower levels of staff Review performance reward policies Intensive training on project management skills. Strengthening evaluation and monitoring systems. Maintain staff continuity on key positions Conduct regular team building sessions Develop a key staff retention policy 224 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LOCAL ECONOMIC DEVELOPMENT Appointed Officer responsible for Council and committees coordination Portfolio committees not meeting as regularly as required Fully fledged Corporate Services Dept. in place Not delinking Council secretarial services from Council Coordination LED strategy is almost finalized and is aligned to IDP and PGDS. Inadequate staffing and multiple roles where LED units exist District LED unit established and functional FINANCIAL VIABILITY AND MANAGEMENT Sound financial management. Not meeting legislative reporting requirements. Effective coordination and administration of Council and committees resolutions Ineffective functioning of council committees and improper administration of Council resolutions Decentralised Council records Council secretarial function be located in Corporate services Facilitate conducive environment for investment and economic activity that reduce rate of poverty and unemployment A jobless economic growth that is divergent from the national targets Develop a clear investment programme arising from inputs of business, communities and government Provide support to LED units in Locals Forge consensus on sustainable anchor projects Council and MAYCO meetings not aligned to reporting deadlines. Implement yearly targets Compliance with legislative reporting requirements. Provide effective feedback to communities. Forfeiture of grants. Factor growth summit resolutions in the 5 year IDP and sector plans Scheduling of all councils meetings in accordance with reporting deadlines. 225 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Low revenue base. GOOD GOVERNANCE AND PUBLIC PARTICIPATION Develop and maintain relations with local municipalities and other spheres of government Established District Intergovernmental Forum. Ineffective Implementation of DIGF resolutions. District Clusters established. Ineffective representation of Senior Personnel from all tiers of government. Functionality of District technical committees (MMs and CFOs). Deliver effectively on the mandate of the District. Loss of confidence in municipal programmes by communities Harmonization of the NSDP, PGDS and IDP. Disintegrated planning approach. Insufficient funding for identified community needs Lack of coherent planning among the three spheres of government. Explore alternative means of enhancing revenue generation Strengthening functionality of existing structures. 226 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Provide effective and efficient assurance services to the District and the six local municipalities Existence of Internal Audit unit and Audit committee. Incapacity to cope with work load. Effective and Efficient internal control systems. Greater exposure to risks. Effective management of risks Internal Audit unit not a strategic partner. Improved management, control and governance processes. Non realization of business objectives. Inadequate management reports to enable the audit committee to advice accordingly. Objectivity and credibility of financial reporting will be strengthened Inefficient climate of discipline and control which will amplify opportunities for fraud and non accountability on utilization of public funds. Weak interface between the Executive and administration Proper advice and guidance to decision makers Ineffective decision making. Effective coordination and support of Audit Committee. Managing the The position of interface with the MM filled executive mayor and council The manager EM appointed and five line functions depts. High staff turn over at senior & middle management level. Ineffective implementation of council decisions and programmes. Insufficient Human Resource. Strengthening Internal Audit Unit. Unit not at the Senior management level. Review of the unit structure Non improvement of controls and governance processes Strengthen the cooperation and coordination between Audit Committee ,Management and Council Poor service delivery Clear retention strategy on rare skilled personnel. Role clarification of the Executive and administration legislative functions Establish clear programmes of interface. 227 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Oversee the Co ompetent strategic personnel to offer planning for the professional municipality support and technical guidance during IDP Review Processes for WDM and Locals PIMSS offer continuous support to local municipalities on planning issues Established district clusters Lack of capacity and competent planners at all local municipalities Minimise the capacity gap between the district and its local municipalities on planning issues Compromise t he developmental goals of municipalities Gathering of relevant data from various sources. Conduct targeted IDP training workshops in respective local municipalities Backup systems on Acquisition of data to inform required systems to planning i.e. GIS, etc assist during the planning process PIMSS fulfilling the internal IDP responsibilities Alignment of sector plans with municipalities I DP Provide guidance and support to District and the Locals in respect to planning issues in line with the DPLG strategic objectives. PIMSS personnel is on a contract basis Enhancing the ability of the planning division would enable the municipality to fulfil its developmental role DPLG has committed to fund its operation until March 2007. Locating the unit where it will be able to discharge its original mandate. Absorb the functions of the unit at senior managerial level. Alignment of IDP and BUDGET processes in some local municipalities Application and Contextualisation of the NSDP and PGDS district wide 228 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Facilitate Ward committees mechanisms for established in all community locals. participation Effective IDP Rep- Forum. Ineffective representation of communities. Proper presentation of community needs. Develop and maintain relations with local municipalities and other spheres of government Ineffective Implementation of DIGF resolutions. Ineffective representation of Senior Personnel from all tiers of government. Harmonization of the NSDP,PGDS and IDP. Established District Intergovernmental Forum. District Clusters established. Loss of confidence in the capacity of municipality to deliver on community needs. Disintegrated planning approach. Insufficient support of ward committee operations. Strengthen support to ward committee operations. Lack of coherent planning at horizontal an vertical level. Strengthening functionality of existing structures. Functionality of District technical committees (MMs and CFOs). 229 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Provide effective and efficient assurance services to the District and the six local municipalities Existence of Internal Audit unit and Audit committee. Incapacity to cope with work load. Effective management of risks Internal Audit unit not a strategic partner. Effective coordination and support of Audit Committee. Inadequate management reports to enable the audit committee to advice accordingly. Effective and Efficient internal control systems. Greater exposure to risks. Insufficient Human Resource. Strengthening Internal Audit Unit. Improved management, control and governance processes. Objectivity and credibility of financial reporting will be strengthened Non realization of business objectives. Unit not at the Senior management level. Review of the unit structure Inefficient climate of discipline and control which will amplify opportunities for fraud and non accountability on utilization of public funds. Non improvement of controls and governance processes Strengthen the cooperation and coordination between Audit Committee, Management and Council 230 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 CURRENT STAFF COMPLEMENT DEPARTMENT TOTAL Organogram DESIGNATION STATUS MUNICIPAL MANAGER OCCUPIED INTERNAL AUDITOR OCCUPIED SENIOR ADMIN/PROCUREMENT OFFICER OCCUPIED SECRETARY OCCUPIED PIMSS SUPPORT STAFF (Contract) SENIOR PROFESSIONAL PLANNER OCCUPIED JUNIOR PROFESSIONAL PLANNER OCCUPIED PMS CO-ORDINATOR OCCUPIED ADMINISTRATIVE SUPPORT OFFICER OCCUPIED 08 08 08 08 231 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 O F F IC E O F T H E MU N IC IP A L MA N A G E R P 19 MA N A G E R P 20 S E C R E T A R Y PL 7 P 21 D E P U T Y MA N A G E R S T R A T E G IC O P E R A T IO N S PL 2 P 25 IN T E R N A L A U D IT O R PL 4 P 22 R IS K A N D IN T E R N A L C O N T R O L O F F IC E R PL 5 232 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.2 SUMMARY OF STAFFING INFORMATION PER DEPARTMENT The table below indicates the total number of posts per function as at 30 April 2007 as well as the number of posts filled and the vacancies per function. Department Total no. of posts No. of filled posts No. of vacancies Office of the Mayor 10 8 2 Office of the Municipal Manager 8 8 0 Financial Services 13 10 3 Corporate Services 20 15 5 Technical Services 7 2 5 Social Services 17 14 3 Planning and Economic Development 7 5 2 82 62 20 Total 233 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.3 EMPLOYMENT EQUITY STATISTICS Workforce profile as at 30 April 2007 Occupational category Male A C Female I W A Legislators, senior officials and managers 10 Professionals 2 Technicians and associate professionals 3 2 Clerks 8 17 C 2 Total I W 0 1 13 0 2 5 3 28 Service and sales workers Skilled agricultural and fishery workers Craft and related trade workers Plant and machine operators and assemblers 1 Elementary occupations 7 6 1 TOTAL 31 25 13 1 7 62 I W Total 1 1 22 1 5 6.15.4 NUMERICAL GOALS FOR 2006/07 Male Occupational category A Legislators, senior officials and managers C Female I W A 9 1 1 9 Professionals 1 1 Technicians and associate professionals 1 Clerks 9 Service and sales workers 7 C 2 1 1 2 2 9 1 3 25 5 1 2 15 Skilled agricultural and fishery workers Craft and related trade workers Plant and machine operators and assemblers 1 Elementary occupations 1 TOTAL 29 1 1 4 31 3 4 3 3 5 10 12 82 234 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.5 SKILLS DEVELOPMENT PROGRAMMES Training and skills development interventions No. of staff trained Cost in rand R Management department programme 1 11 250.00 Development and using performance training 2 10 374.00 Disaster risk management programme 1 11 600.00 Information and records management course 1 4 560.00 Skills Development Facilitator 1 4 817.64 Discipline, arbitration and cross examination skills 2 9 006.00 Developing and using performance measures to improve government 1 6 187.00 Finance, accounts and budgets for secretaries and Pas 1 3 705.00 Skills audit workshop 1 3 500.00 Pay-Day HR software training 2 2 310.52 Executive leadership: Municipal development programme 3 45 000.00 TOTAL 16 112 310.16 6.15.6 PERSONNEL EXPENDITURE TRENDS Financial year R’000 % of total expenditure 2001/02 6 393 729 14.1% 2002/03 10 684 975 14.5% 2003/04 13 094 024 17.2% 2004/05 16 336 377 14.1% 2005/06 16 737 306 14.2% 235 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.7 COUNCIL’S FINANCIAL POSITION AT 30 JUNE 2006 Note 2006 R 2005 R NET ASSETS AND LIABILITIES Net assets 94 059 334 92 194 321 Government Grant Reserve Donations and Public Contribution Reserve Revaluation Reserve Accumulated surplus 226 1 158 431 92 242 286 1 112 431 90 364 Current liabilities Consumer deposits Provisions Creditors Unspent conditional grants and receipts VAT 1 2 3 4 6 TOTAL NET ASSETS AND LIABILITIES 978 321 997 038 032 253 997 039 16 101 428 24 531 943 12 493 4 508 10 979 107 366 365 377 748 572 12 620 6 946 520 17 296 575 276 228 110 160 762 116 726 264 24 287 683 12 840 866 24 200 661 87 022 12 546 295 294 571 85 873 079 103 885 398 ASSETS Non-current assets Property, plant and equipment Long term receivables 5 7 Current assets Consumer debtors Other debtors Current portion of long term debtors Call Investment deposits Bank balance and cash TOTAL ASSETS 8 9 7 10 11 1 882 706 106 13 000 70 177 269 646 608 000 556 110 160 762 4 258 728 170 33 000 65 726 953 850 696 000 899 116 726 264 236 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.8 HUMAN RESOURCE POLICIES APPROVED BY COUNCIL DRAFTED AND READY FOR LLF IN - PROCESS Travelling & Subsistence HIV/AIDS System of Delegations Cellphone Employment Equity Security Conditional Grant Employee Assistance Sexual Harrassment Overtime Smoking Health & Safety Training & Development Remuneration Induction Internship Succession Planning Performance Management IT Security Staff Provisioning Fleet Management 237 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.9 INSTITUTIONAL CAPACITY The table underneath indicate where policy exist, and when it was adopted Issues District munic Adopted November 2004 82 Mogalakwena Lephalale Mookgophong Bela-Bela Thabazimbi Adopted 2001 Adopted in 2002 Adopted 2006 Adopted, Jan 2005 Adopted 31st May 2006 942 349 263 176 327 62 449 286 240 173 274 Job Evaluation NOT COMPLETE D Completed Submitted to TASK Committee Completed, awaiting results Not completed Completed. Results awaiting Yes Job description completed,feedback from Provincial office awaited. Yes-Manual system Information Management System Delegations Registry Unit is established Registry unit in place In the process. Service provider appointed Not completed Registry Unit is established YES Yes 2000 Yes-partly Implemented Adopted in 2006. Completed 2002 Yes PMS YES Yes Implemented yes YES Yes Submitted up to 2004/2005 Adopted. Implemented only for Senior Managers Completed. Submitted to LGSETA Adopted, 2002 Skills Development Plan Employment Equity Plan Adopted in 2004 but not implemented Policy adopted in 2003 Adopted, 2002 yes YES Yes Adopted in 2003 Compiled and agreed EE Plan in place. Reviewed but not yet adopted Not in place yes Employment Assistance Programme Occupational Health and Safety Plan Website NO No Policy adopted in 2003 In progress Policy adopted 2004. Not yet implemented Not in place DLGH will help NO No Policy adopted in 2005 Committee in place Not in place. Structure exists. Established 2003 yes PARTIAL Yes www.mogalakwena.org.za munic@lephalale.gov. za Yes Modille.gov.z a In place. Mookgophong.gov.za In process In process Organisational Structure Total Staff Composition Filled Positions Modimolle 192 192 238 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Communication Plan Yes No Completed 2005 Yes No Adopted, 2002 yes Customer Care Strategy (Batho Pele) Indigent Policy NO No Through Premier and District office Yes No Adopted, 2004 yes NO Yes Yes Yes Yes Adopted, 2004 HIV/Aids Plan NO Yes Policy exists Yes In process Focus Groups Programme (Youth, Gender and Disability) Financial Delegations Yes Yes Policy adopted in 2003 Adopted in 2005 Yes Programmes in place, but no proper institutional arrangements In place Yes(draft) No Yes being reviewed in line with MFMA Yes being reviewed in line with regulations Yes Partially Yes Yes Adopted in 2006. In process of being implemented. Adopted, 2002 No Yes In process of being reviewed in accordance with SCM Policy Adopted in 2005 Yes Yes Adopted, 2005 Yes Established Yes. External (WDM) Not in place yes Yes Yes Done Yes Yes Yes Yes in place, Submitted to Dept. of Local Govt. & Housing Yes Not done Yes-Approved May 2005 NO In process for community participation Yes Adopted, 2002 Yes Yes Yes No Yes Adopted, 2004 Yes Yes No Yes No No No l Yes yes Procurement Framework Audit Committees By-law reforms Credit Policy Disaster Management Plan Project Management Unit No 239 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.10 CORPORATE GOVERNANCE Municipality Waterberg Mogalakwena Lephalale Modimolle Mookgophong Bela-Bela Thabazimbi Internal Audit Performance Committee Management Established System Implemented Yes NO Established in Sept 2005 Yes External service provided by WDM No Yes Procurement Terms of Policy in Reference for place Mayor in place Delegations of Authority in place Customer Care System in place & Functioning Tracking System for Council Decisions in place Financial Delegations of Functional Authority in terms of the Delegations of Municipal Finance Authority in terms of Management Act the Municipal Systems Act Yes, Partly YES NO YES YES NO NO NO YES NO IN PROCESS YES NO NO Yes In Process Partly Partly YES Adopted in 2004 Yes, reviewed but not resolution implemented A30/2005(11) Yes Yes Yes Yes Yes Yes Yes Partly. Section 57 employees only Yes Yes. No formal document Yes Yes No Yes Yes Yes Yes Yes Yes No Yes Partly Yes Yes Yes Yes Yes Yes 240 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.11 PERFORMANCE MANAGEMENT SYSTEM MUNICIPALITY WATERBERG ADOPTED Yes, in January 2004 IMPLEMENTATION Yes, partially REVIEW STATUS Yes , 2007/08 CHALLENGES INTERVENTIONS The System was not user-friendly and difficult to implement Review in accordance with current regulations Cascading it to middle managers Cascade the application of the system to other levels of staff In the process of appointing a performance audit committee. Establishment of a performance audit committee MOGALAKWENA Yes NO Yes 2005/06 LEPHALALE Yes, Adopted 2003 NO Yes 2005/06 MODIMOLLE Yes Yes Yes 2005/06 MOOKGOPHONG Yes Yes,partially. Manual system utilized Yes 2005/06 Personnel to assist roll out of PMS The system was incomplete and difficult to implement Took effort to simplify the system for implementation. Lack of funding Cascading the system to middle management No internal capacity to implement the system i.e. personnel Cascading the system to middle managers Councilors not adequately involved on PMS implementation District to in the assist development of SDBIP’ s Engaged Service provider to assist in the review process Solicit funding from other sources Made budget provision to review and implement system. Consultants invited to submit proposals Monthly reports to be submitted BELA-BELA Yes NO Yes 2005/06 No performance audit committee in place THABAZIMBI Yes NO Yes 2005/06 Performance contract not signed yet Monthly reports to be submitted 241 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.15.12 BY-LAWS Waterberg Mogalakwena Lephalale Modimolle TWENTY EIGHT Community Participation not published yet. SIXTY FOUR TWO 36 TEN(10) Mookgophong Bela-Bela Thabazimbi None Drafted Approved None Yes Achieved: enacted None FORTY FOUR Planned: under consideration One Outstanding None FIVE None TEN(10) None All None Challenges None Lack of council approval on adoption of bylaws In-house capacity to conclude Bylaws. Lack of funds to promulgate the amended 21 bylaws and to compile new bylaws cost is estimated at R400 000-00. None Capacity to update By-laws Consultation and public participation. 242 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PUBLIC PARTICIPATION AND WARD COMMITTEES 243 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.16.1 WARD COMMITTEES ESTABLISHED MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE 3.MODIMOLLE 4.MOOKGOPHONG 5.BELA-BELA 6.THABAZIMBI NO. OF WARD COMMITTEES ESTABLISHED 31 11 07 07 07 10 6.16.2 ISSUES DEALT WITH BY WARD COMMITTEES MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE 3.MODIMOLLE 4.MOOKGOPHONG 5.BELA-BELA 6.THABAZIMBI ISSUES DEALT WITH AT WARD LEVEL Community needs Community needs Community needs Service delivery issues Advice and making recommendations on matters affecting the ward Immediate Community needs 6.16.3 ISSUES FROM WARD COMMITTEE SERVING IN COUNCIL MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE 3.MODIMOLLE 4.MOOKGOPHONG 5.BELA-BELA 6.THABAZIMBI RESPONSE YES YES, if necessary YES YES, presented by Ward Councillors YES YES 244 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.16.4 SUPPORT PROVIDED TO OFFICE OF THE SPEAKER TO DEAL WITH THIS RESPONSIBILITY MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE 3.MODIMOLLE 4.MOOKGOPHONG 5.BELA-BELA 6.THABAZIMBI TYPE OF SUPPORT OFFERED TO SPEAKER Administrative and logistical Support Administrative,ward committees,Portfolio of Councillors, Chair of the council. Administrative and logistical Support Handled by the Mayor. Limited institutional arrangements. Work study in process Administrative and logistical Support Administrative and logistical Support 6.16.5 BUDGETS FOR WARD COMMITTEES MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE 3.MODIMOLLE 4.MOOKGOPHONG 5.BELA-BELA 6.THABAZIMBI BUDGET No specific budget Provide light refreshments in meetings and traveling expenses R 150000/3,also provide light refreshments in meetings and traveling expenses, training, Audit committee, forum meetings No specific budget Provide light refreshments in meetings and traveling expenses R44 000.00 R140 000 (Community Based Planning) R150 000 6.16.6 CHALLENGES CONFRONTING THE WARD COMMITTEES MUNICIPALITY 1.MOGALAKWENA 2.LEPHALALE CHALLENGES Lack of incentives Low morale of communities Negative propaganda Holding constant meetings with communities and Ward Councilors Active involvement of communities in governance issues 245 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 3.MODIMOLLE Continuity Remuneration Constructive reports Training Budget constraints Proper feed back to constituencies 4.MOOKGOPHONG Continuity Remuneration Constructive reports Training on their roles and responsibilities Community Development Workers not providing the expected support Budget constraints Proper report back to communities Distances to travel for meetings Training of ward committee members to enable effective participating in decision making The need to establish appropriate support service in the office of the Speaker Continuity Remuneration Constructive reports Training Budget Constraints 5.BELA-BELA 6.THABAZIMBI 246 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.17. GENERAL OVERVIEW OF THE INSTITUTIONAL SWOT ANALYSIS STRENGTHS Regulatory framework Awareness creation (events, campaigns, seminars, conferences, publications, Imbizos, summits) Capacity in the District municipal area Technical training / Advisory services (technical advice, consultation, information sharing) Economic development planning IDP co-ordination Financial management Asset management WEAKNESSES Regulatory framework Policy instruments (policies, strategies, standards, plans, guidelines, standard operating procedures) Legislative instruments (by-laws, agreements) External stakeholder compliance monitoring (audits, assessments, enforcements, inspections) Status monitoring (surveys, surveillance, detections, testing) Capacity in the District municipal area Authorisation decisions (permits, certification, licenses) Stakeholder institutional arrangements (forums establishment / maintenance, SLA’s, MOU’s, performance monitoring, contract management) Implement district municipal services Spatial development planning Infrastructure development Social development Local municipal institutional support Municipal health services Corporate governance practices Compliance management Risk management Business leadership Strategic positioning (strategic planning, municipal structuring) Business culture Business performance management Communication Service delivery 247 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Stakeholder management Resource management People management Information management Knowledge management Programme/project management Contract management OPPORTUNITIES Mining investment Tourism investment Wildlife management Agricultural farming Donor funding Political stability Legislative framework Education system Management of dreaded diseases Intergovernmental support Absence of a provincial planning framework THREATS Budget constraints Diminishing revenue base Insufficient skills base Diminishing intergovernmental grants Poverty Insufficient Provincial Government support Unemployment Insufficient industrial investment Insufficient job opportunities Unclear roles and responsibilities on powers and function between Province and Local Government Inadequate Transport network Restrictive legislative requirements Crime Vulnerabilities: HIV Aids Natural disasters 248 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 6.18. IMPLICATIONS OF THE SITUATIONAL ANALYSIS The demographics show a noticeable uneven development within the District. On the one hand there is a noticeably rural-urban divide coupled with high levels of poverty in rural areas. The causes of rural poverty are very complex and are a mixture of various forces. Basic to poverty in the Waterberg district is access to basic services; health services, employment, and land. The Waterberg District Municipal Vision elements relating to addressing imbalance of the past and service provision needs to be translated into substantial development strategies in order to address these challenges. The situational analysis of the Waterberg District Municipal Area implies that there is an urgent need to address the following issues: Unemployment Poverty Alleviation Services backlog including Free Basic Services HIV/AIDS Health Care Local Economic Development Infrastructure development and maintenance Land Acquisition Environmental Conservation Spatial Development, Land Use Management and Land Development Rural Development Community Development Skills Development Institutional Development 249 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION B 250 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 STRATEGIES PHASE 251 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7. GUIDING POLICIES AND LEGISLATION This section constitutes the alignment between the national objectives; Provincial Growth and Development Strategy [PGDS], National Spatial Development Perspective (NSDP) principles and the Accelerated and Shared Growth Initiative of South Africa [ASGISA] principles, and the district strategic priorities; it further reflects on the state of the nation address [SONA]; and the state of the province address [SOPA] delivered in February 2006 and the district vision, mission and values. 7.1 MILLENIUM DEVELOPMENT GOALS MILLENNIUM DEVELOPMENT GOALS (MDG) GOAL 1: ERADICATE EXTREME POVERTY AND HUNGER TARGET Target 1: Halve, between 1990 and 2015, the proportion of people whose income is less than one dollar a day. Target 2: Halve, between 1990 and 2015 , the proportion of people who suffer from hunger. INDICATOR 1. Proportion of population below $1 (PPP)per day 2.Poverty gap ratio(incidence x depth of poverty) 3.Share of poorest quintile in national consumption 4. Prevalence of underweight children under five years of age 5.Proportion of population below minimum level of dietary and energy consumption GOAL 2: ACHIEVE UNIVERSAL PRIMARY EDUCATION TARGET Target 3: Ensure that ,by 2015, children everywhere, boys and girls alike , will be able to complete a full course of primary schooling. INDICATOR 6. Net enrolment ratio in primary education 7. Proportion of pupils starting grade 1 who reach grade 5 8.Literacy rate of 15-24 years-olds GOAL 3 :PROMOTE GENDER EQUALITY AND EMPOWER WOMEN TARGET Target 4: Eliminate gender disparity in primary and secondary education preferably by 2005 and to all levels of education no later than 2015 INDICATOR 9. Ratios of girls to boys in primary, secondary and tertiary education 10.ration of literate females to males of 15-24 year-olds 11.Share of women in wage employment in the non agricultural sector 12. Proportion of seats held by women in national parliament GOAL 4 :REDUCE CHILD MORTALITY TARGET Target 5 : Reduce by two thirds, between 1990 and 2015, the under five mortality rate. INDICATOR 13. Under five mortality rate 14. Infant mortality rate 15. Proportion of 1 year-old children immunized against measles GOAL 5 : IMPROVE MATERNAL HEALTH TARGET Target 6 : Reduce by three- quarters, between 1990 and 2015, the maternal mortality ratio. INDICATOR 16. Maternal mortality rate 17. Proportion of births attended by skilled health personnel 252 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 GOAL 6 :COMBAT HIV/AIDS, MALARIA AND OTHER DISEASES TARGET Target 7 : Have halted by 2015 and begun to reverse the spread of HIV/AIDS Target 8 : Have halted by 2015 and begun to reverse the incidence of malaria and other major diseases. INDICATOR 18. HIV prevalence among 14-24 year old pregnant women 19.Condom use rate of the contraceptive prevalence rate 20.Number of children orphaned by HIV/AIDS 21. Prevalence and death rates associated with malaria 22. Proportion of population in malaria risk areas using effective malaria prevention and treatment measures 23.Prevalence and death rates associated with TB 24. Proportion of TB cases detected and cured under directly observed treatment short course GOAL 7 :ENSURE ENVIRONMENT SUSTAINABILITY TARGET Target 9 : Integrate the principles of sustainable development into country policies and programmes and reverse the loss of environment resources. INDICATOR 25. Proportion of land area covered by forest 26.Ratio of area protected to maintain biological diversity to surface area 27. Energy use (kg oil equivalent)per $1 GDP (PPP) 28. Carbon dioxide emissions (per capita) and consumption of ozone depleting CFCs 29.Proportion of population using solid fuels Target 10 : Halve ,by2015 ,the proportion of people without sustainable access to safe drinking water. Target 11 : By 2020, to have achieved a significant improvement in the lives of at least 100 million slum dwellers. 30. Proportion of population with sustainable access to an improved water source, urban and rural 31.Proportion of urban population with access to improved sanitation 32.Proprtion of households with access to secure tenure ( owned or rented) GOAL 8 : DEVELOP A GLOBAL PARTNERSHIP FOR DEVELOPMENT TARGET Target 12 : Develop further an open , rule – based, predictable , non-m discriminatory trading and financial system. Includes a commitment to good governance ,development and poverty reduction – both nationally and internationally. INDICATOR 253 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Target 13: Address the special needs of the least developed countries. Includes: tariff and quota free access of least developed countries’ exports; enhanced programmme of debt relief for HIPC and more generous ODA for countries to poverty reduction. Official development Assistance 33. Net ODA , total and to LDCs, as percentage of OECD/DAC donors gross national income 34. Proportion of total bilateral, sector-allocable ODA of OECD/DAC donors to basic social services (basic education, primary health care, nutrition, safe water and sanitation) 35. Proportion of bilateral ODA of OECD/DAC donors that is untied Market access Target 14: Address the special needs of landlocked countries and small island developing states. (through the programme of Action for the sustainable Development o f small island Developing states and the outcome of the twenty- second special session of the General Assembly) TARGET Target 15 : Deal comprehensively with the debt problems of developing countries through national and international measures in order to make debt sustainable in the long term. Target 16 :In co- operation with developing countries , develop and implement strategies for decent and productive work for youth Target 17 :In co-operation with pharmaceutical companies, provide access to affordable, essential drugs in developing countries Target 18: In co-operation with the private sector, make available the benefits of new technologies, especially information and communication 38.Proportion of total developed country imports ( by value and excluding arms) from developing countries and LDCs admitted free duties. 39. Average tariffs imposed by developed countries on agricultural products and textiles and clothing from developing countries 40. Agricultural support estimate for OECD countries as per GDP 41. Proportion of ODA provided to help build trade capacity INDICATOR Debt sustainability 42. Total number of countries that have reached their HIPC decision points and number that have reached their HIPC completion points 43. Debt relief committed under HIPC initiative, US$ 44. Debt service as a percentage of exports of goods and services 45. Unemployment rate of 15-24 years, each sex and total 46. Proportion of population with access to affordable essential drugs on a sustainable Basis 47. Telephone lines and cellular subscribers per 100 population 48. Personal computers in use per 100 population and internet users per 100 population 254 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.2 National Spatial Development Perspective A framework for contextualizing and applying the NSDP 7.2.1 Introduction At the turn of the first decade of democracy, government undertook a body of work intended to provide an analysis of the advances and challenges of the first decade of democracy. The analytical insights of the TYR and 2014 scenarios provoked an incisive appraisal of ideas and thoughts about the development trajectory going forward into the second decade of freedom. A major observation made by the TYR is that: The advances made in the First Decade by far supersede the weaknesses. Yet, if all indicators were to continue along the same trajectory, especially in respect of the dynamic of economic inclusion and exclusion, we could soon reach a point where the negatives start to overwhelm the positives. The TYR goes on to warn that this “could precipitate a vicious cycle of decline in all spheres”. Based on an appreciation of the progress made and mindful of the fact that critical challenges remain as a result of the terrible legacy of apartheid, government set itself the objectives of growing the economy, tackling the high levels of poverty, reducing the stubbornly high levels of unemployment and promoting social inclusion. 7.2.2 Meeting the challenge One of the key measures identified by government to enable the developmental state to actively intervene in and inform and shape the trajectory for the Second Decade of Freedom IS BETTER PERFORMANCE OF THE STATE. Better performance by the state entails 3 things: • Make government as a whole work better in meeting common objectives and outcomes; • Need for decisive, coordinated interventions to improve the state's capacity to spend and deliver services • Need to specifically include a geographical dimension to growth and employment The framework addresses all of these by focusing on the key question of how does government go about achieving its objectives of accelerating growth and addressing poverty and inequality. Development occurs in geographic space. Hence our ability as a country to accelerate growth and reduce unemployment and poverty is principally tied to the growth potential of different areas and regions. According to the NSDP, developing a coherent understanding of regional economic development and territorial patterns of economic development, social exclusion and resource use is of 255 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 paramount importance in achieving our objectives. The NSDP argues that undertaking infrastructure investment and development spending decisions on the basis of an area’s unique potential is likely to produce far more desirable and sustainable outcomes in terms of addressing poverty and improving growth. Four assumptions underpin the statement above: Dynamic qualities of areas are developed historically and culturally over a long period of time. In no country in the world is social and economic development and potential evenly distributed. Different regions have different economic potentials and the spatial variations in the incidence of poverty are also vastly different. Diverse and disparate spatial contexts suggests a policy approach which itself should be differentiated and conducive to the requirements of the different contexts. Government has identified district and metropolitan areas as the pivotal sites on which to build an understanding of the nature and distribution of regional potential across the country. The district/metro levels are also understood to be the basic units to drive intergovernmental coordination to maximize the potential of regions. This is not to suggest that the notion of regional growth and development potential equates neatly with district/metro administrative boundaries. On the contrary, the growth and development of districts/metros areas is impacted upon by actors and factors both within and beyond their administrative borders. However sub-national structures such as districts/metro areas have a valuable role to play in capitalising on synergies and harnessing the energies and contributions of a range of actors and role players with a view to enhancing an areas social & economic potential. 7.2.3 Contextualising the NSDP Contextualising and applying the NSDP has to be understood within the perspective that the overall performance of our economy hinges on the growth and development potential of regions. Theories and models abound explaining why some regions are more successful than others (Storper, 2004). While there are no universal rules, an emerging consensus is that the depth and quality of institutions6 are a crucial common denominator in initiating and sustaining economic growth in regions and that poverty and inequality are more likely to be addressed if redistributive interventions are combined with strategies to maximise an areas unique economic potential. 6 The notion of an institution is distinct from the term organisation (Hassen Mohamed, 1997). According to Bryant and White (1984), institutions are a “valued and persistent set of rules that shape patterns of human behaviour and relationships” while organisations are “groups consciously established to achieve specific purposes through a division of labour”. 256 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 This immediately raises the question of what we mean by a region. The concept of a region does not equate to districts/metros, and thus requires further elaboration. DTI’s RIDS provides some definitions based on the work of Michael Porter. Generally it is held that regions are not mere spatial entities but are seen as part of a wider set of economic connections and institutions (Ash Amin, 2006). According to Amin, there are two policy implications flowing from this conception. One, local effort has to work through these broader economic connections and institutional obligations and two there can be no simple division of responsibilities between national, provincial and local institutions. This is the general understanding from which this document proceeds. While the focus in this document is on districts and metros, the conception of a region as comprising a wider set of economic connections and institutional obligations recognises that regions could be defined in a way that may embody a number of districts and metros such as in the case of the Gauteng Global City Region or a coherent region may exist within a district or metropolitan area. This brings into play a different division of responsibilities. In the case of the Gauteng City Region, the PGDS has an important role in functionally linking and integrating districts/metros to enhance the competitiveness and development impact of the wider global city region. By the above conception a district or metro may be viewed as a coherent region or districts and metros may be the essential building blocks of a potentially wider regional entity. Whatever the conception, at the core of the regional focus in this document are districts and metros as the essential building blocks for a regional focus. Hence this framework is focused on configuring district/metro areas to assume strategic responsibility for building an understanding of the nature and extent of development poverty and inequality in spatial terms. Moreover the framework is geared towards ensuring integrated development planning by municipalities serves as a tool to integrate and coordinate implementation in terms of geographical space and time and hence has to inform and be informed by the planning of other spheres of government, including sectoral/departmental planning of line agencies. In this regard this document provides a framework to give effect to government’s goal of developing credible IDPs and making district/metro IDPs the local expressions of the development plans of all spheres and agencies of government within an overall system of cooperative governance. With this in mind, contextualising the NSDP implies district/metros developing a shared understanding of the social, growth and environment trends, processes and dynamics at play, providing strategic leadership and seeking to align the plans of all levels and departments of government, communities, labour & the private sector to maximize growth and development opportunities. This framework attempts to give effect to this broad mission. The proposed framework is not intended to be a blue print or set of prescribed steps nor is it a technique. Rather it provides a broad context for district/metros to play a key part in effecting structural transformation and drive innovation, growth and development performance of their areas by maximising potential and seeking out new areas of potential or advantage. It is intended to provide a context for mobilising a district/metro development path based on just, equitable and ecologically sustainable foundations. 257 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 A key axiom of this framework is that district and metros promote a democratically and interactively pluralistic process that draws together state and non-state institutions and groups in particular the poor and marginalised. This entails engaging in decision-making processes that encourage “informational transparency, consultative and inclusive decision-making and strategy building on the basis of reflexive monitoring of goals”7. 7.2.4 Framework for contextualising and applying the NSDP at district and metropolitan levels As mentioned the framework is not meant to be a blue print. Rather it is meant to provide a context for districts/metros to take leadership and play a pivotal role in coordinating and aligning the actions of a wide spectrum of actors to bring about social and economic transformation. The framework and its application will also differ from area to area, between district and metro and within districts or metros. a. Developing a shared analysis The objective is for various state and non-state stakeholders to better understand an areas growth and development potential with the aim of fostering greater growth and development. Understanding an area implies more than gathering data as is the case with most planning initiatives currently. Generating appropriate and relevant data is important, but of crucial importance is to develop, analyse and interpret socio-economic data with the necessary rigour and insight. This entails a comprehensive and incisive analysis of current and future trends with respect to poverty, inequality, economic development and ecological sustainability in spatial terms, the forces and factors driving these trends and the strategic implications thereof. Failure to understand issues of development and inequality in spatial terms means that policy and planning decisions will be made in an empirical and analytical vacuum. The district/metro has a pivotal role to play in getting various stakeholders to develop a shared understanding of the essential characteristics, trends and dynamics of the district/metro space economy. Insightful and rigorous analysis supports proper planning and effective decision-making in a number of ways. These include: Identifying the determinants of poverty and social exclusion and how poverty, inequality and exclusion are reproduced; Identifying the special and long-term, hard to replicate unique characteristics that comprise the area’s competitive and comparative advantages. The presence of or potential for the emergence of distinct industrial districts or territorial complexes; The broader set of social relations binding firms and workers to each other as well as the actor-rationalities which operate within the region’s dominant institutions and their impact on the distribution of resources and opportunity and innovation. 7 Ash Amin, 2006, Regional Policy in a Global Economy, Paper presented at the International Seminar ‘Comparing Regional Development Policies in Brazil and the European Union’, Brasilia, 23 March 2006 258 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Use of renewable and non-renewable resources and the risks and opportunities this poses for the area’s growth and development trajectory. b. Shared socio- economic vision or development trajectory The shared analysis above is likely to generate varying challenges and competing demands. It provides the basis for interpreting the strategic direction, promoting policy coordination and fitting government actions into a spatial terms of reference. By spatial terms of reference we mean injecting spatial considerations into strategic policy making and planning within the public sector. Districts and metros will need to develop necessary processes and practices to forge a shared vision and development trajectory among various stakeholders. By a shared vision and development trajectory we don’t mean arriving at a short, crisp and politically correct vision statement. What is implied here is a strategic dialogue with stakeholders within and outside of government which states that given our shared understanding of the features and characteristics of the district/metro space economy, what are the long-term social and economic outcomes we would strive to achieve and how should the NSDP principles be contextualised and applied to put the area on a firm development path? It must be remembered that districts/metros are not neutral arbiters merely mediating the varied interests in society. Instead districts and metros should consciously and actively seek to ensure that the development trajectory is underscored by the fundamental values of socio-material citizenship underpinning our constitution. Our government is committed to the objectives of social and economic justice and democratic nation building. Metros and districts have to be vigilant in ensuring that the development trajectory reconciles and is underscored by our basic aspirations of accelerated and shared growth, poverty reduction, sustainable resource use, protection of biodiversity and social cohesion. In this regard the shared development trajectory or vision is more than a short and catchy statement, but a compelling story of the strategic outcomes to be achieved (as an example seen Jo’burg’s core vision elements for each of the 12 sector areas). c. Priority interventions and Critical strategies Translating the development trajectory into clear goals (long, medium and short-term), priority interventions for reaching the goals and backed by coherent objectives and strategies is an important part of good planning and strategy making. The shared analysis and development should inform the planning processes of spheres of government and all sectors in so far as these are in charge of implementing or financing projects at local levels. These interventions, objectives and strategies should find concrete expression in the IDPs which should spell out the 5 year plans for achieving the medium-term goals and objectives of the district/metro. The IDP should serve as a tool to integrate and coordinate implementation of the priority intergovernmental actions critical to achieving the developmental goals and objectives of the area. d. Building the institutional base for multi-stakeholder co-operation and action 259 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 A central theme running through this framework is that achieving the long-term development outcomes in a district or metro depends on the mobilisation of collective action by a range of role players both inside and outside of government. A governance framework that enables the district/metro to draw together government and extra-government organisations into a participatory and integrated decision-making process is therefore important. Such a governance framework must accomplish at least the following minimum requirements: It must enable the district/metro to identify with various agencies and spheres of government the critical or priority intergovernmental actions to achieve the development goals and outcomes; These intergovernmental priority actions must be integrated into the IDP of the district/metro so that the IDP becomes the local expression of the plans of all spheres of government; Drawing on the Intergovernmental Relations Framework Act as a facilitative piece of legislation, appropriate intergovernmental forums will have to be established and protocols and or service level agreements hammered out to tie commitments into firm agreements; Proper mechanisms for monitoring and promoting accountability need to be developed; The IDPs incorporating the 5 year development goals and objectives should be cascaded up within government and provide government with a rigorous appreciation of the development potential of each district and metro which would feed into an iterative process of review, refinement and further elaboration of the NSDP. 7.2.5 Implementing the framework As already stated, the framework for contextualising and applying the NSDP must be seen as an integral part of developing more credible IDPs. As such it is part of the IDP development process and not a new process or something extraneous to the IDP development process. The framework will initially be implemented on a pilot basis in a select number of districts and metros and WDM pride to be part of the piloted district municipalities nationa wide. 260 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.2.6 FIVE PRINCIPLES OF THE NSDP Rapid economic growth that is sustained and inclusive is a pre-requisite for the achievement of other policy objectives, amongst which poverty alleviation is key; Government has a constitutional obligation to provide basic services to all citizens (e.g. water, energy health and educational facilities) wherever they reside; Beyond the constitutional obligation identified in Principle 2 above, Govt spending on fixed investment, should be focused on localities of economic growth and/or economic potential in order to: gear up private sector investment stimulate sustainable economic activities create long-term employment opportunities Efforts to address past and current social inequalities should focus on people not places: In localities with low development potential, Govt spending should focus on providing social transfers, human resource development and labour market intelligence which would enable people to become more mobile and migrate to localities that are more likely to provide sustainable employment or other economic opportunities. In localities where there are both high levels of poverty and development potential, this could include fixed capital investment beyond basic services to exploit the potential of those localities. In order to overcome the spatial distortions of Apartheid, future settlement and economic development opportunities should be channelled into activity corridors and nodes that are adjacent to or link the main growth centres Infrastructure investment should primarily support localities that will become major growth nodes in South Africa and the SADC region to create regional gateways to the global economy. 261 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7. 3 Reflections from the State of the Nation Address, February 2007 • Realistic IDP’s • Credible Local Economic Development Programme • Human resources capacity • Management and Operational System • To implement IDP’s and LED’s • Integration of planning and implementation across the government spheres • Intergovernmental Relations Framework Act as a guiding tool of integration and planning • Lessons learnt from Project Consolidate • Properly qualified managers, professional and technical personnel • Job creation • Reduction of unemployment by half [2014] • HIV and Aids mainstreaming • Bucket Eradication [2007] • Alignment of PGD and IDP’s to land distribution programme • Youth and women co-operatives programme 7.4 Strategic Objectives of the PGDS Five Key Objectives: 1. 2. 3. 4. 5. Improve the quality of life of the population of limpopo Growing the economy To improve the institutional efficiency and effectiveness of government Regional integration Enhance innovation and competitiveness 7.5 Reflections from the State of the Province Address, February 2007: • Municipal transformation and capacity development • Basic service delivery and infrastructure development • Local Economic Development • Financial management 262 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 • Improving functionality of ward committees • Project Consolidate initiatives • Strengthening Intergovernmental Relations • Support to municipalities 7.6 Accelerated Shared Growth Initiative in South Africa Education and skills development Eliminating the second economy Human resource training Expanded Public Works Programme Youth skills training Governance and institutional interventions Skills problems identified in project consolidate Deployment of graduates Expenditure management To improve the capacity of local government to support local economic development Intervention in the EPWP New elements of EPWP: Early Childhood Development component, home based care NB: for the success of this programme partnerships are a key component. 7.7 Waterberg District Municipality’s Strategic Goals Strategic Goal 1: To provide a sound district regulatory framework Strategic Goal 2: To promote management capacity in the District municipal area Strategic Goal 3: To implement district municipal services Strategic Goal 4: To ensure effective corporate services 263 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 All role-players in a municipality need a joint vision as a common ground, which provides guidance to the municipality and the residents. The Council’s decisions have to be oriented towards clearly defined and agreed objectives, which at the same time give orientation towards management, and which form the basis for performance management and the accountability of the municipal government towards the residents. The activities of the Council (Councillors and officials), as well as all stakeholders (Local Municipalities, Sector Departments, Private Sector, Non Governmental Organisations (NGO’s), etc) need to be guided and focused by strategies relating to and addressing the issues (problems, constraints, opportunities etc) as identified from the analysis. The strategies are formulated by all stakeholders and represent the joint decision-making by all stakeholders. 7.8 BUSINESS DEFINITION VISION Waterberg …. the cradle of rural growth and development MISSION To provide a municipal governance management framework that ensures sustainable service delivery towards a better life for all. 264 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.9 STRATEGIC GOALS AND OBJECTIVES FRAMEWORK STRATEGIC GOALS AND OBJECTIVES FRAMEWORK To provide a sound district regulatory framework o Policy instruments (policies, strategies, standards, plans, guidelines, standard operating procedures) o Legislative instruments (by-laws, agreements) o External stakeholder compliance monitoring (audits, assessments, enforcements, inspections) o Status monitoring (surveys, surveillance, detections, testing) o Authorisation decisions (permits, certification, licenses) To promote management capacity in the District municipal area o Advisory services (technical advice, consultation, information sharing) o Awareness creation (events, campaigns, seminars, conferences, publications, Imbizos, summits) o Stakeholder institutional arrangements (forums establishment / maintenance, SLA’s, MOU’s, performance monitoring, contract management) To implement district municipal services o Spatial development planning o Economic development planning o IDP co-ordination o Infrastructure development o Social development o Local municipal institutional support o Municipal health services o Environmental / Conservation management o Disaster risk management To ensure effective corporate services o Corporate governance practices o Compliance management o Risk management o Business leadership o Strategic positioning (strategic planning, municipal structuring) 265 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 o Business culture o Business performance management o Communication o Service delivery o Stakeholder management o Resource management o People management o Financial management o Information management o Asset management o Knowledge management o Programme/project management o Contract management 7.10 CORE BUSINESS VALUES CORE BUSINESS VALUES Commitment Integrity Productivity Excellence Transparency Accountability 7.11 OUTCOMES OUTCOMES Poverty reduction Sustainable service delivery Economic growth Political stability Administrative stability 7.12 STAKEHOLDER FRAMEWORK 266 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 STAKEHOLDER FRAMEWORK Clients o Users of sold services Beneficiaries o Waterberg community o General public o Local municipalities Service providers (inbound to business entity) o Providers of funds o Providers of technology o Providers of infrastructure / facilities o Providers of information o Providers of services Regulators o Auditor General o Standing / portfolio Committees o Relevant Government Departments o Relevant PFMA Chapter 13 institutions o Constitution Chapter 9 and 10 institutions Strategic partners o Private-public partnerships o Public public partnership o Public-private partnerships Service providers (outbound – providing services on behalf of business entity to business entity clients) o Local municipalities o Government departments o Consultants / contractors Organised coalitions o Labour o Local government o Business Employees Media 267 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.13 DISTRICT PRIORITY ISSUES AGGREGATION OF DISTRICT PRIORITIES CONSULTATION WITH COMMUNITIES PRIORITY ISSUE 1. Water, Sanitation & Drought relief NAME OF MUNICIPALITY B-BELA MKGPHNG LEPH X X X TBZ X MOG X Roads and Storm water X X X X X X X X X X X X X X 3. Economic Development; 4. Transport Planning 5. Land Development X X X AVERAGE Municipal Health and Environmental MOD 5 5 X 6 2 X 6 X 1 X 5 Management 7. Health and Social Development X X 8. Disaster Management Community Participation & Communication X X X X X 1 X X X Institutional Development 0 Education X X Safety and Security X X Sports, Arts and Culture X X X Electricity X X X 5 X X 4 X X X 5 X X 5 3 From the above table it is apparent that isses relating to Unemployment and housing and land development are at alarming proportions. Water,sanitation and drought relief, roads and stormwater, Health and Social Development,Consultation and Community participation in municipal programmes, safety and Security and Sports ,Arts & Culture are the second most important issues raised durignthe Imbizos Education, Electricity, Transport planning and Institutional Development are clustered in the last category of the most needs of communities 268 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Section 26(c) of the Municipal Systems Act, 2000 (Act No. 32 of 2000) stipulates that an Integrated Development Plan must reflect, “the council’s development priorities and objectives for its elected term, including its local economic development aims and its internal transformation needs”. The municipality identified four (4) Strategic goals and the Key performance areas (objectives) as illustrated above. The under-mentioned Issues from a municipal perspective were identified and listed according to order of priority: 1. Water, Sanitation & Drought relief 2. Roads and Storm water 3. Economic Development; 4. Transport Planning 5. Land Development 6. Municipal Health and Environmental Management 7. Social Development 8. Disaster Management 9. Community Participation & Communication 10.Institutional Development 11.Education 12.Safety and Security 13.Sports, Arts and Culture 14.Electricity 269 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.14 NATIONAL KPA’s The minister of DPLG has recently pronounced five national key performance areas that must be adhered to when conducting performance planning in the local government sphere. and they are as listed below: Basic services and Infrastructure development Local Economic Development Transformation and Organisational Development Financial viability and Management Good Governance and Public Participation 7.15 NATIONAL KPI’s The minister of DPLG has recently pronounced nine national key performance indicators that must be adhered to when conducting performance assessment in the local government sphere. and they are as listed below: (a) The percentage of households with access to basic level of water, sanitation, electricity and solid waste removal; (b) the percentage of households earning less than R1100 per month with access to free basic services; (c) the percentage of a municipality's capital budget actually spent on capital projects identified for a particular financial year in terms of the municipality's integrated development plan; (d) the number of jobs created through municipality's local economic development initiatives including capital projects 270 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 (e) the number of people from employment equity target groups employed in the three highest levels of management in compliance with a municipality's approved employment equity plan; (f) the percentage of a municipality's budget actually spent on implementing its workplace skills plan; and (g) financial viability as expressed by the following ratios: (i) A BC D Where "A" represents debt coverage "B" represents total operating revenue received "C" represents operating grants "D" represents debt service payments (i.e. interest + redemption) due within the financial year; (ii) A B C Where "A" represents outstanding service debtors to revenue "B" represents total outstanding service debtors "C" represents annual revenue actually received for services; 271 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 (iii) A BC D Where "A" represents cost coverage "B" represents all available cash at a particular time "C" represents investments "D" represents monthly fixed operating expenditure. 272 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 7.16 ALIGNMENT OF THE WDM STRATEGIC GOALS WITH NATIONAL KPA’S KPA 1: MUNICIPAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT Strategic Goal 1: To provide a sound district regulatory framework OBJECTIVES / KPA PERFORMANCE INDICATOR Policy instruments (policies, strategies, standards, plans, guidelines, standard operating procedures) Legislative / legal instruments (by-laws, agreements) External stakeholder compliance monitoring (audits, assessments, enforcements, inspections) Status monitoring (surveys, surveillance, detections, testing) New policy instruments planned versus milestones met (%) Policy instruments planned to be reviewed versus reviewed (%) Ad hoc regulatory inputs requested versus provided (%) New legislative instruments planned versus milestones (%) Legislative instruments planned to be reviewed versus reviewed (%) Compliance monitoring interventions planned versus conducted (%) Ad hoc compliance monitoring requests versus conducted (%) Recommendations approved versus implemented by external stakeholders (%) Council resolutions versus implemented by external stakeholders (%) Status monitoring interventions planned versus conducted (%) Ad hoc status monitoring requests received versus conducted (%) TARGET TARGET TARGET TARGET TARGET 80 85 90 90 90 75 80 85 90 90 90 95 95 95 95 80 85 90 95 95 80 85 90 95 95 80 85 90 95 95 80 85 90 95 95 75 80 85 90 90 70 75 80 80 85 70 75 80 85 90 90 90 90 90 90 06/07 07/08 08/09 09/10 10/11 273 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Recommendations approved versus implemented (%) Council resolutions versus implemented (%) 55 60 65 70 75 75 80 85 90 95 274 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Strategic Goal 2: To promote sound management capacity in the District municipal area OBJECTIVES / KPA Technical training / Advisory services (technical advice, consultation, information sharing) Strategic Goal 3: PERFORMANCE INDICATOR PERFORMANCE INDICATOR Spatial development planning IDP co-ordination Social development Local municipal Institutional support Municipal health services Disaster risk management TARGET TARGET TARGET TARGET 06/07 07/08 08/09 09/10 10/11 75 80 85 90 95 60 65 70 75 80 To implement district municipal services OBJECTIVES / KPA Environmental / Conservation management Advisory services requested versus provided (%) Advisory services planned versus provided (%) Training interventions planned versus conducted (%) Information sharing interventions planned versus conducted (%) TARGET District spatial development framework milestones met (%) District IDP co-ordination implementation plan milestones met (%) District social development plan milestones met (%) Local municipal institutional support milestones met (%) Municipal health plan milestones met (%) Municipal health standards targets met (%) District conservation plan milestones met (%) Compliance to international conservation protocols (%) District development compliance to EIA standards (%) District disaster risk management plan / framework milestones met (%) TARGET TARGET TARGET TARGET TARGET 06/07 07/08 08/09 09/10 10/11 60 65 70 75 80 60 65 70 75 80 70 75 75 80 80 60 65 70 75 80 60 60 45 45 65 65 50 50 70 70 55 55 70 70 60 60 70 70 65 65 45 50 55 60 65 50 55 60 65 70 275 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Strategic Goal 4: To ensure effective support services OBJECTIVES / KPA Business leadership / management (Strategic positioning; Organisation culture; Business performance management; Stakeholder management; Communication; Service delivery) Resource management People management PERFORMANCE INDICATOR Financial management Information / knowledge management Information / communication (connectivity) TARGET TARGET TARGET 07/08 08/09 09/10 10/11 Business culture / employee satisfaction rating (%) 45 48 50 52 55 Business targets met (%) 65 70 75 80 80 Stakeholder satisfaction rating (%) 50 55 60 65 70 Internal service level charters required versus signed (%) 70 75 80 85 90 Internal stakeholder consultative forums planned to be established versus established (%) 90 90 90 90 90 Budgeted positions filled (%) Skills development plan targets met (%) Additional human resource capacity required versus business case provided (%) Human resources required versus requirements submitted timeously (%) Interns trained (n) Variance on budget spent (%) Services provided versus fees collected (%) Knowledge planned to be documented versus documented (%) 50 60 100 45 65 100 40 70 100 35 75 100 30 80 100 100 100 100 100 100 6 10 70 50 15 10 75 55 15 10 80 60 15 10 85 65 20 10 90 70 Website updates required versus content submitted timeously (%) ICT developments / procurement planned versus requirements submitted timeously to ICT component (%) 95 95 95 95 95 95 95 95 95 95 TARGET 06/07 TARGET 276 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 technology management Asset management (Fixed assets and consumables) Asset data integrity rating (%) 75 80 85 90 95 Assets required versus available (%) 75 80 85 90 95 Programme / project management 90 90 90 90 90 90 90 90 90 90 Contract management Programme / projects completed within time (%) Programmes / projects completed within budget (%) Contractor performance rating (%) 50 55 60 65 70 277 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 2: BASIC SERVICE AND INFRASTRUCTURE DEVELOPMENT OBJECTIVES / KPA PERFORMANCE INDICATOR Spatial development planning Economic development planning Infrastructure development District spatial development framework milestones met (%) Economic development plan milestones met (%) State wide economic planning milestones met (%) Jobs planned to be created versus created (%) Infrastructure planned to be developed versus milestones met (%) Infrastructure planned to be procured versus milestones met (%) Infrastructure plan milestones met (%) Maintenance budget required as per regulations versus secured (%) TARGET TARGET TARGET TARGET TARGET 06/07 07/08 08/09 09/10 10/11 60 65 70 75 80 60 65 70 75 80 60 65 70 75 80 55 60 65 70 75 75 80 85 90 95 55 60 65 70 75 90 90 90 90 90 60 65 70 70 70 278 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 3 LOCAL ECONOMIC ECONOMIC DEVELOPMENT Strategic Goal 3: To implement district municipal services OBJECTIVES / KPA Spatial development planning Economic development planning Infrastructure development PERFORMANCE INDICATOR District spatial development framework milestones met (%) Economic development plan milestones met (%) State wide economic planning milestones met (%) Jobs planned to be created versus created (%) Infrastructure planned to be developed versus milestones met (%) Infrastructure planned to be procured versus milestones met (%) Infrastructure plan milestones met (%) Maintenance budget required as per regulations versus secured (%) TARGET TARGET TARGET TARGET TARGET 60 65 70 75 80 60 60 65 65 70 70 75 75 80 80 55 75 60 80 65 85 70 90 75 95 55 60 65 70 75 90 60 90 65 90 70 90 70 90 70 06/07 07/08 08/09 09/10 10/11 279 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 4 MUNICIPAL FINANACIAL VIABILITY AND MANAGEMENT Strategic Goal 4: To ensure effective support services TARGET TARGET TARGET TARGET TARGET PERFORMANCE INDICATOR 06/07 07/08 08/09 09/10 10/11 Audit queries received versus responded to (%) 95 95 95 95 95 Compliance to regulatory frameworks (%) 75 80 85 85 90 Variance on budget spent (%) Services provided versus fees collected (%) Asset data integrity rating (%) 10 70 75 10 75 80 10 80 85 10 85 90 10 90 95 Assets required versus available (%) 75 80 85 90 95 Programme / projects completed within time (%) Programmes / projects completed within budget (%) 90 90 90 90 90 90 90 90 90 90 OBJECTIVES / KPA Corporate governance practices (Compliance management; Best practices management; Risk management) Financial management Asset management (Fixed assets and consumables) Programme / project management 280 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 5 GOOD GOVERNANCE AND PUBLIC PARTICIPATION Strategic Goal 2: To promote sound management capacity in the District municipal area OBJECTIVES / KPA Technical training / Advisory services (technical advice, consultation, information sharing) TARGET TARGET TARGET TARGET 06/07 07/08 08/09 09/10 10/11 Advisory services requested versus provided (%) Advisory services planned versus provided (%) Training interventions planned versus conducted (%) Information sharing interventions planned versus conducted (%) Awareness interventions planned versus conducted (%) 75 80 85 90 95 60 65 70 75 80 75 80 85 90 95 Stakeholder forums planned to be established versus established (%) Forums functionality gaps identified versus recommendations made (%) SLA’s / MOU’s / agreements planned versus submitted for signature (%) SLA’s / MOU’s / agreements submitted versus signed (%) 75 80 85 90 95 95 95 95 95 95 80 85 90 95 95 45 50 55 60 65 PERFORMANCE INDICATOR Awareness creation (events, campaigns, seminars, conferences, publications, Imbizo’s, summits) Stakeholder institutional arrangements (forums establishment / maintenance, SLA’s, MOU’s, performance monitoring, contract management) TARGET 281 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION C 282 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJECTS PHASE 283 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The identification, selection. Approval and funding of the projects underwent stringent procedures and phases as outlined underneath: 8. Project Initiation phase During this phase the following were put into consideration: The need for the project is established, its feasibility is investigated and initial estimates of cost generated The basic processes for the initiation phase are: – Selecting the project. – Identifying the needs to be met. – Collecting historical data. – Determining objectives. – Determining high level deliverables and estimates. – Developing a product description (particularly in the private sector). – Identifying the qualifications of the project manager that would be best suited for the particular project. – Determining high level resource requirements. – Determining internal and external project constraints. – Assessing the socio economic and political environment and its possible impact on the project. – Conducting a feasibility study 8.1 Project identification and selection One project’s viability could determine the success or failure of an institution Project selection is about making a commitment for the future Organisations do not always have the resources to embark on all the projects it would want to, need to prioritise by addressing or asking the following questions: – Will the project create a difference in the community. – Will the project meet the needs of and make a positive contribution to the community’s welfare. – Will the project maximise the utilisation of the workforce, plant, and equipment? – Whether the project would improve the municipality’s service delivery rating and boast the community’s confidence in the municipality. 284 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.2 INPUT PERSPECTIVE 8.2.1 FINANCIAL ALLOCATIONS FOR CAPITAL PROGRAMMES PRIORITY NO FUNCTIONS OF MUNICIPALITY % ALLOCATION FUNDS ALLOCATED PER FINANCIAL YEAR 2007/2008 2008/2009 1 2 3 4 5 Water,Sanitation,Drought relief Roads and Stormwater Economic Development Transport Planning Land Development 20.00% 31.42% 18.89% 0.00% 0.49% 14,400,000 22,620,000 13,600,000 6 7 8 Municipal Health and Enviromental management Health and Social Development Disaster Management 8.19% 0.00% 8.10% 5,900,000 2,500,000 5,830,000 2,300,000 9 10 11 12 13 Community Participation and Communication Institutional Development Education Safety and Security Sport Arts and Culture TOTAL 4.66% 7.23% 0.00% 0.00% 1.02% 100.00% 3,350,000 5,200,000 1,600,000 1,300,000 750,000 72,000,000 0 5,800,000 35,200,000 13,500,000 7,200,000 1,000,000 2009/2010 38,000,000 4,950,000 4,000,000 2010/2011 2011/2012 39,000,000 46,000,000 1,700,000 1,500,000 1,500,000 1,500,000 0 850,000 51,000,000 0 900,000 41,400,000 0 1,000,000 48,500,000 350,000 285 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.2.3 FIVE YEAR CAPITAL INVESTMENT PROGRAMME PROJ NO PROJECT RESPONSIBLE IMPLEMENTING OFFICIAL IDP CAPITAL IDP OPERATING CAPITAL INVESTMENT PER FINANCIAL YEAR (R) 07/08 08/09 09/10 10/11 11/12 TOTAL CAPITAL BUDGET FUNDER WDM PRIORITY NO 1: WATER, SANITATION AND DROUGHT RELIEF DWS - 02 Drought relief plan Manager: Technical Services 400,000 400,000 400,000 New Sewer Mabaleng/Alma Manager: Technical Services 4,000,000 4,000,000 4,000,000 DSA -31 Northam Sewer Ext 5 Phase 2 & Ext 7 Manager: Technical Services 10,000,000 10,000,000 10,000,000 14,400,000 14,400,000 2,500,000 2,500,000 1,500,000 WDM TOTAL - - - - WDM WDM 14,400,000 PRIORITY NO 2: ROADS AND STORMWATER DRS - 01 Development of Roads Management Plan Manager: Technical Services DRS-33 Integrated Infrastructure Master Plan Manager: Technical Services 1,500,000 1,500,000 1,500,000 WDM DRS - 21 Modimolle Access Road Brick Paving of str. Phahameng Manager: Technical Services 770,000 770,000 770,000 WDM DRS - 22 Bela Bela Access Road Brick Paving of str Pienaarsrivier Manager: Technical Services 300,000 300,000 300,000 WDM DRS - 23 Mookgophong Access Road Brick Paving of 36th street Manager: Technical Services 150,000 150,000 150,000 WDM 286 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DRS - 24 Lephalale Access Road Tarring of str Marapong Manager: Technical Services 900,000 900,000 900,000 WDM DRS - 25/6 Thabazimbi Access Road Tarring of str in Northam Manager: Technical Services 900,000 900,000 900,000 WDM DRS - 27 Mogalakwena Access Road Regravel and Rehab Mathekga - Moshuka Rd Manager: Technical Services 200,000 200,000 200,000 WDM NEW Upgrade of Road Bakenberg to Mapela via Sepherane & Mmahlogo ( D3507) Manager: Technical Services 6,000,000 6,000,000 18,000,000 WDM DRS - 30 Mogalakwena Access Road Regravel Rd - Lesodi - Mmamatlakala Manager: Technical Services 100,000 100,000 100,000 WDM DRS - 31 Mogalakwena Access Road - EPWP Paving of Mahwelereng Str Manager: Technical Services 1,800,000 1,800,000 1,800,000 WDM DRS-34 Mogalakwena Access Road -Upgrade gravel to tar Sadoma Road to N11 Manager: Technical Services 1,500,000 1,500,000 10,000,000 10,000,000 10,000,000 10,000,000 41,500,000 WDM DRS-35 Mogalakwena Access Road -Upgrade gravel to tar Segole to Magagamatala Manager: Technical Services 1,500,000 1,500,000 10,000,000 12,000,000 14,000,000 16,000,000 53,500,000 WDM DRS-32 Road numbering Manager: Technical Services 1,500,000 1,000,000 2,500,000 WDM New Construction of bridge Rust de Winter small holdings (EPWP) Manager: Technical Services 3,000,000 3,000,000 3,000,000 WDM NEW Upgrade of road Bela-Bela - Alma Manager: Technical Services 1,500,000 1,500,000 15,000,000 15,000,000 15,000,000 20,000,000 66,500,000 WDM 22,620,000 22,620,000 13,500,000 38,000,000 39,000,000 46,000,000 159,120,00 0 1,500,000 1,500,000 1,500,000 TOTAL 12,000,000 PRIORITY NO 3: ECONOMIC DEVELOPMENT DUE - 28 Waterberg Economic Development Agency Manager: Planning and Economic Development 1,500,000 4,500,000 287 WDM WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Upgrading of the abattoir Manager Technical Services DUE-31 Coordination of District wide LED Manager: Planning and Economic Development DUE-34 Construction of Wildlife Centre Manager Technical Services DUE-35 Madisha Goat Co-operative Manager: Planning and Economic Development DUE-36 Livestock farming (C2C Agricultural Coopratives) DUE 29 DUE-37 DUE-38 3,200,000 100,000 1,000,000 4,300,000 WDM 200,000 400,000 250,000 850,000 WDM 3,000,000 3,000,000 6,000,000 WDM 750,000 750,000 750,000 750,000 2,250,000 WDM/LI BSA Manager: Planning and Economic Development 450,000 450,000 450,000 450,000 1,350,000 WDM/EU -LED Lephalale Agricultural Corridor Manager: Planning and Economic Development 3,000,000 3,000,000 1,000,000 1,000,000 5,000,000 WDM Tourism Development Manager: Planning and Economic Development 1,500,000 1,500,000 1,500,000 WDM 5,900,000 13,600,000 TOTAL 3,200,000 200,000 3,000,000 7,700,000 7,200,000 4,950,000 1,000,000 4,000,000 1,000,000 4,000,000 0 0 25,750,000 PRIORITY NO 4: TRANSPORT DTR-02 Multi-Modal Transport Facilities Manager: Planning and Economic Development TOTAL 0 0 350,000 350,000 350,000 350,000 5,000,000 - - WDM 5,000,000 PRIORITY NO 5: LAND LA - 04 Policy on Sub-Division of Agricultural Land Manager: Planning and Economic Development TOTAL 350,000 0 0 - - 350,000 PRIORITY NO.06: MUNICIPAL HEALTH AND ENVIRONMENTAL MANAGEMENT 288 WDM WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DSE-06 Identification, auditing and maintenance of landfill sites Managers Tech. Services 3,000,000 3,000,000 NEW Waste Management strategy Manager Social Services 300,000 New Refuse Buy Back centre at Mogalakwena Manager Social Services NEW Strategic Environmental Management Plan DHW-07 DSE - 07 4,000,000 WDM 300,000 300,000 WDM 1,200,000 1,200,000 1,200,000 Buyisa-eBag Manager: Social Services 700,000 700,000 700,000 WDM Municipal Health Plan Manager: Social Services 800,000 800,000 800,000 WDM Develop and review air quality plan Manager: Social Services 600,000 600,000 200,000 800,000 WDM 6,600,000 6,600,000 1,200,000 TOTAL 1,000,000 0 - - 7,800,000 PRIORITY NO 8: DISASTER MANAGEMENT DDM-01 Disaster-Centre-Modimolle Managers Tech. Services 1,400,000 1,400,000 1,400,000 WDM DDM-02 Disaster-Centre-Lephalale Managers Tech. Services 3,100,000 3,100,000 3,100,000 WDM DDM-07 Upgrade existing District Disaster Management Centres Manager Social Services 700,000 WDM TOTAL 700,000 4,500,000 0 4,500,000 500,000 500,000 700,000 0 - - 5,200,000 PRIORITY NO 9: COMMUNITY PARTICIPATION AND COMMUNICATION Communication Manager: Executive Mayor's Office 500,000 289 WDM WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Special Projects Manager Executive Mayors Office 1,400,000 1,400,000 District public participation Manager: Executive Mayor's Office 1,450,000 1,450,000 1,600,000 1,700,000 3,350,000 1,600,000 1,700,000 TOTAL 3,350,000 - - 1,400,000 WDM 4,750,000 WDM 6,650,000 PRIORITY NO 10: INSTITUTIONAL DEVELOPMENT 7,150,000 WDM and DLG & H 2,000,000 WDM 3,800,000 WDM 330,000 WDM 7,300,000 WDM DIN - 17 Procurement of movable assets Manager Corporate Service 3,550,000 3,550,000 DIN - 20 Mayoral House Managers Technical Services 2,000,000 2,000,000 DIN-19 Revise and Develop By-Laws Manager:Corporate Services 500,000 500,000 New Training of volunteer Fire Fighters Manager Corporate Service 330,000 330,000 DIN-021 Implementation of IT Master Plan Manager:Corporate Services 6,800,000 6,800,000 500,000 7,630,000 13,180,000 2,900,000 1,500,000 1,500,000 1,500,000 20,580,000 750,000 750,000 800,000 850,000 900,000 1,000,000 4,300,000 WDM 5,000,000 WDM TOTAL 5,550,000 2,100,000 300,000 500,000 1,000,000 500,000 1,000,000 500,000 1,000,000 PRIORITY NO 13: SPORTS, ARTS AND CULTURE DSE-01 Co-ordination of Sports, Arts and Culture Manager Social Services DSC - 06 District MPC sport, arts and culture conference facility Managers Techn. And Social Services TOTAL 5,000,000 750,000 750,000 5,800,000 850,000 900,000 1,000,000 9,300,000 PRIORITY NO 14: ELECTRICITY 290 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 0 TOTAL GRAND TOTAL 0 17,750,000 61,600,000 0 0 0 79,350,000 33,900,000 51,000,000 - 41,400,000 - 48,500,000 WDM 0 254,150,00 0 Minus Counterfunding 1200000- Buyisa E Bag 1250000- DLG&H 2500000- DLG&H 74,400,000 291 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.4 INVESTMENT ALLOCATION PER NATIONAL KPA KPA 1: BASIC SERVICE AND INFRASTRUCTURE DEVELOPMENT PROJ PROJECT RESPONSIBLE IMPLEMENTING OFFICIAL IDP CAPITAL IDP OPERATING NO CAPITAL INVESTMENT PER FINANCIAL YEAR (R) 07/08 08/09 09/10 10/11 TOTAL CAPITAL BUDGET FUNDE R 11/12 PRIORITY NO 1: WATER, SANITATION AND DROUGHT RELIEF DWS - 02 Drought relief plan Manager: Technical Services 400,000 400,000 400,000 WDM New Sewer Mabaleng/Alma Manager: Technical Services 4,000,000 4,000,000 4,000,000 WDM DSA -31 Northam Sewer Ext 5 Phase 2 & Ext 7 Manager: Technical Services 10,000,000 10,000,000 10,000,000 WDM 2,500,000 2,500,000 1,500,000 WDM PRIORITY NO 2: ROADS AND STORMWATER DRS - 01 Development of Roads Management Plan Manager: Technical Services DRS-33 Integrated Infrastructure Master Plan Manager: Technical Services 1,500,000 1,500,000 1,500,000 WDM DRS - 21 Modimolle Access Road Brick Paving of str. Phahameng Manager: Technical Services 770,000 770,000 770,000 WDM DRS - 22 Bela Bela Access Road Brick Paving of str Pienaarsrivier Manager: Technical Services 300,000 300,000 300,000 WDM DRS - 23 Mookgophong Access Road Brick Paving of 36th street Manager: Technical Services 150,000 150,000 150,000 WDM DRS - 24 Lephalale Access Road Tarring of str Marapong Manager: Technical Services 900,000 900,000 900,000 292 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DRS - 25/6 Thabazimbi Access Road Tarring of str in Northam Manager: Technical Services 900,000 900,000 900,000 WDM DRS - 27 Mogalakwena Access Road Regravel and Rehab Mathekga - Moshuka Rd Manager: Technical Services 200,000 200,000 200,000 WDM NEW Upgrade of Road Bakenberg to Mapela via Sepherane & Mmahlogo ( D3507) Manager: Technical Services 6,000,000 6,000,000 18,000,000 WDM DRS - 30 Mogalakwena Access Road Regravel Rd Lesodi - Mmamatlakala Manager: Technical Services 100,000 100,000 100,000 WDM DRS - 31 Mogalakwena Access Road - EPWP Paving of Mahwelereng Str Manager: Technical Services 1,800,000 1,800,000 1,800,000 WDM DRS-34 Mogalakwena Access Road -Upgrade gravel to tar Sadoma Road to N11 Manager: Technical Services 1,500,000 1,500,000 10,000,000 10,000,000 10,000,000 10,000,000 41,500,000 WDM DRS-35 Mogalakwena Access Road -Upgrade gravel to tar Segole to Magagamatala Manager: Technical Services 1,500,000 1,500,000 10,000,000 12,000,000 14,000,000 16,000,000 53,500,000 WDM DRS-32 Road numbering Manager: Technical Services 1,500,000 1,000,000 2,500,000 WDM New Construction of bridge Rust de Winter small holdings (EPWP) Manager: Technical Services 3,000,000 3,000,000 3,000,000 WDM NEW Upgrade of road Bela-Bela - Alma Manager: Technical Services 1,500,000 1,500,000 15,000,000 66,500,000 WDM 12,000,000 15,000,000 15,000,000 20,000,000 PRIORITY 3:LOCAL ECONOMIC DEVELOPMENT DUE 29 Upgrading of the abattoir Manager Technical Services 3,200,000 3,200,000 100,000 DUE-34 Construction of Wildlife Centre Manager Technical Services 3,000,000 3,000,000 3,000,000 1,000,000 4,300,000 6,000,000 PRIORITY NO 4: TRANSPORT 293 WDM Waterberg District Municipality WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DTR-02 Multi-Modal Transport Facilities Manager: Planning and Economic Development TOTAL 0 0 1,000,000 4,000,000 1,000,000 4,000,000 5,000,000 - - 5,000,000 PRIORITY NO.06: MUNICIPAL HEALTH AND ENVIRONMENTAL MANAGEMENT DSE-06 Identification, auditing and maintenance of landfill sites Managers Tech. And Social Services 3,000,000 3,000,000 1,000,000 4,000,000 Waterberg District Municipality 1,400,000 Waterberg District Municipality 3,100,000 Waterberg District Municipality 2,000,000 Waterberg District Municipality PRIORITY NO 8: DISASTER MANAGEMENT DDM-01 DDM-02 Disaster-Centre-Modimolle Managers Tech. And Social Services Disaster-Centre-Lephalale Managers Tech. And Social Services 1,400,000 3,100,000 1,400,000 3,100,000 PRIORITY NO 10: INSTITUTIONAL DEVELOPMENT DIN - 020 Mayoral House Managers Technical and Corpr.Services 2,000,000 2,000,000 294 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 2: LOCAL ECONOMIC DEVELOPMENT PROJ PROJECT RESPONSIBLE IMPLEMENTING OFFICIAL IDP CAPITAL IDP OPERATING NO CAPITAL INVESTMENT PER FINANCIAL YEAR (R) 07/08 08/09 09/10 10/11 TOTAL CAPITAL BUDGET FUNDER 11/12 PRIORITY NO 3: ECONOMIC DEVELOPMENT Coordination of District wide LED Manager: Planning and Economic Development 200,000 200,000 400,000 250,000 850,000 Waterberg District Municipality DUE-35 Madisha Goat Co-operative Manager: Planning and Economic Development 750,000 750,000 750,000 750,000 2,250,000 WDM/LIBSA DUE-36 Livestock farming (C2C Agricultural Co-opratives) Manager: Planning and Economic Development 450,000 450,000 450,000 450,000 1,350,000 WDM/EULED Lephalale Agricultural Corridor Manager: Planning and Economic Development 5,000,000 Waterberg District Municipality Tourism Development Manager: Planning and Economic Development 1,500,000 Waterberg District Municipality DUE-31 DUE-37 DUE-38 3,000,000 1,500,000 3,000,000 1,500,000 1,000,000 1,000,000 295 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 3: MUNICIPAL TRANSFORMATION AND ORGANIZATIONAL DESIGN PROJ PROJECT RESPONSIBLE IMPLEMENTING OFFICIAL IDP CAPITAL IDP OPERATING NO CAPITAL INVESTMENT PER FINANCIAL YEAR (R) 07/08 08/09 09/10 1,500,000 1,500,000 1,500,000 10/11 TOTAL CAPITAL BUDGET FUNDER 4,500,000 WD M 350,000 WDM 7,150,000 WDM and DLG & H 2,000,000 WDM 3,800,000 WDM 330,000 WDM 7,300,000 WDM 11/12 PRIORITY NO 3: ECONOMIC DEVELOPMENT DUE - 28 Waterberg Economic Development Agency Manager: Planning and Economic Development 1,500,000 PRIORITY NO 5: LAND LA - 04 Policy on Sub-Division of Agricultural Land Manager: Planning and Economic Development 350,000 350,000 PRIORITY NO 10: INSTITUTIONAL DEVELOPMENT DIN - 17 Procurement of movable assets Manager Corporate Service 3,550,000 3,550,000 Mayoral House Managers Technical Services 2,000,000 2,000,000 DIN-19 Revise and Develop By-Laws Manager:Corporate Services 500,000 500,000 New Training of volunteer Fire Fighters Manager Corporate Service 330,000 330,000 DIN-021 Implementation of IT Master Plan Manager:Corporate Services 6,800,000 6,800,000 DIN - 20 2,100,000 300,000 500,000 500,000 1,000,000 500,000 1,000,000 500,000 1,000,000 296 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 KPA 4: FINANCIAL MANAGEMENT AND VIABILITY No projects were identified for this KPA KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION PRIORITY NO 9: COMMUNITY PARTICIPATION AND COMMUNICATION Communication Manager: Executive Mayor's Office Special Projects Manager Executive Mayors Office District Public Participation Manager: Executive Mayor's Office 500,000 1,400,000 1,450,000 500,000 1,400,000 1,450,000 1,600,000 1,700,000 500,000 Waterberg District Municipality 1,400,000 Waterberg District Municipality 4,750,000 Waterberg District Municipality 4,300,000 Waterberg District Municipality PRIORITY NO 13: SPORTS, ARTS AND CULTURE DSE-01 Co-ordination of Sports, Arts and Culture Manager : Office of the Executive Mayor 750,000 750,000 800,000 850,000 900,000 1,000,000 297 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.5 OUTPUT PERSPECTIVE 8.5.1 Strategic Goal 1: OBJECTIVES / KPA Policy instruments (Policies, Strategies, Standards, Plans, Guidelines, Standard operating procedures ) PERFORMANCE INDICATORS New policy instruments planned versus milestones met (%) Policy instruments planned to be reviewed versus reviewed (%) Ad hoc regulatory input requested versus provided (%) To provide a sound district regulatory framework OUTPUTS New policy instruments Integrated infrastructure master plan o Water service development plan o Electricity master plan o Fleet master plan o Integrated transport plan (ITP) Building master plan o o o Policy instruments (Policies, Strategies, Standards, New policy instruments planned versus o Integrated roads and storm water master plan Drought Relief Plan Sanitation and waste water master plan 2006 / 2007 April – June July – Sept. 1st Draft master plan Stakeholder consultation report Final draft water service development plan submitted for approval 1st Draft electricity master plan submitted for approval 1st Draft fleet master plan submitted for approval Final Draft ITP submitted for approval 1st Draft building master plan submitted for approval 1st Draft roads and storm water master plan submitted for approval Implementation progress report N/A 1st Draft sanitation and waste water master plan submitted for approval Stakeholder consultation report Stakeholder consultation report Implementation progress report Stakeholder consultation report Stakeholder consultation report 2007 / 2008 Quarterly outputs Oct. – Dec Jan - March April – June Final draft master plan submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Final draft master plan submitted for approval Final draft master plan submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Final draft master plan submitted for approval Final draft master plan submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Stakeholder consultation report Final draft master plan submitted for approval Implementation progress report 298 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Plans, Guidelines, Standard operating procedures ) milestones met (%) Policy instruments planned to be reviewed versus reviewed (%) Ad hoc regulatory input requested versus provided (%) District social development plan milestones met (%) Integrated District / Local Economic development plan N/A District broad based black economic empowerment policy 1st Draft District broad based black economic empowerment policy District Entrepreneuri al support policy 1st Draft Entrepreneurial support policy o IDP coordination o Social development o Crime prevention strategy District IDP coordination implementation plan milestones met (%) Social Development Master Plan approved 1st Draft o o o o Integrated sports, arts and culture policy District Youth development implementatio n plan Stakeholder consultation report 1st Draft Stakeholder consultation report 1st Draft Stakeholder consultation report Final draft submitted for approval Implementation progress report Implementation progress report Implementation progress report Local economic development implementation plan Stakeholder consultation report Implementation progress report Implementation progress report Implementation progress report Final draft policy submitted for approval Stakeholder consultation report Implementation progress report Implementation progress report Implementation progress report Reviewed 2007/08 approved 2008/09 IDP review process plan approved Implementation progress report Framework approved 1st draft submitted for adoption Stakeholders consultation report Final plan submitted for approval Final draft policy submitted for approval Implementation progress report Implementation progress report Implementation progress report Final draft policy submitted for approval Implementation progress report Implementation progress report Implementation progress report Final draft policy submitted for approval Implementation progress report Implementation progress report Implementation progress report Final draft policy submitted for approval Reviewed IDP 299 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 o o o District HIV and AIDS implementatio n plan District Gender policy implementatio n plan District Disability policy Local municipality institutional support plan District IGR policy framework 1st Draft Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 300 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Municipal health services plan o Water quality monitoring management plan o Conservation management plan o Audit policy o Risk management strategy o Resources management strategies N/A 1st Draft Implementation progress report Implementation progress report Implementation progress report Final draft policy submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Final Draft policy submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Stakeholder consultation report 1st Draft Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report Final draft policy submitted for approval 1st Draft Stakeholder consultation report 301 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 o Knowledge management strategy 1st Draft Stakeholder consultation report o Environmenta l /Conservation Management Plan 1st Draft Stakeholder consultation report Final Draft policy submitted for approval Implementation progress report Implementation progress report (IDP performance review reports based on SDBIP ) Final draft policy submitted for approval o Disaster risk management plan (Water quality , fire, etc) Legislative/Leg al instruments (Bylaws, agreements) Regulatory input report New N legislative/legal e instruments w Bylaw l development e project plan g i District Spatial development framework 1st Draft review Stakeholder consultation report Final draft policy review submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report (IDP performance) IDP review framework IDP review process plan Budget review process plan Implementation progress report Implementation progress report (IDP performance review reports based on SDBIP ) Implementation progress report (IDP performance review reports based on SDBIP) Implementation progress report Implementation progress report Stakeholder consultation report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Final draft policy review submitted for approval Report as required Report as required Report as required Report as required Report as required Project implementation progress report Project implementation progress report Project implementation progress report Project implementation progress report 1st Draft Stakeholder consultation report Final Draft submitted for approval 302 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 s l a t i v e Municipal services implementation Agreements development plan 1st Draft Stakeholder consultation report Final Draft submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report i n s t r u m e n t s p l a n n e d v e r s u s m i l e s t o n e s m 303 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Status monitoring (Surveys, Surveillance, Detections, Assessments, Sampling, Metering, Testing) Compliance S monitoring t recommendations a implementation t report per u approved schedule s Ad hoc compliance monitoring service m report o Status monitoring n recommendations i implementation t report per o approved schedule Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required 304 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Ad r hoc status monitoring i service report n g Report as required Report as required Report as required Report as required Report as required i n t e r v e n t i o n s p l a n n e d v e r s u s c o n d u c t e d ( % ) 305 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Authorisation decisions (Permits, Certification) Authorisation A decisions report u t h o r i s a t i o n Report as required Report as required Report as required Report as required Report as required a p p l i c a t i o n s r e c e i v e d v e r 306 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 s u s f i n a l i s e d w i t h i n p r e s c r i b e d t i m e ( % ) 307 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Legislative/Leg al instruments (Bylaws, agreements) New N legislative/legal e instruments w Bylaw l development e project plan g i 1st Draft Stakeholder consultation report Final Draft submitted for approval Project implementation progress report Project implementation progress report Project implementation progress report Project implementation progress report 308 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 s l a t i v e Municipal services implementation Agreements development plan 1st Draft Stakeholder consultation report Final Draft submitted for approval Implementation progress report Implementation progress report Implementation progress report Implementation progress report i n s t r u m e n t s p l a n n e d v e r s u s m i l e s t o n e s m 309 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Status monitoring (Surveys, Surveillance, Detections, Assessments, Sampling, Metering, Testing) Compliance S monitoring t recommendations a implementation t report per u approved schedule s Ad hoc compliance monitoring service m report o Status monitoring n recommendations i implementation t report per o approved schedule Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required Report as required 310 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Ad r hoc status monitoring i service report n g Report as required Report as required Report as required Report as required Report as required i n t e r v e n t i o n s p l a n n e d v e r s u s c o n d u c t e d ( % ) 311 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Authorisation decisions (Permits, Certification) Authorisation A decisions report u t h o r i s a t i o n Report as required Report as required Report as required Report as required Report as required a p p l i c a t i o n s r e c e i v e d v e r s u 312 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 s f i n a l i s e d w i t h i n p r e s c r i b e d t i m e ( % ) 313 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.5.2 Strategic Goal 2: OBJECTIVES / KPA Technical training / advisory services (Technical advice / consultation, Information sharing) Awareness creation (Campaigns, Events, Workshops, Seminars, Conferences, Workshops Publications) To promote sound management capacity in the district municipal area PERFORMANC E INDICATORS Advisory services requested versus provided (%) Training interventions planned versus conducted (%) Awareness interventions planned versus conducted (%) Promotional material required versus requirements submitted timeously to OUTPUTS 2006 / 2007 April – June July – Sept. 2007 / 2008 Quarterly outputs Oct. – Dec Jan - March April – June Technical training / advisory service report Report as required Report as required Report as required Report as required Report as required Training interventions schedule per district service delivery area 1st Draft Implementati on progress report Implementati on progress report Implementati on progress report Implementation progress report Implementati on progress report Implementati on progress report Implementati on progress report Implementation progress report Publish upon approval Publish upon approval Publish upon approval Publish upon approval Awareness intervention schedule per municipal area District Information Publications schedule Stakeholder consultation report Final draft submitted for approval 1st Draft Stakeholder consultation report Final draft submitted for approval Publish upon approval 314 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 relevant support services (%) Media coverage report (Radio, TV, Print, etc) Media coverage report with an intervention plan Report on implementation of recommendation s Stakeholder institutional arrangements management (Forum establishment / development, SLA, MOUs, Performance monitoring, Contract management ) Stakeholder forums planned to be established versus established (%) Forums functionality gaps identified versus recommendatio ns made (%) SLAs / MOUs / Agreements planned versus submitted for signature (%) Media coverage report with an intervention plan Media coverage report with an intervention plan Media coverage report with an intervention plan Report on implementati on of recommenda tions Implementati on progress report Report on implementati on of recommenda tions Implementati on progress report Report on implementati on of recommenda tions Implementati on progress report Media coverage report with an intervention plan Implementation report on recommendations Events/Campaigns/Semi nars/ workshop/ schedule 1st Draft Stakeholder consultation report Final draft policy submitted for approval New Stakeholder Forums establishment / disestablishment report Stakeholder capacity development report New SLA’s / MOU’s / Agreements report Report submitted to council Report submitted to council Report submitted to council Report submitted to council Report submitted to council Report as required Report submitted to council 1st Draft Report as required Report submitted to council Implementati on progress report Report as required Report submitted to council Implementati on progress report Report as required Stakeholder directory Report as required Report submitted to council Implementati on progress report Stakeholder consultation report Implementation progress report Report submitted to council Implementation progress report Final draft policy submitted for approval Component 315 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.5.3 Strategic Goal 3: OBJECTIVES / KPA Infrastructure development To implement district municipal services PERFORMANCE INDICATORS Infrastructure planned to be developed versus milestones met (%) Infrastructure planned to be procured versus milestones met (%) Infrastructure plan milestones met (%) Maintenance budget required as per regulations versus secured (%) OUTPUTS 2006 / 2007 April – June 10 km road development (rehabilitation and regravelling) (against a backlog of 11 000 km) Mayoral house (Modimolle) Additional office Space Architects appointed Council approval (Technical designs etc.) Contractors appointed Rehabilitated Landfill sites Contractor appointed Upgraded abattoir Technical design approved Wild Life Centre Northam Sewer Treatment Plant Upgraded Radium to Syferskuil road Contractor appointed Consultants appointed Consultants appointed July – Sept. Project completion report Technical designs approved Implementatio n progress report Implementatio n progress report Project implementation report Project implementation report Technical design approved Contractor appointed Technical design approved Contractor appointed 2007 / 2008 Quarterly outputs Oct. – Dec Jan - March Contractor appointed Implementatio n progress report Implementatio n progress report Project completion report Project completion report Implementatio n progress report Project completion report April – June Implementatio n progress report Project implementation report Project completion report Project implementation report Project implementation report Project completion report Project implementation report Project implementation report Project completion report 316 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Technical design approved Transport Management Disaster Management District integrated Transport management plan milestones met(%) District disaster risk management plan / framework milestones met (%) Upgraded road Segole to Magagamatala Consultants appointed Multi-Modal Facilities N/A Disaster Centres in Modimolle and Lephalale Contractors appointed 50 Disaster Risk Management volunteers trained per Local Municipality Implementation progress report Implementatio n progress report Compatible Disaster Risk Management IT System (integrate to master systems plan) Implementation progress report Implementatio n progress report Contractor appointed 1st Draft project plan approved Project implementation report Project implementation report Project implementation report Project completion report Implementatio n progress report Project completion report Implementatio n progress report Implementatio n progress report Implementatio n progress report Implementatio n progress report Implementatio n progress report Implementatio n progress report 50% of Volunteers trained Implementatio n progress report 317 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 8.5.4 Strategic Goal 4: OBJECTIVES / KPA Corporate governance practices (Compliance management, best practices management, risk management) Business management / leadership (Strategic positioning, Business performance management, Business culture development, Stakeholder relations, Service delivery, Corporate governance) To ensure effective support services PERFORMANCE INDICATORS Audit queries received versus responded to (%) Compliance to regulatory framework (%) Organisational culture / employee satisfaction rating (%) Business targets met (%) Client satisfaction rating (%) Internal services level charters required versus signed (%) Internal stakeholder consultative forums planned to be established versus established (%) OUTPUTS Audit query response report Compliance report against internal municipal policies Compliance report against regulations of external stakeholders Best practices Strategic plan Operational plan Reviewed structure 2006 / 2007 April – June 2007 / 2008 Quarterly outputs Oct. – Dec Jan - March April – June Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report submitted to Council Report as required Report submitted to Council Report as required Report submitted to Council Report as required Final Draft submitted to Council for approval Final Draft submitted to Council for approval Final Draft submitted to Council for approval Progress report Progress report Strategic plan 2008 / 09 Progress report Progress report Progress report Develop 2008 / 09 Operational Plan Progress report An improvement plan based on the employee satisfaction survey results (if measured by the Municipality) Improvement plans based on stakeholder satisfaction feedback Internal municipality service level charters July – Sept. Final Draft submitted to Council for approval Reviewed structure requirements submitted Survey report Developed improvement plans Implementation progress report Implementation progress report Stakeholder satisfaction survey report Developed improvement plans Implementation progress report Report as required Report as required Report as required Stakeholder satisfaction feedback review Implementation progress report Report as required 318 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Internal consultative stakeholder forums (within Municipality) Visits / meetings report External Municipality International Business assets management People management Budgeted positions filled (%) Skills development plan targets met (%) Additional human resource capacity required versus business case provided (%) Human resource required versus requirements submitted timeously (%) Interns trained (n) Vacancy rate report Skills development plan Human resources deficit report Individual performance management system Review current performance management system and adapt to current needs Report on municipal internal decision making / management process Implementation plan to address gaps / deficiencies Implementation progress report Implementatio n progress report Implementation progress report Implementation progress report Structure of external municipality visits report approved Structure of external municipality visits report approved Vacancy rate report structure approved Implementation progress report Implementation progress report Implementation progress report Implementatio n progress report Implementation progress report Implementation progress report Implementation progress report Implementatio n progress report Implementation progress report Implementation progress report Implementation progress report Implementatio n progress report Implementation progress report Implementation progress report Implementation progress report Implementatio n progress report Implementation progress report Implementation progress report Business case as required Project implementation progress report Business case as required Project implementation progress report Skills development plan 2007 / 2008 Business case as required approved PMS implementation report Business case as required Project implementation progress report Skills development plan 2008 / 2009 Business case as required Project implementation progress report 319 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Financial management Information / knowledge management ICT management Asset management (fixed assets and consumables) Programme / project Variance on budget spent (%) Knowledge planned to be documented versus documented (%) Website updates required versus content submitted timeously (%) ICT developments / procurement planned versus requirements submitted timeously to ICT component (%) Assets data integrity rating (%) Assets required versus requirements submitted timeously (%) Programmes / Performance management capacity intervention plan Approved project plan Performance assessment reports Organisational Assessment report Report Expenditure report Plan on identified knowledge to be documented Draft website online for internal consumption and approval District website online for public consumption Submit website content as required Interns training report Variance reports Knowledge documentation plan Website content structure approved Core systems development planned GIS strategic information reports MUN Master system plan Assets establishment / improvement plan Programme / project reports Project implementation progress report Assessment report Project implementation progress report Assessment report Project implementation progress report Assessment report Project implementation progress report Assessment report Report Expenditure report Implementation progress report Report Expenditure report Implementatio n progress report Implementatio n progress report Report Expenditure report Report Expenditure report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report GIS reports GIS reports GIS reports GIS reports GIS reports Master system plan submitted for approval Final Draft approved Implementation progress report Implementatio n progress report Implementatio n progress report Implementation progress report Implementation progress report Implementation progress report Implementation progress report Report as required Report as required Report as required Report as required Report as required Implementation progress report 320 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 management Contract management projects completed within time (%) Programmes / projects completed within budget (%) Contractor performance rating (%) Development Agency Project initiation report approved Business plan approved Contractor performance report Report as required Report as required Implementatio n progress report Report as required Implementation progress report Implementation progress report Report as required Report as required 321 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION D 322 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 INTEGRATION PHASE 323 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.1 INTRODUCTION With the Integration Phase of the IDP process the Municipality ensures that project proposals conform to objectives and agreed strategies with resource frames (financial and institutional) and with legal requirements. Moreover, the individual project proposals have to be scheduled in terms of content, location and timing in order to arrive at consolidated integrated programmes for the municipality, as well as sector agencies or corporate services providers involved in the provision of services. The purpose of this section is to report on and ensure that national and provincial guidelines related to crosscutting dimensions are adequately considered. This was achieved by the drafting of various inter-sector programmes, as prescribed in the Municipal Systems Act, 2000 (Act 32 of 2000), other legislation, and the IDP Guide Packs. Please note that the Waterberg District Municipality had insufficient resources for the drafting of specific sector plans/programmes to the required level of detail in all instances. Only the plans/programmes essential to the IDP process at this point in time have, therefore, been drafted, as required. 324 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.2 INTEGRATED SECTOR PROGRAMMES 9.2.1 ROADS AND TRANSPORT (ROADS AGENCY LIMPOPO) PROJECT NAME Road D3500/D4380 Roads D3110 Roads D1897 Roads D2533/D1000 Road D1711 LOCATION GaKgabudi to Mapela to Bakenburg Ga-Seleka to Shongoane Radium Road (P1/3 –NW/Cyferskuil) Mabula/Mabalingwe: Rietspruit to Flora Marken to Rebone Roads D1231/D3363/D3371 Mokopane to GaMashashane Roads P201/D1234/D869/D1309/D2702 Koedoeskop to Northam to Dwaalboom (PPC):50/50 Mokopane to Kloof Pass to Marken Kgopong to Makekeng Road D192 to Mabuladithlare Road P19/1 Road D192 Road D3521 TOTAL DESCRIPTION STARTIN G DATE COMPL ETION DATE 11/08/2005 10/05/2007 28 000 000 15 000 000 30 000 000 22/08/2005 22/07/2007 30 000 000 20 792 000 0 7 000 000 11 200 000 0 8 000 000 8 758 000 0 5 000 000 0 0 5 000 000 0 20 000 000 5 000 000 35 000 000 0 Maintenance 0 20 000 000 0 Upgrading of road (Gravel to tar) 0 4 000 000 0 3 000 000 0 0 91 000 000 94 750 000 Upgrading of road (Gravel to tar) (34.5 kmkm) Upgrading of road (Gravel to tar) ( 28.8 km) Upgrading of road (Gravel to tar) (7.3 km) Upgrading of road (Gravel to tar) (12 km ) Upgrading of road (Gravel to tar) (31 km ) (Design Only at the moment) Upgrading of road (Gravel to tar) (29 km ) (Design Only at the moment) Upgrading of road (Gravel to tar) (Design Only at the moment) Upgrading of road (Gravel to tar) (7.8 km) 29/08/2006 October 2005 29/05/2007 11/10/2006 BUDGET (RANDS) 2006/07 2007/08 2008/09 50 000 000 325 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 ROADS AND TRANSPORT ( ROADS AGENCY LIMPOPO) ROAD No. D2460/ D184/ D1629/ D113 D2702 D180, D178, P240/1 D192 D1689, D1754, D1897 D928 D2001 P20/2,D1234 D908,D1038 D924,D934 D1958 LENGTH km DISTRICT From road D2460 to road D112 23 Waterberg Dwaalboom to road D1173 (border-line with Botswana) 36 Waterberg Bela Bela to Alma 47 Waterberg 45 Waterberg 46 Waterberg 7 Waterberg 36 Waterberg 35 Waterberg 22 Waterberg 50 Waterberg 33 Waterberg 34 Waterberg ROAD PARTICULARS GaMotlana to GaMalekwa to GaRapadi Steilloop to Melinda to Mokurwanyane Radium to Cyferskuil Marekeli National Park to Leeupoort Lephalalle to Stockpoort Borderpost Koedoeskop to Northam Rietspruit to Zandrivier to Rhenosterpoort to Donkerpoort Hartbeestlaagte to Nysvley Nature Reserve to Blindesfontein to Middelplaats Nokayamatlala to GaMalokwa to GaMolaka to Mapela to Mmahlogo to Groenfontein 414 COST ESTIMATE 46,000,000 72,000,000 94,000,000 90,000,000 92,000,000 05/06 06/07 07/08 08/09 09/10 6 10 10 10 10 0 12 15 15 15 15 0 14 20 20 20 20 0 20 15 15 20 20 0 15 20 15 20 22 0 14 14,000,000 72,000,000 70,000,000 44,000,000 100,000,000 66,000,000 68,000,000 828,000,000 10/11 Remaining 0 10 15 15 15 17 0 10 15 15 15 15 0 10 10 10 10 4 0 20 20 20 20 20 0 11 10 15 15 15 0 8 10 15 15 20 0 136 160 179 175 178 0 0 326 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.2.2 SAFETY AND SECURITY SA POLICE SERVICE (LIMPOPO) INFRASTRUCTURAL PROJECTS FOR 2007/2008 – 2009/2010 PROJECT NAME LOCATION Building of Tolwe Police Stations Waterpoort Vaalwater Roedtan PROJECT STATUS BUDGET 2007/2008 - R 17 000 000 R 24 000 000 R 36 000 000 R 34 000 000 PREVIUOS WXPENDITURE ON THE PROJECT - FUNDING SOURCES RESPONSIBLE AGENT SAPS SAPS SAPS SAPS SAPS SAPS SAPS SAPS 9.2.3 HOUSING DEVELOPMENT Project Name HOUSING District WATERBERG Municipality MODIMOLLE Location Phagameng.(Ext 4) No of Erven 1003 HOUSING WATERBERG Mookgopong Naboomspruit (Ext 6) 500 2007/2008 Financial . HOUSING WATERBERG LEPHALALE Marapong (Ext 4) 1356 2007/2008 Financial year. HOUSING WATERBERG MOGALAKWENA POTGIETERSUS Ext 20 1475 2007/2008 Financial year. HOUSING WATERBERG Bela-Bela 350 2007/2008 Financial year RADIUM Year 2007/2008 Financial y 327 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.2.4 HEALTH AND SOCIAL DEVELOPMENT Project Name District L/Municipality Overall Project Budget Implementin g agent 2005/06 2006/07 2007/08 2008/09 R10m R21m R2m CLINIC BUILDING AND UPGRADE PROGRAMME Thabaleshoba Waterberg HC Chalema Waterberg Bela Bela Waterberg Vaalwater Waterberg Regorogile 2 Waterberg Smashersblok Waterberg Piennarsrevier Waterberg Beauty Waterberg CLINIC WATER SUPPLY Settlers Waterberg Kroomdraai Waterberg Vaalkop Waterberg Mapela Waterberg Mosesetjane Waterberg Mogalakwena R34m Public Works R1.4m Mogalakwena Bela Bela Modimolle Thabazimbi Tabazimbi Bela-Bela Lephalale R3.8m R3.2m R3.2m R3.2m R3.2m R3.2m R3.2m Public Works Public Works Public Works Public Works Public Works Public Works Public Works R3.8m R3.8m R3.8m Bela Bela Thabazimbi Mogalakwena Mogalakwena Mogalakwena R100,000.00 R100,000.00 R100,000.00 R100,000.00 R100,000.00 DWAF DWAF DWAF DWAF DWAF R100,000.00 R100,000.00 R100,000.00 R100,000.00 R100,000.00 DWAF DWAF DWAF DWAF DWAF DWAF R114,000.00 R114,000.00 R114,000.00 R114,000.00 R114,000.00 R114,000.00 R3.8m R3.8m R3.9m R3.9m CLINIC SANITATION PROGRAMME Abbotspoort Bavaria Bokwalakwala Kroomdraai Lekhureng Mankuwe Waterberg Waterberg Waterberg Waterberg Waterberg Waterberg Lephalale Mogalakwena Mogalakwena Thabazimbi Mogalakwena Mogalakwena R114,000.00 R114,000.00 R114,000.00 R114,000.00 R114,000.00 R114,000.00 328 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Seleka Shongoane Vaalkop Waterberg Waterberg Waterberg Lephalale Lephalale Moglakwena Project Name District L/Municipality R114,000.00 R114,000.00 R114,000.00 Overall Project Budget HOSPITAL UPGRADE AND BUILDING PROGRAME Thabazimbi Waterberg Thabazimbi 63,000,000 EMERGENCY MEDICAL SERVICES Warmbaths Waterberg Bela Bela Thabazimbi Waterberg Thabazimbi 2005/06 2006/07 2007/08 2008/09 Public works 7,m 12m 34m 10m Public Works Public Works Public Works Public Works All All All All All All All All Public Works All All Implementin g agent 2005/06 2006/07 2007/08 2008/09 R1m R13m R8m Budget centralized R87,000,000 Project Name L/Municipality Overall Project Budget Mogalakwena Implementin g agent Public Works Thabazimbi Lephalale Lephalale Mogalakwena Mogalakwena Modimolle Bela Bela Mogalakwena Mookgophong NURSING COLLEGES Mokopane Waterberg R114,000.00 R114,000.00 R114,000.00 R3,600.000 R3,600.000 STAFF ACCOMMODATION Thabazimbi Waterberg Witpoort Waterberg Ellisras Waterberg George Masebe Waterberg Voorttrekker Waterberg FH Odendaal Waterberg Warmbaths Waterberg Mokopane Waterberg Mookgophong Waterberg HC District DWAF DWAF DWAF R22m R3,600.000 R3,600.000 Public Works 329 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 FORENSIC PATHOLOGY SERVICES MORTUARIES (FPSM) Warmbaths Waterberg Bela Bela R8,8 m Mokopane Waterberg Mogalakwena R10m Project Name District L/Municipality SOCIAL DEVELOPMENT FACILITIES Modimole one-stop Waterberg Modimole centre Rapadi satellite Waterberg Mogalakwena Steenbokpan satellite Waterberg Lephalale Tolwe satellite Waterberg Mogalakwena Northam satellite Waterberg Thabazimbi Rooiberg satellite Waterberg Thabazimbi Lesodi satellite Waterberg Mogalakwena Pienarsrivier satellite Waterberg Belea-Bela Shongoane satellite Waterberg Mogalakwena Vingerkraal satellite Waterberg Bela-Bela Mosesetjani satellite Waterberg Mogalakwena Mattenau satellite Waterberg Mogalakwena VICTIM EMPOWERMENT CENTRES (VEPs) Bela-Bela Waterberg Bela-Bela Mookgopong Township Waterberg Mookgopong Rebone Waterberg Mogalakwena Northam Waterberg Thabazimbi Thushang Waterberg Mogalakwena Phagameng Bakenberg Moshate Waterberg Waterberg Waterberg Modimole Mogalakwena Mogalakwena Public Works R8,8m R10m Overall Project Budget Implementin g agent R3.5m Public Works R3.5m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works Public Works R1.8m R600,000.00 Public Works R600,000.00 Public Works R600,000.00 Public Works R600,000.00 Public Works R600,000.00 Public Works DROP-IN CENTERS R700,000.00 Public Works R700,000.00 Public Works R700,000.00 Public Works 2005/06 2006/07 2007/08 2008/09 R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m R1.8m Ri.8m R600,000.00 R600,000 R600,000 R600,000 R600,000 R700,000.00 R700,000.00 R700,000 R700,000 330 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.2.5 ENVIRONMENT, TOURISM AND ECONOMIC DEVELOPMENT PROJECT NAME LOCATION PROJECT AMOUNT SOURCE OF FUNDING Thutlane sacred site Mogalakwena Municipality R 1 500 000 DEDET Telekishi Ramasobana Hospital;ity and Tourism Co-operative Mogalakwena Municipality R 31 000 DEDET Moepel Eco-tourism Mogalakwena Municipality R5 000 000 DEDET Melkbos Community Based Conservation Enterprise Lephalale Municipality Babirwa Small Scale Mining Pebble Collection Mogalakwena Municipality R 1 500 000 DEDET Upgrading of the Marakele National Park Thabazimbi Municipality R 7 287 953 DEDET DEDET 331 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9.3 CAPITAL INVESTMENT PROGRAMMES OF LOCAL MUNICIPALITIES 9.3.1 THABAZIMBI LOCAL MUNICIPALITY PRIORITIES LINKED OBJECTIVES OF THE PGDS: IMPROVING THE QUALITY OF LIFE PRIORITY NO.1: WATER AND SANITATION PROJECT NO. PROJECT DESCRIPTION Responsible Implementing 2006/07 2007/08 2008/09 2009/10 department PRIORITY NO.1: WATER SUPPLY / PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE TOTAL CAPITAL BUDGET FUNDER LTW -01 Temporary water Schilpadnest. Rooiberg Bulk Water. 10 000 000 DWAF 17 188 639 MIG 13 000 000 DWAF LTW – 04 LTW – 09 (new) LTW- 13 LTW-17 LTW-18 LTW-26 at Thabazimbi Upgrading of Bulk water System – Pump Station to reservoir Northam upgrading of water network Thabazimbi: Marakele bulk water pipeline Regorogile extension 6 and 7 water reticulation Thabazimbi upgrading borehole water scheme Manager: Services Manager: Services Manager Services Manager Services Manager: Services Manager: Services Manager: Services Tech. Tech. :Tech. 5 000 000 7 361 040 - :Tech. 3 000 000 9 827 599 5 000 000 8 000 000 - 2 000 000 3 000 000 - 5 000 000 2 000 000 3 000 000 - 5 000 000 - Tech. Tech. 3 900 000 - - - 3 900 000 Tech. - 1 400 000 3 600 000 - 5 000 000 DWAF DWAF TLM/MIG DWAF DWAF 332 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJEC T NO. Responsible TOTAL Implementing 2006/07 2007/08 2008/09 2009/10 CAPITAL department BUDGET. PRIORITY NO.1: SANITATION/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE LTS – 01 Northam Waste Water Manager: Tech. 5 350 000 6 500 000 12 000 000 Treatment Plant Services LTS – 07 Northam Sewer Manager: Tech. Reticulation ext 7 Services 2 000 000 3 663 000 5 663 000 LTS – 13 Thabazimbi Waste Water Manager: Tech. treatment plant Services 7 000 000 6 000 000 13 000 000 LTS - 16 Regorogile extension 6 & 7 Manager: Tech. bulk network Services 3 900 000 3 900 000 LTS – 17 Provision of Sanitation Manager: Tech. (new) facilities at Letswai Metsi Services 100 000 50 000 25 000 175 000 PROJEC T NO. PROJECT DESCRIPTION Responsible TOTAL Implementing 2006/07 2007/08 2008/09 2009/10 CAPITAL department BUDGET. PRIORITY NO.2: ELECTRICITY/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE LTEL - Installation of new streetlight and Manager: Tech 17 high masts: Rooiberg, Northam Services 545 731 3 878 4 674 000 and Regorogile 269 LTEL – Electrification of Regorogile ext 6 Manager: Tech. 100 000 688 000 788 000 19 and 7 Services PROJEC T NO. FUNDE R DWAF DWAF DWAF DWAF DLGH ANGLO PLATI NUM PROJECT DESCRIPTION PROJECT DESCRIPTION Responsible Implementing 2006/07 2007/08 2008/09 2009/10 TOTAL CAPITAL FUNDE R TLM / MIG DME FUNDER 319 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 department BUDGET . PRIORITY NO. 3: ECONOMIC DEVELOPMENT / PRIORITIES LINKED OBJECTIVE OF THE PGDS: GROWING THE ECONOMY LTPED – 02 LTPED – 07 LTPED – 09 Local Economic Strategy Manager: Planning Spatial Development Framework Development of a Cultural Village/ Strydom House Manager: Planning LTPED – 13 LTPED18 LTPED20 LTPED21 Butterland Bakery PROJEC T NO. PROJECT DESCRIPTION 150 000 150 000 180 000 100 000 100 000 Implementing department 580 000 150 000 1 500 000 1 500 000 160 000 100 000 100 000 250 000 200 000 100 000 127 000 127 000 100 000 93 000 186 000 93 000 372 000 2008/09 TOTAL BUDGET. - Manager: Planning Health and Social Development Women of Integrity Bakery Health and Social Project Development Kanana Bakery Project Health and Social Development Kromdraai Vegetable Health and Social Garden Development - 280 000 380 000 2 150 000 - 360 000 550 000 354 000 - 2006/07 2007/08 2009/10 TLM DLGH TLM DBSA TLM/ DBSA EU Dept of Soc. Dev. Dept of Soc. Dev. Dept of Soc. Dev. Dept of Soc. Dev. FUNDE R PRIORITY NO. 4: ROADS AND STORM WATER/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE & GROWING THE ECONOMY LTRS – Paving/ Tarring Of Manager: Technical 3 307 500 1 417 500 MIG 05 Rooiberg Internal Roads. Services 4 725 000 LTRS – Paving/ Tarring of Manager: Technical MIG 06 Regorogile Internal roads. Services 568 000 5 395 443 5 964 000 320 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LTRS 26 – Paving of Northam internal roads PROJEC T NO. PROJECT DESCRIPTION PROJEC T NO. PROJECT DESCRIPTION Manager: Services Implementing department Technical - 2006/07 - 2007/08 4 630 500 2008/09 1 984 500 2009/10 6 615 000 MIG TOTAL BUDGET. FUNDE R PRIORITY NO.5: SOLID WASTE AND ENVIRONMENT/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE LTSE – Upgrading of Regorogile Manager: Social Services 2 500 000 MIG 01 Cemetry 2 500 000 Responsible TOTAL Implementing 2006/07 2007/08 2008/09 2009/10 CAPITAL FUNDE department R BUDGET. PRIORITY NO.7: HOUSING AND TRANSPORT/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE LTHT – Housing at Northam Manager: Social 1 500 2 400 000 3 900 000 DLGH 01 Services 000 LTHT – Housing for Rooiberg Manager: Social 2 000 1 685 000 DLGH 02 residents Services 000 3 685 000 LTHT - Housing for Thabazimbi/ Manager: Social 3 000 3 633 000 3 633 000 DLGH 03 Regorogile Services 000 LTHT - Housing for Schilpadnest Manager: Social 3 500 000 4 000 000 7 500 000 DLGH 04 residents Services LTHT – Housing for Raphuthi and Manager: Social 1 100 2 200 000 3 200 000 DLGH 05 Koedoeskop Residents Services 000 (Farms) LTHT - Regorogile ext 3 & 4 Manager: Social 1 500 1 500 000 3 000 000 6 000 000 DLGH 06 upgrading of old RDP Services 000 321 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LTHT 07 LTHT 08 LTHT 09 LTHT 10 LTHT 11 PROJEC T NO. - houses Housing at Northam Residents (PHP) Housing for Rooiberg Residents (PHP) Promotion of Road Safety - Housing for Dwaalboom - Housing Development of middle cost income - PROJECT DESCRIPTION Manager: Services Manager: Services Manager: Services Manager: Services Manager: Services Social - 2 320 000 - 4 600 000 DLGH 2 100 000 - 3 600 000 DLGH - 2 300 000 1 500 000 100 000 Social - Social 100 000 - 200 000 DLGH Social - 100 000 1 000 000 - 1 100 000 DLGH Social - 100 000 2 100 000 - 3 100 000 DLGH TOTAL CAPITAL BUDGET. FUNDE R Responsible Implementing 2006/07 2007/08 2008/09 2009/10 department PRIORITY NO.12: INSTITUTIONAL / PRIORITY LINKED OBJECTIVE OF THE PGDS: GROWING THE ECONOMY LTI - 01 New Civic Centre Manager: Corporate 1 500 000 22 000 000 Services LTI – 05 Municipal Internet Website Manager: Corporate Services 150 000 LTI – 15 Development of Manager: Corporate Performance Management Services 350 000 150 000 Systems LTI – 16 Fleet monitoring system Manager: Corporate Services 200 000 300 000 LTI – 17 Integrated Human Manager: Corporate Resource Management Services 350 000 Strategy TLM 23 500 000 150 000 500 000 TLM TLM TLM 500 000 350 000 TLM 322 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LTI – 18 LTI – 19 LTI – 20 LTI – 21 PROJEC T NO. Anti corruption and Fraud strategy Review Skills Development Plan Revenue enhancement strategy Compilation of asset registry Manager: Services Manager: Services Manager: Services Manager: Services Corporate - TLM - 250 000 250 000 500 000 - 250 000 250 000 - 500 000 - 400 000 200 000 - 600 000 500 000 - - Corporate Corporate Corporate 500 000 Responsible TOTAL Implementing 2006/07 2007/08 2008/09 2009/10 CAPITAL department BUDGET. 13. SPORTS ARTS AND CULTURE/ PRIORITIES LINKED OBJECTIVE OF THE PGDS: IMPROVING THE QUALITY OF LIFE LTSACConstruction of Regorogile Manager: Social 01 multi purpose sports centre Services 314 332 3 285 668 3 600 000 LTSACUpgrading of extensions of Manager: Social 02 Northam Sports Facility Services 61 000 939 000 1 000 000 LTSACConstruction of Raphuthi Manager: Social 03 Multi sports facility Services 50 000 150 000 100 000 300 000 LTSAC04 TLM MSIG DBSA MSIG TLM DBSA PROJECT DESCRIPTION Construction of Regorogile Multi purpose Sports Centre Manager: Services Social 975 721 1 424 279 - - 2 400 000 FUNDE R MIG MIG ANGLO PLATS TLM MIG 323 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5-YEAR CAPITAL INVESTMENT PLAN OF LEPHALALE LOCAL MUNICIPALITY. IDP PROJECTS TOTAL BUDGET PROJ NO PROJECT PRIORITY NO 1: WATER AND SANITATION 1 RESERVOIR ONVERWACHT 2 MOKURUANYANE RWS REFURBUSHMENT OF WATER PIPES 3 Marapong,Onverwacht,Town 4 WITPOORT RESERVOIR 5 SANITATION VILLAGES TOTAL PRIORITY NO 2: ROADS,STROM WATER & PUBLIC WORKS 6 LEPHALALE ACCES ROADS TOTAL PRIORITY NO 3: HOUSING RESPONSIBLE MANAGER 07/08 08/09 09/10 10/11 11/12 O P E R A T FUNDER CAPITAL MR.TLHAKO 4 070 MR.TLHAKO 2 500 4 070 2 500 4 070 2 500 MIG MIG MR.TLHAKO 2 000 MR.TLHAKO 1 400 MR.TLHAKO 5 000 13 570 2 000 1 400 5 000 13 570 2 000 1 400 5 000 13 570 LM,DWAF MIG LM,MIG 900 900 900 900 LM,WDM MR.TLHAKO 7 MARAPONG X2 CONSTRUCTION OF ROADS Me. COCQuYT 8 RURAL HOUSING: Me. 900 900 40 3 717 40 3 717 40 LM 3 717 DPLG 324 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 9 10 11 12 13 14 15 16 17 18 CONSTRUCTION OF 243 HOUSES RURAL HOUSING: CONSTRUCTION OF 108 HOUSES STEENBOKPAN HOUSING: CONSTRUCTION OF 150 HOUSES MARAPONG X3: CONSTRUCTION OF 306 HOUSES (redevelopment hostels) THABO MBEKI AND THABO MBEKI X1 SURVEY ACCREDITATION OF HOUSING DIVISION MARAPONG X4 CONSTRUCTION OF 150 HOUSES STEENBOKPAN HOUSING: CONSTRUCTION OF 20 HOUSES (Inhabitants of Hostel & Glenover mine Employees) RURAL HOUSING: CONSTRUCTIONOF 200 HOUSES CONSTRUCTON OF 16 HOUSES AT CAMP SITES RENOVATION OF 30 STAFF HOUSES COCQuYT Me. COCQuYT 2 138 2 138 2 138 DPLG Me. COCQuYT 4 789 4 789 4 789 DPLG 11 628 11 628 11 628 DPLG Me. COCQuYT Me. COCQuYT Me. COCQuYT 10 10 10 LM 5 5 5 LM Me. COCQuYT 5 609 Me. COCQuYT 638 Me. COCQuYT 6 809 5 609 638 6 809 DPW 430 220 DPW 400 430 487 650 650 1 317 1 317 5 609 DPLG 638 DPLG 6 809 DPLG DPLG DPW 325 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 19 RENOVATION OF OFFICES CONSTRUCTION OF 1356 20 HOUSES IN MARAPONG X4 TOTAL PRIORITY NO 4: EDUCATION AND TRAINING GA-PHAKULA COMBINED 21 SCHOOL:12 CLASSROOMS LEREKHURENG COMBINED 22 SCHOOL:12 CLASSROOMS MORUKHURUKHUNG 23 PRIMARY: 8 CLASSROOMS RELEHUMANE PRIMARY24 UITSPAN: 8 CLASSROOMS 25 YOUTH ADVISORY CENTRE EQUIPMENT & FURNITURE 26 YOUTH CENTRE TOTAL PRIORITY NO 5:ENVIRONMENTAL WASTE MANAGEMENT SOLID WASTE DUMPING 27 SITES TRANSFARE OF DUMPING SITE LAND TO 28 MUNICIPALITY TOTAL PRIORITY NO 6: EMPLOYMENT DPW Me. COCQuYT 260 53 562 89 779 260 260 DPW 53 562 91 172 53 562 2 242 88 930 DPLG 6 000 13 389 13 389 DoET 4 000 6 000 14 160 14 160 DoET 910 DPW 3 889 DPW 4 160 DPW 3 190 3 500 6 000 12 690 12 690 DoET DPW DPW 5 707 5 000 4 000 6 500 16 207 5 000 16 207 5 000 DoET LGH LGH 1 500 23 446 Me. COCQUYT Me COCQUYT 3 500 487 15 000 24 500 1 500 62 946 1 500 1 500 LGH 61 446 100 100 100 LM 150 250 150 250 150 250 LM LM 326 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 LEPHALALE TOURIST INFO CENTRE/MUSEUM MACRO-ECONOMIC IMPACT ANALYSIS: NEW POWER STATION AND EXPANSION AT GROOTGELUK MINE 30 BIO DIEZEL PROJECT LIMPOPO MARULA31 MUKUNBI INDUSTRIES GEO-SPATIAL ANALYSIS 32 PLATFORM (GAP) LEPHALALE AGRICULTURAL CORRDOR TOTAL PRIORITY NO 7: ELECRICITY VILLAGE HIGH MAST 33 LIGHTING TOTAL PRIORITY NO 8: HEALTH & WELFARE 34 STEEBOKPAN CLINIC PROVISION OF ADEQUATE 35 MEDICAL FACILITIES RESTRUCTURING OF 36 HEALTH SERVICES HIV/AIDS WELLNESS 37 CENTRE- MARAPONG TOTAL PRIORITY NO 9: LAND 29 1 800 1 800 1 800 500 500 500 500 500 500 DEDET DEDET 500 500 500 DEDET 450 450 450 DEDET 5 000 8 750 5 000 8 750 WDM 2 000 2 000 2 000 2 000 2 000 2 000 MIG DPW 1 800 1 800 1 800 DHW DHW 825 DHW 750 3 750 PPP/LM 55 3 430 1 500 1 500 825 55 880 1 500 1 500 825 55 880 1 000 1000 825 55 880 1 000 1000 825 4 125 750 750 55 1 630 275 6 950 4 125 DHW 750 275 4 400 LM/EF DHW PPP/LM/ DHW 327 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 38 ESTABLISH PROPER GIS PROMOTION OF DEVELOPMENT(Acquisition 39 of Altootyd farm 506 LQ) TOTAL PRIORITY NO 10:COMMUNITY SERVICES REGIONAL RURAL 40 CEMETRIES STEENBOKPAN CEMETERY 41 (fencing) TOTAL PRIORITY NO 11:RECREATIONAL FACILITIES MOGOL CLUB;SUBSIDY IN 42 GRANT MARAPONG: SUBSIDY IN 43 GRANT TOTAL PRIORITY NO12: SAFETY AND SECURITY WALK THROUGH METAL 44 DETECTOR SECURITY ALARM SYSTEM: 45 STORE/WORKSHOP 46 47 MAGNETIC NOTICE BOARD FIXED LADDERS FOR 150 150 150 45 000 45 150 45 000 45 150 45 000 45 150 DLGH 100 LM 50 LM Me. COCQUYT Me. COCQUYT 100 100 50 Me. COCQUYT Me. COCQUYT 150 150 347 347 347 LM 139 139 486 LM 486 50 50 LM 139 486 MR THOBANE MR THOBANE MR THOBANE MR 50 LM 50 150 80 80 80 LM 50 50 25 50 LM LM 328 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 BUILDINGSX3 SAFETY SYMBOLIC SIGNS: 48 MUNICIPAL FACILITIES TOTAL PRIORITY N0 13:PUBLIC TRANSPORT THOBANE MR THOBANE 25 10 215 25 10 215 LM 215 329 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5-YEAR CAPITAL INVESTMENT PLAN OF MOGALAKWENA LOCAL MUNICIPALITY. DESCRIPTION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Phola Park Roads & Stormwater Mahwelereng Roads Mahwelereng Stormwater Extension 19 Roads & Stormwater Sekgakgapeng Main Taxi Route Tshamahanzi Roads Bakenberg Taxi Roads Mapela Taxi Routes Madiba Taxi Routes Masodi Taxi Routes Rebone Roads & Stormwater Projects to be Identified Mosoge Taxi Routes Witrivier Taxi Routes Molekane Taxi Routes Ditlotswana Taxi Routes Mitchel Taxi Routes Ham No.1 Taxi Routes Leleso Taxi Routes Mountain View Taxi Routes Uitziight Taxi Routes DESCRIPTION Total Project Cost ROADS & STORMWATER 3,850,000.00 15,000,000.00 7,000,000.00 5,300,000.00 6,200,000.00 4,000,000.00 8,500,000.00 6,000,000.00 4,000,000.00 5,340,000.00 6,800,000.00 2,325,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,100,000.00 3,500,000.00 Total Project Cost Budget 2007/8 850,000.00 10,000,000.00 7,000,000.00 1,300,000.00 2,200,000.00 4,000,000.00 4,000,000.00 0.00 0.00 1,500,000.00 3,800,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Budget 2007/8 Budget 2008/9 3,000,000.00 5,000,000.00 0.00 4,000,000.00 4,000,000.00 0.00 4,500,000.00 6,000,000.00 4,000,000.00 3,840,000.00 3,000,000.00 2,325,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Budget 2008/9 Budget 2009/10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 2,100,000.00 3,500,000.00 Budget 2009/10 330 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Taolome Water Phahladira Ham No.1 Moshate Water Marulaneng Water Supply Ditlotswana Kaditshwene Kromkloof Sepharane Pudiyakgopa Lesodi 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Malapile Thabaleshoba Nelly Jakkalskui Vergenoeg Kromkloof Galakwena Tshamahanzi Nkidikitlana Mokopane Sewer Household Sanitation 1. 2. 3. Hawkers Shelter Bakenberg Bakery Business Centre WATER & SANITATION 800,000.00 1,500,000.00 1,900,000.00 664,050.00 3,000,000.00 854,850.00 1,300,000.00 1,700,000.00 900,000.00 1,100,000.00 640,000.00 640,000.00 640,000.00 1,300,000.00 640,000.00 640,000.00 640,000.00 640,000.00 640,000.00 640,000.00 7,280,000.00 18,800,000.00 LED & UNEMPLOYMENT 2,500,000.00 1,000,000.00 6,000,000.00 0.00 1,500,000.00 1,900,000.00 664,050.00 3,000,000.00 0.00 1,300,000.00 0.00 0.00 0.00 0.00 800,000.00 0.00 0.00 0.00 0.00 854,850.00 0.00 1,700,000.00 900,000.00 1,100,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 640,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,280,000.00 4,800,000.00 640,000.00 640,000.00 1,300,000.00 640,000.00 640,000.00 640,000.00 640,000.00 640,000.00 640,000.00 0.00 10,000,000.00 1,500,000.00 600,000.00 0.00 1,000,000.00 400,000.00 0.00 0.00 0.00 6,000,000.00 331 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DESCRIPTION Total Project Cost Budget 2007/8 Budget 2008/9 Budget 2009/10 LAND & CEMETERIES 1. Cemetery: Mahwelereng 4,350,000.00 1,350,000.00 1,500,000.00 1,500,000.00 2. Town Planning Services (New Township) 3,985,000.00 1,000,000.00 1,460,000.00 1,525,000.00 3. Park Development 1,287,850.00 0.00 1,000,000.00 287,850.00 300,000.00 300,000.00 SOLID WASTE & ENVIRONMENTAL MANAGEMENT 1. Landfill Development 1,100,000.00 500,000.00 SOURCE: EQUITABLE SHARE DESCRIPTION 1. 2. 3. 4. 5. 6. 7. Stormwater (Various Villages) Madiba Taxi Routes Masodi Mapela Taxi Roads Rebone Roads & Stormwater Marulaneng Taxi Routes Tipeng Taxi Routes 1. High Mast Lights in Villages 1. Masodi Total Project Cost Budget 2007/8 ROADS & STORMWATER 3,000,000.00 3,000,000.00 4,050,000.00 900,000.00 1,800,000.00 900,000.00 900,000.00 0.00 897,887.00 0.00 4,000,000.00 0.00 3,060,000.00 0.00 CRIME PREVENTION, SAFETY & SECURITY 3,400,000.00 900,000.00 WATER & SANITATION 1,500,000.00 1,500,000.00 Budget 2008/9 Budget 2009/10 0.00 3,150,000.00 900,000.00 900,000.00 897,887.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,000,000.00 3,060,000.00 1,000,000.00 1,500,000.00 0.00 0.00 332 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 2. 3. 4. 5. 6. 7. Madiba Molekane Mushi Chere Leyden Galakwenastroom 1,500,000.00 1,000,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,000,000.00 LAND & CEMETERIES 1. Black Rock 3,452,810.00 2. Servicing of Stands (Mahwelereng & Part of Extension 20) 5,000,000.00 DESCRIPTION 1. Extension 19 2. Extension 20 (962 Houses) DESCRIPTION 1. 2. 3. 4. 5. 1,500,000.00 1,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500,000.00 1,500,000.00 1,500,000.00 1,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1,102,500.00 0.00 1,152,113.00 3,000,000.00 1,198,197.00 2,000,000.00 SOURCE: DEPARTMENT OF MINERALS AND ENERGY (DME) Total Project Cost Budget Budget 2007/8 2008/9 ELECTRICITY 1,800,000.00 1,800,000.00 0.00 5,743,000.00 0.00 2,292,000.00 SOURCE: LOTTERY FUNDING Total Project Cost SPORTS, ARTS & CULTURE Rebone Stadium – Roll over from 05/06 adjustment budget 730,000.00 Mahwelereng Stadium - Roll over from 05/06 adjustment budget 336,000.00 Bavaria Stadium – Roll over from 05/06 adjustment budget 500,000.00 Mapela Stadium - Roll over from 05/06 adjustment budget 500,000.00 Project Management for Above Projects 152,232.00 Budget 2007/8 730,000.00 336,000.00 500,000.00 500,000.00 152,232.00 Budget 2008/9 Budget 2009/10 0.00 3,451,000.00 Budget 2009/10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 333 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SOURCE: EQUITABLE SHARE DESCRIPTION Total Project Cost Budget 2007/8 Budget 2008/9 Budget 2009/10 LED & UNEMPLOYMENT 1. Makgae LRAD Project – Poultry & Crop Farming 2,500,000.00 2,500,000.00 0.00 0.00 2. Bathokoa Tlou Farming Project – Crop Farming 1,600,000.00 1,600,000.00 0.00 0.00 3. Mogalakwena PLAS 1 Project – Game & Livestock Farming 3,000,000.00 3,000,000.00 0.00 0.00 SOURCE: DEPT. OF EDUCATION & TRAINING DESCRIPTION 1. 2. 3. 4. 5. 6. 7. Total Project Cost Additional classrooms at Lechaba Primary School, Matebeleng Additional classrooms at Monene Primary School, Paulos Farm Additional classrooms at Serupa Primary School, Tevredenheid Additional classrooms Nkeketlhalwa Primary School, Diphichi Additional classrooms Thutlane Primary School, Mothwathwase Additional classrooms Matatane Secondary School, Klipplaatdrift Additional classrooms Lephadimisha Secondary School, Taolome EDUCATION R R R R R R R 1,950,000.00 1,300,000.00 650,000.00 650,000.00 650,000.00 1,300,000.00 1,300,000.00 Budget 2007/8 R R R R R R R 1,950,000.00 1,300,000.00 650,000.00 650,000.00 650,000.00 1,300,000.00 1,300,000.00 Budget 2008/9 Budget 2009/10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOURCE: DEPT. OF EDUCATION & TRAINING 334 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 DESCRIPTION 1. 2. 3. 4. 5. Thabaleshoba Health Center Mokopane Nursing College Social Development Facilities – Lesodi Victim Empowerment Center – Rebone Victim Empowerment Center – Bakenberg Total Project Cost HEALTH & WELFARE R21,000,000.00 R13,000,000.00 R 1,800,000.00 R 600,000.00 R 700,000,00 Budget 2007/8 R21,000,000.00 R13,000,000.00 R 1,800,000.00 R 600,000.00 R 700,000,00 Budget 2008/9 Budget 2009/10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOURCE: DEPT. OF AGRICULTURE DESCRIPTION 1. 2. 3. 4. 5. 6. Eickstein Farming - Cattle and broiler production Elandbosch Farm - Livestock enterprise Grootpan Farm - Livestock enterprise Vergenoeg Farm - Livestock enterprise Monyeki Farm - Livestock enterprise Elim Farm - Livestock enterprise Total Project Cost LED & UNEMPLOYMENT R 747,650.00 R 497,750.00 R 451,700.00 R 250,880.00 R 241,176.00 R 310,250.00 Budget 2007/8 R R R R R R 747,650.00 497,750.00 451,700.00 250,880.00 241,176.00 310,250.00 Budget 2008/9 Budget 2009/10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 335 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5-YEAR CAPITAL INVESTMENT PLAN OF MODIMOLLE LOCAL MUNICIPALITY. 1. INFRASTRUCTURE DEVELOPMENT AND BASIC SERVICE DELIVERY 1.1 WATER PROJECTS COST 2007/8 2008/9 2009/10 2010/11 Upgrading of Donkerpoort Purification Plant Modimolle Town 3ML Reservoir 2 000 000 3 500 000 3 500 000 Dam Safety Compliance 8 000 000 4 000 000 Water Reticulation (Hans Campher) Extension 10 Water Reticulation Equipping of Boreholes (Mabatlane) Replacement of Asbestos Pipes Water cart Mabatlane TOTAL 2011/12 2 000 000 SOURCE OF FUNDING MIG MIG 4 000 000 MIG 200 000 200 000 2 900 000 2 000 000 900 000 PEIG 2 500 000 1 000 000 1 500 000 MIG 500 000 MIG 500 000 650 000 650 000 Reserve Funds Internal Loan 22 750 000 336 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.2 SANITATION PROJECTS COST 2007/8 2008/9 2009/10 2010/11 SOURCE OF FUNDING 20 000 000 10 000 000 Pressure Tower & Leseding Sewer Reticulation Upgrade Sewer Ponds to conventional (Mabatlane) 1 000 000 1 000 000 9 500 000 5 500 000 4 000 000 MIG Upgrade Sewer Ponds to conventional (Mabaleng) 6 500 000 3 000 000 3 500 000 MIG Sewer Tanker (Mabatlane) 1 500 000 Upgrading of Sewer Line (Abattoir) Sewer Reticulation Phagameng X 9 Sewer Reticulation Mabatlane X 4 Sewer Reticulation Phagameng X 10 Sewer Reticulation Hans Campher (Modimolle) 2 000 000 2 000 000 WDM (Grant) 4 200 000 4 200 000 MIG 6 500 000 6 500 000 MIG Modimolle Waste Water Treatment Plant (Upgrade) MIG MIG 1 500 000 5 500 000 500 000 10 000 000 2011/12 5 500 000 500 000 MIG MIG Internal Fund (Reserve) 337 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.3 ELECTRICITY PROJECTS COST 2007/8 34 500 000 10 000 000 Christmas Lights 500 000 100 000 Alternative Energy Supply (Rural Community) 500 000 Electrification Hans Campher (Modimolle) 200 000 Upgrading of Modimolle Electricity Network Electrification Phagameng X9 Electrification Phagameng x 10 Street lighting (all areas) 2008/9 14 000 000 200 000 2009/10 2010/11 10 500 000 2011/12 SOURCE OF FUNDING External & Internal loan 400 000 Internal Funds 500 000 MIG Reserve Fund 4 500 000 4 500 000 DME 5 000 000 5 000 000 DME 2 000 000 MIG 3 800 000 1 800 000 TOTAL 338 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.4 ROADS AND STORMWATER PROJECTS COST 2007/8 2008/9 2009/10 2010/11 2011/12 SOURCE OF FUNDING Resealing of Roads 10 000 000 1 000 000 1 500 000 3 000 000 2 500 000 2 000 000 MIG Surfacing of Roads 12 000 000 4 000 000 1 000 000 1 000 000 2 000 000 4 000 000 MIG Upgrading Joe Slovo Bridge (Modimolle) 6 500 000 3 500 000 3 000 000 Storm water control (all areas) Paving of Road (Modimolle Cemetery) 5 000 000 1 000 000 1 000 000 200 000 200 000 MIG Reconstruction of Lillian Ngoyi (Modimolle) 2 500 000 2 500 000 MIG Reconstruction of Joe Modise (Modimolle) 3 000 000 1 500 000 Subsoil Drainage (all areas) 500 000 500 000 Hans Campher (Modimolle) 500 000 500 000 200 000 100 000 Construction of Roads Phagameng X 10 MIG 2 000 000 1 000 000 1 500 000 MIG MIG MIG Internal Funds (reserve) 100 000 Internal Funds TOTAL 339 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.5 LAND AND HOUSING PROJECTS COST 2007/8 Landfill site development 4 000 000 Communal farming and grazing 3 500 000 Animal Pound Housing Development Phagameng x 9 (1 003 units) 350 000 36 000 000 350 000 36 000 000 Township establishment 1 000 000 1 000 000 2008/9 2009/10 2010/11 2011/12 4 000 000 3 500 000 SOURCE OF FUNDING WDM (Grant) DLA DLG&H DLG&H Internal Funds (Reserve) TOTAL 1.6 SOLID WASTE AND ENVIRONMENT PROJECTS Construction of Crematorium Upgrading of ablution block Modimolle Cemetery COST 2007/8 2008/9 2009/10 1 500 000 200 000 2010/11 1 500 000 200 000 2011/12 SOURCE OF FUNDING MIG MIG 340 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Extension and upgrade of cemeteries (all areas) 1 800 000 1 800 000 MIG TOTAL 1.7 TRANSPORT PROJECTS Development of Parking meters Traffic Lights (Modimolle) Upgrading Taxi Rank (all areas) COST 300 000 2007/8 2008/9 2009/10 2010/11 2011/12 300 000 SOURCE OF FUNDING Grant (who) which 200 000 200 000 2 000 000 500 000 Internal funds 500 000 500 000 500 000 MIG 341 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.8 SPORT, ARTS, CULTURE AND RECREATION PROJECTS Development of sports fields (all areas) Identification and Development of Heritage Sites Construction of sports complex (Mabatlane) Development of Modimolle Stadium (2010) Upgrading and construction of parks Revamping and construction of old Commando (show grounds) Removal of old monument Erection of new sign board for (OR Tambo/Nelson Mandela Square COST 2007/8 500 000 200 000 1 200 000 1 200 000 8 500 000 4 500 000 2008/9 200 000 15 000 000 70 000 70 000 2 000 000 500 000 100 000 2010/11 100 000 2011/12 SOURCE OF FUNDING Internal funds Lotteries 30 000 000 10 000 2009/10 10 000 4 000 000 Lotteries 15 000 000 RFP”S Internal funds 1 000 000 500 000 MIG Internal funds 100 000 Internal funds TOTAL 342 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.9 EDUCATION PROJECTS Establishment of ECD Centres Construction of Schools Provision of Basic Services to Schools COST 2007/8 2008/9 2009/10 2010/11 2011/12 SOURCE OF FUNDING Department of Education Department of Education Department of Education 343 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 1.10 HEALTH AND SOCIAL DEVELOPMENT PROJECTS COST 2007/8 2008/9 2009/10 2010/11 2011/12 Construction of Health Centre at Mabatlane Development of South African Social Security Agency Centre at Modimolle SOURCE OF FUNDING Health and Social Development Health and Social Development 2. LOCAL ECONOMIC DEVELOPMENT (LED) PROJECTS COST Flea markets (Modimolle) Mabatlane CBD Development Revitalization of Hydroponic Project (Mabaleng) BEEHIVE Industrial Park 1 000 000 3 500 000 Dipudi Coop Completion of WATRAP Flee markets (Mabatlane) Donkerpoort Dam Water Sports Facility 150 000 1 800 000 850 000 500 000 2007/8 2008/9 2009/10 500 000 2 500 000 500 000 1 000 000 800 000 500 000 200 000 100 000 1 000 000 1 000 000 100 000 500 000 2010/11 2011/12 SOURCE OF FUNDING MIG MIG RFP’s EU 150 000 1 200 000 450 000 500 000 400 000 Internal funds Internal funds MIG RFP”s 344 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Establishment of Water Front Facility (Modimolle – next to Mr Munchies) Recycling project of Modimolle and Mabatlane Development of Industrial area 8 000 000 8 000 000 RFP’s 100 000 100 000 RFP’s 500 000 500 000 Internal funds 345 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJECTS COST 2007/8 Establishment of Shopping Centre Modimolle 30 000 000 30 000 000 Establishment of Tourism Centre 2 400 000 Urban Greening Modimolle Mountain Heritage Site Development Provision for Mabatlane Emerging Farmers 2008/9 2009/10 2 400 000 200 000 200 000 2010/11 2011/12 SOURCE OF FUNDING RFP”s RFP’s Internal 7 500 000 2 500 000 2 500 000 2 500 000 RFP’s 300 000 100 000 100 000 1 000 000 Land Affairs 346 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 3. MUNICIPAL INSTITUTION AND TRANSFORMATION PROJECTS COST 2007/8 2008/9 Upgrading of financial system 1 000 000 1 000 000 2 x LDV (Water and Sewer) 2 x LDV (Electricity) 320 000 320 000 320 000 320 000 1 x LDV (Town Planning) 160 000 160 000 1 x LDV (Public Works) 160 000 160 000 1 x LDV (Pool Vehicle – Corporate Services) 160 000 160 000 4 x 1400 (Budget & Treasury) 400 000 400 000 Mayoral Vehicle 400 000 400 000 3 x Tractors 1 x LDV (Parks) 750 000 160 000 750 000 160 000 1 x Trailer (Parks) 150 000 150 000 1 x Tractor (Refuse) 230 000 230 000 Mini Mass Containers 1 000 000 1 000 000 Excavator (20 ton) 1 500 000 2009/10 2010/11 2011/12 SOURCE OF FUNDING WDM (Grant) WDM (Grant) 1 500 000 347 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJECTS Tipper Truck (Landfill Site – Mabatlane & Modimolle) Compactor (Landfill Site – Mabatlane & Modimolle) Compactor (Public Works – Modimolle) Tools (Mechanical) Mabaleng Grader Tipper Truck (Modimolle) Water Cart (Modimolle & Mabatlane) Plate Compactor Loader (TLB) (Modimolle Landfill Site) Pump and Irrigation system (Modimolle Landfill Site) COST 2007/8 2008/9 2009/10 2010/11 2011/12 SOURCE OF FUNDING 1 300 000 1 300 000 WDM (Grant) 2 000 000 2 000 000 WDM (Grant) 180 000 180 000 30 000 1 900 000 650 000 30 000 1 900 000 650 000 1 300 000 650 000 50 000 550 000 550 000 100 000 100 000 650 000 50 000 WDM (Grant) WDM (Grant) 348 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 PROJECTS COST 2007/8 2008/9 Concrete palisade fencing (Mabatlane and Modimolle Landfill Sites) 2 000 000 2 000 000 Sewer Trailer/Vector (Mabatlane) 1 200 000 1 200 000 Parks Equipment (all areas) 15 000 15 000 Breathalyzers Two Way radios 25 000 40 000 25 000 40 000 Security system 350 000 350 000 Clock system Heavy duty lawn mowers 300 000 250 000 300 000 250 000 Blue traffic lights (patrol vehicles) 50 000 50 000 Air conditioners (halls) 300 000 300 000 75 000 75 000 Upgrading of testing station 100 000 100 000 Upgrading of traffic offices 100 000 100 000 Air conditioners (offices) 2009/10 2010/11 2011/12 SOURCE OF FUNDING WDM Internal funds (loan) 349 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Library security system 100 000 100 000 IT Equipment 400 000 400 000 PROJECTS COST 2007/8 2008/9 IT Infrastructure 400 000 400 000 Office furniture 800 000 800 000 70 000 70 000 7 000 000 7 000 000 Office partitioning Office extensions 2009/10 2010/11 2011/12 SOURCE OF FUNDING Office Mabaleng 400 000 400 000 Internal funds Upgrading of Leseding Hall 100 000 100 000 Internal funds Demarcation of church site (Mabatlane) 150 000 150 000 Internal funds 50 000 50 000 Internal funds P A system 350 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 5-YEAR CAPITAL INVESTMENT PLAN OF BELA-BELA LOCAL MUNICIPALITY. 351 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 352 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 353 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 FIVE YEAR CAPITAL INVESTMENT PROGRAMME MOOKGOPHONG LOCAL MUNICIPALITY CAPITAL BUDGET 2007/2008 MOOKGOPHONG MUNICIPALITY 4.80% 5.30% 2008 BUDGETED 2009 BUDGETED 2010 BUDGETED General Reserves 30,000 31,440 33,106 Equipment Operating Income 12,000 12,576 13,243 MPHL-09 General Reserves 30,000 - - - General Reserves 15,000 - - - MPHL-10 General Reserves 10,000 - - - Cadastral mapping MPHL-11 General Reserves 50,000 - - - LDV Equipment General Reserves - 200,000 1,024,000 1,073,152 MPRS-05 MIG General Reserves DESCRIPTION IDP PROJECT 2007 FUNDING Roll-over 020 PUBLIC WORKS ADMIN Update GIS Office Furniture & Computer stand Survey Mookgophong Ext 3 (Phase 2) Town Establishment Mookgophong Ext 5 Survey Town Establishmnet Thusang Ext 1 022 PUBLIC WORKS Installation of bulk stormwater Storm water 700,000 210,600 1,130,029 115,872 354 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Resurfacing roads Upgrading of Hans van Rensburg Street parking Stormwater MKG X3 Phase 2 105,000 110,040 MPRS-06 General Reserves 262,000 274,576 289,129 MPRS-07 General Reserves 600,000 628,800 662,126 MIG 350,708 367,542 387,022 1,500,000 1,572,000 - 500,000 526,500 526,500 General Reserves 1,655,316 Stormwater NABOOM X3 MPRS-02 General Reserves Upgrading Roedtan Parking MPRS-13 General Reserves 500,000 500,000 New water tank and pump on existing truck MPRS-12 General Reserves 100,000 - - Compressor Equipment Operating Income 30,000 - - Prime application equipment Equipment Operating Income 30,000 - - Construction boards Equipment Operating Income 10,000 10,480 Carport Equipment Operating Income 30,000 - - Grader Equipment General Reserves - 1,200,000 - MPIN-05 General Reserves 250,000 - - Equipment General Reserves 300,000 100,000 - - 11,035 026 CORPORATE SERVICES Fencing of the Civic centre Office equipments and furniture 355 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Computer & printer (2) Equipment Operating income 30,000 - - Vacuum cleaners Equipment Operating income 22,000 - - 028 FINANCE SERVICES Cabling computer - New building Upgrading Computer equipment ` Equipment General Reserves 500,000 - Equipment General Reserves 350,000 366,800 General Reserves - - GAMAP/GRAP compliance 386,240 - 034 TRAFFIC SERVICES Speed humps x 5 Street names Roedtan / Thusang Maintenance General Reserves 45,000 45,000 Equipment General Reserves 35,000 - - Vehicle :BMW trade-in Equipment General Reserves 100,000 - - Stop signs Equipment Operating Income 10,000 10,480 Blue light and markings Equipment Operating Income 15,050 - - Taxi Rank MPRS-14 General Reserves - - - MPIN-04 General 044 PUBLIC BUILDINGS Extension of Mookgophong 898,000 47,385 11,035 356 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Civic Centre Renovation of Old Civic Centre Upgrading electrical reticulation at Civic centre Reserves 3,275,000 4,550,000 - Building General Reserves 500,000 - - Building General Reserves 100,000 - - Computers : Public use (3) Equipment General Reserves 45,000 - - Wall unit and wall murals Equipment Operating Income 15,600 - - Development of parks MPSC-01 General Reserves 80,000 83,840 88,284 Parks equipments Equipment Operating Income 50,000 52,400 55,177 Remove invasive plants Equipment Operating Income 20,000 20,960 22,071 Petrol hand pump Equipment Operating Income 5,000 - - Refurbish Parks Building Zozo hut at swimmingpool at Lapa Refurbish fence $ buildings :Mkg Cementry Maintanance Operating Income 10,000 - - Equipment Operating Income 10,000 - - Maintanance Operating Income 15,000 - - Maintenance General Reserves 050 LIBRARY 052 PARKS SPORTS AND 053 RECREATION Upgrading of facilities/ 132,425 357 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 maintenance Grand : Lotto 120,000 MPSC-04 600,000 125,760 1,320,000 CLEANSING:REFUSE 062 REMOVAL 60 x Side walk Containers Equipment Operating Income 26,000 27,248 2 x Trolleys Equipment Operating Income 2,000 - 10 X Mass containers Equipment General Reserves 50,000 52,400 Tractor Development of new landfile site Vehicle General Reserves 300,000 - - MPSW-04 General Reserves 1,700,000 400,000 - Vacuum cleaners Equipment Operating Income 2,000 - - 5 x Carport Equipment Operating Income 25,000 - - Tiles for testing room Equipment Operating Income 6,000 - - Computer and printer Equipment General Reserves 38,000 - - Palisade fencing MPSS-05 General Reserves 100,000 - - Cameras for testing station Equipment General Reserves - 35,000 28,692 55,177 064 LICENSING 36,855 358 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 066 SEWERAGE Tar access road to sewage works Removal and fit of crane on truck General Reserves 250,000 - - Maintenance General Reserves 60,000 - - Sewage Equipment Burgular gates at Nyl pump station Paint Nyl pump station buildings Equipment Operating Income 10,000 11,000 Equipment Operating Income 10,000 - - Equipment Operating Income 10,000 - - Drain rod machine Equipment Operating Income 40,000 - - MPEL-03 General Reserves 450,000 471,600 496,595 Equipment Operating income 20,000 20,960 22,071 New water resources Back-up generator for Nyl pump station Replacement of valve and bulk meters Repair accomodation/pump station MPWS-11 MIG 2,250,000 - - Equipment General Reserves 300,000 - - Maintenance General Reserves 60,000 62,880 50,000 - New pump for pump station Equipment 082 ELECTRICITY Upgrading electrical reticulation networks Electrical Equipment 12,000 088 WATER Maintenance General Reserves General Reserves 66,213 - 359 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Water equipments Equipment Operating Income Roedtan water network MPWS-12 General Reserves 200,000 Roedtan boreholes Upgrading Welgevendon purification works Upgrading Welgevendon raw pumpline MPWS-05 General Reserves 350,000 TOTAL 6,128,000 Operating Income General Reserves 80,000 - 6,000 6,288 - 4,500,000 - - 18,926,358 12,873,222 4,000,000 13,510,000 55% MIG 4,324,708 18% Roll-over 4,478,000 18% Lotto Grand 1,920,000 8% 20,834,900 24,704,358 - 11,027,320 2% 471,650 24,704,358 2006/2007 6,621 100% 18.57% 360 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION E 361 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 IMPLEMENTATION PHASE 362 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The implementation of the projects and programmes of the municipality is guided by the performance management systems framework that is attached underneath 10.1 INTRODUCTION The Municipal Planning and Performance Management Regulations stipulates that a municipality’s Performance Management System (PMS) must entail a framework that describes and represents how the municipality's cycle and processes of performance planning, monitoring, measurement, review, reporting and improvement will be conducted, organised and managed, including determining the roles of the different role-players. In line with the said legal requirement this framework is a policy document that will set out the requirements that the Waterberg District Municipality’s PMS will need to fulfill, the principles that informed its development and subsequent implementation, the preferred performance model of the Municipality, the process by which the system will work, the delegation of responsibilities for different roles in the process and a plan for the implementation of the system. 10.2 THE LEGISLATIVE FRAMEWORK FOR PERFORMANCE MANAGEMENT The legislative and policy framework for PMS includes the Constitution, The Municipal Systems Act, the Municipal Finance Management Act, Municipal Planning and Performance Management Regulations, The White Paper on Local Government and Batho Pele principles. The main regulatory mechanism for PMS is Chapter 6 of the MSA and the related Municipal Planning and Performance Management Regulations. The major PMS policy instruments is the 1998 White Paper on Local Government supported by the Batho Pele principles, which policies was given legal stature through the adoption of the Municipal Systems Act in 2000 (Act 32 of 2000). The said Act requires all municipalities to: Develop a performance management system Set targets and monitor and review the performance of the Municipality based on indicators linked to their Integrated Development Plan (IDP) Table and publish an annual performance report on performance of the Municipality forming part of its annual report as per the Municipal Finance Management Act (MFMA). Incorporate and report on a set of general (sometimes also referred to as national) indicators prescribed by the Minister responsible for local government 363 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Conduct, on a continuous basis, an internal audit of all performance measures Have their annual performance report audited by the Auditor-General Involve the community in setting indicators and targets and reviewing municipal performance These are some of the main elements and requirements of the legislative requirements for the development and implementation of a performance management system for municipalities. For the ease of reference and for the benefit of a comprehensive Waterberg District Municipality Performance Management System Framework, more detailed legislative and policy guidelines and requirements are included in the framework. 10.2.1 The White Paper on Local Government (1998) The White Paper on Local Government (1998) suggested that local government should introduce the idea of performance management systems. The White Paper noted that, "Involving communities in developing some municipal key performance indicators increases the accountability of the municipality. Some communities may prioritise the amount of time it takes a municipality to answer a query; others will prioritise the cleanliness of an area or the provision of water to a certain number of households. Whatever the priorities, by involving communities in setting key performance indicators and reporting back to communities on performance, accountability is increased, and public trust in the local government system enhanced" (The White Paper on Local Government, 1998). 10.2.2 Batho Pele (1998) Similarly, the White Paper on Transforming Public Service Delivery (Batho Pele) puts forward eight principles for good public service: Consultation: Citizens should be consulted about the level and quality of public service they receive, and, where possible, should be given a choice about the services which are provided. 364 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Service standards: Citizens should know what standard of service to expect. Access: All citizens should have equal access to the services to which they are entitled. Courtesy: Citizens should be treated with courtesy and consideration Information: Citizens should be given full and accurate information about the public services they are entitled to receive. Openness and transparency: Citizens should know how departments are run, how resources are spent, and who is in charge of particular services. Redress: If the promised standard of service is not delivered, citizens should be offered an apology, a full explanation and a speedy and effective remedy; and when complaints are made citizens should receive a sympathetic, positive response. Value-for-money: Public services should be provided economically and efficiently in order to give citizens the best possible value-for-money. "Importantly, the Batho Pele White Paper notes that the development of a service-oriented culture requires the active participation of the wider community. Municipalities need constant feedback from service-users if they are to improve their operations. Local partners can be mobilised to assist in building a service culture. For example, local businesses or non-governmental organisations may assist with funding a helpline, providing information about specific services, identifying service gaps or conducting a customer survey" The White Paper on Local Government (1998). 365 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 10.2. 3 The Municipal Systems Act (2000) The principle requirements of the Municipal Systems Act have already been highlighted. To provide further insights into the requirements of the Act, the different sections of Chapter 6 of the MSA will be summarised: Section 38: Requires municipalities to establish a Performance Management System, promote a performance management culture and administer its affairs in an economical, effective, efficient and accountable manner. Section 39: Gives Executive Mayor the responsibility for managing the development of a Performance Management System, as well as powers of delegation of responsibilities and the responsibility of submitting the PMS to Council. Section 40: Places responsibility on the municipality for the monitoring and review of its PMS. Section 41: Outlines the core components to be included in the PMS of the municipality, and refers to KPI’s, targets, measurement mechanisms, steps for improvement and the reporting processes. Section 42: Requires the municipality to establish mechanisms and procedures for community involvement in the process, in terms of Chapter 4 of the MSA. Section 43: Allows the minister to establish general KPI’s which must be included in the KPI’s of municipalities, to the extent that these general KPI’s are relevant to the municipality. Section 44: Requires the municipality to notify stakeholders internally and the general public of its KPI’s and targets. Section 45: Requires the municipality to conduct an internal audit of its performance as well as an audit by the auditor general. Section 46: Requires the municipality to prepare an annual performance report. Section 47: Requires MEC to compile an annual performance report for the municipalities within the province Section 48: The Minister has to compile an annual report and submit it to parliament, in terms of the performance of the municipalities in relation to general KPI’s Section 49: Allows the Minister to make regulations or issue guidelines for the purpose of Chapter 6 of the MSA 366 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 10.2.4 Municipal Planning and Performance Management Regulations (2001) The Minister responsible for local government published the Municipal Planning and Performance Management Regulations (2001) in terms of the Municipal Systems Act (Section 49) setting out in detail the requirements for a municipal PMS. The Regulations also contain the general Key performance Areas prescribed by the Minister responsible for local government. Listed as stated underneath KPA 1: BASIC SERVICE AND INFRASTRUCTURE DEVELOPMENT KPA 2:LOCAL ECONOMIC DEVELOPMENT KPA 3:TRANSFORMATION AND ORGANIZATIONAL DEVELOPMENT KPA 4:FINANCIAL VIABILITY AND MANAGEMENT KPA 5:GOOD GOVERNANCE AND PUBLIC PARTICIPATION Although not a legislative or policy requirement, the Department of Provincial and Local Government’s Performance Management Guide for Municipalities provides relevant guidelines for the preparation and implementation of Performance Management Systems. The detailed programme will to a great extent be based on these Guides, linked in with the relevant legislative requirements. 10.2.5 Municipal Finance Management Act (2004) It is also important to note that the Municipal Finance Management Act (MFMA) contains various important provisions related to municipal performance management. It requires municipalities to annually adopt a Service Delivery and Budget Implementation Plan (SDBIP) with service delivery targets and performance indicators. Whilst considering and approving the annual budget the Municipality must also set measurable performance targets for each revenue source and vote. The Municipality must lastly compile an annual report, which must include a performance report compiled in terms of the Systems Act. In terms of circular 13 issued by National Treasury provision is also made for the compilation on an annual basis of departmental SDBIPs. 367 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 10.2.6 Performance management and measures at various levels Performance management can be applied to various levels within any organisation. The legislative framework as set out above provides for performance management at various levels in a municipality including strategic (sometimes also referred to as municipal, organisational or corporate) level, operational (also referred to as services, departmental or section/team) level and lastly, individual level. At strategic level the five-year IDP of a municipality forms the basis for performance management, whilst at operational level the annual SDBIP forms the basis. The IDP is a long-term plan and by its nature the performance measures associated with it will have a long-term focus, measuring whether a municipality is achieving its IDP objectives. A SDBIP (both for the municipality as a whole and that of a department) is more short-term in nature and the measures set in terms of the SDBIP, reviewing the progress made with implementing the current budget and achieving annual service delivery targets. The measures set for the Municipality at strategic level is captured in a strategic (municipal/organisational/corporate) scorecard structured in terms of the preferred performance management model of the Municipality. The measures at operational level are to be captured in the SDBIP of the Municipality and the SDBIPs of the various Departments in the Municipality. By cascading performance measures from strategic to operational level, both the IDP and the SDBIP, forms the link to individual performance management .This ensures that performance management at the various levels relate to one another which is a requirement of the Municipal Planning and Performance Regulations. The MFMA specifically requires that the annual performance agreements of managers must be linked to the SDBIP of a municipality and the measurable performance objectives approved with the budget. 368 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The following diagram indicates the performance management at various levels: Performance Management Responsibility Level IDP (5 year) Organisational SDBIP (Annually) Departmental Workplans Monthly/quarterly Team/Individual Setting Targets Measurement Performance Management and measurement in the Waterberg District Municipality 10.3 OBJECTIVES OF THE PERFORMANCE MANAGEMENT SYSTEM As indicated in the previous chapter the Municipality’s PMS is the primary mechanism to monitor, review and improve the implementation of it’s IDP and to gauge the progress made in achieving the objectives as set out in the IDP. The objectives for any municipal performance management system is guided and regulated by the relevant legislation and policy guidelines. The Planning and Performance Management Regulations informs the objectives to a great extent. The PMS for the Waterberg District Municipality includes the following objectives that the system should fulfill: 369 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Meeting IDP Objectives To ensure that the priorities as contained within the IDP are achieved, by measuring the success of meeting these Effective Community Participation The Performance Management System is to ensure that effective community participation is achieved throughout the process. Financial Accountability The system should assist in improving the financial accountability of the key office bearers and officials. Facilitate increased accountability The performance management system should provide a mechanism for ensuring increased accountability between the local community, politicians, the Municipal Council and the municipal management team. Facilitate learning and improvement The PMS should facilitate learning in order to enable the Municipality to improve delivery. Provide early warning signals It is important that the system ensure decision-makers are timeously informed of performance related risks, so that they can facilitate intervention, if necessary. Facilitate decision-making The performance management system should provide appropriate management information that will allow efficient, effective and informed decision-making, particularly on the allocation of resources. 370 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The functions listed above are not exhaustive, but summarize the intended benefits of the system. These intended functions should be used to evaluate and review the performance management system on a regular basis. 10.4 PRINCIPLES GOVERNING THE WATERBERG DISTRICT MUNICIPAL PMS The principles that should govern the Waterberg District Municipal PMS are developed to ensure that the PMS is relevant, especially in attaining its objectives and legislative requirements. The said principles are the following: Effective- utilization of financial and human resources Simplicity -so as to facilitate implementation given any current capacity constraints, Politically Acceptable -To all political role players, Administratively Managed- in terms of its day-to-day implementation, Implementable -within any current resource constraints, Transparency And Accountability- both in terms of developing and implementing the system, Efficient And Sustainable- in terms of the ongoing implementation and use of the system, Public Participation- in terms of granting citizens their constitutional right to participate in the process, Integration- of the PMS with the other management processes within the Municipality, Objectivity -based on credible information and lastly, Reliability -of the information provided on the progress in achieving the objectives as set out in its IDP. 10.5 PREFERRED PERFORMANCE MANAGEMENT MODEL A performance management model can be defined as the grouping together of performance indicators, sometimes based on the type of indicator, into logical categories or groups (often called perspectives), as a means to enhance the ability of an organisation to manage and analyse its performance. As such a model provides a common framework for what aspects of performance is going to be measured and managed. It further ensures that a balanced set of measures are employed that are not relying on only one facet of performance and therefore not presenting a holistic assessment of the performance of an organisation. 371 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 A number of performance models are available and any of them could be applied by the Municipality. The available models include the Municipal Scorecard, Balanced Scorecard and the Key Performance Area Model. The Municipality has however chosen its own model known as the Balanced Score Card , which is primarily based on the Key Performance Area Model and relevant to the powers and functions of the municipality. In terms of the said model all indicators are grouped together into the national Key Performance Areas and all the Municipality’s performance scorecards have been structured accordingly. 10.6 THE PROCESS OF MANAGING PERFORMANCE The annual process of managing performance at strategic level in the Municipality involves the steps as set out in the diagram below: 1. Performance Planning 6. Performance Review 2. Performance Monitoring PERFORMANCE MANAGEMENT 5. Performance Reporting 3. Performance Measurement 4. Performance Analysis The following table spells out in more detail the role of all relevant role players in each of the above steps: 372 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Stakeholders Citizens and Communities Council Performance Planning Be consulted on needs Develop the long term vision for the area Influence the identification of priorities Influence the choice of indicators and setting of targets Facilitate the development of a longterm vision. Develop strategies to achieve vision Identify priorities Adopt indicators and set targets Measurement and Analysis Performance Reporting & Reviews Be given the opportunity to review municipal performance and suggest new indicators and targets Review municipal performance Annually 373 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Stakeholders Mayoral Committee and the IDP Steering Committee Municipal Manager + Senior Managers Performance Planning Play the leading role in giving strategic direction and developing strategies and policies for the organization Manage the development of an IDP Approve and adopt indicators and set targets Communicate the plan to other stakeholders Assist the Mayoral Committee in Providing strategic direction and developing strategies and policies for the organisation Manage the development of the IDP Ensure that the plan is integrated Identify and propose indicators and targets Communicate the plan to other stakeholders Measurement and Analysis Performance Reporting & Reviews Conduct the major reviews of municipal performance, determining where goals had or had not been met, what the causal reasons were and to adopt response strategies Regularly monitor the implementation of the IDP, identifying risks early Ensure that regular monitoring (measurement, analysis and reporting) is happening in the organisation Intervene in performance problems on a daily operational basis Conduct regular reviews of performance Ensure that performance reviews at the political level are organized Ensure the availability of information Propose response strategies to the Mayoral Committee 374 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Stakeholders Senior Managers Performance Planning Develop service plans for integration with other sectors within the strategy of the organisation Measurement and Analysis Measure performance according to agreed indicators, analyse and report regularly Manage implementation and intervene where necessary Inform decision-makers of risks to service delivery timeously Performance Reporting & Reviews Conduct reviews of service performance against plan before other reviews The balance of this chapter looks at each of the steps in more detail and how they will unfold in the process of managing performance in the Municipality. Although the steps and what follow relates mainly to performance management at strategic level, the principles and approaches as espoused could also be applied to performance management at operational level. It will be apparent throughout the rest of this chapter that the link between the organizational and employee performance has been provided for as part of the recommendations of the actions to be followed, thus addressing the legal requirement of linking the two. 10.6.1 Performance Planning The performance of the Municipality is to be managed in terms of its IDP and the process of compiling an IDP and the annual review thereof therefore constitutes the process of planning for performance. It should be noted that the last component of the cycle is that of performance review and the outcome of such a review process must inform the next cycle of IDP compilation/review by focusing the planning processes on those areas in which the Municipality has under-performed. 10.6.2 Performance monitoring 375 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Performance monitoring is an ongoing process by which a Manager accountable for a specific indicator as set out in the balanced scorecard (or a service delivery target contained in an annual SDBIP) continuously monitors current performance against targets set. The aim of the monitoring process is to take appropriate and immediate interim (or preliminary) action where the indication is that a target is not going to be met by the time that the formal process of performance measurement, analysis, reporting and review is due. In the instance of the Waterberg District Municipality it is recommended that the balanced scorecard of the Municipality be reported on a quarterly basis to the Executive Mayor (EM). Performance monitoring requires that in between the said formal cycle of performance measurement appropriate action be taken should it become evident that a specific performance target is not going to be met. It is therefore, proposed that at least on a monthly basis Managers track performance trends against targets for those indicators that lie within the area of accountability of their respective Departments as a means to identify performance related problems and take appropriate remedial action on time. It will be appropriate for each Senior Manager to delegate to the Assistant Manager/ Any senior official in the department, the responsibility to monitor the performance for his/her sector. Such Assistant Managers/Senior Officials are, after all, best placed given their understanding of their sector to monitor on a regular basis whether targets are being met currently or will be met in future, what the contributing factors are to the level of performance and what interim remedial action needs to be undertaken. 10.6.3 Performance measurement Performance measurement refers to the formal process of collecting and capturing performance data to enable reporting to take place for each key performance indicator and against the target set for such indicator. Given the fact that initially at least the Municipality will have to rely on a manual process to manage its performance provision has been made in the balanced scorecard for the name of an official responsible for reporting on each indicator (please note that this might not necessarily be the same official accountable for performance on an indicator). 376 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The said official will, when performance measurement is due, have to collect and collate the necessary performance data or information and capture the result against the target for the period concerned on the strategic scorecard and report the result to his/her Manager making use of the said scorecard after completing the next step (see performance analysis below). It should be noted at this stage that for each of the scorecards of the Municipality two formats exist namely a planning and reporting format. The planning format is used to plan and capture the performance targets for each indicator whilst the reporting format is used to capture actual performance against targets and to report to the Executive Mayor and Council. 10.6.4 Performance analysis Performance analysis involves the process of making sense out of measurements. It requires interpretation of the measurements as conducted in terms of the previous step to determine whether targets have been met and exceeded and to project whether future targets will be met or not. Where targets have not been met performance analysis requires that the reasons therefore should be examined and corrective action recommended. Where targets have been met or exceeded, the key factors that resulted in such success should be documented and shared so as to ensure organisational learning. In practice the aforementioned entails that the Senior Manager responsible for each indicator will have to, after capturing the performance data against targets on the strategic scorecard, analyse the underlying reasons why a target has/has not been met and capture a summary of his/her findings on the strategic scorecard. The Manager will thereafter have to compile a draft recommendation in terms of the corrective action proposed in instances where a target has not been achieved and also capture this on the strategic scorecard. Provision has been made on the reporting format of the strategic scorecard to capture both the “reason for the performance status” (in other words the results of the analysis undertaken) and the ”corrective action” proposed. The strategic scorecard as completed must then be submitted to a formal meeting of the senior management team for further analysis and consideration of the draft recommendations as captured by the relevant Managers. This level of analysis should examine performance across the organisation in terms of all its priorities with the aim to reveal and capture whether any broader organisational factors are limiting the ability to meet any performance targets in addition to those aspects already captured by the relevant Manager. The analysis of the strategic scorecard by senior management should also ensure that quality performance reports are submitted to Executive Mayor and that adequate response strategies are proposed in cases of poor performance. Only once senior management has considered the strategic scorecard, agreed to the 377 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 analyses undertaken and captured therein and have reached consensus on the corrective action as proposed, can the strategic (municipal/organizational/ corporate) scorecard be submitted to the Executive Mayor for consideration and review. 10.6.5 Performance reporting and review The next two steps in the process of performance management namely that of performance reporting and performance review will be dealt with at the same time. This section is further divided into three sections dealing with the requirements for quarterly versus annual reporting and reviews respectively and lastly a summary is provided of the various reporting requirements. 10.6.5.1 In-year performance reporting and review The submission of the strategic scorecard to the Executive Mayor for consideration and review of the performance of the Municipality as a whole is the next step in the process. The first such report is a major milestone in the implementation of any PMS and it marks the beginning of what should become a regular event namely using the performance report as a tool to review the Municipality’s performance, and subsequently the IDP, and to make important political and management decisions on how to improve. As indicated earlier it is recommended that the strategic (organisational/corporate/municipal) scorecard be submitted to the Executive Mayor for consideration and review on a quarterly basis. The reporting should therefore take place in October (for the period July to end of September - quarter 1 of the financial year), January (for the period October to the end of December - quarter 2), April (for the period January to the end of March - quarter 3) and July (for the period April to the end of June - quarter 4). The review in January will coincide with the mid-year performance assessment as per section 72 of the MFMA. The said section determines that the accounting officer must by 25 January of each year assess the performance of the municipality and report to the Council on inter alia its service delivery performance during the first half of the financial year and the service delivery targets and performance indicators as set out in its SDBIP. Performance reviews is the process where the leadership of an organisation, after the performance of the organisation have been measured and reported to it, reviews the results and decide on appropriate action. The EM in reviewing the strategic (municipal/organisational/corporate) scorecard submitted to her on a quarterly basis will have to ensure that targets committed to in the scorecard have been met, where they have not, that satisfactory and sufficient reasons have been 378 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 provided by senior management and that the corrective action being proposed is sufficient to address the reasons for poor performance. If satisfied with the corrective action as proposed these must to be adopted as formal resolutions of Council, minuted and actioned accordingly. 10.6.5.2 Annual performance reporting and review On an annual basis a comprehensive report on the performance of the Municipality also needs to be compiled. The requirements for the compilation, consideration and review of such an annual report are set out in chapter 12 of the MFMA. In summary it requires that: All municipalities for each financial year compile an annual report The annual report be tabled within seven months after the end of the financial year The annual report immediately after it has been tabled be made public and that the local community be invited to submit representations thereon The municipal Council consider the annual report within nine months after the end of the financial year and adopt an oversight report containing the council’s comments on the annual report The oversight report as adopted be made public The annual report as tabled and the Council’s oversight report be forwarded to the Auditor-General, the Provincial Treasury and the department responsible for local government in the Province The annual report as tabled and the Council’s oversight report are submitted to the Provincial legislature. The oversight report to be adopted provides the opportunity for full Council to review the performance of the Municipality. The requirement that the annual report once tabled and the oversight report be made public similarly provides the mechanism for the general public to review the performance of the Municipality. It is however, proposed that in an effort to assist the public in the process and subject to the availability of funding, a user-friendly citizens’ report be produced in addition to the annual report for public consumption. The citizens’ report should be a simple, easily readable and attractive document that translates the annual report for public consumption. 379 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 It is also proposed that annually a public campaign be embarked upon to involve the citizens of the Municipality in the review of municipal performance over and above the legal requirements of the Municipal Systems Act and the MFMA. Such a campaign could involve all or any combination of the following methodologies: Various forms of media including radio, newspapers and billboards should be used to convey the annual report. The public should be invited to submit comments on the annual report via telephone, fax and email. Public hearings could be held in a variety of locations to obtain input of the annual report. Making use of existing structures such as ward and/or development committees to disseminate the annual report and invite comments. Hosting a number of public meetings and road shows at which the annual report could be discussed and input invited. Producing a special issue of the municipal newsletter in which the annual report is highlighted and the public invited to comment. Posting the annual report on the council website and inviting input The public review process should be concluded by a formal review of the annual report by the IDP Representative Forum of the Municipality. Lastly it should be mentioned that the performance report of a municipality is only one element of the annual report and to ensure that the outcome thereof timeously inform the next cycle of performance planning in terms of an IDP compilation/review process, it is recommended that the annual performance report be compiled and completed as soon after the end of a financial year as possible but ideally not later that two months after financial-year end. 10.6.5.3 Summary of various performance reporting requirements The following table, derived from both the legislative framework for performance management and this PMS framework, summarise for ease of reference and understanding the various reporting deadlines as it applies to the Municipality: 380 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Report 1. Departmental SDBIPs Frequency Continuous Submitted for consideration and/or review to Manager of Department Executive Mayor in consultation with the MM Executive Mayor in consultation with the MM Remarks See MFMA Circular 13 of National Treasury for further information 2. Monthly budget statements Monthly See sections 71 and 54 of the MFMA 3. Departmental scorecards Monthly 4. Strategic (municipal/organisational/ corporate) Scorecard Quarterly Executive Mayor This PMS framework (see section 7.5.1 above) 5. SDBIP mid-year budget and performance assessment Annually during January of each year Executive Mayor (in consultation with MAYCO ) See sections 72 and 54 of the MFMA 6. Performance report Annually Council 7. Annual report Annually Council Only if developed separately from Departmental SDBIPs See section 46 of the Municipal Systems Act as amended. Said report to form part of the annual report (see 7 below) See chapter 12 of the MFMA 381 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 10.7 THE AUDITING OF PERFORMANCE MEASURES 10.7.1 The role of internal audit in terms of performance management The MFMA requires that the Municipality must establish an internal audit section which service could be outsourced depending on its resources and specific requirements. Section 45 of the Municipal Systems Act stipulates that the results of the Municipality’s performance measures must be audited by the said internal audit section as part of the internal auditing process and annually by the Auditor-General. The Municipal Planning and Performance management Regulations stipulates that internal audit section must on a continuous basis audit all performance and the auditing must include an assessment of the following: (i) The functionality of the municipality’s performance management system. (ii) Whether the municipality’s performance management system complies with the Act. (iii) The extent to which the municipality’s performance measurements are reliable in measuring the performance of municipalities by making use of indicators. Each of the aforementioned aspects will now be looked at briefly. Functionality The function could be defined as a proper or expected activity or duty or to perform or operate as expected. This could also be applied to the operation of any system such a PMS. The internal audit section must therefore on a regular basis audit whether the PMS of the Municipality is functioning as developed and described in this framework. 382 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 Compliance To comply can be defined as to act in the way that someone else has commanded. In this respect it is clear that the legislature wishes to ensure that the Municipality’s PMS complies strictly with the requirements of the Systems Act, Regulations and the MFMA. This compliance check would require that the Municipality’s internal audit unit, at least on an annual basis, verifies that the Municipality’s PMS complies with the said legal requirements. Reliability To rely could be defined as to trust or depend (upon) with confidence. Reliability in the context of PMS refers to the extent to which any performance measures reported upon could be seen as being reliable, e.g. if the performance target was to build 500 houses and it is reported that the target has been met or exceeded, it must be established whether the information is factually correct or only an estimation or even worse, purposeful misrepresentation. Undertaking a reliability audit will entail the continuous verification of performance measures and targets reported upon. This will require that the Municipality sets in place a proper information management system (electronically or otherwise) so that the internal audit section is able to access information regularly and to verify its correctness. The Municipality’s internal auditor must submit quarterly reports on the audits undertaken to the Municipal Manager and the Audit Committee. 10.7.2.Audit Committee The MFMA and the Municipal Planning and Performance Management Regulations require that the municipal council establish an audit committee consisting of a minimum of three members, where the majority of members are not employees of the municipality. No Councillor may be a member of an audit committee. Council shall also appoint a chairperson who is not an employee. The Regulations gives municipalities the option to establish a separate performance audit committee whereas the MFMA provides only for a single audit committee. The operation of this audit committee when dealing with performance management is governed by section 14 (2-3) of the Regulations which require that the audit committee must: 383 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 review the quarterly reports submitted to it by the internal audit unit review the municipality's PMS and make recommendations in this regard to the Council of the Municipality at least twice during a financial year submit an audit report to the municipal Council In order to fulfill their function a performance audit committee may, according to the MFMA and the Regulations, communicate directly with the council, municipal manager or the internal; and external auditors of the municipality concerned; access any municipal records containing information that is needed to perform its duties or exercise its powers; request any relevant person to attend any of its meetings, and, if necessary, to provide information requested by the committee; and investigate any matter it deems necessary for the performance of its duties and the exercise of its powers. The Municipality has already established an Audit Committee and it is recommended that their responsibility in terms of performance management be as set out in the MFMA, Regulations and this framework. 10.8 PERFORMANCE INVESTIGATIONS The Audit Committee should also be able to commission in-depth performance investigations where there is either continued poor performance, a lack of reliability in the information being provided or on a random ad-hoc basis. The performance investigations should assess: The reliability of reported information The extent of performance gaps from targets 384 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The reasons for performance gaps Corrective action and improvement strategies While the internal audit section may be used to conduct these investigations, it is preferable that external service providers, preferably academic institutions, who are experts in the area to be audited, should be used. Clear terms of reference will need to be adopted by the Council for each such investigation. 10.9 .GENERAL ISSUES RELATING TO PERFORMANCE MANAGEMENT The following is some general issues related to performance management that needs to be taken into consideration in implementing the PMS of the Municipality: 10.8.1 Annual review of the Performance Management System As stated earlier, one of the functions of the audit committee is to on at least an annual basis, review the PMS of the Municipality. It is envisaged that after the full cycle of the annual review and reporting is complete and the audit committee has met as required; the internal audit section will compile a comprehensive assessment/review report on whether the Municipality’s PMS meets the system objectives and principles as set out in this framework and whether the system complies with the Systems Act, PMS Regulations and the MFMA. This report then needs to be considered by the audit committee and any recommendations on amendments or improvements to be made to the PMS, submitted to the Council for consideration. The Municipal Systems Act requires the Municipality also annually evaluate its PMS. The review undertaken by the audit committee and its recommendations could serve as input into this wider municipal review of the PMS and it is proposed that after the full cycle of the annual review is complete; the Municipal Manager will initiate an evaluation report, taking into account the input provided by departments. The report will then be discussed by the Management Team and finally submitted to the Council for discussion and approval. 10.8.2Amendments to key performance indicators and targets The Municipality will have to adopt a policy on amendments to indicators and targets. It is recommended that such amendments may be proposed but will be subject to the approval of the Executive Mayor in consultation with the Municipal Manager. 385 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 10.10.INTEGRATING PMS WITH THE COUNCIL’S EXISTING MANAGEMENT CYCLE International best practice indicates that PMS stand the best chance to succeed if it is integrated with the current management cycle of the Municipality. The purpose of such a cycle would be to guide the integration of important processes such as the strategic planning or development process in terms of the IDP methodology, the annual budget process and the formal process of evaluating and assessing Council’s performance in terms of the approved PMS and this framework.. 10.11 INSTITUTIONAL ARRANGEMENTS The implementation of the PMS in terms of this framework would require co-ordination and it is recommended that at organisational level this be the task of the Manager: Corporate Services supported by the PIMSS Centre through the aid of the PMS Co-ordinator. This is not to say that it would be the said person’s responsibility to measure, analyse and report on performance but only to ensure that this happens and that material is collated and available for analyses and review as per this framework on behalf of the Municipal Manager. At an individual level the responsibility for co-ordination, administration and record keeping should be the responsibility of the Assistant Manager responsible for human resource management. The Municipality also needs to ensure that its internal audit section is capacitated to deal with the additional responsibilities it has in terms of performance management over and above its traditional financial audit responsibilities. 10.12 CONCLUSION In conclusion it must be emphasised that there are no definitive solutions to managing municipal performance. The process of implementing a performance management system must be seen as a learning process, where the Municipality must continuously improve the way the system works to fulfil the objectives of the system and address the emerging challenges from a constantly changing environment. 386 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 SECTION F 387 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 APPROVAL PHASE 388 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 11.1 BACKGROUND The Constitution of the Republic of South Africa and the Municipal Systems Act requires council to develop a service delivery plan to address the developmental needs and fulfil its developmental role at local government level. The document outlining how council intends to carry out its developmental role during its term of office will be in the form of the Integrated Development Plan, which is reviewed annually. Having further adhered to provisions of Sections 27 and 29 of the Systems Act, the IDP review process commenced in August 2006 after the adoption of the IDP review framework and process plan by Council. Council has in further compliance with legislation established structures that will ensure that its developmental role is achieved. In total two steering committee meetings, one management strategic retreat workshop (Spearheaded by the Municipal Manager), one Executive strategic Workshop (Lead by the Executive Mayor), One strategic retreat workshop for the entire district, District wide IDP/Budget Imbizos, Three session on the NSDP application and Contextualisation, One District Growth and Development Summit, Three representative forums meetings were held to solicit inputs and comments from relevant stakeholders regarding the reviewed IDP as presented. 11.2 DISCUSSION Section 34 of the Systems Act requires that a municipal council must review its integrated development plan annually in accordance with its performance measurements. The Executive Mayor managed also in terms of section 21 of the MFMA to co-ordinate the process for preparing the annual budget and reviewing the municipality’s IDP with a time schedule outlining key deadlines, and presented same at least 10 months prior to the start of the budget year for adoption by Council. Council adopted the IDP review framework and process plans on the 31 August 2006. Subsequent to that a draft IDP was approved on the 30 April 2007. A grace of 21 days was granted to the public to make inputs and forward comments on the draft IDP through print media. The inputs from the public from the district Imbizos and personal submissions were collated and presented to the various structures of the IDP in terms of the process plan, including the IDP representative Forum and subsequent to that the District wide strategic workshop for final integration. 389 WATERBERG DISTRICT MUNICIPALITY IDP REVIEW 2007/2008 The Mayoral committee recommended the adoption and Council during its seating of the 31 May 2007 approved the reviewed IDP for the financial year 2007/08. 390