P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 ³ÖÖÖ›ÍüÖ ²µÖÖÃÖ ¯Öϲ֭¬Ö ²ÖÖê›Ôü ´ÖãµÖ †×³ÖµÖ­ŸÖÖ/ ¯ÖÏ•ÖÖ»Öß ¯Ö׸ü“ÖÖ»Ö­Ö ¯Öß. ‹›ü ›üß.(™üß.‹ÃÖ.)×­Ö¤êü¿ÖÖ»ÖµÖ ‹ÃÖ ‹»Ö ›üß ÃÖß Óú¯Ö»ÖîŒÃÖ, ‡Ó›ü ‹×¸üµÖÖ, ±êúÃÖ-1, “ÖÓ›üßÖœÍü-160002 Telefax : 0172-2654468 EPABX-0172-2653735 Extn- 301 E.mail: dirpp@bbmb.nic.in To M/S CTR Manufacturing Industries Ltd., Nagar road, Pune – 411 014 Memo No. /PNT-402 Dated: Sub: Design, Manufacture, testing, supply, delivery, installation, pre- commissioning tests and commissioning of 4 nos. Nitrogen Injection Fire prevention & Extinguishing System (NIFPES) at Dehar Power House, Switchyard, BBMB, Slapper against Specification No. BBMB/T316. Reference: 1. Your offer no.MKM/FS/25/60095/Q dt. 01.03.2006 2. Your office reference no. MKM/FS/26/60095/Q/A dt. 19.05.2006 3. Your office reference no. MKM/FS/27/60095/L dt. 30.07.2007 4. Your office reference no. GM/FS/27/60095/N dt. 14.09.2007 5. Your office reference no. GM/FS/27/60095/P dt. 19.11.2007 With reference to your offer and subsequent correspondence as referred above, a detailed purchase order for the design, manufacture, testing, supply, Page 1 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 delivery, installation, pre-commissioning tests & commissioning Nitrogen Injection Fire prevention & Extinguishing Systems (NIFPES) on 4 nos. oil filled transformers at Dehar Power House, Slapper on the following prices and terms & conditions is hereby placed on you:Sr. No. Description 1 i) 2 3 Nitrogen Injection Fire 4 nos. Prevention & Extinguishing System (NIFPES) conforming to Specification No. BBMB/ T-316 suitable for 220kV DC input supply (Scope of supply as per Appendix-F). Erection & commissioning 4 nos. (inclusive of service tax) ii) iii) Qty Unit For Destn. price inclusive of packing & forwarding freight, excise duty, CST, octroi , service tax & cess (Rs.) 4 5,50,000 Total For Destn. price inclusive of packing & forwarding freight, excise duty, CST, octroi , service tax & cess (Rs.) 5 22,00,000 60,000 LS 2,40,000 LS Spares as detailed in 1 set 67,700 67,700 Appendix- E Grand Total 25,07,700 Rupees Twenty Five Lac Seven Thousand & Seven Hundred only Note: The above prices dare FIRM and inclusive of packing & forwarding charges, freight charges, excise duty, CST, octroi, service tax and educational cess. Insurance shall be arranged by BBMB. Any other tax/duty if applicable, later on shall be to the supplier’s account. 2. Terms of Payment In respect of material, 100% payment shall be made within 30 days of receipt of material at site in good condition and according to the Specification & physical verification and record entry by the consignee in the relevant GR/MB. Page 2 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 In respect of erection & commissioning charges. 100% payment shall be made after successful erection & commissioning of the system. Page 3 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 3. Dated: 29.11.2007 Delivery of Material & Approval of Drawings The drawings shall be supplied within 30 days of receipt of this Purchase Order and the same shall be approved within 20 days of receipt of the same. If the drawings are found to be deficient in any manner, the deficiency, so communicated, would be rectified within next 10 days. The ordered material shall be delivered within 90 days of receipt of approval of drawings. The delay beyond 30 days in submission of drawings in the first instance and beyond 10 days in resubmission of drawings (after removal of deficiencies, if pointed out) would count towards levy of penalty as per Clause 7 of this Purchase Order. 4. Warranty The supplier shall be responsible to replace free of cost, with no transportation or insurance cost to the purchaser upto the destination, the whole or any part of the material which in normal and proper use, proves defective in quality or workmanship, subject to the condition that the defect is noticed within 24 months from the date, the equipment is commissioned/ put to use by the end user or 30 months from the date of dispatch whichever period may expire earlier, as per Clause 12 of Appendix ‘A’ to the Purchase Order. 5. Warranty Deed The supplier shall execute a warranty deed on the enclosed proforma Appendix ‘B’, on a non- judicial stamp paper as per Clause 13 of Appendix ‘A’ to the Purchase Order. 6. Performance Bank Guarantee The supplier shall furnish a Performance Bank Guarantee on the enclosed proforma Appendix ‘C’ to the tune of 10% of contract price as per Clause 14 of Appendix ‘A’ to the Purchase Order. Page 4 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 7. Dated: 29.11.2007 Penalty Charges If the supplier fails to abide by the provisions of clause ‘Delivery Period’, he shall pay @ ½% per week or part thereof of the contract value [Ex-works delivery price and F&I charges (excluding taxes & duties)] of such portion of material as has not been delivered within the ‘Delivery Period’, subject to maximum of 10% of the contract value of the delayed/undelivered portion of the material as penalty charges. 8. Transportation & Handling of Material The material shall be dispatched by rail/road on ‘freight prepaid’ basis. The supplier shall be responsible for transportation & handling of material upto destination as per Clause 17 of Appendix ‘A’ to the Purchase Order. 9. Transit Insurance i) Insurance will be arranged under BBMB Open transit insurance policy to cover transit risks. Any damages and short shipment shall be reported to the Insurance Company “M/S Cholamandalam MS General Insurance Limited, SCO No. 118-120, Sector 34/A, Chandigarh 160034” by the consignee under Transit Insurance policy No. MO0004202-000-00. Any amendment in the policy shall be intimated to the supplier before dispatch of material. ii) The consignment shall be insured for its landed cost. The firm will intimate the following particulars to the insurance company at the time of dispatch. a) Name & station of the sending party b) Name & station of the receiving party c) Description of consignment d) P.O. or job order No. e) Value of consignment f) Mode of transportation g) GR/RR/A.W.B No. and date. Page 5 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 10. Dated: 29.11.2007 Installation & Commissioning of system a) The installation, carrying out pre-commissioning tests & commissioning of equipment shall be done by the supplier to the complete satisfaction of the purchaser and/or his representative. b) The shutdown required for installation & commissioning of NIFPES shall be arranged as per requirement and shall depend upon system constraints and approval by the Power Controller, BBMB, Chandigarh/NRLDC, New Delhi. The scope of supply & installation shall be as per Appendix-F. c) i) The supplier shall ensure that:no new opening is made on the transformer. Only the available openings on the transformers shall be utilized and, at the most, new openings in radiator pipe by using tee joints with gate/butterfly valves may be used. ii) performance of transformers shall not be affected in any manner due to installation & commissioning of NIFPES. This requirement is of paramount importance & form the essence of this Purchase Order. iii) high level of cleanliness during installation & commissioning shall be maintained. iv) NIFPES does not interfere with general maintenance/other activities carried on the transformers & in the substation and provision of NIFPES on remaining transformers at the substation. 11. Drawings & Manuals a) The drawings, to be supplied within 30 days of receipt of Purchase Order shall consist of detailed layout drawings (depicting layout of pipes, cables & various components of the system) & equipment drawings, duly dimensioned, wherever required, complete bill of material, control circuit drawings, nitrogen flow rate and transformer oil flow rate for PNRV operation. The location & size of plinth for F.E. cubicle & oil pit shall be clearly indicated on the drawing. b) After approval of drawings, 4 (four) sets of drawings alongwith reproducibles and 4 (four) sets of Operation & Maintenance Manual (bound) shall be furnished to the purchaser. Page 6 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 c) Dated: 29.11.2007 To prepare contract drawings and bill of material, the supplier must visit the Dehar Power House Switchyard, Slapper, distt. Mandi, Himachal Pradesh for on the spot assessment and consultation with field authorities i.e. Sr. Xen/Elect. Mtc., Dehar Power House, Slapper in respect of location of oil pit for tank, pipes, cables, F.E cubicle, control box etc. The location of oil pit shall be decided keeping in view, interalia, the existing transformers and additional transformers likely to be installed at the substation to be covered later on under NIFPES. 12. Test & Inspection a) Factory Tests Test shall be carried out on individual equipment of the system, as applicable and total system at the supplier’s works in presence of purchaser’s representative. b) Performance Test Performance test of the complete system shall be carried out by the supplier after complete installation at site in the presence of representative of the purchaser before commissioning the system, to the complete satisfaction of the purchaser. These tests shall include simulation & verification of the response of the complete system without injection of the nitrogen gas. c) The purchaser reserves the right to inspect the material at any time during the course of its manufacture/assembly. 13. Guaranteed Technical Particulars The equipment shall satisfy the Guaranteed Technical Particulars given in Appendix-D 14. Completeness of Equipment All fittings, accessories & components which may have not been specifically mentioned in this purchase order but are actually otherwise necessary for completeness of equipment shall be deemed to have been included in the scope of supply of the supplier. 15. Workmanship Page 7 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 The material offered shall be of best quality and workmanship. The responsibility for procurement of quality raw material shall be solely of supplier and in no case any assistance for the procurement of raw material shall be provided by the Purchaser, and the delivery schedule shall not be affected due to non supply of raw material. Therefore, the supplier will have to ensure adequate quantity of quality raw material in his stock so that the progress of work is not hampered. No extension in delivery period will be allowed on the pretext of non-availability or short supply of raw material and this shall not constitute a valid reason of force majeure. The material shall conform to the relevant Indian/International Standards and wherever applicable, the relevant Standard shall be mentioned. To the extent possible, various parts of NIFPES meant for various transformers shall be interchangeable. 16. Packing & Forwarding The Supplier shall be required to pack and protect the material securely so as to avoid damage during transit. The Supplier shall be responsible for all losses or damage caused or occasioned by any defect in packing. The F.E cubicle & control box shall be affixed with a weather proof & corrosion resistant name plate inscribed with P.O. No. & date, name of manufacturer, batch of manufacturing, transformer nomenclature and other relevant details. 17. Despatch Instructions The material is to be dispatched as per the dispatch instructions given below to the Purchase Order. Sr. Description No. 1. Nitrogen Injection Fire Prevention & Extinguishing System (NIFPES) as per BBMB Qty. to be Mode of Name of dispatched Despatch consignee to equipment is to be consigned 4 By Rail/ SDO/S&T, Road BBMB, Dehar Power House, Slapper Name of concerned Addl. S.E./ Sr. Xen Name of concerned Accounts Officer Resident Engineer, Dehar Power House, BBMB, Slapper Sr. A.O., BBMB, Slapper Page 8 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 Spec. No. BBMB/T316. All other terms & conditions, except to the extent modified above, shall be as per Appendix ‘A’ to the Purchase Order. You are requested to acknowledge the receipt of this Purchase Order and return one copy of the same, duly appended with signature of your authorized person, on each page. DA/ i. Appendix A to F ii. 2 spare copies of P.O ×-Ö¤êü¿Öú/µÖÖê•Ö­ÖÖ ‹¾ÖÓ ºþ¯ÖÖÓú­Ö {¯ÖÖ¸êüÂÖ•Ö ¯ÖÏ•ÖÖ»Öß} ¯ÖéšüÖÓ•ú-Ö -Ö´²Ö¸ü: / ¯Öß ‹­Ö ™üß 402 פü-ÖÖÓ•ú: ˆ¯Ö¸üÖêŒŸÖ úß ¯ÖÏ×ŸÖ ×­Ö´­Ö×»Ö×ÖŸÖ úÖê †Ö¾Ö¿µÖú úÖµÖÔ¾ÖÖÆüß ÆêüŸÖã ³Öê•Öß •ÖÖŸÖß Æîü •Öß… 1. ×¾ÖŸÖßµÖ ÃÖ»ÖÖÆüúÖ¸ü ‹¾ÖÓ ´ÖãµÖ »ÖêÖÖ †×¬ÖúÖ¸üß, ²Öß ²Öß ‹´Ö ²Öß, “Ö›üßÖœÍü… 2. ×¾Ö¿ÖêÂÖ ÃÖד־Ö, ²Öß ²Öß ‹´Ö ²Öß, “Ö›üßÖœÍü… 3. ´ÖãµÖ †×³ÖµÖ­ŸÖÖ (úÖµÖÔ ³ÖÖÖ), /¯ÖÏÖÖ»Öß ¯Ö׸ü“ÖÖ»Ö­Ö ²Öß ²Öß ‹´Ö ²Öß, “Ö›üßÖœÍü… 4. †¬ÖßÖÖ †×³ÖµÖ­ŸÖÖ, ¤êüÆü¸ü ×¾ÖªãŸÖ ‘Ö¸ü, ²Öß ²Öß ‹´Ö ²Öß, ÃÖ»ÖÖ¯Ö›Íü… 5. †×ŸÖ׸üŒŸÖ †¬ÖßÖÖ †Û³ÖµÖ­ŸÖÖ, Elect. Mtc. ×›ü×¾Ö•Ö­Ö, ¤êüÆü¸ü ×¾ÖªãŸÖ ‘Ö¸ü, ²Öß ²Öß ‹´Ö ²Öß, ÃÖ»ÖÖ¯Ö›Íü… 6. ãÖÖ­ÖßµÖ †×³ÖµÖ­ŸÖÖ, ¤êüÆü¸ü ×¾ÖªãŸÖ ‘Ö¸ü, ²Öß ²Öß ‹´Ö ²Öß, ÃÖ»ÖÖ¯Ö›Íü… Page 9 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 7. ¾Ö׸üšü »ÖêÖÖ †×¬ÖúÖ¸üß, ²Öß ²Öß ‹´Ö ²Öß, ÃÖ»ÖÖ¯Ö›Íü… 8. ˆ¯Ö ´Ö›ü»Ö †×¬ÖúÖ¸üß, ‹ÃÖ ‹Ó›ü ™üß, ²Öß ²Öß ‹´Ö ²Öß, ÃÖ»ÖÖ¯Ö›Íü… 9. ‹ÃÖ ‹ÃÖ ‹´Ö/²Öß ²Öß ‹´Ö ²Öß, “Ö›üßÖœÍü, for hosting the Purchase Order on BBMB Website This issues with the approval of the Middle Level Purchase Committee of BBMB(PW) accorded in its meeting held on 12.11.2007 as conveyed by Special Secretary, BBMB, Chandigarh vide memo no. 32110-15/B-769/12.11.2007 dated 14.11.2007. This has been scrutinized by the Sr. Accounts Officer, BBMB, Chandigarh vide H.M. No. 1849 dated 28.11.2007. ÃÖ»ÖÓ­Ö/µÖ£ÖÖêŒŸÖ ×-Ö¤êü¿Öú/µÖÖê•Ö­ÖÖ ‹¾ÖÓ ºþ¯ÖÖÓ•ú-Ö {¯ÖÖ¸êüÂÖ•Ö ¯ÖÏ•ÖÖ»Öß} Appendix -A TERMS AND CONDITIONS OF PURCHASE ORDER 1. F.O.R./EX-GODOWN RATE The above rates are FOR/Ex-Godown _____________ packing and forwarding charges if any, will be paid extra at actuals but not exceeding the quoted charges and should be included in the bill duly supported by original vouchers. 2. DELIVERY PERIOD Supply of items as stipulated in this contract shall be completed by supplier within 90 days of receipt of technically & commercially clear order. The technical clearance of the P.O. will be deemed from receipt of approved drawings by the supplier, allowing one week time for postal transit in case of outstation letters and three days in case of local letters. The supplier will, however, ensure that the complete drawings are received by the purchaser within 30 days of receipt of purchase order. The delay in submission of drawings by the supplier shall also invite levy of penalty @ specified in Para 5 below. In case the supplier is unable to complete whole or any item of supply within stipulated period, for recognized reasons of ‘Force Majeure’ mentioned in clause 3 below, he shall be responsible to furnish well in time sufficient documentary evidence to the satisfaction of the purchaser to prove the existence of conditions mentioned in the Clause 3, so as to justify grant of extension by the purchaser of the Page 10 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 ‘Delivery Period’ mentioned above. Such extension will be granted by purchaser for the period for which the completion of supply is proved, by the supplier, to have been delayed for the said reasons due to ‘Force Majeure’. In case of delay in delivery, the dispatches shall be made only after obtaining written consent of the purchaser. 3. FORCE MAJEURE The supplier shall not be liable for any penalty charges due to delay in manufacture or delivery of material resulting from any causes beyond the supplier's reasonable control including but not limited to compliance with regulations, orders or instructions of Central/State or Municipal Govt. or Agency, thereto, acts of God, Acts of Civil & Military authorities, fires, floods, strikes, lockouts, freight embargoes, war risks, riots and civil commotion’s, power cuts over and above the cuts imposed at present, rebellion and disturbances. The supplier will seek extension of delivery period within three weeks of occurrence of such an event and clearly state anticipated delay in supply on account of such an event/events. On receipt of such request from the supplier, extension in delivery period may be granted for the period for which the completion of work is proved by the supplier to have been delayed for circumstances covered by reasons of 'Force Majeure' subject to further conditions that if the delivery period is likely to be extended by more than 60 days on account of any event, the purchaser shall have the option to accept any portion of the balance material and cancel the order for the rest provided, however, that if material had been manufactured exclusively for the purchaser under contract prior to the commencement of FORCE MAJEURE circumstances, it shall be accepted by the purchaser and the cancellation will be without any liability for damages on the part of the supplier and without any payment of compensation by the Board. 4. EXTENSION IN DELIVERY PERIOD Any genuine delay in approval of technical detailed drawings, issuance of amendment of purchase order, conducting inspection and approval of inspection test/tests certificates for allowing despatches etc. will count towards extension of delivery period by corresponding period other than admissible under Force Majeure conditions, if any, substantiated by the supplier and duly accepted by the Purchasing Authority. Date of delivery shall be taken as 7 th day after the date of readiness of material for inspection in case of purchase order upto Rs.5 lac and 14 th day after the date of readiness of material for inspection in case of purchase order more than Rs.5 lac, provided the material offered has passed the inspection and proof of despatch of material within 7 days of the receipt of despatch authorization and road permit (wherever required) is given by the supplier. In case, however, the material fails during inspection at the works/site, as the case may be, either fully or partially or the material is not ready for inspection when the inspector visits the works for inspection, the re-inspection charges shall be recovered from the firm. The date of readiness of the material in this case will be reckoned with reference to the date from which the material/equipment is offered to be ready for the re-inspection provided the material passes the inspection that follows the offer. In case the material is not dispatched within 7 days of the receipt of dispatch authorization and Page 11 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 the road permit(wherever required), date of delivery shall be taken as date of receipt of material by the consignee at site/store. 5. PENALTY CHARGES If the supplier fails to abide by the provisions of clause ‘Delivery period’, he shall be liable to pay @ 1/2% per week or part thereof the ex-works delivery price excluding taxes & duties (but including freight & insurance charges where break-up of FOR Destination price is not available) of such portion of material as has not been delivered within the "Delivery period" subject to maximum of 10% of the contract value of the delayed/undelivered portion of the material. The date of delivery shall be reckoned in accordance with the provisions of above clause No. 4 ‘Extension of Delivery period’. 6. TERMS OF PAYMENT Normally the standard terms of payment of Board shall be 100% within 30 days after the receipt of material at site in good condition, according to the specification and physical verification and record entry by the consignee in the relevant G.R/M.B. 6.1 i) The purchaser may consider to allow the following terms of payment to the firms who have established business with the Bhakra Beas Management Board. 95% advance payment against Bank documents on proof of despatch of material by Rail/Bank approved Road Transporter subject to the fulfillment of other conditions & production of documents as prescribed in the purchase order. The balance 5% payments shall be released within 30 days after ensuring receipt of material and recording entry in GR/MB provided the material conforms to the prescribed specifications and is of requisite quality. ii) 100% payment against Bank documents on proof of dispatch of material by rail bankers approved road transporters but for this mode of payment a bank guarantee (on standard proforma to be supplied by the purchaser) of the value of 10% of the contract price to guarantee the receipt of material in good condition and according to prescribed specification shall have to be furnished by the supplier/manufacturer. It shall be kept valid for a period of one year from the date of final execution of the contract. The bank guarantee shall be furnished by the supplier one month before the commencement of delivery. 6.2 Bank charges are to be borne by the supplier. 7. CENTRAL SALES TAX/STATE SALES TAX The Central sales tax/Punjab/Haryana/Himachal sales tax will be paid extra at actuals at the rates prevailing at the time of delivery but limited to the rates prevailing within contractual delivery period. Page 12 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 The supplier shall furnish original vouchers and/or following certificates duly signed by the supplier:i) Certified that the transaction on which sales tax has been claimed/shall be included in the return submitted/to be submitted to the Sales Tax authorities for the assessment of the Sales Tax and the amount claimed from the purchaser has been/shall be paid to the sales Tax Authorities. ii) Certified that the goods on which Sales tax has been charged have not beenexempted under the Central Sales Tax Act, the rules made thereunder and the charges on account of Sales Tax on these goods are correct under the provisions of the relevant Act, or rules made thereunder. Certified that we shall indemnify the purchaser in case it is found at a laterstage that wrong or incorrect payment has been recovered on account of the Sales Tax paid by us. iii) iv) 8. Certified that we are registered as a dealer under the Central Sales Tax and our Registration No. is____________________. EXCISE DUTY,OCTROI AND OTHER DUTIES a) EXCISE DUTY The statutory payment of excise duty will be made extra subject to actual proof of payment having been made by you to the Excise Deptt. But rates limited to the rates prevailing within the contractual delivery period. The supplier shall also furnish following certificates duly signed by him while claiming payment of excise duty:i) Certified that the sum of Rs.____________(Rupees___________________ _____________________) towards Excise duty has been paid to the Central material) Excise Authorities affected towards despatch from__________ of (Name of Station____________ to___________________ consigned to_______________________ Under R.R.No.___________Dated__________vide Bill No.____________ Dated____________. ii) Certified that the excise duty charged is at the prevailing rates & no part of the same is refundable. In case, any excise duty paid on this material is refunded to the supplier it will be passed on to the purchaser. iii) Certified that the goods on which Excise duty has been charged have not been exempted under the Central Excise Duty and the Central Excise Page 13 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 Duty charged on these goods is not more than what is payable under the provisions of the relevant Act or rules made thereunder. iv) (b) Certified that we shall indemnify the purchaser, in case it is found at a later stage that wrong or incorrect payment has been recovered on account of Excise duty paid to us. OCTROI & OTHER DUTIES/TAXES Octroi and other duties/taxes, if leviable on the finished goods at the station of despatch at the time of supply shall be paid at actuals subject to production of original payment documents and subject to the rates prevailing within the contractual delivery period, if the same have not been included in the quoted prices. To avoid any complications, with regard to octroi at the destination station, the material shall be despatched in the name of consignee and not to self. However, OCTROI charges as applicable at the destination station shall be borne by the purchaser. Page 14 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 9. Dated: 29.11.2007 NEGLIGENCE If the supplier neglects to execute the work with due diligence and expedition or refuses or neglects to comply with any reasonable orders given in writing by the purchaser in connection with purchase orders or shall contravene the provisions of the purchase order, the purchaser may give 21 day's Notice in writing to the supplier to make good the failure, neglect or contravention complained of and should the supplier fail to comply with the notice within a reasonable time from the date of service thereof, in case of failure, neglect or contravention capable of being made good within that time or otherwise within such time as may be reasonably necessary for making it good then and in such case the purchaser shall be at liberty to take the work wholly or partly out of the hands of the supplier and recontract at reasonable price with any other person or persons. In such an event, it shall be lawful for the purchaser to retain any such balance which may otherwise be due by him to the supplier on any account including the amount of Bank Guarantees and apply the same towards the execution of the whole or balance of the work so recontracted, as aforesaid. If, no such balance is due by the purchaser to the supplier or if due is not sufficient to cover the amount thus recoverable from the supplier, it shall be lawful for the purchaser to recover the whole or balance of the amount from the supplier by action of the law. 10. BANKRUPTCY If the company commits any act of bankruptcy or being corporation commence to be wound up except for reconstruction purpose, or carry on its business under a receiver, the executors, successor or other representative in law of the estate of the supplier or any such receiver, liquidator, or any person in whom the contract may become vested shall forth with give notice thereof in writing to the purchaser and shall take all reasonable steps to prevent stoppage of the work, have the option carrying out the contract subject to the supplier, providing such guarantee as may be required by the purchaser but not exceeding the value of the work for the time being remaining executed. In the event of stoppage of the work the period of the option under this clause shall be fourteen (14) days only. Provided that should the above option not be exercised, the contract may be determined by the purchaser by notice in writing to the supplier and the same power and provisions reserved to the purchaser in the last proceeding clause of taking the work out of the supplier's hands shall immediately become operative. 11. i) REPLACEMENT OF REJECTED MATERIAL Material found damaged, substandard or defective or not conforming to the prescribed specification in any manner, at the consignee's end, shall not be accepted and an intimation to this effect shall be given to the supplier by the consignee. The Purchasing Authority shall promptly take up the matter with supplier/shall intimate the supplier to this effect and ask him to rectify or replace the defective substandard material forthwith and in any case within 60 days from the date of intimation or rejection of material, failing which the Board shall reserve right to get the Page 15 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 ii) iii) 12. Dated: 29.11.2007 defect/damages rectified at the supplier's cost or to dispose off such material and adjust the sale proceeds thereof, if any, against its claim on the supplier. All expenses involved in the replacement by way of handling, transportation, storage etc. shall be on supplier's account. In respect of the defective/substandard supplies the date on which such a supply is replaced shall be reckoned as the effective date of delivery there against and the delay shall be worked out accordingly with reference to the date on which the supply was due as per terms of contract, for the purpose of determining penalties/charges recoverable under clause-5 above. The provisions of sub clause (i) & (ii) above shall apply mutatis mutandis, to the material found substandard or defective during the period of warranty. WARRANTY The supplier shall be responsible to replace free of cost, with no transportation or Insurance cost to the purchaser upto the destination, the whole or any part of the material which in normal and proper use proves defective in quality or workmanship, subject to the condition that the defect is noticed within 24 months from the date, the material is commissioned/put to use by the end user or 30 months from the date of despatch whichever period may expire earlier. The consignee or any other officer of the purchaser actually using the material will give prompt notice of each such defect to the supplier as well as the purchasing authority. The replacement shall be effected by the supplier within a reasonable time but not exceeding 60 days. The supplier shall also arrange to remove the defective supply within a reasonable period but not exceeding 60 days from the date of issue of the notice in respect thereof, failing which the purchasing authority shall reserve the right to dispose off the defective material in any manner considered fit by it at the sole risk of the supplier. Any sales proceeds of the defective material after meeting the expenses incurred on its custody, disposal, handling etc. shall, however, be credited to the supplier's account and set off against any outstanding dues of the purchaser against the supplier. These provisions shall also apply equally against the replaced material . In case the material is again found to be defective within a period of 24 months of its replacement it shall also have to be replaced similarly. 13. WARRANTY DEED The supplier shall execute a warranty deed, on the standard proforma to be supplied by the purchaser, on a non-judicial stamp paper required for such deeds as per the relevant act of the state in which it will be executed and signed and shall be kept valid for a period of 24 months from the date the material is commissioned/put to the use by end user or 30 months from the date of despatch, whichever is earlier to cover the warranty period of the material to be supplied. The warranty deed shall be supplied immediately after placement of purchase order. 14. PERFORMANCE BANK GUARANTEE Page 16 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 The supplier shall furnish a performance Bank Guarantee (on a standard proforma to be supplied by the purchaser) to the tune of 10% value of the contract to cover the satisfactory working of the material during the period of warranty as per clause-12 above and it shall also be kept valid till such time any claim of the purchaser is pending against the supplier. The performance Bank Guarantee shall be furnished by the supplier one month before the commencement of delivery. 15. TEST AND INSPECTION The supplier shall also intimate the purchaser about the readiness of material for inspection and same shall be inspected within 15 days from the receipt of notice. In case the representative of the purchaser finds on arrival at the supplier's premises that the material was not ready for inspection and that the notice given by the supplier was infructuous, the expenditure incurred by the purchaser on arranging for such inspection shall be recovered from the supplier. No material shall be despatched without prior inspection and approval of test certificates by the purchaser unless otherwise directed. The inspected material shall be despatched within 7 days from the date of receipt of instructions allowing despatch of material and road permit (wherever required). The Test certificates of each batch of supply shall be supplied in sextruplicates to the Director, Planning & Design Directorate (Transmission System), Bhakra Beas Management Board (Power Wing), 66KV Grid Substation, SLDC Complex, Industrial Area Phase-I, Chandigarh-160002 for approval. A photostat copy of the inspection/test report signed/approved by the said Director and letter conveying approval of Test Certificates and clearance for despatch shall be attached by the supplier to the forwarding Railway Receipt or the receipted goods challan as the case may be. However, if the inspection is waived off by the purchaser, the supplier shall attach a copy of the Purchaser's letter waiving off inspection with the Railway Receipt or the receipted goods challan and the supplier shall be responsible for rectification of all defects noticed by the consignee after receipt of material. 16. PACKING All apparatus and equipment shall be securely packed for safe delivery at destination and supplier shall be responsible for all losses or damages caused or occasioned due to improper or defective packing. Double boxing to give extra protection to the equipment against mechanical injury shall be used, if required. All parts requiring protection from moisture including polished parts which rust rapidly, shall be double boxed with trapper or in such other approved manner. All parts such as coils parts, containing coils for electrical machines. Instruments, relays, motors etc. requiring utmost protection against moisture shall be packed in metal lined sealed boxes with trapper or sisal kraft paper or any other approved material inserted between metal lined box and the outer layer of boxing. All boxes shall be marked with signs indicating the up and down sides of the boxes and also unpacking instructions considered necessary by the supplier. Page 17 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 The contents of the boxes shall have place marks corresponding to the number in the packing list to enable easy identification. The prices include packing charges also and as such, no extra payment shall be made on this account. 17. TRANSPORTATION, INSURANCE & HANDLING OF MATERIAL The supplier shall be responsible for transportation & handling of material upto destination station/store as per dispatch instructions. The material shall be dispatched by Rail/Road “Freight Pre-paid” under open transit insurance policy undertaken by BBMB. The details of open transit policy shall be intimated by the purchaser to the supplier before dispatch of material. The purchaser shall lodge claim for shortage/damages etc., if any, during transit with the insurance company. 18. ARBITRATION If at any time any question, dispute or difference whatsoever, shall arise, between the purchaser and the supplier upon or in relation to or in connection with the contract. Provisions of the Arbitration and Conciliation Act, 1996 shall be applicable. The work under the contract, if reasonably possible, shall be continued during the Arbitration proceedings and no payment due or payable by the purchaser shall be withheld on account of such proceedings. 19. CANCELLATION OF PURCHASE ORDER The purchaser shall have the right to amend or cancel the order at any time before the receipt of intimation regarding manufacturing of material, if he is satisfied that the delay in execution of the order by the supplier is wilful and detrimental to the interest of the Board. In case where after the commencement of manufacture, there is wilful delay on the part of the supplier to the despatch/manufacture of the material, the purchaser may cancel the order for whole/unexecuted portion after giving a notice of 15 days to the supplier. 20. JURISDICTION OF COURT In case of any dispute between the parties, the courts at Chandigarh only shall have the jurisdiction to settle/decide and adjudicate upon such matters. 21. SIGNING OF PURCAHSE ORDER The supplier will be furnished with three copies of the purchase order. Two copies shall be retained by the supplier. The third copy of the purchase order will be returned by the supplier to the purchaser after signing each and every page of P.O. by his authorized representative in token of the unconditional acceptance of the purchase order. The supplier shall also furnish documentary evidence that the signatory is an authorized representative of the supplier. Page 18 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 Page 19 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 APPENDIX -B (WARRANTY DEED) (To be executed on the appropriate value of Non-Judicial Stamp Papers) This warranty deed made this day the__________________________ _________________________________________ between Messers (supplier’s name) through ____________________hereinafter referred to as “The supplier” which expression shall include its legal representatives, successors and assigns of the one part, and the Bhakra Beas Management Board, Chandigarh through Chief Engineer/System Operation, a statutory body constituted under Section 79 (1) read with Section-80 (6) of Punjab Re-organisation Act, 1966 hereinafter referred to as “ the Board” which expression shall include its successors and assigns of the other part. Where as the Board has placed on the supplier P.O. No.________________________________________________________________ ___________________________________________________________________ ___________________________________________________________________ _for the design, manufacture, testing, supply and delivery of the material as specifically and fully described in the said P.O. and whereas the above said P.O. has been accepted and whereas the above said P.O. has been accepted by the Supplier vide their letter No.____________________________________________________thus constituting a legally enforceable contract between the parties above named. NOW THEREFORE THIS DEED WITNESSTH AND THE SUPPLIER HEREBY WARRANTIES AS UNDER:That the supplier shall be responsible to replace free of cost, with no transportation or insurance cost to the Board upto the destination, as specified in the said P.O. or the Despatch instructions issued in pursuance of the said P.O. the whole or any part of the material which in normal and proper use proves defective in quality or workmanship subject to the condition that the defect is noticed within 24 months from the date of commissioning of equipment or 30 months from the despatch, whichever period may expire earlier. The consignees or any other representative of the Board actually using the material will give prompt written notice Page 20 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 of each such defect to the supplier. The replacement shall be affected by the supplier within a reasonable time but not in any case exceeding 60 (Sixty) days. The supplier shall also arrange to remove the defective supply within a reasonable period but not exceeding 60 (Sixty) days from the date of issue of the notice in respect thereof, failing which the Board shall reserve the right to dispose off the defective material in any manner considered fit by it at the sole risk and cost of the supplier. Any sale proceeds of the defective material after meeting the expenses incurred on its custody, disposal, handling etc. shall however, be credited to the supplier’s account and set off against any outstanding dues of the Board against the supplier. That the above provisions shall also equally apply to the replaced material. In case the material is again found to be defective within a period of 24 months of its replacement, it shall also have to be replaced similarly. The supplier further declares that this deed has been executed by its lawfully constituted attorney legally competent to sign and execute and has been stamped as required under the relevant Act of the State in which it has been executed & signed and that the warranty herein before contained shall not be affected by any change in the constitution of the supplier. In witness whereof the parties hereto have executed this deed on the date and year first above mentioned. Witness:- For and on behalf of the Supplier:- 1. Signature _________________ Signature _________________ Name & Full Address ________ Name & Designation ________ Signature _________________ Signature _________________ Name & Full Address ________ Name & Designation ________ 2. Witness:- For and on behalf of the Board:- 1. Signature _________________ Signature _________________ Name & Full Address ________ Name & Designation ________ Signature _________________ Signature _________________ Name & Full Address ________ Name & Designation ________ 2. APPENDIX-C PERFORMANCE BANK GUARANTEE Page 21 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 (TO BE EXECUTED ON THE APPROPRIATE VALUE OF NON-JUDICIAL STAMPED PAPERS) This agreement is made this _____________day of ________________between M/S (Banker’s Name)______________________through a company registered under the Companies Act, 1956/Banking Statute/ a body corporate constituted under the Banking Companies (Acquisition and Transfer of undertaking) Act V or 1970 having its registered office at ________________hereinafter called the “Guarantor” which expression shall unless repugnant to the context or meaning thereof include its successors and assigns of the first part, M/S ________________________through (designation of the person signing The Bank Guarantee _______________________________________________(on behalf of the supplier) a company registered under companies Act, 1956, having its registered office at (Address of Registered office_______________________) hereinafter called the “Supplier” which expression shall unless repugnant to the context or meaning thereof include its successors and assigns of the second part and the Bhakra Beas Management Board, Chandigarh through Chief Engineer/System Operation, a statutory body constituted under Section 79 (1) read with Section-80 (6) of the Punjab Re-organisation Act, 1966 hereinafter called the ‘Board’ which expression shall unless repugnant to the context or meaning thereof include its successors and assigns of the third part. Whereas the supplier had, interalia, agree to Board___________________________________(hereinafter equipment) on the terms and conditions supply called contained to the the “said in the P.O.No.____________________________ dt._______________________(hereinafter_______________________________ called the “said P.O..”) Placed by the Board on the supplier and unconditionally accepted by the supplier. And whereas under clause 14 of Appendix-A of the said P.O. the supplier is required to furnish a Bank Guarantee for a sum Rs._______________________________ (Rupees_________________________being the____________________value of all the consignments of the said equipment on account of retention money, which but for this guarantee would be withheld by the Board till such time that the said equipment is received in good condition by the Board and in accordance with the Page 22 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 specifications of the same and Dated: 29.11.2007 the said equipment has given satisfactory performance during its warranty period as per clause 12 of the appendix-‘A’ of the said P.O. and also till such time that any claim of the Board is pending against the supplier, to guarantee the payment of the retention money on bill submitted against supply of the said equipment on order from time to time upto a maximum amount of the sum of Rs._________ (Rupees____________________________________________________________ _________________________________________________________________) And whereas at the request on the supplier the Board has agreed not to retain 10% of the contract price of all the consignments and in lieu thereof to accept a Bank Guarantee equivalent to the 10% of the contract price of all the consignments from the guarantor for the aforesaid purposes & for the due performance of the said P.O. by the supplier on the terms & conditions hereinafter contained, this deed, witnesseth and it is hereby agreed by and between the parties hereto as follows:The Guarantor hereby guarantees to the Board the quality, workmanship and design of the said equipment in accordance with the prescribed specifications and the terms of the said P.O. and that the said equipment when received by the Board shall be in good condition and shall give satisfactory performance during its warranty period as per clause 12 of Appendix-‘A’ of the said P.O. and agrees to indemnify and keep indemnified the Board to the extent of Rs._________________________in the aggregate against all losses, damages, cost, charges and expenses which may be suffered or incurred by the Board on account of non-receipt of the said equipment in good condition or on account of any defect in the said equipment or on account of any breach or breaches on the part of the supplier of any of the terms and conditions of the said P.O. in the supply of and during the warranty period of the said equipment. The guarantor further agrees that the Board shall be the sole judge whether or not the supplies have been made according to the prescribed specifications, design and workmanship and laid down in the said P.O. and whether or not the said equipment has been received in good condition by the board and whether or not the said equipment has given satisfactory performance during its warranty period and whether or not the supplier has committed breach or breaches of any of the terms and conditions of the said P.O. Page 23 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 and the extent of loss, damages, cost, charges or expenses suffered or incurred by the Board on account thereof. The guarantor hereby guarantees and undertakes to release & pay immediately the amount of Rs.______________________to the Board on receipt of written instructions from the Board and the supplier shall not have any right or cause to interfere. All rights to get the Bank Guarantee encashed shall rest with the Board solely at its discretion without assigning any reason whatsoever. The guarantor further agrees that this guarantee shall remain in full force and effect for 24 months from the date of its issue in the first instance. This guarantee shall be revalidated subsequently for a further period, if required, under clause 14 of Appendix-‘A’ of the said P.O. so as to cover P.O. and also till such time any claim of the Board is pending against the supplier. The guarantor also agrees and undertakes not to revoke this guarantee before the same is discharged as aforesaid except with the previous consent of the Board in writing. The Guarantor hereby further agrees that the Board shall have the fullest liberty without affecting in any manner obligation of the guarantor hereunder with or without the consent of the guarantor to vary any of the terms of the said P.O. or to extend time of performance of the said P.O. by the supplier from time to time or to postpone for any time or from time to time any of the powers exercise-able by the Board against the supplier and either to forebear or enforce any of the terms or conditions relating to the said P.O. and the Guarantor shall not be relieved from his liability by reason of any variations or any extension being granted to the supplier or for any forbearance, act or commission on the part of the Board, or any indulgence by the Board to the supplier or by any such matter or thing whatsoever which under the law relating to sureties would but for this provision have effect of so relieving the guarantor, nor would it be necessary for the Board to sue the supplier before suing the said guarantor for the amount/damages due under this deed of guarantee. The guarantor hereby further affirms and declares that this guarantee has been executed by their lawfully constituted attorney legally competent to sign and Execute and has been stamped as required for such guarantees under the relevant Act of the State in which it has been executed and signed and the guarantee herein Page 24 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 before contained shall not be affected by any change in the Constitution of the Guarantor (Bank) or the Constitution of the supplier. The Guarantor hereby further agrees that any claim or dispute arising under this deed shall fall within the exclusive jurisdiction of courts at Chandigarh. Notwithstanding, anything herein before contained the Guarantor’s liability under this guarantee is restricted to Rs.____________________________ (Rupees___________________________________). The guarantee shall remain valid upto______________________________________.Unless claim in writing is presented to the guarantor within six months from that date and if unpaid, a suit or action to enforce such claim under this guarantee is filed against the guarantor within said period of six months, all the rights of the Board under the said guarantee shall be forfeited and the guarantor shall be released and discharged from all liability thereunder. In witness whereof the parties hereto have put their perspective hands on the day and the year first above mentioned. Witness: For & on behalf of the Guarantor: 1. Signatures:_____________ 2. Name & Designation_______ Witness: For and on behalf of the Supplier. 1. Signatures:______________ 2. Name & Designation_______ Witness: For and on behalf of the Board. 1. Signatures:_______________ 2. Name & Designation_______ Appendix ‘D’ Guaranteed Technical Particulars Sr. No. 1 2 3 i) Description Name of Manufacturer Model Fire Cubicle Dimensions (LXBXH)mm Particulars CTR Manufacturing Industries Ltd, Pune PNTMXXXB10 1200x500x1800+100 (Base) Page 25 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Sr. No. ii) Description Weight 4 i) ii) iii) iv) Nitrogen Cylinder Make and Specification Gross weight (Kg) Weight of empty cylinder (Kg) Pressure at which N2 will be released (Kg/Cm2) Normal range of pressure Maximum allowable cylinder pressure Purity (PPM) Volume of Cylinder v) vi) vii) viii) 5. i) ii) 6. i) ii) iii) 7. i) ii) 8. i) ii) 9. i) ii) 10. i) ii) 11. i) ii) iii) Fire Extinction Period On commencement of Nitrogen Injection (seconds) On system activation upto post cooling Fire detectors Sensing temp (0C) Heat sensing are per fire detector Make PNRV Make Whether proximity switch provided Power Source F.E. cubicle Control box Dated: 29.11.2007 Particulars 550 Kg Maximum Everest Kanto/Maruti Koastu as per IS 7285 76 58 10Kg/Cm2 150Kg/Cm2 200 kgf/cm2 at 150C 99% 68 ltr. water capacity, 10.3 cubic meter Maximum 30 seconds 30 minutes 1410C 800mm radius or 2.01 sq. mtr. Minimax CTR Yes 230V AC 110V DC & 230V AC for DC fail alarm Control Box Dimensions (mm) 500x270x700 Weight 46 Kg Cables (Separately for each type) Make & Type FRLS –SEPL, Reliance KCI, Skytone/ equivalent FS – Doncaster, Reliance, equivalent Size and no. of cores 12 core and 4 core for FRLS and 4 core for FS Pipe Make and Material Mukut, Goldrig, Amar, Siddharth, Jindal, Equivalent to IS Type ERW - Class C ERW - Class B (for supports) Class B, GI Size 150,125,100,80,25,50mm Page 26 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Sr. No. 12. i) ii) Description MS oil tank Thickness of sheet Specification of material iii) Capacity Dated: 29.11.2007 Particulars 5mm Mild Steel with internal painting for corrosion/rust resistance 10000 Litres Page 27 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 Appendix ‘E’ Spares to be supplied by the Supplier Sr. No. Item 1. Filled Nitrogen Cylinder 2. Hose pipes alongwith fittings 3. Fire Detectors 4. 5. Thermostats Heating elements Qty. 1 Nos 1 set 1 set (12 nos.). 4 nos. 4 Nos. Note: One No. spare DC- DC converter shall be supplied alongwith main equipment without any extra cost. Page 28 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 Appendix ‘F’ Scope of the Supplier for Supply of Material and Installation of the System A. Material 1. Fire Extinguishing Cubicle: Fire Extinguishing Cubicle made of 3mm thick sheet painted with post office red colour (shade 538 of IS-5) from inside and outside with hinged split doors fitted with high quality temper free lock, with base frame and containing, oil drain assembly, nitrogen cylinder, electro mechanical control unit for oil drain and nitrogen release, pressure monitoring switch for back up protection for release of nitrogen, detectors necessary for monitoring system, flanges with gate/butterfly valves on top panel for connecting pipe connections from transformer, panel lighting etc. 2. Control Box: Control box for monitoring system operation, automatic control and remote operation, with alarms, indication light switches, push buttons, audio signal, line fault detection suitable for tripping and signaling on 110V DC supply alongwith suitable 220-110V DC-DC converter. 3. Pre-stressed non-return valve (PNRV): PNRV working mechanically on transformer oil flow rate, with proximity switch for remote alarm indication and with visual position indicator. 4. Fire Detectors: Fire detectors to be fitted on the top of oil tank, OLTC/Off Ckt. tap changer, rated for 1410C for heat sensing each fitted with two no. cable glands. 5. Signal box: Signal box for terminating cable connections from PNRV and fire detectors. 6. Oil tank: Mild steel oil tank, with moisture proof coating and with water tight cover to be placed in the oil pit. The tank to be provided with manhole, air vent pipe through silica gel breather and drain valve. One no. MS oil tank of capacity 10,000 ltrs shall be provided at Dehar Power Switchyard. The location of the tank shall be approved by the purchaser. All the transformers, to be fitted with NIFPES at that substation, shall be connected through suitable piping arrangement, to this common oil tank. 7. Other Material a) b) c) d) e) Fire survival cable 4 core x 1.5 mm2 . Fire resistant low smoke (FRLS) cable 12 core x 1.5mm 2 Fire resistant low smoke (FRLS) cable 4 core x 1.5mm 2 . Pressure relief valve (if not provided by transformer manufacturer) DC-DC converter 220-110V DC Page 29 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 Dated: 29.11.2007 f) Pipe connections between transformer and F.E. cubicle, ERW class ‘C’ pipes with bends, flanges, other fittings and gate/butterfly valves as required. g) Pipe connections with fittings for connection between F.E. cubicle – oil tank h) Mandatory spares: As per Appendix ‘E’ j) All other consumables or non-consumables necessary for complete system. B. Arrangement on Transformer Tank 1. Oil drain opening with pipe, flange and manual gate valve at about 120mm below the top cover. 2. Nitrogen Injection openings with pipe size DN 25 with flanges and manual gate valves on tank sides at about 100-200mm from the bottom plate, NRV on nitrogen injection pipe between transformer and gate valve. Flanges having 4 nos. 18 dia holes with PCD as 155mm and dummy pipe on the conservator pipe between buchholz relay and conservator tank manual gate valve, for fixing PNRV. Supply of fire detector brackets on top cover. Supply of brackets for fixing signal box at a suitable location on tank side wall. Supply of requisite welding material. C. Installation of System 1. Pipe connections between Transformer, Fire Extinguishing cubicle and Oil Pit a. 2. Oil drain pipe connection between outlet valve provided on the transformer tank, F.E. cubicle. b. Drain pipe connection between oil drain pipe bottom (in F.E. cubicle) to the oil pit. c. Nitrogen injection pipe connections between inlet openings on transformer tank and flange provided on F.E. cubicle top panel. Cabling Connecting all fire detectors in parallel and terminating in signal box, using fire survival 4 core x 1.5 mm2 cable. Connecting PNRV to signal box, using FRLS 4 core x 1.5mm 2 cable. Connections to F.E cubicle for 230V AC single phase panel light supply, using FRLS 4 core x 1.5mm2 cable. Connections from relay panel to control box using FRLS 4 core x 1.5mm2 cable. Connections from DC source to control box through DC-DC converter, using FRLS 4 core x 1.5 mm2 cable. Connections between Trs. Signal box to control box and between control box to F.E. cubicle using FRLS 12 core x 1.5mm2 cable. Page 30 of 31 P.O. No. 1619 /P&D(TS)/PNT-402 D. Dated: 29.11.2007 Pre-commissioning Test Pre-commissioning test shall be carried out by the supplier in the presence of representative of the purchaser, prior to commission the system. E. All other jobs except the following shall be in the scope of Supplier 1. 2. Civil works viz. oil pit for tank, plinth for F.E. cubicle. Potential free contacts for required electrical signals on relay panel for connections to control box. Power supply 220V DC for control box and 230VAC for Fire Extinguishing cubicle lighting. Power supply for welding etc. during installation Material handling facilities as per availability, for unloading/handling equipment at site. Vacuum pump, oil preparation, draining and topping up of oil. Skilled and unskilled labour required for installation of NIFPES. 3. 4. 5. 6. 7. Page 31 of 31