(COMPANY NAME) Initial Environmental Review Checklist Dept / Locations : Page : Interviewee : Date of visit : Prepared by : 1) General Information a) Organisation Structure (Department personnel and structure chart) b) c) d) e) Question Current activities / processes / products No. of employees Environmental coordinator Type of facilities f) Type of plant(s) / machinery g) Types of goods provided by major suppliers h) Types of services provided by major contractors i) Any future activities / services Comments (List activities or provide process flow) (Office / lab / workshop / warehouse / others) (List of plant / machinery utilised) (List of major suppliers and their product type) (List of major contractors and their product type) 2) Materials and Energy Usage and Control 687303903 Page 1 (COMPANY NAME) Initial Environmental Review Checklist a) b) c) d) e) f) g) h) i) j) k) l) m) n) Question Major materials consumed and quantities Materials purchasing policy Materials usage control and/or recycling practices Water consumption Major water usage group (s) Any water treatment facilities Water control policy or conservation measure Electricity consumption Major electricity usage group(s) Electricity conservation measures Type of fuel consumed and quantity Major fuel usage group(s) Fuel conservation measures Other material conservation policy / measures Comments (Material inventory / Purchasing record) 3) Materials Storage and Handling a) b) c) d) e) f) Question Types and quantity of materials stored Specifications (e.g. MSDS) Material inventory control Expired / off-specification products records Spill / leakage record, time Spill kits / tools Comments (List of chemicals) (Inventory control procedure) 4) Wastewater Management Question a) Wastewater sources b) Characteristics of wastewater c) Wastewater treatment method d) Wastewater recycling / reuse / minimization measures e) Wastewater discharges to f) Relevant discharge licenses and regulatory requirements g) Records of wastewater discharges 687303903 Comments (Wastewater analysis reports) (Any treatment process flow diagram and system operating manuals) (Layout indicated with discharge points) Page 2 (COMPANY NAME) Initial Environmental Review Checklist 5) Air Emission Management Question a) Air emission sources b) Characteristics of air emissions c) Air pollution control method Comments (Air emission analysis reports) (Any treatment process flow diagram and system operating manuals) d) Air emission minimization measures e) Air emission releases to f) Relevant environmental legislation and requirements / licenses g) Records of air emission 6) Chemical Waste Management Question a) Chemical waste sources b) Characteristics of chemical waste c) Chemical waste handling / treatment method Comments (List of type of chemical wastes) (Any treatment process flow diagram and system operating manuals or List of waste collectors) d) Chemical waste recycling / minimization measures e) Chemical waste disposal f) Relevant disposal licenses and regulatory requirements g) Records of chemical waste disposal 7) Solid Waste Management a) b) c) d) e) f) Question Major types of solid waste Generation quantity Waste disposal method Waste reduction / recycling measures Relevant regulatory requirements on waste disposal / licenses Record of solid waste disposal 687303903 Comments (List of waste collectors if on-site disposal) Page 3 (COMPANY NAME) Initial Environmental Review Checklist 8) Noise and Other Waste Management Question a) Noise sources and noise level b) Noise control method Comments (Noise analysis reports) (Any noise control process flow diagram and system operating manuals) c) Noise control regulations / standards d) Radioactive waste sources e) Types of radioactive waste and quantity f) Regulatory requirements / licenses 9) Environmental Incidents / Accidents a) b) c) d) Question Nonconformity (e.g. material leakage, complaint, warning, non-compliance record) Date and time of occurrence Causes of nonconformity Corrective action Comments 10) Environmental Training Question a) Existing environmental training programmes (name, time, target staff) b) Future training plan Comments 11) Environmental Audit Question a) Any environmental audit conducted b) Auditing scope, location c) Auditor / auditing firm Comments 12) Supplier and Contractor Consideration Question a) List of major suppliers and contractors b) Environmental assessment of suppliers and contractors on their products or services c) Selection criteria for suppliers / contractors 687303903 Comments Page 4 (COMPANY NAME) Initial Environmental Review Checklist 13) EMS Requirement Question a) Environmental Policy b) Legal and Other Requirements c) Environmental Aspects d) Objectives, Targets and Programmes e) Resources, Roles, Responsibility and Authority f) Competence, Training and Awareness g) Communication h) Documentation i) Control of Documents j) Operational Control k) Emergency Preparedness and Response i) Existing emergency plans and procedures for dealing with environmental incidents (e.g. accidental emissions, discharge, leakage...etc.) ii) Relevant guidance documents / guidelines iii) Type of drills conducted, records l) Monitoring and Measurement m) Evaluation of Compliance n) Nonconformity and Preventive Action and Corrective Action o) Control of Records p) Internal Audit q) Management Review r) Environmental Initiatives 687303903 Comments (Relevant environmental regulations / requirements) (Company operating procedures, Work Instruction) (Environmental audit reports) Page 5